# Simplified Acquisition of Base Engineering Requirements (SABER FY 27-32)

Canonical: https://abierto.us/opportunities/saberfy2732

- Solicitation number: SABERFY2732
- Notice type: Presolicitation
- Status: Closed. Deadline was May 27, 2026 at 1:00 AM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA8601 AFLCMC Pzio (FA8601)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Z2JZ Repair Or Alteration Of Miscellaneous Buildings
- Set-aside: 8(a) set-aside
- First posted: April 14, 2026
- Last posted: May 26, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/1f6e996ba3f14003afc464a12bb5fd52/view

## Description

This DRAFT Solicitation is updated to add RFI Responses to the attached documents. This is a DRAFT Solicitation. The Government is seeking feedback on the requirement, no award will be made as a result of this Draft Solicitation.

Simplified Acquisition of Base Engineering Requirements (SABER)The Contractor shall provide all management, labor, material, equipment, (unless furnished by the Government), transportation, supervision and design capabilities to accomplish over one hundred (100+) simultaneous projects for a broad range of maintenance, repair and minor construction work on real property at Wright Patterson AFB, OH.

The base encompasses over 120 tenant and host organizations on four areas of land totaling 8,145 acres, and 850 facilities containing 16.4 million SF, with missions varying tremendously in complexity and nature. In addition, over 20 General Officers reside or work at WPAFB. The size and diversity of WPAFB necessitates expeditious response and efficient management of the heavy volume of task orders (TO) placed against the SABER contract.

Facilities include, but are not limited to, research and development, hospital, secure areas, airfields, flight line, infrastructure, administrative, residential, pavements, industrial, recreational, fitness, assembly, and formal offices. etc. Prompt response and execution of all task orders is required. The Contracting Officer (CO) will issue a request for proposal (RFP) describing basic requirements for each individual task order.

Following review of the Contractor?s proposal, the CO will negotiate with the Contractor if elevated, and award an individual TO. The Contractor shall be required to maintain a local office to facilitate services

## Publications

- April 14, 2026: Presolicitation, due April 30, 2026 at 12:30 PM EDT. Notice 8d1a209519104d18a75c4457aa8465b9. https://sam.gov/workspace/contract/opp/8d1a209519104d18a75c4457aa8465b9/view
- May 26, 2026: Presolicitation, due May 27, 2026 at 1:00 AM EDT. Notice 1f6e996ba3f14003afc464a12bb5fd52. https://sam.gov/workspace/contract/opp/1f6e996ba3f14003afc464a12bb5fd52/view

## Points of contact

- Amanda Vanhorn, amanda.vanhorn@us.af.mil, 3866361000

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/saberfy2732.
