{"canonical":"https://abierto.us/opportunities/n6660425q0140","key":"N6660425Q0140","url":"https://abierto.us/opportunities/n6660425q0140","title":"Air Compressor","solicitation_number":"N6660425Q0140","notice_type":"k","open":false,"response_deadline":"2025-07-03T18:00:00Z","first_posted":"2025-06-05","last_posted":"2025-06-27","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE NAVY","office":"NUWC DIV NEWPORT","naics":"333912","psc":"4310","set_aside":"SBA","place_state":"RI","place_county":"44005","place_county_name":"Newport County","place_city":"4449960","place_city_name":"Newport","winner":null,"award_amount":null,"publications":[{"notice_id":"2672fd05c67d405ebc056595a3f9bc96","title":"Air Compressor","solicitation_number":"N6660425Q0140","notice_type":"s","base_type":"s","posted":"2025-06-05","posted_at":null,"due_at":"2025-06-04T18:00:00Z","due_date":"2025-06-04","cancelled":null,"archived":null,"archive_date":"2025-06-19","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2672fd05c67d405ebc056595a3f9bc96/view","enriched":false,"history":[]},{"notice_id":"e515e387844f49959177d74f8b27d2b7","title":"Air Compressor","solicitation_number":"N6660425Q0140","notice_type":"k","base_type":"s","posted":"2025-06-05","posted_at":null,"due_at":"2025-06-16T18:00:00Z","due_date":"2025-06-16","cancelled":null,"archived":null,"archive_date":"2025-07-01","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e515e387844f49959177d74f8b27d2b7/view","enriched":false,"history":[]},{"notice_id":"3d9aadd16ce549bbab56830b28a2d5ea","title":"Air Compressor","solicitation_number":"N6660425Q0140","notice_type":"k","base_type":"k","posted":"2025-06-11","posted_at":null,"due_at":"2025-06-16T18:00:00Z","due_date":"2025-06-16","cancelled":null,"archived":null,"archive_date":"2025-07-01","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3d9aadd16ce549bbab56830b28a2d5ea/view","enriched":false,"history":[]},{"notice_id":"e30c173c2ccd450eb5e9bbd7f456067e","title":"Air Compressor","solicitation_number":"N6660425Q0140","notice_type":"k","base_type":"k","posted":"2025-06-12","posted_at":null,"due_at":"2025-06-16T18:00:00Z","due_date":"2025-06-16","cancelled":null,"archived":null,"archive_date":"2025-07-01","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e30c173c2ccd450eb5e9bbd7f456067e/view","enriched":false,"history":[]},{"notice_id":"927358eff4094715bd776a3016d201e9","title":"Air Compressor","solicitation_number":"N6660425Q0140","notice_type":"k","base_type":"k","posted":"2025-06-16","posted_at":null,"due_at":"2025-06-16T18:00:00Z","due_date":"2025-06-16","cancelled":null,"archived":null,"archive_date":"2025-07-01","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/927358eff4094715bd776a3016d201e9/view","enriched":false,"history":[]},{"notice_id":"55644de33f6b4171868c1e4ca2beed97","title":"Air Compressor","solicitation_number":"N6660425Q0140","notice_type":"k","base_type":"k","posted":"2025-06-27","posted_at":null,"due_at":"2025-07-03T18:00:00Z","due_date":"2025-07-03","cancelled":null,"archived":null,"archive_date":"2025-07-18","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/55644de33f6b4171868c1e4ca2beed97/view","enriched":false,"history":[]},{"notice_id":"9fff319c05254d469515430e3fee8ef2","title":"Air Compressor","solicitation_number":"N6660425Q0140","notice_type":"k","base_type":"k","posted":"2025-06-27","posted_at":null,"due_at":"2025-07-03T18:00:00Z","due_date":"2025-07-03","cancelled":null,"archived":null,"archive_date":"2025-07-18","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9fff319c05254d469515430e3fee8ef2/view","enriched":false,"history":[]}],"latest_notice_id":"9fff319c05254d469515430e3fee8ef2","first_type":"s","notices":[{"dates":{"posted":"2025-06-05","response_deadline":{"raw":"2025-06-04T14:00:00-04:00","utc":"2025-06-04T18:00:00Z","date":"2025-06-04","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2672fd05c67d405ebc056595a3f9bc96/view"},"naics":{"codes":["333912"],"primary":"333912"},"title":"Air Compressor","agency":{"office":{"code":"N66604","name":"NUWC DIV NEWPORT"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"02841-1703","city":"NEWPORT","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-06-19","archive_type":"auto15"},"contacts":[{"name":"Maria Diaz-Sotomayor","role":"primary","email":"maria.d.diaz-sotomayor.civ@us.navy.mil","phone":"4018322028"}],"base_type":{"code":"s","label":"Special Notice"},"notice_id":"2672fd05c67d405ebc056595a3f9bc96","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"e804527d23883fc3de6ab9a7e4c6793a3f797b532e9eccb0f55b0645b0ee7405","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Special Notice The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) requires the procurement, installation and maintenance of a 50HP Rotary Screw Compressor and Air Dryer. A combined Synopsis and Solicitation Notice is forthcoming. Offerors are encouraged to perform a site visit prior to fully understand the scope of this requirement. A responsible source may submit a request for a Site Visit to occur at a requested and mutually agreed upon date between the Government and contractor from 27 May 2025 through 05 June 2025. Instructions to request a Site Visit are provided as an attachment to this document. This notice is NOT a request for competitive proposals. A responsible source may submit a request for a Site Visit. Any questions regarding this notice shall be submitted prior to 04 June 2024 at 1400 EST. The Government Point of Contact is Maria Diaz-Sotomayor, maria.d.diaz-sotomayor.civ@us.navy.mil. The anticipated place of performance under this contract is the Naval Undersea Warfare Center located in Newport, Rhode Island. Attachments: Statement of Work - DRAFT Compressor Specifications Compressor Layout Model Site Visit Instructions 02-JUN-2025 - Notice Amendment 0001 Notice amended to add questions and answers. Question: Reading the bid did not state a need for filters and an oil / water separator? Does the air room need either or? Also, will there be a forklift on site? Will someone be operating the forklift? Answer: Existing dryer is equipped with a SULLAIR 250024-427 filter going into the dryer and a SULLAIR 250024-435 filter discharging from the dryer. Contractor will be responsible for supplying and installing same or equivalent on new dryer. Forklift on site is a Combi lift CB6000. 6000lb capacity. An Operator will be available if arrangements are made in advance.","origin":"extract"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"N6660425Q0140","place_of_performance":{"zip":"02841","city":{"name":"Newport"},"state":{"code":"RI"},"country":{"code":"USA"}},"product_service_code":"4310"},{"dates":{"posted":"2025-06-05","response_deadline":{"raw":"2025-06-16T14:00:00-04:00","utc":"2025-06-16T18:00:00Z","date":"2025-06-16","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e515e387844f49959177d74f8b27d2b7/view"},"naics":{"codes":["333912"],"primary":"333912"},"title":"Air Compressor","agency":{"office":{"code":"N66604","name":"NUWC DIV NEWPORT"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"02841-1703","city":"NEWPORT","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-07-01","archive_type":"auto15"},"contacts":[{"name":"Maria Diaz-Sotomayor","role":"primary","email":"maria.d.diaz-sotomayor.civ@us.navy.mil","phone":"4018322028"}],"base_type":{"code":"s","label":"Special Notice"},"notice_id":"e515e387844f49959177d74f8b27d2b7","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"2de75f7828f2627adce9a7aaf3aaae6cae5b0cf3d31227ceeb370bb512e586a5","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Please see attached documentation for all details about this opportunity.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"N6660425Q0140","place_of_performance":{"zip":"02841","city":{"name":"Newport"},"state":{"code":"RI"},"country":{"code":"USA"}},"product_service_code":"4310"},{"dates":{"posted":"2025-06-11","response_deadline":{"raw":"2025-06-16T14:00:00-04:00","utc":"2025-06-16T18:00:00Z","date":"2025-06-16","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3d9aadd16ce549bbab56830b28a2d5ea/view"},"naics":{"codes":["333912"],"primary":"333912"},"title":"Air Compressor","agency":{"office":{"code":"N66604","name":"NUWC DIV NEWPORT"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"02841-1703","city":"NEWPORT","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-07-01","archive_type":"auto15"},"contacts":[{"name":"Maria Diaz-Sotomayor","role":"primary","email":"maria.d.diaz-sotomayor.civ@us.navy.mil","phone":"4018322028"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"3d9aadd16ce549bbab56830b28a2d5ea","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"5d565969fabb1d4fbd8f8e9e41cc8993b7ced923a4834210202319f37eb1497b","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Please see attached documentation for all details about this opportunity. AMENDMENT 0001- June 9, 2025 This solicitation is amended to correct a typographical error on the solicitation and to answer questions from Industry. 1. In the RFQ, page 2, where the labor matrix referred to the \"full five (5) years\" the document is corrected to read \"full three (3) years\". The amended document N6660425Q0140-0001 is added to this notice. 2. QUESTION: On the Combined Synopsis and Solicitation document, there is a request for a labor matrix. Is the matrix shown the preferred style? ANSWER: The offeror may propose any labor category, or labor catergories desired to perform the tasking in the SOW. The maximum amount of hours per year is 40 hours, which the offeror may distribute between the proposed labor categories as needed to perform the task. 3. QUESTION: The request on this document is for 5 years, but the SOW is for 3 years after the1 year warranty period. Presuming we are servicing during the first year of operation also, I see that as 4 years total. Am I reading one of the documents incorrectly? ANSWER: RFQ document corrected to show three (3) years. Per the requirements of CLIN 0001, year one will be included in the warranty. Maintenance services, and emergent services are required from years two, three, and four of the order.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"N6660425Q0140","place_of_performance":{"zip":"02841","city":{"name":"Newport"},"state":{"code":"RI"},"country":{"code":"USA"}},"product_service_code":"4310"},{"dates":{"posted":"2025-06-12","response_deadline":{"raw":"2025-06-16T14:00:00-04:00","utc":"2025-06-16T18:00:00Z","date":"2025-06-16","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e30c173c2ccd450eb5e9bbd7f456067e/view"},"naics":{"codes":["333912"],"primary":"333912"},"title":"Air Compressor","agency":{"office":{"code":"N66604","name":"NUWC DIV NEWPORT"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"02841-1703","city":"NEWPORT","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-07-01","archive_type":"auto15"},"contacts":[{"name":"Maria Diaz-Sotomayor","role":"primary","email":"maria.d.diaz-sotomayor.civ@us.navy.mil","phone":"4018322028"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"e30c173c2ccd450eb5e9bbd7f456067e","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"46280b2bc11b3883dda3c5bd53a4ee56b2460812155d1372ceb30f12baf03c4c","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Please see attached documentation for all details about this opportunity. AMENDMENT 0001- June 9, 2025 This solicitation is amended to correct a typographical error on the solicitation and to answer questions from Industry. 1. In the RFQ, page 2, where the labor matrix referred to the \"full five (5) years\" the document is corrected to read \"full three (3) years\". The amended document N6660425Q0140-0001 is added to this notice. 2. The specification document is corrected to remove the words \"oil free\". 3. The Site Visit document is revised to correct the contact email address for the Visit Control Center to: nuwc_npt_access_control@navy.mil 4. QUESTION: On the Combined Synopsis and Solicitation document, there is a request for a labor matrix. Is the matrix shown the preferred style? ANSWER: The offeror may propose additional labor categories as required to perform the SOW tasking. Total labor hours for the year shall not exceed 40 hours. 5. QUESTION: The request on this document is for 5 years, but the SOW is for 3 years after the1 year warranty period. Presuming we are servicing during the first year of operation also, I see that as 4 years total. Am I reading one of the documents incorrectly? ANSWER: RFQ document updated to three (years), per Answer 1 above. Warranty under CLIN 0001, for year one (1), shall include annual preventive maintenance services. 6. QUESTION: The bid asks for maintenance costs for three years. Maintenance on Sullair air compressors is based on hours of operation. Do you know how many hours per year the compressor operates? One shift (8 hours/day), two shifts (16 hours per day ), three shifts (24 hours per day) or 24/7. A single shift is approximately 2,000 hours. Need to know this to quote maintenance costs. ANSWER: 16 hours/day. 7. QUESTION: The performance 240 cfm is the performance of a lubricated air compressor not an oil free compressor. An oil free 50 hp air compressor only delivers about 216 cfm. Please confirm if want an Oil Free air compressor. ANSWER: A lubricated air compressor is acceptable. Oil carryover is unavoidable for lubricated air compressors. The requirement for oil free air is that the discharge from the proposed ‘system’ (compressor, dryer and filter) achieve ISO 8573-1 Air Quality 2.4.2 as the current system provides. The Specifications document has been updated, per Answer 2 above.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"N6660425Q0140","place_of_performance":{"zip":"02841","city":{"name":"Newport"},"state":{"code":"RI"},"country":{"code":"USA"}},"product_service_code":"4310"},{"dates":{"posted":"2025-06-16","response_deadline":{"raw":"2025-06-16T14:00:00-04:00","utc":"2025-06-16T18:00:00Z","date":"2025-06-16","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/927358eff4094715bd776a3016d201e9/view"},"naics":{"codes":["333912"],"primary":"333912"},"title":"Air Compressor","agency":{"office":{"code":"N66604","name":"NUWC DIV NEWPORT"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"02841-1703","city":"NEWPORT","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-07-01","archive_type":"auto15"},"contacts":[{"name":"Maria Diaz-Sotomayor","role":"primary","email":"maria.d.diaz-sotomayor.civ@us.navy.mil","phone":"4018322028"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"927358eff4094715bd776a3016d201e9","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"c28e6435a04409ea998d5e5365c1e78711706a4ed1efe9ebe1e33bacd5863800","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Please see attached documentation for all details about this opportunity. AMENDMENT 0001- June 9, 2025 This solicitation is amended to correct a typographical error on the solicitation and to answer questions from Industry. 1. In the RFQ, page 2, where the labor matrix referred to the \"full five (5) years\" the document is corrected to read \"full three (3) years\". The amended document N6660425Q0140-0001 is added to this notice. 2. The specification document is corrected to remove the words \"oil free\". 3. The Site Visit document is revised to correct the contact email address for the Visit Control Center to: nuwc_npt_access_control@navy.mil 4. QUESTION: On the Combined Synopsis and Solicitation document, there is a request for a labor matrix. Is the matrix shown the preferred style? ANSWER: The offeror may propose additional labor categories as required to perform the SOW tasking. Total labor hours for the year shall not exceed 40 hours. 5. QUESTION: The request on this document is for 5 years, but the SOW is for 3 years after the1 year warranty period. Presuming we are servicing during the first year of operation also, I see that as 4 years total. Am I reading one of the documents incorrectly? ANSWER: RFQ document updated to three (years), per Answer 1 above. Warranty under CLIN 0001, for year one (1), shall include annual preventive maintenance services. 6. QUESTION: The bid asks for maintenance costs for three years. Maintenance on Sullair air compressors is based on hours of operation. Do you know how many hours per year the compressor operates? One shift (8 hours/day), two shifts (16 hours per day ), three shifts (24 hours per day) or 24/7. A single shift is approximately 2,000 hours. Need to know this to quote maintenance costs. ANSWER: 16 hours/day. 7. QUESTION: The performance 240 cfm is the performance of a lubricated air compressor not an oil free compressor. An oil free 50 hp air compressor only delivers about 216 cfm. Please confirm if want an Oil Free air compressor. ANSWER: A lubricated air compressor is acceptable. Oil carryover is unavoidable for lubricated air compressors. The requirement for oil free air is that the discharge from the proposed ‘system’ (compressor, dryer and filter) achieve ISO 8573-1 Air Quality 2.4.2 as the current system provides. The Specifications document has been updated, per Answer 2 above. AMENDMENT 0002- June 16, 2025 Amended to incluse questions and answers from Industry. 1. QUESTION: Compressor discharge to be 1.5\" type L copper tubing using existing Kaeser discharge line to the 2\" copper header. New union and isolation valve will be installed. ANSWER: Yes. 2. QUESTION: Voltage of compressor is 460/3/60. Dryer voltage is 230/1/60 ANSWER: Yes. 3. QUESTION: New dryer to include a 1.0u (micron) prefilter and a .01u (micron) afterfilter ANSWER: Yes. 4. QUESTION: Access to building is thru the ground height overhead door on the side of the building. ANSWER: Yes. 5. QUESTION: Aisleways to be free and clear of obstructions when we arrive to place compressor. ANSWER: Yes. 6. QUESTION: Use of NUWC Newport fork truck to move the compressor from the overhead door area to the compressor room is allowed. ANSWER: Operated by NUWC personnel, otherwise Contractor must provide their own. 7. QUESTION: New dryer bypass and piping to include Gardner Denver discharge will be 2\" copper tubing type L. ANSWER: Yes. 8. QUESTION: Maintenance costs are based on 4,000 hours of operation annually. ANSWER: Yes.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"N6660425Q0140","place_of_performance":{"zip":"02841","city":{"name":"Newport"},"state":{"code":"RI"},"country":{"code":"USA"}},"product_service_code":"4310"},{"dates":{"posted":"2025-06-27","response_deadline":{"raw":"2025-07-03T14:00:00-04:00","utc":"2025-07-03T18:00:00Z","date":"2025-07-03","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/55644de33f6b4171868c1e4ca2beed97/view"},"naics":{"codes":["333912"],"primary":"333912"},"title":"Air Compressor","agency":{"office":{"code":"N66604","name":"NUWC DIV NEWPORT"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"02841-1703","city":"NEWPORT","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-07-18","archive_type":"auto15"},"contacts":[{"name":"Maria Diaz-Sotomayor","role":"primary","email":"maria.d.diaz-sotomayor.civ@us.navy.mil","phone":"4018322028"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"55644de33f6b4171868c1e4ca2beed97","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"7b1587cd196435bea41cd51304a46c7e6c97042fc8da82a6f70eae6afa3ac873","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Please see attached documentation for all details about this opportunity. AMENDMENT 0001- June 9, 2025 This solicitation is amended to correct a typographical error on the solicitation and to answer questions from Industry. 1. In the RFQ, page 2, where the labor matrix referred to the \"full five (5) years\" the document is corrected to read \"full three (3) years\". The amended document N6660425Q0140-0001 is added to this notice. 2. The specification document is corrected to remove the words \"oil free\". 3. The Site Visit document is revised to correct the contact email address for the Visit Control Center to: nuwc_npt_access_control@navy.mil 4. QUESTION: On the Combined Synopsis and Solicitation document, there is a request for a labor matrix. Is the matrix shown the preferred style? ANSWER: The offeror may propose additional labor categories as required to perform the SOW tasking. Total labor hours for the year shall not exceed 40 hours. 5. QUESTION: The request on this document is for 5 years, but the SOW is for 3 years after the1 year warranty period. Presuming we are servicing during the first year of operation also, I see that as 4 years total. Am I reading one of the documents incorrectly? ANSWER: RFQ document updated to three (years), per Answer 1 above. Warranty under CLIN 0001, for year one (1), shall include annual preventive maintenance services. 6. QUESTION: The bid asks for maintenance costs for three years. Maintenance on Sullair air compressors is based on hours of operation. Do you know how many hours per year the compressor operates? One shift (8 hours/day), two shifts (16 hours per day ), three shifts (24 hours per day) or 24/7. A single shift is approximately 2,000 hours. Need to know this to quote maintenance costs. ANSWER: 16 hours/day. 7. QUESTION: The performance 240 cfm is the performance of a lubricated air compressor not an oil free compressor. An oil free 50 hp air compressor only delivers about 216 cfm. Please confirm if want an Oil Free air compressor. ANSWER: A lubricated air compressor is acceptable. Oil carryover is unavoidable for lubricated air compressors. The requirement for oil free air is that the discharge from the proposed ‘system’ (compressor, dryer and filter) achieve ISO 8573-1 Air Quality 2.4.2 as the current system provides. The Specifications document has been updated, per Answer 2 above. AMENDMENT 0002- June 16, 2025 Amended to incluse questions and answers from Industry. 1. QUESTION: Compressor discharge to be 1.5\" type L copper tubing using existing Kaeser discharge line to the 2\" copper header. New union and isolation valve will be installed. ANSWER: Yes. 2. QUESTION: Voltage of compressor is 460/3/60. Dryer voltage is 230/1/60 ANSWER: Yes. 3. QUESTION: New dryer to include a 1.0u (micron) prefilter and a .01u (micron) afterfilter ANSWER: Yes. 4. QUESTION: Access to building is thru the ground height overhead door on the side of the building. ANSWER: Yes. 5. QUESTION: Aisleways to be free and clear of obstructions when we arrive to place compressor. ANSWER: Yes. 6. QUESTION: Use of NUWC Newport fork truck to move the compressor from the overhead door area to the compressor room is allowed. ANSWER: Operated by NUWC personnel, otherwise Contractor must provide their own. 7. QUESTION: New dryer bypass and piping to include Gardner Denver discharge will be 2\" copper tubing type L. ANSWER: Yes. 8. QUESTION: Maintenance costs are based on 4,000 hours of operation annually. ANSWER: Yes. AMENDMENT 0003 - June 27 2025 The solicitation was amended to offer clarification on the CLIN structure and quote format requirement. As a result of this modification the response time has been extended through July 3, 2025.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"N6660425Q0140","place_of_performance":{"zip":"02841","city":{"name":"Newport"},"state":{"code":"RI"},"country":{"code":"USA"}},"product_service_code":"4310"},{"dates":{"posted":"2025-06-27","response_deadline":{"raw":"2025-07-03T14:00:00-04:00","utc":"2025-07-03T18:00:00Z","date":"2025-07-03","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9fff319c05254d469515430e3fee8ef2/view"},"naics":{"codes":["333912"],"primary":"333912"},"title":"Air Compressor","agency":{"office":{"code":"N66604","name":"NUWC DIV NEWPORT"},"subtier":{"code":"1700","name":"DEPT OF THE NAVY"},"department":{"code":"017","name":"DEPT OF DEFENSE"},"office_address":{"zip":"02841-1703","city":"NEWPORT","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-07-18","archive_type":"auto15"},"contacts":[{"name":"Maria Diaz-Sotomayor","role":"primary","email":"maria.d.diaz-sotomayor.civ@us.navy.mil","phone":"4018322028"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"9fff319c05254d469515430e3fee8ef2","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"eda2ccf3abef8cb9864da708a63aea2c810c6f2b4c17c7eeb2f4de766e1a451f","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Please see attached documentation for all details about this opportunity. AMENDMENT 0001- June 9, 2025 This solicitation is amended to correct a typographical error on the solicitation and to answer questions from Industry. 1. In the RFQ, page 2, where the labor matrix referred to the \"full five (5) years\" the document is corrected to read \"full three (3) years\". The amended document N6660425Q0140-0001 is added to this notice. 2. The specification document is corrected to remove the words \"oil free\". 3. The Site Visit document is revised to correct the contact email address for the Visit Control Center to: nuwc_npt_access_control@navy.mil 4. QUESTION: On the Combined Synopsis and Solicitation document, there is a request for a labor matrix. Is the matrix shown the preferred style? ANSWER: The offeror may propose additional labor categories as required to perform the SOW tasking. Total labor hours for the year shall not exceed 40 hours. 5. QUESTION: The request on this document is for 5 years, but the SOW is for 3 years after the1 year warranty period. Presuming we are servicing during the first year of operation also, I see that as 4 years total. Am I reading one of the documents incorrectly? ANSWER: RFQ document updated to three (years), per Answer 1 above. Warranty under CLIN 0001, for year one (1), shall include annual preventive maintenance services. 6. QUESTION: The bid asks for maintenance costs for three years. Maintenance on Sullair air compressors is based on hours of operation. Do you know how many hours per year the compressor operates? One shift (8 hours/day), two shifts (16 hours per day ), three shifts (24 hours per day) or 24/7. A single shift is approximately 2,000 hours. Need to know this to quote maintenance costs. ANSWER: 16 hours/day. 7. QUESTION: The performance 240 cfm is the performance of a lubricated air compressor not an oil free compressor. An oil free 50 hp air compressor only delivers about 216 cfm. Please confirm if want an Oil Free air compressor. ANSWER: A lubricated air compressor is acceptable. Oil carryover is unavoidable for lubricated air compressors. The requirement for oil free air is that the discharge from the proposed ‘system’ (compressor, dryer and filter) achieve ISO 8573-1 Air Quality 2.4.2 as the current system provides. The Specifications document has been updated, per Answer 2 above. AMENDMENT 0002- June 16, 2025 Amended to incluse questions and answers from Industry. 1. QUESTION: Compressor discharge to be 1.5\" type L copper tubing using existing Kaeser discharge line to the 2\" copper header. New union and isolation valve will be installed. ANSWER: Yes. 2. QUESTION: Voltage of compressor is 460/3/60. Dryer voltage is 230/1/60 ANSWER: Yes. 3. QUESTION: New dryer to include a 1.0u (micron) prefilter and a .01u (micron) afterfilter ANSWER: Yes. 4. QUESTION: Access to building is thru the ground height overhead door on the side of the building. ANSWER: Yes. 5. QUESTION: Aisleways to be free and clear of obstructions when we arrive to place compressor. ANSWER: Yes. 6. QUESTION: Use of NUWC Newport fork truck to move the compressor from the overhead door area to the compressor room is allowed. ANSWER: Operated by NUWC personnel, otherwise Contractor must provide their own. 7. QUESTION: New dryer bypass and piping to include Gardner Denver discharge will be 2\" copper tubing type L. ANSWER: Yes. 8. QUESTION: Maintenance costs are based on 4,000 hours of operation annually. ANSWER: Yes. AMENDMENT 0003 - June 27 2025 The solicitation was amended to offer clarification on the CLIN structure and quote format requirement. As a result of this modification the response time has been extended through July 3, 2025.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"N6660425Q0140","place_of_performance":{"zip":"02841","city":{"name":"Newport"},"state":{"code":"RI"},"country":{"code":"USA"}},"product_service_code":"4310"}],"due_at":"2025-07-03T18:00:00Z","due_date":"2025-07-03","closes_at":"2025-07-03T18:00:00Z","awardable":true,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N66604","office_name":"NUWC DIV NEWPORT","state":"RI","county":"44005","county_name":"Newport County","city":"4449960","city_name":"Newport","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"9fff319c05254d469515430e3fee8ef2","description":{"text":"Please see attached documentation for all details about this opportunity. AMENDMENT 0001- June 9, 2025 This solicitation is amended to correct a typographical error on the solicitation and to answer questions from Industry. 1. In the RFQ, page 2, where the labor matrix referred to the \"full five (5) years\" the document is corrected to read \"full three (3) years\". The amended document N6660425Q0140-0001 is added to this notice. 2. The specification document is corrected to remove the words \"oil free\". 3. The Site Visit document is revised to correct the contact email address for the Visit Control Center to: nuwc_npt_access_control@navy.mil 4. QUESTION: On the Combined Synopsis and Solicitation document, there is a request for a labor matrix. Is the matrix shown the preferred style? ANSWER: The offeror may propose additional labor categories as required to perform the SOW tasking. Total labor hours for the year shall not exceed 40 hours. 5. QUESTION: The request on this document is for 5 years, but the SOW is for 3 years after the1 year warranty period. Presuming we are servicing during the first year of operation also, I see that as 4 years total. Am I reading one of the documents incorrectly? ANSWER: RFQ document updated to three (years), per Answer 1 above. Warranty under CLIN 0001, for year one (1), shall include annual preventive maintenance services. 6. QUESTION: The bid asks for maintenance costs for three years. Maintenance on Sullair air compressors is based on hours of operation. Do you know how many hours per year the compressor operates? One shift (8 hours/day), two shifts (16 hours per day ), three shifts (24 hours per day) or 24/7. A single shift is approximately 2,000 hours. Need to know this to quote maintenance costs. ANSWER: 16 hours/day. 7. QUESTION: The performance 240 cfm is the performance of a lubricated air compressor not an oil free compressor. An oil free 50 hp air compressor only delivers about 216 cfm. Please confirm if want an Oil Free air compressor. ANSWER: A lubricated air compressor is acceptable. Oil carryover is unavoidable for lubricated air compressors. The requirement for oil free air is that the discharge from the proposed ‘system’ (compressor, dryer and filter) achieve ISO 8573-1 Air Quality 2.4.2 as the current system provides. The Specifications document has been updated, per Answer 2 above. AMENDMENT 0002- June 16, 2025 Amended to incluse questions and answers from Industry. 1. QUESTION: Compressor discharge to be 1.5\" type L copper tubing using existing Kaeser discharge line to the 2\" copper header. New union and isolation valve will be installed. ANSWER: Yes. 2. QUESTION: Voltage of compressor is 460/3/60. Dryer voltage is 230/1/60 ANSWER: Yes. 3. QUESTION: New dryer to include a 1.0u (micron) prefilter and a .01u (micron) afterfilter ANSWER: Yes. 4. QUESTION: Access to building is thru the ground height overhead door on the side of the building. ANSWER: Yes. 5. QUESTION: Aisleways to be free and clear of obstructions when we arrive to place compressor. ANSWER: Yes. 6. QUESTION: Use of NUWC Newport fork truck to move the compressor from the overhead door area to the compressor room is allowed. ANSWER: Operated by NUWC personnel, otherwise Contractor must provide their own. 7. QUESTION: New dryer bypass and piping to include Gardner Denver discharge will be 2\" copper tubing type L. ANSWER: Yes. 8. QUESTION: Maintenance costs are based on 4,000 hours of operation annually. ANSWER: Yes. AMENDMENT 0003 - June 27 2025 The solicitation was amended to offer clarification on the CLIN structure and quote format requirement. As a result of this modification the response time has been extended through July 3, 2025.","html":null,"origin":"extract"},"contacts":[{"name":"Maria Diaz-Sotomayor","role":"primary","email":"maria.d.diaz-sotomayor.civ@us.navy.mil","phone":"4018322028"}],"place_of_performance":{"zip":"02841","city":{"name":"Newport"},"state":{"code":"RI"},"country":{"code":"USA"}},"office_address":{"zip":"02841-1703","city":"NEWPORT","state":"RI","country":"USA"},"naics_codes":["333912"],"award":null,"attachments":[],"awards":[],"related":[{"key":"N6660427Q0003","latest_notice_id":"790271b3e5e84cb39d2b6c264a8a0148","title":"Atlantic Undersea Test and Evaluation Center (AUTEC) Pay and Benefit Study","solicitation_number":"N6660427Q0003","notice_type":"k","first_type":"k","first_posted":"2026-09-03","last_posted":"2026-09-11","notices":2,"due_at":"2026-09-18T18:00:00Z","due_date":"2026-09-18","closes_at":"2026-09-18T18:00:00Z","awardable":true,"open":true,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N66604","office_name":"NUWC DIV NEWPORT","naics":"541990","psc":"R699","set_aside":"SBA","state":"RI","county":"44005","county_name":"Newport County","city":"4449960","city_name":"Newport","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"N6660426Q0459","latest_notice_id":"9a53a39093954ea9893b98c71ca8b63f","title":"Aeration Blower and Silencer Vibration and Shock Fixture Fabrication","solicitation_number":"N6660426Q0459","notice_type":"k","first_type":"k","first_posted":"2026-09-04","last_posted":"2026-09-11","notices":3,"due_at":"2026-09-18T18:00:00Z","due_date":"2026-09-18","closes_at":"2026-09-18T18:00:00Z","awardable":true,"open":true,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N66604","office_name":"NUWC DIV NEWPORT","naics":"541380","psc":"J047","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"N6660426R0163","latest_notice_id":"74b30e52ff494cdca2482cff0bf01d55","title":"Construction - NUWCDIVNPT - Consolidated Secure Facility","solicitation_number":"N6660426R0163","notice_type":"o","first_type":"r","first_posted":"2026-02-18","last_posted":"2026-09-11","notices":7,"due_at":"2026-09-21T18:00:00Z","due_date":"2026-09-21","closes_at":"2026-09-21T18:00:00Z","awardable":true,"open":true,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N66604","office_name":"NUWC DIV NEWPORT","naics":"236220","psc":"Y1AZ","set_aside":"SBA","state":"RI","county":"44005","county_name":"Newport County","city":"4449960","city_name":"Newport","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"N6660426Q0307","latest_notice_id":"241c7b4ecdf24bef96da657c837aa7d9","title":"Towed Array Transporter and Dockside Handling","solicitation_number":"N6660426Q0307","notice_type":"k","first_type":"k","first_posted":"2026-08-28","last_posted":"2026-09-15","notices":2,"due_at":"2026-09-22T18:00:00Z","due_date":"2026-09-22","closes_at":"2026-09-22T18:00:00Z","awardable":true,"open":true,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N66604","office_name":"NUWC DIV NEWPORT","naics":"336212","psc":"2330","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"N6660426Q0264","latest_notice_id":"dd9b83340319431a875c6da35f4320dc","title":"Antennas","solicitation_number":"N6660426Q0264","notice_type":"k","first_type":"k","first_posted":"2026-04-17","last_posted":"2026-09-09","notices":4,"due_at":"2026-09-23T18:00:00Z","due_date":"2026-09-23","closes_at":"2026-09-23T18:00:00Z","awardable":true,"open":true,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N66604","office_name":"NUWC DIV NEWPORT","naics":"334419","psc":"5998","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"}]}