# DBB NSWC - Building 4 Secure Perimeter at Philadelphia Naval Yard in Philadelphia, PA

Canonical: https://abierto.us/opportunities/n4008524r2817

- Solicitation number: N4008524R2817
- Notice type: Sources sought
- Status: Closed. Deadline was August 19, 2024 at 3:30 PM EDT
- Department: Department of the Navy
- Agency: Department of the Navy
- Contracting office: Navfacsyscom Mid-Atlantic (N40085)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Y1JZ Construction Of Miscellaneous Buildings
- Set-aside: 8(a) set-aside
- Place of performance: Philadelphia, Pennsylvania
- County: Philadelphia County (FIPS 42101). https://abierto.us/counties/philadelphia-county-pa-42101
- City: Philadelphia. https://abierto.us/cities/philadelphia-pa-4260000
- First posted: August 7, 2024
- Last posted: August 7, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/5d0b44c3fa4d4537b66d7bc2c0ce07d7/view

## Description

This project is a Design-Bid-Build that will install a crash-rated perimeter around Building 4 as a result of the PNYA Perimeter Security Study for Security Engineering Planning Assessment (SEPA) criteria and recommendations. The proposed action includes the installation of crash-rated post and rail, bollards, and active vehicle barriers, and associated modifications to utilities and roadways.

The proposed action is required to protect multiple Naval Surface Warfare Center Philadelphia Division (NSWCPD) buildings and assets. The proposed action does not include any alterations to character defining features of Building 4. The proposed action will not remove any trees from the project area. Trees in the project area will be protected with temporary snow fences during excavation and hand tools will be used for excavation in the critical root zone.

During construction, the contractor will be required to follow the National Center for Preservation Technology and Training (NCPTT) and National Park Service’s (NPS) Guidance for Protecting Historic Trees During Construction. The area of total ground disturbance for the project is below state NPDES permit limits and the city PCSMP stormwater permit threshold requirements. An ERSA package will be submitted to Philadelphia Water Department however.

Action will be taken to determine if a Common Plan of Development is created for either the city or the state when the construction time of the project is determined. At this time, no Common Plan of Development is anticipated.

## Publications

- August 7, 2024: Sources sought, due August 19, 2024 at 3:30 PM EDT. Notice 5d0b44c3fa4d4537b66d7bc2c0ce07d7. https://sam.gov/workspace/contract/opp/5d0b44c3fa4d4537b66d7bc2c0ce07d7/view

## Points of contact

- Francis Caruso, francis.a.caruso10.civ@us.navy.mil, 2158974345
- Anthony Zampetti, anthony.zampetti@navy.mil, 2158978877

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/n4008524r2817.