# FMS REPAIR - N0038325PR0R634

Canonical: https://abierto.us/opportunities/n0038325r0015

- Solicitation number: N0038325R0015
- Notice type: Solicitation
- Status: Closed. Deadline was July 31, 2025 at 4:00 PM EDT
- Department: Department of the Navy
- Agency: Department of the Navy
- Contracting office: NAVSUP Weapon Systems Support (N00383)
- NAICS: 336412 Aircraft Engine and Engine Parts Manufacturing
- Product or service code: 1550 Drones
- Place of performance: Aurora, Oregon
- County: Marion County (FIPS 41047). https://abierto.us/counties/marion-county-or-41047
- City: Aurora. https://abierto.us/cities/aurora-or-4103300
- First posted: July 2, 2025
- Last posted: July 2, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/6f0aab53c5214eb493614a235dcdac28/view

## Description

**SOLICITATION NOTES:** Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor’s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.

**Required RTAT:** 549 days after receipt of asset The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.

**Throughput Constraint:** Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of

per month reflects no throughput constraint.

**Induction Expiration Date:** 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.

**Reconciliation:** A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.

ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, ORSENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred.

**POC:**

**Carmelena Oldroyd Phone:**

**771-229-0530 E-mail:** carmelena.c.oldroyd.civ@us.navy.mil

## Publications

- July 2, 2025: Solicitation, due July 31, 2025 at 4:00 PM EDT. Notice 6f0aab53c5214eb493614a235dcdac28. https://sam.gov/workspace/contract/opp/6f0aab53c5214eb493614a235dcdac28/view

## Points of contact

- Carmelena Oldroyd, carmelena.c.oldroyd.civ@us.navy.mil, 771-229-0530

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/n0038325r0015.
