# OA Testing of DODIC MT93 (B-1 Pin Puller Impulse Cart)

Canonical: https://abierto.us/opportunities/n0017425simacqjpo0049

- Solicitation number: N0017425SIMACQJPO0049
- Notice type: Special notice
- Status: Closed. Deadline was March 26, 2025 at 10:00 AM EDT
- Department: Department of the Navy
- Agency: Department of the Navy
- Contracting office: NSWC Indian Head Division (N00174)
- NAICS: 541330 Engineering Services
- Product or service code: R425 Engineering and Technical Services
- Place of performance: Indian Head, Maryland
- County: Charles County (FIPS 24017). https://abierto.us/counties/charles-county-md-24017
- City: Indian Head. https://abierto.us/cities/indian-head-md-2441500
- First posted: March 12, 2025
- Last posted: March 12, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/8f338f2ac48343bc941922a08655e324/view

## Description

SEE STATEMENT OF WORK

NSWC IHD requires test support in order to evaluate the performance and reliability level of the items listed in Table I. This requires performing non-destructive tests and ballistic/functional tests in accordance with the document(s) listed in Section 2.0 and providing data sheets in addition to testing summaries to the Government. The provided results will be compared directly with lot acceptance test (LAT) data to ascertain the effects of age and service exposure on performance and reliability.

Quantities listed are approximate and could change, however; the total quantity shall not exceed what is listed in Table I. Additionally, the government reserves the right to test less than the number listed in Table I if required. Requirements The contractor shall conduct and document an ordnance assessment test and analysis for the test sample. All tests subsequently listed in this document shall be completed in accordance with the document(s) listed in Section 2.0.

In the event that there have been changes to any of the documents in Section 2.0, the government shall be notified of the change and provided a copy for concurrence. The contractor shall provide the instrumentation, test equipment, gauges or any other equipment needed to support this effort. REQUIREMENTS The testing shall be completed within one-hundred and twenty (120) days after receipt of the government furnished material (GFM) test sample, including the delivery of data. The contractor shall provide a report of all non-destructive and destructive

## Publications

- March 12, 2025: Special notice, due March 26, 2025 at 10:00 AM EDT. Notice 8f338f2ac48343bc941922a08655e324. https://sam.gov/workspace/contract/opp/8f338f2ac48343bc941922a08655e324/view

## Points of contact

- Tammy Kershner, tammy.r.kershner.civ@us.navy.mil, 3018026161

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/n0017425simacqjpo0049.
