# JFSD230068 REPAIR HVAC SYSTEM HYDRANT FUELING B658

Canonical: https://abierto.us/opportunities/jfsd230068

- Solicitation number: JFSD230068
- Notice type: Presolicitation
- Status: Closed. Deadline was February 12, 2025 at 5:00 PM EST
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA4659 319 Cons PK (FA4659)
- NAICS: 541330 Engineering Services
- Product or service code: C1JZ Architect And Engineering- Construction: Miscellaneous Buildings
- Set-aside: Total small business set-aside
- Place of performance: Grand Forks AFB, North Dakota
- County: Grand Forks County (FIPS 38035). https://abierto.us/counties/grand-forks-county-nd-38035
- City: Grand Forks AFB. https://abierto.us/cities/grand-forks-afb-nd-3832140
- First posted: January 13, 2025
- Last posted: February 6, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/786e58758f7c4281bb0675ad24fa973c/view

## Description

Added Questions and Answers. 6 Feb 25 The Architect-Engineer (A-E) shall perform field reconnaissance, studies, site investigations, and a preliminary design meeting with the users, including travel and work required to obtain engineering information and design data to produce contract documents for this project. The Base Civil Engineering Project Manager will assist in scheduling design meetings.

Building 658 is a 3800 sq ft hydrant fueling facility for jet fuel and includes significant fuels piping fed from the nearby outdoor storage tanks. Most of the space in the facility is a fuels piping bay. There is also a small control room and bathroom in the facility. The heating in building 658 is inadequate to maintain heat in the fuel bay. The bay is currently heated by 4 hydronic unit heaters, supported by a 400 MBH boiler which also supplies heat to the rest of the facility.

The fuels piping bay eye wash station does not have sufficient accessible hot water. Current domestic hot water is supplied by a small on demand electric hot water heater, which appears to be inadequate. The fuel coming from these outdoor storage tanks cools the space when operations commence during winter months, providing additional heat load.

The small control room and bathroom are not included as part of this project, though the heat load from the air handler and bathroom in this area will have to be considered for boiler sizing. Historical drawings for this facility have been lost. Site investigation and measurements will be critical to the success of this project.

## Publications

- January 13, 2025: Presolicitation, due February 12, 2025 at 5:00 PM EST. Notice 048327b714b94b8dbf7f1c3fcc75bf50. https://sam.gov/workspace/contract/opp/048327b714b94b8dbf7f1c3fcc75bf50/view
- February 6, 2025: Presolicitation, due February 12, 2025 at 5:00 PM EST. Notice 786e58758f7c4281bb0675ad24fa973c. https://sam.gov/workspace/contract/opp/786e58758f7c4281bb0675ad24fa973c/view

## Points of contact

- Trenton Cott, trenton.cott@us.af.mil, 7017475314
- Monique Padilla, monique.padilla.3@us.af.mil, 7017473903

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/jfsd230068.