# C0 Service Building Renovation

Canonical: https://abierto.us/opportunities/isd362164da

- Solicitation number: ISD_362164_DA
- Notice type: Solicitation
- Status: Closed. Deadline was October 30, 2024 at 6:00 PM EDT
- Department: Department of Energy
- Contracting office: Fermilab - DOE Contractor (899034)
- NAICS: 238350 Finish Carpentry Contractors
- Product or service code: Y1JZ Construction Of Miscellaneous Buildings
- Set-aside: Total small business set-aside
- Place of performance: Batavia, Illinois
- County: Kane County (FIPS 17089). https://abierto.us/counties/kane-county-il-17089
- City: Batavia. https://abierto.us/cities/batavia-il-1704078
- First posted: September 27, 2024
- Last posted: October 22, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/e845c3ae6969492283990bdb53872a32/view

## Description

On October 22, 2024, Amendment 02 was issued. This Amendment to the RFP is being issued to provide responses to questions from prospective offerors. Please see the attached Q&A document and epoxy flooring picture attachment. On October 3, 2024, Amendment 01 was issued. This Amendment to the RFP is being issued to include the following exhibits/documents on SAM.gov:

a. Exhibit J - Proposal Certifications, Form PUR-466, Rev. 1 (10/14/2021).

b. Exhibit K - Subcontractor Annual Representations & Certifications (SARC), Form SARC (Rev. 3) (04/08/2022).

c. Exhibit L - Construction Environmental, Safety & Health Certification (CESHC).

d. Business Visitor Registration Instructions & Directions The Scope of Work for this project includes:

Remove and replace main entrance/exit double doors with frame and all components. (Prime and Paint as well). Doors to be ENERGY STAR certified with a thermal break. Remove and replace (2) south side single doors with frame and all components. (Prime and Paint also). Doors to be ENERGY STAR certified with a thermal break. Remove and replace (11) EOL windows. Windows to be a minimum double-pane ENERGY STAR certified with a low-e coating. Re-Epoxy roughly 500 Sq Ft of concrete flooring.

Remove and replace EOL commode, sink and mirror in restroom. Install a large new sink. (sink onsite already at C0) Patch and Paint Walls in the hallway and 2 rooms that were re done. For more detailed information, please review the attached SOW titled, "Exhibit A SOW C0_Renovation."

## Publications

- September 27, 2024: Solicitation, due October 30, 2024 at 6:00 PM EDT. Notice 070bce3b038a493ba4f93fc818ce788b. https://sam.gov/workspace/contract/opp/070bce3b038a493ba4f93fc818ce788b/view
- October 3, 2024: Solicitation, due October 30, 2024 at 6:00 PM EDT. Notice b15a939f880f4ba5b1c646d2bfe080e3. https://sam.gov/workspace/contract/opp/b15a939f880f4ba5b1c646d2bfe080e3/view
- October 3, 2024: Solicitation, due October 30, 2024 at 6:00 PM EDT. Notice efce76f9d9364ef2b7f7151a9de41b8c. https://sam.gov/workspace/contract/opp/efce76f9d9364ef2b7f7151a9de41b8c/view
- October 22, 2024: Solicitation, due October 30, 2024 at 6:00 PM EDT. Notice e845c3ae6969492283990bdb53872a32. https://sam.gov/workspace/contract/opp/e845c3ae6969492283990bdb53872a32/view

## Points of contact

- Danielle Amico, damico@fnal.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/isd362164da.