# Static Dissipative Flooring

Canonical: https://abierto.us/opportunities/isd348175scm

- Solicitation number: ISD-348175-SCM
- Notice type: Solicitation
- Status: Closed. Deadline was June 7, 2024 at 6:00 PM EDT
- Department: Department of Energy
- Contracting office: Fermilab - DOE Contractor (899034)
- NAICS: 238330 Flooring Contractors
- Product or service code: Y1DB Construction Of Laboratories And Clinics
- Place of performance: Batavia, Illinois
- County: Kane County (FIPS 17089). https://abierto.us/counties/kane-county-il-17089
- City: Batavia. https://abierto.us/cities/batavia-il-1704078
- First posted: May 14, 2024
- Last posted: May 29, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/75230612a777413ab4eec3a3da8dc4f5/view

## Description

On 5/23/2024, Amendment 01 was added to this solicitation. Please see documents titled, "Amendment 01" & "Floor Pic 1-3." On 5/29/2024, Amendment 02 was added to this solicitation. Minor changes to SOW description and proposal due date extension until 06/07/2024.

**Scope of Work:** STATIC DISSIPATIVE FLOORING The general scope of this project is to prepare and lay ESD protective epoxy floor in G-WEST (G723) laboratory in the HEERC building (approximately 3,000 sqf). ? Grind and/or shotblast existing surface for proper adhesion of applied product ? Install Dur-A-Flex Dur-A-Gard ESD Primer with copper grounding tape, grounding points provided by others. ? Install Dur-A-Flex ESD Gard ? Install Dur-A-Flex Armor Top ESD urethane ?

Per site visit all existing caulk to remain, installation will terminate at caulk lines ? Installation duration 5-6 days working all areas simultaneously ? Pricing based on open box install if walls have been installed need to see wall plan and/or visit site.

**Requirements:** ESD protective floor within the range 10^6-10^9 Ohms.

**Tasks:** 1. Grind existing concrete floor to remove sealer and open up new concrete 2. Honour service trenches and vibration isolation trenches 3. Slope floor to level floor around trenches 4. Prime floor with penetrating moisture tolerant primer 5. Base coat floor with appropriate ESD protective epoxy 6. Lay out copper stripes and ground floor 7. Finish and clean-up floor.

**Period of Performance:** 30 Days

## Publications

- May 14, 2024: Solicitation, due May 29, 2024 at 6:00 PM EDT. Notice d20e515dbf0d414ca0377c3d821e3c70. https://sam.gov/workspace/contract/opp/d20e515dbf0d414ca0377c3d821e3c70/view
- May 23, 2024: Solicitation, due May 29, 2024 at 6:00 PM EDT. Notice 6f59337751d049369469b9677c72fb9a. https://sam.gov/workspace/contract/opp/6f59337751d049369469b9677c72fb9a/view
- May 29, 2024: Solicitation, due June 7, 2024 at 6:00 PM EDT. Notice 75230612a777413ab4eec3a3da8dc4f5. https://sam.gov/workspace/contract/opp/75230612a777413ab4eec3a3da8dc4f5/view