BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Abierto//abierto.us//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
BEGIN:VEVENT
UID:inl27002-deadline@abierto.us
DTSTAMP:20261104T071924Z
DTSTART:20270424T055900Z
DTEND:20270424T061400Z
SUMMARY:Offers due: ATR Plant Protection System (PPS) Seismic Switch Repl
 acement (INL-27-002)
DESCRIPTION:Response deadline for ATR Plant Protection System (PPS) Seism
 ic Switch Replacement from BATTELLE ENERGY ALLIANCE–DOE CNTR\, ENERGY\, 
 DEPARTMENT OF. Confirm the deadline on SAM.gov before submitting. https:
 //abierto.us/opportunities/inl27002
URL:https://abierto.us/opportunities/inl27002
BEGIN:VALARM
ACTION:DISPLAY
TRIGGER:-P3D
DESCRIPTION:Three days to the deadline: ATR Plant Protection System (PPS)
  Seismic Switch Replacement
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
TRIGGER:-P1D
DESCRIPTION:One day to the deadline: ATR Plant Protection System (PPS) Se
 ismic Switch Replacement
END:VALARM
END:VEVENT
END:VCALENDAR
