{"canonical":"https://abierto.us/opportunities/fa910124industrialwaterchiller","key":"FA910124INDUSTRIALWATERCHILLER","url":"https://abierto.us/opportunities/fa910124industrialwaterchiller","title":"20-Ton Industrial Water Chiller","solicitation_number":"FA910124IndustrialWaterChiller","notice_type":"a","open":false,"response_deadline":"2024-06-17T13:00:00Z","first_posted":"2024-05-06","last_posted":"2024-07-03","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE AIR FORCE","office":"FA9101 AEDC PKP PROCRMNT BR","naics":"333415","psc":"4120","set_aside":"SBA","place_state":"TN","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":"TEXAS PATRIOT INTERNATIONAL, LLC","award_amount":"78208.00","publications":[{"notice_id":"ed1921053c7e41a8b6c6ccb7199d3163","title":"20-Ton Industrial Water Chiller","solicitation_number":"FA910124IndustrialWaterChiller","notice_type":"r","base_type":"r","posted":"2024-05-06","posted_at":null,"due_at":"2024-05-10T18:00:00Z","due_date":"2024-05-10","cancelled":null,"archived":null,"archive_date":"2024-05-25","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ed1921053c7e41a8b6c6ccb7199d3163/view","enriched":false,"history":[]},{"notice_id":"e75a96d942874b21ba9c5572b526007a","title":"20-Ton Industrial Water Chiller","solicitation_number":"FA910124IndustrialWaterChiller","notice_type":"o","base_type":"r","posted":"2024-05-30","posted_at":null,"due_at":"2024-06-17T13:00:00Z","due_date":"2024-06-17","cancelled":null,"archived":null,"archive_date":"2024-12-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e75a96d942874b21ba9c5572b526007a/view","enriched":false,"history":[]},{"notice_id":"4688b11838204fed98ad477b2a2ad0f1","title":"20-Ton Industrial Water Chiller","solicitation_number":"FA910124IndustrialWaterChiller","notice_type":"o","base_type":"o","posted":"2024-06-04","posted_at":null,"due_at":"2024-06-17T13:00:00Z","due_date":"2024-06-17","cancelled":null,"archived":null,"archive_date":"2024-12-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/4688b11838204fed98ad477b2a2ad0f1/view","enriched":false,"history":[]},{"notice_id":"8a915e10bc544d2ea0518e14dce74cc6","title":"20-Ton Industrial Water Chiller","solicitation_number":"FA910124IndustrialWaterChiller","notice_type":"o","base_type":"o","posted":"2024-06-04","posted_at":null,"due_at":"2024-06-17T13:00:00Z","due_date":"2024-06-17","cancelled":null,"archived":null,"archive_date":"2024-12-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8a915e10bc544d2ea0518e14dce74cc6/view","enriched":false,"history":[]},{"notice_id":"c0dcb060bcfe44cfaa6ba9ad41350620","title":"20-Ton Industrial Water Chiller","solicitation_number":"FA910124IndustrialWaterChiller","notice_type":"o","base_type":"o","posted":"2024-06-06","posted_at":null,"due_at":"2024-06-17T13:00:00Z","due_date":"2024-06-17","cancelled":null,"archived":null,"archive_date":"2024-12-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c0dcb060bcfe44cfaa6ba9ad41350620/view","enriched":false,"history":[]},{"notice_id":"d23afe2720614f7385a93d9ab07630fa","title":"20-Ton Industrial Water Chiller","solicitation_number":"FA910124IndustrialWaterChiller","notice_type":"a","base_type":"o","posted":"2024-07-03","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-07-18","award_number":"FA910124PB047","awardee_name":"TEXAS PATRIOT INTERNATIONAL, LLC Wylie","amount":"78208.00","link_sam":"https://sam.gov/workspace/contract/opp/d23afe2720614f7385a93d9ab07630fa/view","enriched":false,"history":[]}],"latest_notice_id":"d23afe2720614f7385a93d9ab07630fa","first_type":"r","notices":[{"dates":{"posted":"2024-05-06","response_deadline":{"raw":"2024-05-10T13:00:00-05:00","utc":"2024-05-10T18:00:00Z","date":"2024-05-10","time":"13:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ed1921053c7e41a8b6c6ccb7199d3163/view"},"naics":{"codes":["333415"],"primary":"333415"},"title":"20-Ton Industrial Water Chiller","agency":{"office":{"code":"FA9101","name":"FA9101 AEDC PKP PROCRMNT BR"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"37389-1332","city":"ARNOLD AFB","state":"TN","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-05-25","archive_type":"auto15"},"contacts":[{"name":"Brooke Vandeman","role":"primary","email":"brooke.vandeman@us.af.mil"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"ed1921053c7e41a8b6c6ccb7199d3163","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"a18bac2b6d8047ed59f7fd06a1c844ebd30f3d5e69bb9935174748e8903414c6","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"This is a Sources Sought Notice to determine the availability and technical capability of small and large businesses to meet the Government’s requirement one, 20-ton Industrial Water Chiller, as specified IAW Attachment 1 – DRAFT Technical Specification Sheet, and for an optional quantity of one. Delivery is required to Arnold AFB located in TN.","origin":"extract"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"FA910124IndustrialWaterChiller","place_of_performance":{"city":{"name":"Arnold AFB"},"state":{"code":"TN"},"country":{"code":"USA"}}},{"dates":{"posted":"2024-05-30","response_deadline":{"raw":"2024-06-17T08:00:00-05:00","utc":"2024-06-17T13:00:00Z","date":"2024-06-17","time":"08:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e75a96d942874b21ba9c5572b526007a/view"},"naics":{"codes":["333415"],"primary":"333415"},"title":"20-Ton Industrial Water Chiller","agency":{"office":{"code":"FA9101","name":"FA9101 AEDC PKP PROCRMNT BR"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"37389-1332","city":"ARNOLD AFB","state":"TN","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-31","archive_type":"auto_custom"},"contacts":[{"name":"Brogan Fullmer","role":"primary","email":"brogan.fullmer@us.af.mil"},{"name":"Brooke Vandeman","role":"secondary","email":"brooke.vandeman@us.af.mil"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"e75a96d942874b21ba9c5572b526007a","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"5699ab5e994c108c45c3839290999fb5cf9305a18ca29cd40160e75692ac0f77","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Technical Specifications 20 Ton Industrial Water Chiller 1. General & Operational Data/Specifications a. Must be rated for continuous usage b. Ambient working limits: Minimum requirements are +14 Fahrenheit (?F) or -10 Celsius (°C) through +113 ?F or 45 °C c. Cooling capacity (Capacity based on 45 ?F or 7.22 °C water outlet temperature): 10 ?F or -12.22 °C delta at 95 ?F or 35 °C ambient temperature i. Twenty (20) tons, minimum capacity ii. 239,756 British thermal units (BTUs) per hour (BTUs/hr.), minimum capacity d. Must be designed to use water as a medium e. Cooling Water flow rate: 50 gallons per minute (GPM) or 189.27 liters (L), minimum flow rate f. Head Pressure: Fifty (50) pounds per square inch (PSI) at a flow rate of 46 gallons or 174.12L per minute (GPM) g. Refrigerant Type: R-410A h. Noise rating: Not-to-exceed 69 decibels (dBs) at thirty-two feet (32’) or 10 meters (m) 2. Reservoir/Self-Contained Water Tank: a. Fifty-five (55) gallon or 208.19L minimum capacity b. Chiller is to only operate using water contained in a reservoir/self-contained tank; an external water supply IS NOT required, except to fill the reservoir/self-contained tank. c. Tank is to be stainless steel. 3. Interfaces: a. Power Supply: i. Volts (V): 460V ii. Phase: Three (3) phase alternating current (AC) iii. Hertz (Hz): 60Hz iv. Full Load Amps (FLA): Maximum of 60 FLA b. Fluid Connections i. System water supply: male pipe thread (MPT) two inches (2”) or 5.08 centimeters (cm) ii. System water return: male pipe thread (MPT) two inches (2”) 5.08cm c. Filling reservoir/self-contained tank with drain 4. Weight & Dimensions: System must fit within below dimensions (Note, Reservoir/Self-Contained water tank is included in these measurements a. Dry Weight in pounds (lbs): Not-to-exceed two-thousand six-hundred sixty pounds (2,660 lbs) or 1206.55 kilograms (kg) b. Width: Not-to-exceed forty-five inches (45”) or 114.3cm c. Length/Depth: Not-to-exceed one-hundred inches (100”) 254cm d. Height: Not-to-exceed ninety inches (90”) 228.6cm 5. Portability a. Portability must be maintained while meeting all requirements in these specifications b. System must be self-contained on a movable skid/frame c. Skid/frame is to have lifting hole to allow forklift to move system d. Only permitted items to be disconnected for portability are: i. Power Source identified in 3.a.iv ii. Fluid connections identified in 3.b.i and 3.b.ii e. Drain reservoir/self-contained tank of water 6. Clearance Spacing. The following states minimum space must be provided between the system and an obstacle-- a. Side Clearances: Required clearance for any side of unit is not-to-exceed six and one-half feet (6.5’) or 1.98m b. Top Clearance: Required clearance for top of unit is not-to-exceed ten feet (10’) or 3.04m","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA910124IndustrialWaterChiller","place_of_performance":{"zip":"37389","city":{"name":"Arnold AFB"},"state":{"code":"TN"},"country":{"code":"USA"}},"product_service_code":"4120"},{"dates":{"posted":"2024-06-04","response_deadline":{"raw":"2024-06-17T08:00:00-05:00","utc":"2024-06-17T13:00:00Z","date":"2024-06-17","time":"08:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/4688b11838204fed98ad477b2a2ad0f1/view"},"naics":{"codes":["333415"],"primary":"333415"},"title":"20-Ton Industrial Water Chiller","agency":{"office":{"code":"FA9101","name":"FA9101 AEDC PKP PROCRMNT BR"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"37389-1332","city":"ARNOLD AFB","state":"TN","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-31","archive_type":"auto_custom"},"contacts":[{"name":"Brogan Fullmer","role":"primary","email":"brogan.fullmer@us.af.mil"},{"name":"Brooke Vandeman","role":"secondary","email":"brooke.vandeman@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"4688b11838204fed98ad477b2a2ad0f1","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"fa5e1e699400edb89290245bc62380bf176bf83094d0743e70722b3f6b2a4510","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Technical Specifications 20 Ton Industrial Water Chiller 1. General & Operational Data/Specifications a. Must be rated for continuous usage b. Ambient working limits: Minimum requirements are +14 Fahrenheit (?F) or -10 Celsius (°C) through +113 ?F or 45 °C c. Cooling capacity (Capacity based on 45 ?F or 7.22 °C water outlet temperature): 10 ?F or -12.22 °C delta at 95 ?F or 35 °C ambient temperature i. Twenty (20) tons, minimum capacity ii. 239,756 British thermal units (BTUs) per hour (BTUs/hr.), minimum capacity d. Must be designed to use water as a medium e. Cooling Water flow rate: 50 gallons per minute (GPM) or 189.27 liters (L), minimum flow rate f. Head Pressure: Fifty (50) pounds per square inch (PSI) at a flow rate of 46 gallons or 174.12L per minute (GPM) g. Refrigerant Type: R-410A h. Noise rating: Not-to-exceed 69 decibels (dBs) at thirty-two feet (32’) or 10 meters (m) 2. Reservoir/Self-Contained Water Tank: a. Fifty-five (55) gallon or 208.19L minimum capacity b. Chiller is to only operate using water contained in a reservoir/self-contained tank; an external water supply IS NOT required, except to fill the reservoir/self-contained tank. c. Tank is to be stainless steel. 3. Interfaces: a. Power Supply: i. Volts (V): 460V ii. Phase: Three (3) phase alternating current (AC) iii. Hertz (Hz): 60Hz iv. Full Load Amps (FLA): Maximum of 60 FLA b. Fluid Connections i. System water supply: male pipe thread (MPT) two inches (2”) or 5.08 centimeters (cm) ii. System water return: male pipe thread (MPT) two inches (2”) 5.08cm c. Filling reservoir/self-contained tank with drain 4. Weight & Dimensions: System must fit within below dimensions (Note, Reservoir/Self-Contained water tank is included in these measurements a. Dry Weight in pounds (lbs): Not-to-exceed two-thousand six-hundred sixty pounds (2,660 lbs) or 1206.55 kilograms (kg) b. Width: Not-to-exceed forty-five inches (45”) or 114.3cm c. Length/Depth: Not-to-exceed one-hundred inches (100”) 254cm d. Height: Not-to-exceed ninety inches (90”) 228.6cm 5. Portability a. Portability must be maintained while meeting all requirements in these specifications b. System must be self-contained on a movable skid/frame c. Skid/frame is to have lifting hole to allow forklift to move system d. Only permitted items to be disconnected for portability are: i. Power Source identified in 3.a.iv ii. Fluid connections identified in 3.b.i and 3.b.ii e. Drain reservoir/self-contained tank of water 6. Clearance Spacing. The following states minimum space must be provided between the system and an obstacle-- a. Side Clearances: Required clearance for any side of unit is not-to-exceed six and one-half feet (6.5’) or 1.98m b. Top Clearance: Required clearance for top of unit is not-to-exceed ten feet (10’) or 3.04m See attached vendor questions and answers (Q&A) from the technical evaluator.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA910124IndustrialWaterChiller","place_of_performance":{"zip":"37389","city":{"name":"Arnold AFB"},"state":{"code":"TN"},"country":{"code":"USA"}},"product_service_code":"4120"},{"dates":{"posted":"2024-06-04","response_deadline":{"raw":"2024-06-17T08:00:00-05:00","utc":"2024-06-17T13:00:00Z","date":"2024-06-17","time":"08:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8a915e10bc544d2ea0518e14dce74cc6/view"},"naics":{"codes":["333415"],"primary":"333415"},"title":"20-Ton Industrial Water Chiller","agency":{"office":{"code":"FA9101","name":"FA9101 AEDC PKP PROCRMNT BR"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"37389-1332","city":"ARNOLD AFB","state":"TN","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-31","archive_type":"auto_custom"},"contacts":[{"name":"Brogan Fullmer","role":"primary","email":"brogan.fullmer@us.af.mil"},{"name":"Brooke Vandeman","role":"secondary","email":"brooke.vandeman@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"8a915e10bc544d2ea0518e14dce74cc6","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"188c9e99655eff32ab659f7dcd1ececec5eed3633d32dc1c34c7664262ed1941","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Technical Specifications 20 Ton Industrial Water Chiller 1. General & Operational Data/Specifications a. Must be rated for continuous usage b. Ambient working limits: Minimum requirements are +14 Fahrenheit (?F) or -10 Celsius (°C) through +113 ?F or 45 °C c. Cooling capacity (Capacity based on 45 ?F or 7.22 °C water outlet temperature): 10 ?F or -12.22 °C delta at 95 ?F or 35 °C ambient temperature i. Twenty (20) tons, minimum capacity ii. 239,756 British thermal units (BTUs) per hour (BTUs/hr.), minimum capacity d. Must be designed to use water as a medium e. Cooling Water flow rate: 50 gallons per minute (GPM) or 189.27 liters (L), minimum flow rate f. Head Pressure: Fifty (50) pounds per square inch (PSI) at a flow rate of 46 gallons or 174.12L per minute (GPM) g. Refrigerant Type: R-410A h. Noise rating: Not-to-exceed 69 decibels (dBs) at thirty-two feet (32’) or 10 meters (m) 2. Reservoir/Self-Contained Water Tank: a. Fifty-five (55) gallon or 208.19L minimum capacity b. Chiller is to only operate using water contained in a reservoir/self-contained tank; an external water supply IS NOT required, except to fill the reservoir/self-contained tank. c. Tank is to be stainless steel. 3. Interfaces: a. Power Supply: i. Volts (V): 460V ii. Phase: Three (3) phase alternating current (AC) iii. Hertz (Hz): 60Hz iv. Full Load Amps (FLA): Maximum of 60 FLA b. Fluid Connections i. System water supply: male pipe thread (MPT) two inches (2”) or 5.08 centimeters (cm) ii. System water return: male pipe thread (MPT) two inches (2”) 5.08cm c. Filling reservoir/self-contained tank with drain 4. Weight & Dimensions: System must fit within below dimensions (Note, Reservoir/Self-Contained water tank is included in these measurements a. Dry Weight in pounds (lbs): Not-to-exceed two-thousand six-hundred sixty pounds (2,660 lbs) or 1206.55 kilograms (kg) b. Width: Not-to-exceed forty-five inches (45”) or 114.3cm c. Length/Depth: Not-to-exceed one-hundred inches (100”) 254cm d. Height: Not-to-exceed ninety inches (90”) 228.6cm 5. Portability a. Portability must be maintained while meeting all requirements in these specifications b. System must be self-contained on a movable skid/frame c. Skid/frame is to have lifting hole to allow forklift to move system d. Only permitted items to be disconnected for portability are: i. Power Source identified in 3.a.iv ii. Fluid connections identified in 3.b.i and 3.b.ii e. Drain reservoir/self-contained tank of water 6. Clearance Spacing. The following states minimum space must be provided between the system and an obstacle-- a. Side Clearances: Required clearance for any side of unit is not-to-exceed six and one-half feet (6.5’) or 1.98m b. Top Clearance: Required clearance for top of unit is not-to-exceed ten feet (10’) or 3.04m See attached vendor questions and answers (Q&A) from the technical evaluator.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA910124IndustrialWaterChiller","place_of_performance":{"zip":"37389","city":{"name":"Arnold AFB"},"state":{"code":"TN"},"country":{"code":"USA"}},"product_service_code":"4120"},{"dates":{"posted":"2024-06-06","response_deadline":{"raw":"2024-06-17T08:00:00-05:00","utc":"2024-06-17T13:00:00Z","date":"2024-06-17","time":"08:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c0dcb060bcfe44cfaa6ba9ad41350620/view"},"naics":{"codes":["333415"],"primary":"333415"},"title":"20-Ton Industrial Water Chiller","agency":{"office":{"code":"FA9101","name":"FA9101 AEDC PKP PROCRMNT BR"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"37389-1332","city":"ARNOLD AFB","state":"TN","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-31","archive_type":"auto_custom"},"contacts":[{"name":"Brogan Fullmer","role":"primary","email":"brogan.fullmer@us.af.mil"},{"name":"Brooke Vandeman","role":"secondary","email":"brooke.vandeman@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c0dcb060bcfe44cfaa6ba9ad41350620","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"0326f401b74513af8ab56aea7ba2bdb0307c59c31b062a244c11bae9d1ddf642","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Technical Specifications 20 Ton Industrial Water Chiller 1. General & Operational Data/Specifications a. Must be rated for continuous usage b. Ambient working limits: Minimum requirements are +14 Fahrenheit (?F) or -10 Celsius (°C) through +113 ?F or 45 °C c. Cooling capacity (Capacity based on 45 ?F or 7.22 °C water outlet temperature): 10 ?F or -12.22 °C delta at 95 ?F or 35 °C ambient temperature i. Twenty (20) tons, minimum capacity ii. 239,756 British thermal units (BTUs) per hour (BTUs/hr.), minimum capacity d. Must be designed to use water as a medium e. Cooling Water flow rate: 50 gallons per minute (GPM) or 189.27 liters (L), minimum flow rate f. Head Pressure: Fifty (50) pounds per square inch (PSI) at a flow rate of 46 gallons or 174.12L per minute (GPM) g. Refrigerant Type: R-410A h. Noise rating: Not-to-exceed 69 decibels (dBs) at thirty-two feet (32’) or 10 meters (m) 2. Reservoir/Self-Contained Water Tank: a. Fifty-five (55) gallon or 208.19L minimum capacity b. Chiller is to only operate using water contained in a reservoir/self-contained tank; an external water supply IS NOT required, except to fill the reservoir/self-contained tank. c. Tank is to be stainless steel. 3. Interfaces: a. Power Supply: i. Volts (V): 460V ii. Phase: Three (3) phase alternating current (AC) iii. Hertz (Hz): 60Hz iv. Full Load Amps (FLA): Maximum of 60 FLA b. Fluid Connections i. System water supply: male pipe thread (MPT) two inches (2”) or 5.08 centimeters (cm) ii. System water return: male pipe thread (MPT) two inches (2”) 5.08cm c. Filling reservoir/self-contained tank with drain 4. Weight & Dimensions: System must fit within below dimensions (Note, Reservoir/Self-Contained water tank is included in these measurements a. Dry Weight in pounds (lbs): Not-to-exceed two-thousand six-hundred sixty pounds (2,660 lbs) or 1206.55 kilograms (kg) b. Width: Not-to-exceed forty-five inches (45”) or 114.3cm c. Length/Depth: Not-to-exceed one-hundred inches (100”) 254cm d. Height: Not-to-exceed ninety inches (90”) 228.6cm 5. Portability a. Portability must be maintained while meeting all requirements in these specifications b. System must be self-contained on a movable skid/frame c. Skid/frame is to have lifting hole to allow forklift to move system d. Only permitted items to be disconnected for portability are: i. Power Source identified in 3.a.iv ii. Fluid connections identified in 3.b.i and 3.b.ii e. Drain reservoir/self-contained tank of water 6. Clearance Spacing. The following states minimum space must be provided between the system and an obstacle-- a. Side Clearances: Required clearance for any side of unit is not-to-exceed six and one-half feet (6.5’) or 1.98m b. Top Clearance: Required clearance for top of unit is not-to-exceed ten feet (10’) or 3.04m See attached vendor questions and answers (Q&A) from the technical evaluator.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA910124IndustrialWaterChiller","place_of_performance":{"zip":"37389","city":{"name":"Arnold AFB"},"state":{"code":"TN"},"country":{"code":"USA"}},"product_service_code":"4120"},{"award":{"date":"2024-07-03","amount":"78208.00","number":"FA910124PB047","awardee":{"raw":"TEXAS PATRIOT INTERNATIONAL, LLC Wylie TX 75098 USA","name":"TEXAS PATRIOT INTERNATIONAL, LLC Wylie","location":{"zip":"75098","state":{"code":"TX"},"country":{"code":"USA"}}}},"dates":{"posted":"2024-07-03","award_date":"2024-07-03"},"links":{"sam":"https://sam.gov/workspace/contract/opp/d23afe2720614f7385a93d9ab07630fa/view"},"naics":{"codes":["333415"],"primary":"333415"},"title":"20-Ton Industrial Water Chiller","agency":{"office":{"code":"FA9101","name":"FA9101 AEDC PKP PROCRMNT BR"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"37389-1332","city":"ARNOLD AFB","state":"TN","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-07-18","archive_type":"auto15"},"contacts":[{"name":"Brogan Fullmer","role":"primary","email":"brogan.fullmer@us.af.mil"},{"name":"Brooke Vandeman","role":"secondary","email":"brooke.vandeman@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d23afe2720614f7385a93d9ab07630fa","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"98c805672ade5089450c144f77772b6fc4eedcb5dc7a0311178472cc5a69d36f","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"FA910124IndustrialWaterChiller","place_of_performance":{"zip":"37389","city":{"name":"0"},"state":{"code":"TN"},"country":{"code":"USA"}},"product_service_code":"4120"}],"due_at":"2024-06-17T13:00:00Z","due_date":"2024-06-17","closes_at":"2024-06-17T13:00:00Z","awardable":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA9101","office_name":"FA9101 AEDC PKP PROCRMNT BR","state":"TN","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","winner_key":"RNQJCJMWSKB7","amount":"78208.00","linked_awards":1,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"c0dcb060bcfe44cfaa6ba9ad41350620","description":{"text":"Technical Specifications 20 Ton Industrial Water Chiller 1. General & Operational Data/Specifications a. Must be rated for continuous usage b. Ambient working limits: Minimum requirements are +14 Fahrenheit (?F) or -10 Celsius (°C) through +113 ?F or 45 °C c. Cooling capacity (Capacity based on 45 ?F or 7.22 °C water outlet temperature): 10 ?F or -12.22 °C delta at 95 ?F or 35 °C ambient temperature i. Twenty (20) tons, minimum capacity ii. 239,756 British thermal units (BTUs) per hour (BTUs/hr.), minimum capacity d. Must be designed to use water as a medium e. Cooling Water flow rate: 50 gallons per minute (GPM) or 189.27 liters (L), minimum flow rate f. Head Pressure: Fifty (50) pounds per square inch (PSI) at a flow rate of 46 gallons or 174.12L per minute (GPM) g. Refrigerant Type: R-410A h. Noise rating: Not-to-exceed 69 decibels (dBs) at thirty-two feet (32’) or 10 meters (m) 2. Reservoir/Self-Contained Water Tank: a. Fifty-five (55) gallon or 208.19L minimum capacity b. Chiller is to only operate using water contained in a reservoir/self-contained tank; an external water supply IS NOT required, except to fill the reservoir/self-contained tank. c. Tank is to be stainless steel. 3. Interfaces: a. Power Supply: i. Volts (V): 460V ii. Phase: Three (3) phase alternating current (AC) iii. Hertz (Hz): 60Hz iv. Full Load Amps (FLA): Maximum of 60 FLA b. Fluid Connections i. System water supply: male pipe thread (MPT) two inches (2”) or 5.08 centimeters (cm) ii. System water return: male pipe thread (MPT) two inches (2”) 5.08cm c. Filling reservoir/self-contained tank with drain 4. Weight & Dimensions: System must fit within below dimensions (Note, Reservoir/Self-Contained water tank is included in these measurements a. Dry Weight in pounds (lbs): Not-to-exceed two-thousand six-hundred sixty pounds (2,660 lbs) or 1206.55 kilograms (kg) b. Width: Not-to-exceed forty-five inches (45”) or 114.3cm c. Length/Depth: Not-to-exceed one-hundred inches (100”) 254cm d. Height: Not-to-exceed ninety inches (90”) 228.6cm 5. Portability a. Portability must be maintained while meeting all requirements in these specifications b. System must be self-contained on a movable skid/frame c. Skid/frame is to have lifting hole to allow forklift to move system d. Only permitted items to be disconnected for portability are: i. Power Source identified in 3.a.iv ii. Fluid connections identified in 3.b.i and 3.b.ii e. Drain reservoir/self-contained tank of water 6. Clearance Spacing. The following states minimum space must be provided between the system and an obstacle-- a. Side Clearances: Required clearance for any side of unit is not-to-exceed six and one-half feet (6.5’) or 1.98m b. Top Clearance: Required clearance for top of unit is not-to-exceed ten feet (10’) or 3.04m See attached vendor questions and answers (Q&A) from the technical evaluator.","html":null,"origin":"extract"},"contacts":[{"name":"Brogan Fullmer","role":"primary","email":"brogan.fullmer@us.af.mil"},{"name":"Brooke Vandeman","role":"secondary","email":"brooke.vandeman@us.af.mil"}],"place_of_performance":{"zip":"37389","city":{"name":"Arnold AFB"},"state":{"code":"TN"},"country":{"code":"USA"}},"office_address":{"zip":"37389-1332","city":"ARNOLD AFB","state":"TN","country":"USA"},"naics_codes":["333415"],"award":null,"attachments":[],"awards":[{"award_key":"CONT_AWD_FA910124PB047_9700_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_FA910124PB047_9700_-NONE-_-NONE-/","piid":"FA910124PB047","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"RNQJCJMWSKB7","recipient_name":"TEXAS PATRIOT INTERNATIONAL, LLC","recipient_uei":"RNQJCJMWSKB7","recipient_cage":"9PSC6","recipient_city":"WYLIE","recipient_state":"TX","sub_name":"Department of the Air Force","office_name":"FA9101 AEDC PKP PROCRMNT BR","office_key":"o-FA9101","first_action_date":"2024-07-03","last_action_date":"2024-07-03","actions":1,"obligated":"39104.00","current_total_value":"39104.00","potential_total_value":"78208.00","naics":"333415","psc":"4120","extent_competed":"COMPETED UNDER SAP","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":14,"description":"20 TON INDUSTRIAL WATER CHILLER","method":"piid","confidence":"high","evidence":["award number FA910124PB047 equals the contract number","same awarding office FA9101"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"FA9101PC104SINGLEBOARDCOMPUTER","latest_notice_id":"0656ce05cd4d430bb88717793c5c4a48","title":"PC 104 Single Board Computer","solicitation_number":"FA9101_PC104_SingleBoardComputer","notice_type":"r","first_type":"r","first_posted":"2026-09-14","last_posted":"2026-09-14","notices":1,"due_at":"2026-09-23T18:00:00Z","due_date":"2026-09-23","closes_at":"2026-09-23T18:00:00Z","awardable":true,"open":true,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA9101","office_name":"FA9101 AEDC PKP PROCRMNT BR","naics":"334418","psc":null,"set_aside":null,"state":"TN","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"FA9101269IAS","latest_notice_id":"783e13fa097747e38d1902abd698ee90","title":"RWP Independent Air Supply","solicitation_number":"FA9101269IAS","notice_type":"p","first_type":"p","first_posted":"2026-08-18","last_posted":"2026-09-08","notices":2,"due_at":"2026-09-23T19:00:00Z","due_date":"2026-09-23","closes_at":"2026-09-23T19:00:00Z","awardable":true,"open":true,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA9101","office_name":"FA9101 AEDC PKP PROCRMNT BR","naics":"541330","psc":"4310","set_aside":null,"state":"TN","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"FA9101269BH1HM","latest_notice_id":"237630eda2bc408cbbee8a8bc8eccfd8","title":"Request for White Paper - Heater Modernization","solicitation_number":"FA9101269BH1HM","notice_type":"p","first_type":"p","first_posted":"2026-08-24","last_posted":"2026-08-24","notices":1,"due_at":"2026-09-24T22:00:00Z","due_date":"2026-09-24","closes_at":"2026-09-24T22:00:00Z","awardable":true,"open":true,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA9101","office_name":"FA9101 AEDC PKP PROCRMNT BR","naics":"811310","psc":"J045","set_aside":null,"state":"TN","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"FA910126RCOOLERS","latest_notice_id":"008453b5201f490da62a0e3183fe907b","title":"Process Air Dehumidification Coolers & Process Air Exhaust Coolers","solicitation_number":"FA910126RCoolers","notice_type":"r","first_type":"r","first_posted":"2026-08-31","last_posted":"2026-08-31","notices":1,"due_at":"2026-09-30T19:00:00Z","due_date":"2026-09-30","closes_at":"2026-09-30T19:00:00Z","awardable":true,"open":true,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA9101","office_name":"FA9101 AEDC PKP PROCRMNT BR","naics":"332410","psc":"4420","set_aside":null,"state":"TN","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"FA910126RWPDIGITALTWINS","latest_notice_id":"8ead2f71356641a18bd46382d227600a","title":"Request for Whitepaper - AEDC Facility Digital Twins and Predictive Analytics","solicitation_number":"FA910126RWP-DigitalTwins","notice_type":"o","first_type":"o","first_posted":"2026-08-07","last_posted":"2026-09-10","notices":5,"due_at":"2026-10-08T18:00:00Z","due_date":"2026-10-08","closes_at":"2026-10-08T18:00:00Z","awardable":true,"open":true,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA9101","office_name":"FA9101 AEDC PKP PROCRMNT BR","naics":"541330","psc":"T013","set_aside":null,"state":"TN","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"}]}