# C-17 PSE Interface Unit, Automatic Data Processing

Canonical: https://abierto.us/opportunities/fa862624r0012

- Solicitation number: FA8626-24-R-0012
- Notice type: Solicitation
- Status: Closed. Deadline was June 12, 2024 at 5:00 PM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA8526 AFLCMC WLMK (FA8526)
- NAICS: 541512 Computer Systems Design Services
- Product or service code: 1560 Airframe Structural Components
- Set-aside: Total small business set-aside
- Place of performance: Warner Robins, Georgia
- County: Houston County (FIPS 13153). https://abierto.us/counties/houston-county-ga-13153
- City: Warner Robins. https://abierto.us/cities/warner-robins-ga-1380508
- First posted: March 13, 2024
- Last posted: June 7, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/5a552f80d56048e0b06a5eb7c014bcc6/view

## Description

* Update 06/07/2024* Requirement for Automatic Data Processing Interface Unit is being withdrawn at this time. Will update and repost at a later date. The C-17 Program Management Office has a requirement that is for a firm-fixed price contract for three (3) each NSN:

**7025-01-589-7067, Interface Unit, Automatic Data Processing, P/N:** 17G570827-1 which includes one First Article, one First Article Test Plan, and one First Article Test Report. The operational flight program loading system (OFPLS) currently provides capability to perform multiple operations on C-17 line replacement units (LRUS), both on and off the aircraft.

These operations include loading operational flight programs (OFPS), downloading, storing, or clearing non-volatile random access memory (NVRAM) fault data, and performing OFP integrity checks. The Interface Electrical Cable Assembly allows the communication of the ethernet and USB data between the support equipment computer and the adapter set. The main function is to reload OFP software to the LRU at the intermediate level of maintenance.

A means is required at organizational, intermediate, and depot levels of maintenance for a new adapter set that can resolve these obsolescence, the ruggedization concerns, and still be compatible with the current adapter set. This requirement will be solicited as a 100% small business set aside. All responsible sources may submit a quotation which shall be considered by the agency.

The Government will utilize the Past Performance Information Retrieval System (PPIRS), Excluded Parties List System (EPLS), and other Government databases to determine contractor status before evaluating proposals. Proposals will be evaluated based on the criteria stated in the RFP. All data for this weapon system is considered EXPORT CONTROLLED.

## Publications

- March 13, 2024: Solicitation, due April 12, 2024 at 5:00 PM EDT. Notice 86a3cfb2938142eeb397c84aed17804c. https://sam.gov/workspace/contract/opp/86a3cfb2938142eeb397c84aed17804c/view
- May 8, 2024: Solicitation, due May 30, 2024 at 5:00 PM EDT. Notice 6f315e4e7584487da0813ff72fc836e6. https://sam.gov/workspace/contract/opp/6f315e4e7584487da0813ff72fc836e6/view
- May 23, 2024: Solicitation, due June 21, 2024 at 5:00 PM EDT. Notice ad5d37b09d8147d39a0443a940767fef. https://sam.gov/workspace/contract/opp/ad5d37b09d8147d39a0443a940767fef/view
- May 23, 2024: Solicitation, due June 12, 2024 at 5:00 PM EDT. Notice b2e83bd88b384fbb8fefd6bf6278dd32. https://sam.gov/workspace/contract/opp/b2e83bd88b384fbb8fefd6bf6278dd32/view
- June 7, 2024: Solicitation, due June 12, 2024 at 5:00 PM EDT. Notice 076f94de91784d0487e07075a416a235. https://sam.gov/workspace/contract/opp/076f94de91784d0487e07075a416a235/view
- June 7, 2024: Solicitation, due June 12, 2024 at 5:00 PM EDT. Notice 5a552f80d56048e0b06a5eb7c014bcc6. https://sam.gov/workspace/contract/opp/5a552f80d56048e0b06a5eb7c014bcc6/view

## Points of contact

- Ana Winner, ana.winner@us.af.mil
- Aliscia Pitts, aliscia.pitts@us.af.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/fa862624r0012.
