{"canonical":"https://abierto.us/opportunities/fa489725r0008","key":"FA489725R0008","url":"https://abierto.us/opportunities/fa489725r0008","title":"Fire Alarm System Replacement, Mountain Home AFB","solicitation_number":"FA489725R0008","notice_type":"o","open":false,"response_deadline":"2026-01-28T19:00:00Z","first_posted":"2025-10-16","last_posted":"2026-01-14","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE AIR FORCE","office":"FA4897 366 CONS PKP","naics":"236220","psc":"Z2FZ","set_aside":null,"place_state":"ID","place_county":"16039","place_county_name":"Elmore County","place_city":"1654820","place_city_name":"Mountain Home AFB","winner":null,"award_amount":null,"publications":[{"notice_id":"5ad7bc725caa4a94a8a01f82464d11a1","title":"Fire Alarm System Replacement, Mountain Home AFB","solicitation_number":"FA489725R0008","notice_type":"o","base_type":"o","posted":"2025-10-16","posted_at":null,"due_at":"2025-12-01T22:00:00Z","due_date":"2025-12-01","cancelled":null,"archived":null,"archive_date":"2025-12-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5ad7bc725caa4a94a8a01f82464d11a1/view","enriched":false,"history":[]},{"notice_id":"792a9f991ffa43ec92132f500560b824","title":"Fire Alarm System Replacement, Mountain Home AFB","solicitation_number":"FA489725R0008","notice_type":"o","base_type":"o","posted":"2025-10-16","posted_at":null,"due_at":"2025-12-01T22:00:00Z","due_date":"2025-12-01","cancelled":null,"archived":null,"archive_date":"2026-12-01","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/792a9f991ffa43ec92132f500560b824/view","enriched":false,"history":[]},{"notice_id":"8fb859a3dde8474eabc02fc011ec960f","title":"Fire Alarm System Replacement, Mountain Home AFB","solicitation_number":"FA489725R0008","notice_type":"o","base_type":"o","posted":"2025-10-16","posted_at":null,"due_at":"2025-11-28T22:00:00Z","due_date":"2025-11-28","cancelled":null,"archived":null,"archive_date":"2025-12-28","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8fb859a3dde8474eabc02fc011ec960f/view","enriched":false,"history":[]},{"notice_id":"d23a1e3e4cc4434db390f87063781d6c","title":"Fire Alarm System Replacement, Mountain Home AFB","solicitation_number":"FA489725R0008","notice_type":"o","base_type":"o","posted":"2025-10-17","posted_at":null,"due_at":"2025-12-01T22:00:00Z","due_date":"2025-12-01","cancelled":null,"archived":null,"archive_date":"2026-12-01","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d23a1e3e4cc4434db390f87063781d6c/view","enriched":false,"history":[]},{"notice_id":"d332033df9314e069f677ab562017655","title":"Fire Alarm System Replacement, Mountain Home AFB","solicitation_number":"FA489725R0008","notice_type":"o","base_type":"o","posted":"2025-10-30","posted_at":null,"due_at":"2025-12-01T22:00:00Z","due_date":"2025-12-01","cancelled":null,"archived":null,"archive_date":"2026-12-01","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d332033df9314e069f677ab562017655/view","enriched":false,"history":[]},{"notice_id":"f712fa6b20014d1e9473440869efeb67","title":"Fire Alarm System Replacement, Mountain Home AFB","solicitation_number":"FA489725R0008","notice_type":"o","base_type":"o","posted":"2025-11-19","posted_at":null,"due_at":"2026-01-05T22:00:00Z","due_date":"2026-01-05","cancelled":null,"archived":null,"archive_date":"2027-01-05","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f712fa6b20014d1e9473440869efeb67/view","enriched":false,"history":[]},{"notice_id":"1adaadf959fa4b79932e778ef97a9bfc","title":"Fire Alarm System Replacement, Mountain Home AFB","solicitation_number":"FA489725R0008","notice_type":"o","base_type":"o","posted":"2025-12-01","posted_at":null,"due_at":"2026-01-20T22:00:00Z","due_date":"2026-01-20","cancelled":null,"archived":null,"archive_date":"2027-01-20","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1adaadf959fa4b79932e778ef97a9bfc/view","enriched":false,"history":[]},{"notice_id":"c293e07b263b4c75a3d6347a0c592e92","title":"Fire Alarm System Replacement, Mountain Home AFB","solicitation_number":"FA489725R0008","notice_type":"o","base_type":"o","posted":"2025-12-04","posted_at":null,"due_at":"2026-01-20T22:00:00Z","due_date":"2026-01-20","cancelled":null,"archived":null,"archive_date":"2027-01-20","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c293e07b263b4c75a3d6347a0c592e92/view","enriched":false,"history":[]},{"notice_id":"6801385ead6d4e9392a1247905dd52ba","title":"Fire Alarm System Replacement, Mountain Home AFB","solicitation_number":"FA489725R0008","notice_type":"o","base_type":"o","posted":"2025-12-19","posted_at":null,"due_at":"2026-01-20T22:00:00Z","due_date":"2026-01-20","cancelled":null,"archived":null,"archive_date":"2027-01-20","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/6801385ead6d4e9392a1247905dd52ba/view","enriched":false,"history":[]},{"notice_id":"44cefcf25f8b48e5ad63effff73c5b90","title":"Fire Alarm System Replacement, Mountain Home AFB","solicitation_number":"FA489725R0008","notice_type":"o","base_type":"o","posted":"2026-01-14","posted_at":null,"due_at":"2026-01-28T19:00:00Z","due_date":"2026-01-28","cancelled":null,"archived":null,"archive_date":"2027-01-28","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/44cefcf25f8b48e5ad63effff73c5b90/view","enriched":false,"history":[]}],"latest_notice_id":"44cefcf25f8b48e5ad63effff73c5b90","first_type":"o","notices":[{"dates":{"posted":"2025-10-16","response_deadline":{"raw":"2025-12-01T15:00:00-07:00","utc":"2025-12-01T22:00:00Z","date":"2025-12-01","time":"15:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5ad7bc725caa4a94a8a01f82464d11a1/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fire Alarm System Replacement, Mountain Home AFB","agency":{"office":{"code":"FA4897","name":"FA4897 366 CONS PKP"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"83648-5296","city":"MOUNTAIN HOME AFB","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Cameron Smith","role":"primary","email":"cameron.smith.16@us.af.mil","phone":"2088280743"},{"name":"Konrad Zirkle","role":"secondary","email":"konrad.zirkle.1@us.af.mil","phone":"2088286478"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5ad7bc725caa4a94a8a01f82464d11a1","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T17:45:38.712931Z","row_sha256":"be1c4ded0e1db9f6aaf0552eddd669f51cad710aa62f2df9e9957544ac568f12","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T17:45:38.712931Z","first_seen_at":"2026-09-16T17:45:38.712931Z"},"description":{"text":"Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all \"if applicable\" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. A site visit for any interested parties will be held on October 31st, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Nov 7, 2025. Proposals must be submitted no later than 3:00 PM local (Mountain), November 28, 2025. Questions shall be directed to both POCs.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA489725R0008","place_of_performance":{"zip":"83648","city":{"name":"Mountain Home AFB"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"J063"},{"dates":{"posted":"2025-10-16","response_deadline":{"raw":"2025-12-01T15:00:00-07:00","utc":"2025-12-01T22:00:00Z","date":"2025-12-01","time":"15:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/792a9f991ffa43ec92132f500560b824/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fire Alarm System Replacement, Mountain Home AFB","agency":{"office":{"code":"FA4897","name":"FA4897 366 CONS PKP"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"83648-5296","city":"MOUNTAIN HOME AFB","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2026-12-01","archive_type":"auto_custom"},"contacts":[{"name":"Cameron Smith","role":"primary","email":"cameron.smith.16@us.af.mil","phone":"2088280743"},{"name":"Konrad Zirkle","role":"secondary","email":"konrad.zirkle.1@us.af.mil","phone":"2088286478"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"792a9f991ffa43ec92132f500560b824","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T17:45:38.712931Z","row_sha256":"39b1ead9b644289e900dff33183071431e7e7ea9dee5adcf0f7f0160bf13cd47","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T17:45:38.712931Z","first_seen_at":"2026-09-16T17:45:38.712931Z"},"description":{"text":"Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all \"if applicable\" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. A site visit for any interested parties will be held on October 31st, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Nov 17, 2025. Proposals must be submitted no later than 3:00 PM local (Mountain), Dec 1, 2025. Questions shall be directed to both POCs.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA489725R0008","place_of_performance":{"zip":"83648","city":{"name":"Mountain Home AFB"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"J063"},{"dates":{"posted":"2025-10-16","response_deadline":{"raw":"2025-11-28T15:00:00-07:00","utc":"2025-11-28T22:00:00Z","date":"2025-11-28","time":"15:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8fb859a3dde8474eabc02fc011ec960f/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fire Alarm System Replacement, Mountain Home AFB","agency":{"office":{"code":"FA4897","name":"FA4897 366 CONS PKP"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"83648-5296","city":"MOUNTAIN HOME AFB","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2025-12-28","archive_type":"auto_custom"},"contacts":[{"name":"Cameron Smith","role":"primary","email":"cameron.smith.16@us.af.mil","phone":"2088280743"},{"name":"Konrad Zirkle","role":"secondary","email":"konrad.zirkle.1@us.af.mil","phone":"2088286478"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"8fb859a3dde8474eabc02fc011ec960f","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T17:45:38.712931Z","row_sha256":"9d3e2531213a0c501bbd56ac020c3d21282ae917e6548ae885784339bce9e170","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T17:45:38.712931Z","first_seen_at":"2026-09-16T17:45:38.712931Z"},"description":{"text":"Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all \"if applicable\" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. A site visit for any interested parties will be held on October 31st, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Nov 7, 2025. Proposals must be submitted no later than 3:00 PM local (Mountain), November 28, 2025. Questions shall be directed to both POCs.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA489725R0008","place_of_performance":{"zip":"83648","city":{"name":"Mountain Home AFB"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"J063"},{"dates":{"posted":"2025-10-17","response_deadline":{"raw":"2025-12-01T15:00:00-07:00","utc":"2025-12-01T22:00:00Z","date":"2025-12-01","time":"15:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d23a1e3e4cc4434db390f87063781d6c/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fire Alarm System Replacement, Mountain Home AFB","agency":{"office":{"code":"FA4897","name":"FA4897 366 CONS PKP"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"83648-5296","city":"MOUNTAIN HOME AFB","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2026-12-01","archive_type":"auto_custom"},"contacts":[{"name":"Cameron Smith","role":"primary","email":"cameron.smith.16@us.af.mil","phone":"2088280743"},{"name":"Konrad Zirkle","role":"secondary","email":"konrad.zirkle.1@us.af.mil","phone":"2088286478"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d23a1e3e4cc4434db390f87063781d6c","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T17:45:38.712931Z","row_sha256":"ddc769829f622aaebc0b67f1a9f6d2cc2753c9b2c4c8309888f45b5c531c377b","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T17:45:38.712931Z","first_seen_at":"2026-09-16T17:45:38.712931Z"},"description":{"text":"Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all \"if applicable\" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. A site visit for any interested parties will be held on November 3rd, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Nov 17, 2025. Proposals must be submitted no later than 3:00 PM local (Mountain), Dec 1, 2025. Questions shall be directed to both POCs.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA489725R0008","place_of_performance":{"zip":"83648","city":{"name":"Mountain Home AFB"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"J063"},{"dates":{"posted":"2025-10-30","response_deadline":{"raw":"2025-12-01T15:00:00-07:00","utc":"2025-12-01T22:00:00Z","date":"2025-12-01","time":"15:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d332033df9314e069f677ab562017655/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fire Alarm System Replacement, Mountain Home AFB","agency":{"office":{"code":"FA4897","name":"FA4897 366 CONS PKP"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"83648-5296","city":"MOUNTAIN HOME AFB","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2026-12-01","archive_type":"auto_custom"},"contacts":[{"name":"Cameron Smith","role":"primary","email":"cameron.smith.16@us.af.mil","phone":"2088280743"},{"name":"Konrad Zirkle","role":"secondary","email":"konrad.zirkle.1@us.af.mil","phone":"2088286478"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d332033df9314e069f677ab562017655","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T17:45:38.712931Z","row_sha256":"73beb5f35b609e7a8a2c8d0ef90e6e04556e899a3408c30414f370a966a10ebc","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T17:45:38.712931Z","first_seen_at":"2026-09-16T17:45:38.712931Z"},"description":{"text":"Amendment: RFIs: RFI responses uploaded as an attachment. Site Visit: All interested parties will need to meet at the visitor's center at 1330 local (MST) to acquire day passes and we will go to the site afterwards. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 1400 local time (MST). Idaho Contractor Registration: Removed this requirement. Construction start date: No earlier than 1 June, 2026 Contact info: The phone number for SSgt Smith was input incorrectly. His phone contact number is 208-828-0743 Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all \"if applicable\" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. A site visit for any interested parties will be held on November 3rd, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Nov 17, 2025. Proposals must be submitted no later than 3:00 PM local (Mountain), Dec 1, 2025. Questions shall be directed to both POCs.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA489725R0008","place_of_performance":{"zip":"83648","city":{"name":"Mountain Home AFB"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"J063"},{"dates":{"posted":"2025-11-19","response_deadline":{"raw":"2026-01-05T15:00:00-07:00","utc":"2026-01-05T22:00:00Z","date":"2026-01-05","time":"15:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f712fa6b20014d1e9473440869efeb67/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fire Alarm System Replacement, Mountain Home AFB","agency":{"office":{"code":"FA4897","name":"FA4897 366 CONS PKP"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"83648-5296","city":"MOUNTAIN HOME AFB","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2027-01-05","archive_type":"auto_custom"},"contacts":[{"name":"Cameron Smith","role":"primary","email":"cameron.smith.16@us.af.mil","phone":"2088280743"},{"name":"Konrad Zirkle","role":"secondary","email":"konrad.zirkle.1@us.af.mil","phone":"2088286478"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"f712fa6b20014d1e9473440869efeb67","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T17:45:38.712931Z","row_sha256":"f32bfc8e40b5db3cc461c2e778659a57bb79281788976151139802b018a8adc9","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T17:45:38.712931Z","first_seen_at":"2026-09-16T17:45:38.712931Z"},"description":{"text":"Notice: Due to a number of RFIs and the government working to clarify the requirement, a new proposal due date, RFI due date, and a secondary site visit will be provided within the week. The new proposal due date will be no earlier than 05 Jan 2026. Amendment: RFIs: RFI responses uploaded as an attachment. Site Visit: All interested parties will need to meet at the visitor's center at 1330 local (MST) to acquire day passes and we will go to the site afterwards. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 1400 local time (MST). Idaho Contractor Registration: Removed this requirement. Construction start date: No earlier than 1 June, 2026 Contact info: The phone number for SSgt Smith was input incorrectly. His phone contact number is 208-828-0743 Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all \"if applicable\" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. A site visit for any interested parties will be held on November 3rd, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Nov 17, 2025. Proposals must be submitted no later than 3:00 PM local (Mountain), Dec 1, 2025. Questions shall be directed to both POCs.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA489725R0008","place_of_performance":{"zip":"83648","city":{"name":"Mountain Home AFB"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"J063"},{"dates":{"posted":"2025-12-01","response_deadline":{"raw":"2026-01-20T15:00:00-07:00","utc":"2026-01-20T22:00:00Z","date":"2026-01-20","time":"15:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1adaadf959fa4b79932e778ef97a9bfc/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fire Alarm System Replacement, Mountain Home AFB","agency":{"office":{"code":"FA4897","name":"FA4897 366 CONS PKP"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"83648-5296","city":"MOUNTAIN HOME AFB","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2027-01-20","archive_type":"auto_custom"},"contacts":[{"name":"Cameron Smith","role":"primary","email":"cameron.smith.16@us.af.mil","phone":"2088280743"},{"name":"Taylor Inman","role":"secondary","email":"taylor.inman.1@us.af.mil","phone":"2088280313"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"1adaadf959fa4b79932e778ef97a9bfc","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T17:45:38.712931Z","row_sha256":"260e3f20a80fb84ab822e914a6175ae163e495950ce1395611b2a77bc4330146","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T17:45:38.712931Z","first_seen_at":"2026-09-16T17:45:38.712931Z"},"description":{"text":"Amendment #2: This solicitation has been extended in order to allow for sufficient time for any interested party to submit a proposal as well as attend a site visit. Please see below for pertinent information. RFIs: RFI responses will be uploaded as soon as possible, but are not ready yet. When the questions are uploaded, another amendment will likely follow to update evaluation factors. We want to make this solicitation as competitive as possible, so there will likely be changes to evaluation factors C Nov 3rd Site Visit sign-in included in attachments Additional CAD drawings are available upon request. SAM will not allow for uploading of these documents. Construction start date: No earlier than 1 June, 2026 Contact info: The phone number for SSgt Smith was input incorrectly on the solicitation document. His contact number is 208-828-0743 Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all \"if applicable\" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. Site Visit: A site visit for any interested parties will be held on January 6th, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. All interested parties will need to meet at the visitor's center at 1330 local (MST) to acquire day passes if you do not have base access already. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 1400 local time (MST). Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Jan 12th, 2026 Proposals must be submitted no later than 3:00 PM local (Mountain), Jan 20th, 2026 Questions shall be directed to both POCs.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA489725R0008","place_of_performance":{"zip":"83648","city":{"name":"Mountain Home AFB"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"J063"},{"dates":{"posted":"2025-12-04","response_deadline":{"raw":"2026-01-20T15:00:00-07:00","utc":"2026-01-20T22:00:00Z","date":"2026-01-20","time":"15:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c293e07b263b4c75a3d6347a0c592e92/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fire Alarm System Replacement, Mountain Home AFB","agency":{"office":{"code":"FA4897","name":"FA4897 366 CONS PKP"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"83648-5296","city":"MOUNTAIN HOME AFB","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2027-01-20","archive_type":"auto_custom"},"contacts":[{"name":"Cameron Smith","role":"primary","email":"cameron.smith.16@us.af.mil","phone":"2088280743"},{"name":"Taylor Inman","role":"secondary","email":"taylor.inman.1@us.af.mil","phone":"2088280313"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c293e07b263b4c75a3d6347a0c592e92","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T17:45:38.712931Z","row_sha256":"d291a0c62ef8ddd8c8b5d708e140527a8be6340e3d3500b46e805aab2f05d01e","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T17:45:38.712931Z","first_seen_at":"2026-09-16T17:45:38.712931Z"},"description":{"text":"Amendment #2: (Clerical errors corrected on 04 Dec, 2025) This solicitation has been extended in order to allow for sufficient time for any interested party to submit a proposal as well as attend a site visit. Please see below for pertinent information. RFIs: RFI responses will be uploaded as soon as possible, but are not ready yet. When the questions are uploaded, another amendment will likely follow to update evaluation factors. We want to make this solicitation as competitive as possible, so there will likely be changes to evaluation factors C Nov 3rd Site Visit sign-in included in attachments Additional CAD drawings are available upon request. SAM will not allow for uploading of these documents. Construction start date: No earlier than 1 June, 2026 Contact info: The phone number for SSgt Smith was input incorrectly on the solicitation document. His contact number is 208-828-0743 Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all \"if applicable\" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. Site Visit: A site visit for any interested parties will be held on January 6th, 2026 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. All interested parties will need to meet at the visitor's center at 1330 local (MST) to acquire day passes if you do not have base access already. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 1400 local time (MST). Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Jan 12th, 2026 Proposals must be submitted no later than 3:00 PM local (Mountain), Jan 20th, 2026 Questions shall be directed to both POCs.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA489725R0008","place_of_performance":{"zip":"83648","city":{"name":"Mountain Home AFB"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"J063"},{"dates":{"posted":"2025-12-19","response_deadline":{"raw":"2026-01-20T15:00:00-07:00","utc":"2026-01-20T22:00:00Z","date":"2026-01-20","time":"15:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/6801385ead6d4e9392a1247905dd52ba/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fire Alarm System Replacement, Mountain Home AFB","agency":{"office":{"code":"FA4897","name":"FA4897 366 CONS PKP"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"83648-5296","city":"MOUNTAIN HOME AFB","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2027-01-20","archive_type":"auto_custom"},"contacts":[{"name":"Cameron Smith","role":"primary","email":"cameron.smith.16@us.af.mil","phone":"2088280743"},{"name":"Taylor Inman","role":"secondary","email":"taylor.inman.1@us.af.mil","phone":"2088280313"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"6801385ead6d4e9392a1247905dd52ba","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T17:45:38.712931Z","row_sha256":"42419e10ff654a404c9e7052e45fccd71a0f4c4ad030b6d2efb4bd4d029b8466","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T17:45:38.712931Z","first_seen_at":"2026-09-16T17:45:38.712931Z"},"description":{"text":"Amendment #3 (RFI's answered, SOW adjusted) Additional drawings have been uploaded as PDF - \"(09) B2320 Drawing\" No other drawings are available. Construction start date: No earlier than 1 June, 2026 The incongruency between the SF1442 solicitation number and the number on SAM is an error we cannot fix. Submissions with the SF1442 solicitation number is correct. E-mails with either number will be accepted and responded to. Contact info: The phone number for SSgt Smith was input incorrectly on the solicitation document. His contact number is 208-828-0743 The United States Government (USG) has a requirement for design-build services set forth under this contract at Mountain Home Air Force Base (MHAFB) to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (without hazardous material survey for asbestos and lead-based paints, as per the MHAFB environmental office.), and proposed construction project schedule; followed by construction services to include demolition; new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all \"if applicable\" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. Site Visit: A site visit for any interested parties will be held on January 6th, 2026 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. All interested parties will need to meet at the visitor's center at 1:30 PM local (MST) to acquire day passes if you do not have base access already. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 2:00 PM local time (MST). Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Jan 12th, 2026 Proposals must be submitted no later than 3:00 PM local (Mountain), Jan 20th, 2026 Questions shall be directed to both POCs.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA489725R0008","place_of_performance":{"zip":"83648","city":{"name":"Mountain Home AFB"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"J063"},{"dates":{"posted":"2026-01-14","response_deadline":{"raw":"2026-01-28T12:00:00-07:00","utc":"2026-01-28T19:00:00Z","date":"2026-01-28","time":"12:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/44cefcf25f8b48e5ad63effff73c5b90/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fire Alarm System Replacement, Mountain Home AFB","agency":{"office":{"code":"FA4897","name":"FA4897 366 CONS PKP"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"83648-5296","city":"MOUNTAIN HOME AFB","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2027-01-28","archive_type":"auto_custom"},"contacts":[{"name":"Cameron Smith","role":"primary","email":"cameron.smith.16@us.af.mil"},{"name":"Taylor Inman","role":"secondary","email":"taylor.inman.1@us.af.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"44cefcf25f8b48e5ad63effff73c5b90","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T16:22:40.277975Z","row_sha256":"6c817b2217605676570eb78b027e229232764eb50a360bbca5fc0469fc4ae95c","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T16:22:40.277975Z","first_seen_at":"2026-09-16T16:22:40.277975Z"},"description":{"text":"Amendment 0003 (04 in SAM) -Solicitation has been extended one final time to allow adequate time for responses to RFI Responses (03) -SOW has been updated to reflect responses to RFIs and site visit remarks. -PSC has been updated. -RFI Responses (03) has been uploaded. The United States Government (USG) has a requirement for design-build services set forth under this contract at Mountain Home Air Force Base (MHAFB) to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (without hazardous material survey for asbestos and lead-based paints, as per the MHAFB environmental office.), and proposed construction project schedule; followed by construction services to include demolition; new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all \"if applicable\" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. Site Visit: A site visit for any interested parties will be held on January 6th, 2026 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. All interested parties will need to meet at the visitor's center at 1:30 PM local (MST) to acquire day passes if you do not have base access already. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 2:00 PM local time (MST). Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Jan 12th, 2026 Proposals must be submitted no later than 12:00 PM local (Mountain), Jan 28th, 2026 Questions shall be directed to both POCs.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"FA489725R0008","place_of_performance":{"zip":"83648","city":{"name":"Mountain Home AFB"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"Z2FZ"}],"due_at":"2026-01-28T19:00:00Z","due_date":"2026-01-28","closes_at":"2026-01-28T19:00:00Z","awardable":true,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4897","office_name":"FA4897 366 CONS PKP","state":"ID","county":"16039","county_name":"Elmore County","city":"1654820","city_name":"Mountain Home AFB","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"44cefcf25f8b48e5ad63effff73c5b90","description":{"text":"Amendment 0003 (04 in SAM) -Solicitation has been extended one final time to allow adequate time for responses to RFI Responses (03) -SOW has been updated to reflect responses to RFIs and site visit remarks. -PSC has been updated. -RFI Responses (03) has been uploaded. The United States Government (USG) has a requirement for design-build services set forth under this contract at Mountain Home Air Force Base (MHAFB) to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (without hazardous material survey for asbestos and lead-based paints, as per the MHAFB environmental office.), and proposed construction project schedule; followed by construction services to include demolition; new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all \"if applicable\" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. Site Visit: A site visit for any interested parties will be held on January 6th, 2026 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. All interested parties will need to meet at the visitor's center at 1:30 PM local (MST) to acquire day passes if you do not have base access already. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 2:00 PM local time (MST). Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Jan 12th, 2026 Proposals must be submitted no later than 12:00 PM local (Mountain), Jan 28th, 2026 Questions shall be directed to both POCs.","html":null,"origin":"extract"},"contacts":[{"name":"Cameron Smith","role":"primary","email":"cameron.smith.16@us.af.mil"},{"name":"Taylor Inman","role":"secondary","email":"taylor.inman.1@us.af.mil"}],"place_of_performance":{"zip":"83648","city":{"name":"Mountain Home AFB"},"state":{"code":"ID"},"country":{"code":"USA"}},"office_address":{"zip":"83648-5296","city":"MOUNTAIN HOME AFB","state":"ID","country":"USA"},"naics_codes":["236220"],"award":null,"attachments":[],"awards":[],"related":[{"key":"FA489726Q0031","latest_notice_id":"3b334a2ed77e459787d4bb176347f7cf","title":"Building 2422 Painting","solicitation_number":"FA489726Q0031","notice_type":"k","first_type":"k","first_posted":"2026-09-03","last_posted":"2026-09-14","notices":2,"due_at":"2026-09-17T20:00:00Z","due_date":"2026-09-17","closes_at":"2026-09-17T20:00:00Z","awardable":true,"open":true,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4897","office_name":"FA4897 366 CONS PKP","naics":"238320","psc":"Z1FZ","set_aside":"SBA","state":"ID","county":"16039","county_name":"Elmore County","city":"1654820","city_name":"Mountain Home AFB","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"FA489726Q0025","latest_notice_id":"c715987567744da3ad8290068cdb0f57","title":"Renovate Base Chapel","solicitation_number":"FA489726Q0025","notice_type":"k","first_type":"k","first_posted":"2026-07-22","last_posted":"2026-09-10","notices":8,"due_at":"2026-09-18T20:00:00Z","due_date":"2026-09-18","closes_at":"2026-09-18T20:00:00Z","awardable":true,"open":true,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4897","office_name":"FA4897 366 CONS PKP","naics":"236220","psc":"Z2FE","set_aside":"SDVOSBC","state":"ID","county":"16039","county_name":"Elmore County","city":"1654820","city_name":"Mountain Home AFB","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"}]}