{"canonical":"https://abierto.us/opportunities/fa449726airfield","key":"FA449726AIRFIELD","url":"https://abierto.us/opportunities/fa449726airfield","title":"Repair Transit Ramp Asphalt Phase 1","solicitation_number":"FA449726AIRFIELD","notice_type":"r","open":false,"response_deadline":"2025-08-25T16:00:00Z","first_posted":"2025-08-11","last_posted":"2025-08-11","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE AIR FORCE","office":"FA4497 436 CONS LGC","naics":"237310","psc":"Z2BD","set_aside":"SBA","place_state":"DE","place_county":"10001","place_county_name":"Kent County","place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"2948a0bc2d9541cd9cf82c0970ee00e4","title":"Repair Transit Ramp Asphalt Phase 1","solicitation_number":"FA449726AIRFIELD","notice_type":"r","base_type":"r","posted":"2025-08-11","posted_at":null,"due_at":"2025-08-25T16:00:00Z","due_date":"2025-08-25","cancelled":null,"archived":null,"archive_date":"2025-09-09","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2948a0bc2d9541cd9cf82c0970ee00e4/view","enriched":false,"history":[]}],"latest_notice_id":"2948a0bc2d9541cd9cf82c0970ee00e4","first_type":"r","notices":[{"dates":{"posted":"2025-08-11","response_deadline":{"raw":"2025-08-25T12:00:00-04:00","utc":"2025-08-25T16:00:00Z","date":"2025-08-25","time":"12:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2948a0bc2d9541cd9cf82c0970ee00e4/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Repair Transit Ramp Asphalt Phase 1","agency":{"office":{"code":"FA4497","name":"FA4497 436 CONS LGC"},"subtier":{"code":"5700","name":"DEPT OF THE AIR FORCE"},"department":{"code":"057","name":"DEPT OF DEFENSE"},"office_address":{"zip":"19902-5016","city":"DOVER AFB","state":"DE","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-09-09","archive_type":"auto15"},"contacts":[{"name":"SSgt Mariah Thompson","role":"primary","email":"mariah.thompson@us.af.mil"},{"name":"SSgt Luis Rivera","role":"secondary","email":"luis.rivera_morales@us.af.mil."}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"2948a0bc2d9541cd9cf82c0970ee00e4","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"528964716c2c066f6c554fb0123a9b21274feaddd34be74c126d80cea6ef08e3","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"The project consists of providing all labor, materials and equipment necessary to perform repair of Transient Ramp Phase 1. The scope of work includes the following tasks: saw cutting, milling 2 inches of existing asphalt, repaving with 2 inches of PG 76-22 FAA Mix, sealing edges, and restriping the affected areas, including wingtip lines adjacent to Taxi Lane Alpha. These requirements are detailed in the Statement of Work (SOW).","origin":"extract"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"FA449726AIRFIELD","place_of_performance":{"zip":"19902","city":{"name":"Dover AFB"},"state":{"code":"DE"},"country":{"code":"USA"}},"product_service_code":"Z2BD"}],"due_at":"2025-08-25T16:00:00Z","due_date":"2025-08-25","closes_at":"2025-08-25T16:00:00Z","awardable":true,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4497","office_name":"FA4497 436 CONS LGC","state":"DE","county":"10001","county_name":"Kent County","city":null,"city_name":null,"country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"2948a0bc2d9541cd9cf82c0970ee00e4","description":{"text":"The project consists of providing all labor, materials and equipment necessary to perform repair of Transient Ramp Phase 1. The scope of work includes the following tasks: saw cutting, milling 2 inches of existing asphalt, repaving with 2 inches of PG 76-22 FAA Mix, sealing edges, and restriping the affected areas, including wingtip lines adjacent to Taxi Lane Alpha. These requirements are detailed in the Statement of Work (SOW).","html":null,"origin":"extract"},"contacts":[{"name":"SSgt Mariah Thompson","role":"primary","email":"mariah.thompson@us.af.mil"},{"name":"SSgt Luis Rivera","role":"secondary","email":"luis.rivera_morales@us.af.mil."}],"place_of_performance":{"zip":"19902","city":{"name":"Dover AFB"},"state":{"code":"DE"},"country":{"code":"USA"}},"office_address":{"zip":"19902-5016","city":"DOVER AFB","state":"DE","country":"USA"},"naics_codes":["237310"],"award":null,"attachments":[],"awards":[],"related":[]}