# 66 ABG/SC Giant Voice RTU Relocation

Canonical: https://abierto.us/opportunities/fa283526q0020

- Solicitation number: FA283526Q0020
- Notice type: Combined synopsis and solicitation
- Status: Closed. Deadline was August 10, 2026 at 12:00 PM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA2835 AFLCMC Hanscom Pzi (FA2835)
- NAICS: 811210 Electronic and Precision Equipment Repair and Maintenance
- Product or service code: J063 Maintenance, Repair and Rebuilding of Equipment: Alarm, Signal, and Security Detection Systems
- Set-aside: Total small business set-aside
- Place of performance: Hanscom AFB, Massachusetts
- First posted: July 15, 2026
- Last posted: July 21, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/d22e95074214486397413e46cace23e9/view

## Description

Relocate one (1) Giant Voice (GV) Remote Terminal Unit (RTU) from the 3rd floor of building 1108. This RTU is one of six RTUs that are part of the base-wide ATI Mass Alert system, which is controlled by two Central Control Units (REACT 5000s). The Contractor shall provide all specialized labor, materials, tools, equipment, and supervision required to safely power down, physically transport, re-install, and re-integrate the system.

The objective is to ensure the RTU is restored to Full Operational Capability (FOC) in the new location. This includes the proper handling of all associated radio frequency (RF) cabling, network connections, power configurations, and grounding systems, as well as conducting comprehensive post-move testing and optimization to verify system integrity.

**NOTE:** (Amended) A site visit is scheduled for 30 July 2026 at 9:00am EST at Hanscom AFB, MA. You MUST register prior to attending. Registration to attend the site vist must be provided to kennethea.berry.1@us.af.mil and anthony.coit@us.af.mil, no later than, Tuesday 28 July 2026 at 9:00am, see attached for registration form. Attendance at the site visit is mandatory for a quote to be considered technically acceptable. A physical site survey is critical for this effort.

The vendor must personally inspect both the current and future locations of the unit to evaluate the existing infrastructure. Additionally, the vendor must take precise physical measurements for cable lengths and directly assess the available power utilities to ensure technical feasibility.

## Publications

- July 15, 2026: Combined synopsis and solicitation, due August 10, 2026 at 12:00 PM EDT. Notice 74efa284a2b944a68a94b9a40e2e8cdf. https://sam.gov/workspace/contract/opp/74efa284a2b944a68a94b9a40e2e8cdf/view
- July 21, 2026: Combined synopsis and solicitation, due August 10, 2026 at 12:00 PM EDT. Notice d22e95074214486397413e46cace23e9. https://sam.gov/workspace/contract/opp/d22e95074214486397413e46cace23e9/view

## Points of contact

- Kennethea Berry, kennethea.berry.1@us.af.mil
- Anthony Coit, anthony.coit@us.af.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/fa283526q0020.
