# Uninterrupped Power Supply (UPS) Battery Replacement Service

Canonical: https://abierto.us/opportunities/f3yceb5099a104

- Solicitation number: F3YCEB5099A104
- Notice type: Presolicitation
- Status: Closed. Deadline was May 1, 2025 at 5:00 PM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA8125 AFSC Pzima (FA8125)
- NAICS: 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
- Product or service code: J061 Maintenance, Repair and Rebuilding of Equipment: Electric Wire, and Power and Distribution Equipment
- Set-aside: Total small business set-aside
- Place of performance: Tinker AFB, Oklahoma
- First posted: April 29, 2025
- Last posted: April 29, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/c3baf7a23786403e8393bfd22522b939/view

## Description

** THIS IS A PRE-SOLICITATION NOTICE. NO QUOTES WILL BE ACCEPTED UNTIL THE REQUEST FOR QUOTE (RFQ) IS POSTED. ** Requested Services: 76 CMXG request an annual contract for Preventative Maintenance (PM) for the Uninterrupted Power Supply (UPS) Systems every six (6) months and Battery replacement per battery replacement schedule in accordance with Appendix A. This replacement shall be coordinated with the Government Point of Contact (GPOC) prior to arriving on base.

The objective of PM is to protect the equipment capability and investment by removing causes of failure, performing routine maintenance and providing adjustment to compensate for normal wear before failure occurs. The Contractor shall perform all PM’s IAW the OEM specifications. The Contractor shall perform two (2) PM’s per year on each item listed in Appendix A. The Contractor shall provide a copy of the PM schedule to the GPOC within ten (10) business days after contract award.

The Contractor shall notify the GPOC seven (7) business days prior to each scheduled PM visit. The contractor shall inspect and test any inoperative batteries as needed during the PM function. The Contractor shall remove any dead or expired batteries and install new batteries. The Contractor shall be responsible for providing a forklift to load and unload batteries. The government is contemplating a firm-fixed price type contract with one (1) base year and four (4) option years. This will be 100% small business set-aside. NAICS – 811310;

**Size Standard – $12.5M Requirements for Award:** System for Award Management (SAM) is required to receive any award. Contractors can register electronically at https://sam.gov/content/home.

**NIST SP 800-171 DoD Assessment:** Vendors/Contractors required to implement NIST SP 800-171, in accordance with the DFARS clause 252.204-7012, Safeguarding Covered Defense Information and Cyber incident Reporting, are required at the time of award to have at least a Basic NIST SP 800-171 DoD Assessment that is current (not more than 3 years old) (see DFARS 252.204-7019).

## Publications

- April 29, 2025: Presolicitation, due May 1, 2025 at 5:00 PM EDT. Notice c3baf7a23786403e8393bfd22522b939. https://sam.gov/workspace/contract/opp/c3baf7a23786403e8393bfd22522b939/view

## Points of contact

- Tran Tran, PCO, Tran.Tran.1@us.af.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/f3yceb5099a104.
