# Vindicator System Upgrade

Canonical: https://abierto.us/opportunities/f3st784219a001

- Solicitation number: F3ST784219A001
- Notice type: Solicitation (first published as sources sought)
- Status: Closed. Deadline was September 27, 2024 at 3:00 PM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA4407 375 Cons LGC (FA4407)
- NAICS: 561621 Security Systems Services (except Locksmiths)
- Product or service code: 6350 Miscellaneous Alarm, Signal, and Security Detection Systems
- Set-aside: Total small business set-aside
- Place of performance: Scott AFB, Illinois
- County: St. Clair County (FIPS 17163). https://abierto.us/counties/st-clair-county-il-17163
- City: Scott AFB. https://abierto.us/cities/scott-afb-il-1768328
- First posted: September 5, 2024
- Last posted: September 25, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/f04f2c0a2c6441f684f355fdafe8db1e/view

## Description

**Optional Site Visit:** If you are interested in a site visit, please send A1C Calica an email at neil.calica@us.af.mil no later than 26 September 2024 by 9:00 am Central Standard Time (CST). A site visit is scheduled for 26 September 2024 at 2:30 pm CST. If we do not receive any interests in a site visit by 9:00 am on 26 September 2024, the site visit will be cancelled. The Contractor shall provide all labor, equipment, tools, materials, supplies and supervision to include all consumable items, transportation and other items and services necessary to provide and install the following:

One (1) VSC Site Commander (Win10), five (5) 360-degree Motion Sensors, and one (1) new Vindicator Command and Control/Security Archive Workstations (VCC/SAW) to allow for system status and report generation as wells as, interface into the base’s Vindicator System to allow alarm point viewing at the BDOC. The Contractor will also provide a firmware upgrade for government furnished V5ACS to convert it to a V5IDS.

Contractor is responsible for the relocation of this unit from room 3108. Also, contractor to furnish and install one (1) new 3000W UPS in Rm 3303 equipment rack. In addition, delivery of equipment and start of contract will no later than 90 days after contract award. Once installation is completed, the contractor shall provide training on newly updated system. The contractor shall provide a certified technician on-site (HQ CCC bldg. 1700) within 48 hours from a call requesting warranty support. Please see below:

RFQ Attachment 1 - SOW Attachment 2 - Equipment List Attachment 3 - Clauses

## Publications

- September 5, 2024: Sources sought, due September 11, 2024 at 11:00 AM EDT. Notice 7b8fe6055b384dc79629cebdc60283ad. https://sam.gov/workspace/contract/opp/7b8fe6055b384dc79629cebdc60283ad/view
- September 23, 2024: Solicitation, due September 26, 2024 at 3:00 PM EDT. Notice 9be27f0dd4f049789efa096c6043e5d9. https://sam.gov/workspace/contract/opp/9be27f0dd4f049789efa096c6043e5d9/view
- September 24, 2024: Solicitation, due September 26, 2024 at 3:00 PM EDT. Notice 6ba0bd8a6aec452e8da872b733abfd50. https://sam.gov/workspace/contract/opp/6ba0bd8a6aec452e8da872b733abfd50/view
- September 25, 2024: Solicitation, due September 27, 2024 at 3:00 PM EDT. Notice f04f2c0a2c6441f684f355fdafe8db1e. https://sam.gov/workspace/contract/opp/f04f2c0a2c6441f684f355fdafe8db1e/view

## Points of contact

- Neil Calica, neil.calica@us.af.mil
- Tyler Murphy, tyler.murphy.3@us.af.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/f3st784219a001.
