# Industry Feedback Requested for Progressive Design-Build with Other Transaction Authority Process

Canonical: https://abierto.us/opportunities/eielsonafbrfiforotawithpdb

- Solicitation number: Eielson_AFB_RFI_for_OTA_with_PDB
- Notice type: Special notice
- Status: Closed. Deadline was August 28, 2026 at 8:00 PM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA5004 354 Cons PK (FA5004)
- Place of performance: Alaska
- First posted: August 13, 2026
- Last posted: August 13, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/75da59dd35f947e1a3cb7456931e4af3/view

## Description

**TITLE:**

**Special Notice:** Industry Feedback Requested for Progressive Design-Build with Other Transaction Authority Process AGENCY:

**United States Air Force, Eielson AFB, Alaska DESCRIPTION:** Eielson AFB, Alaska, is requesting industry feedback for the planned Fiscal Year 2027 (FY27) execution of Progressive Design-Build (PDB) for Facilities, Sustainment, Restoration, and Modernization (FSRM) construction projects utilizing an Other Transaction Authority (OTA) procurement method. What is PDB?

PDB is a collaborative project delivery method where the Government selects a design-builder based on qualifications and technical approach rather than price. The selected design-builder works jointly with the Government to provide design and preconstruction services and establishes a guaranteed maximum price (GMP)—a fixed price ceiling—before construction begins.

The process is divided into distinct phases: a competitive, qualifications-based selection to choose a design-builder; (1) a collaborative design and preconstruction services phase to progressively develop the scope and establish a GMP; and (2) a final design and construction phase. This approach replaces the traditional design-build process with a more collaborative acquisition model. What is an Other Transaction?

An Other Transaction (OT) is a legally binding agreement entered into by the Government under specific statutory authority. OTs are not procurement contracts and are therefore not subject to the Federal Acquisition Regulation (FAR). Title 10 U.S.C. § 2808a authorizes the use of OTs for certain facility construction and repair projects. The executed OT Agreement establishes the terms, conditions, responsibilities, and performance requirements for the project. This Industry Announcement contains two attachments for industry review:

**Attachment A:** DRAFT Agreement Articles (i.e., Terms and Conditions)

**Attachment B:** PDB with OTA Industry Questionnaire Feedback received will be used to refine these draft documents and inform Eielson AFB’s final acquisition strategy.

**HOW TO PROVIDE FEEDBACK:** Please submit all industry responses via email to Gregory Johnson at gregory.johnson.68@us.af.mil and David Pfau at david.pfau.2@us.af.mil. The deadline for submission is 4:00 PM ADT on August 28, 2026. When responding to the questionnaire (Attachment B), please ensure your answers for each question are clearly separated. Additional feedback, comments, or concerns are welcome. Do not submit proprietary or sensitive information.

## Publications

- August 13, 2026: Special notice, due August 28, 2026 at 8:00 PM EDT. Notice 75da59dd35f947e1a3cb7456931e4af3. https://sam.gov/workspace/contract/opp/75da59dd35f947e1a3cb7456931e4af3/view

## Points of contact

- Gregory T Johnson, gregory.johnson.68@us.af.mil, 9073774183
- Mr. Dave Pfau, david.pfau.2@us.af.mil, 9073772464

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/eielsonafbrfiforotawithpdb.
