# Maintenance Dredging of Great Kills Harbor, Federal Navigation Project

Canonical: https://abierto.us/opportunities/e619f56aba1a4122a563dad8a39257e4

- Notice type: Special notice
- Status: Closed. Deadline was April 9, 2024 at 12:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W2SD Endist New York (W912DS)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Y1KZ Construction Of Other Conservation And Development Facilities
- First posted: March 25, 2024
- Last posted: March 25, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/e619f56aba1a4122a563dad8a39257e4/view

## Description

Synopsis of Proposed Dredging - Maintenance Dredging of Great Kills Harbor, New York, Federal Navigation Project. Background Information The New York District of the U.S. Army Corps of Engineers (USAGE) proposes to perform maintenance dredging of Great Kills Harbor Federal Channel. The dredged material would be dredged and subsequently placed at the Historic Area Remediation Site (HARS), approximately 4 miles east of Sandy Hook, New Jersey..

The proposed maintenance dredging would remove approximately 200,000 cubic yards of dredged material from Great Kills Harbor. Dredging would be required to a depth of -10 feet and - 8 feet Mean Lower Low Water (MLLW) plus 2 feet allowable overdepth, respectively. The dredged material consists primarily of sand and gravel.

The purpose of the proposed work is to alleviate the effects of shoaling and restore the authorized project dimensions, thereby providing safe and economical use of Great Kills Harbor by military, commercial and recreational boating interests while providing future beneficial use of the dredged material. Based on past dredging cycles, it is recommended that the proposed work only be performed by utilizing a mechanical dredge with a clamshell bucket.

Additionally, multiple ocean-going barges, tug boats and ancillary equipment will be needed to perform the dredging, transport and placement activities. The entire channel will generally not require maintenance dredging; only areas where shoaling has reduced the depth of the channel will require dredging. The dredged material would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the placement site is located.

The Contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed, and to prosecute said work diligently and to complete the basic work ready for use not later than seventy-five (75) calendar days after the receipt by him of the notice to proceed {NTP). The contractor is required to maintain an integrated production of at least 8,000 cubic yards per calendar day. The work is estimated to cost between $1,000,000 and $5,000,000.

Plans and specifications for the subject project are expected to be available in April 2024, with bid opening in May 2024. It is the intention of the government to award in June 2024 and issue the NTP in October 2024. Liquidated Damages of $3,046.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted Procurement.

## Publications

- March 25, 2024: Special notice, due April 9, 2024 at 12:00 PM EDT. Notice e619f56aba1a4122a563dad8a39257e4. https://sam.gov/workspace/contract/opp/e619f56aba1a4122a563dad8a39257e4/view

## Points of contact

- Adrian Stafford-Browne, adrian.j.stafford-browne@usace.army.mil, 9177908087
- Nicholas P. Emanuel, nicholas.p.emanuel@usace.army.mil, 9177908069

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/e619f56aba1a4122a563dad8a39257e4.