# INDUSTRY DAY - DVA American Lake Ph2B Specialty Care Building 201 at Tacoma, WA

Canonical: https://abierto.us/opportunities/deba5a99d5ec48ce86883f6f3dcc1ab8

- Notice type: Special notice
- Status: Closed. Deadline was September 17, 2024 at 5:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W071 Endist Seattle (W912DW)
- Place of performance: Tacoma, Washington
- County: Pierce County (FIPS 53053). https://abierto.us/counties/pierce-county-wa-53053
- City: Tacoma. https://abierto.us/cities/tacoma-wa-5370000
- First posted: September 11, 2024
- Last posted: September 11, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/deba5a99d5ec48ce86883f6f3dcc1ab8/view

## Description

**SPECIAL NOTICE:** INDUSTRY DAY The U.S. Army Corps of Engineers, Northwestern Division (CENWD) – Seattle District (CENWS) is conducting a VIRTUAL Meeting with Industry on upcoming project requirements for the Department of Veteran’s Affairs (DVA) American Lake Ph2B Specialty Care Building 201 on Wednesday, 18 September 2024, from 10:00 AM to 11:00 AM (Pacific Daylight Time (PDT)).

CENWS intends to collaborate with industry as we prepare the acquisition planning and solicitation for the DVA American Lake Campus, Tacoma, Washington. The purpose of the virtual event is for the Government to provide an update and overview of the American Lake program. We understand the importance to the construction industry to have advance knowledge of projects. The webinar will take approximately one-hour where the Government will present information and invite industry to share observations and concerns. This project plans to use the Design Build acquisition Strategy.

**Requirement Information:**

**NAICS Code:** 236220 – Commercial and Institutional Building Construction, with a small business size standard of $39.5 million. Recovery Act?

**No Project Synopsis:** Building 201 will function as ‘seismic replacement’ for, and accommodate services currently provided in, building 81/81AC.

Building 81/81AC is generally understood to have planned seismic improvement and renovation after services are relocated to Building 201. Originally developed as a single construction document set, the project was broken out into Phase 2A Site Development and Phase 2B Building 201 in February 2021. Phase 2A construction began in August 2022 with completion planned for spring of 2025. In fall of 2023 the delivery method for the project changed from design-bid-build to design-build.

Phase 2b (Bldg. 201) This building is intended to provide a new facility for: Cardiology Service, Gastrointestinal / Endoscopy Service, Pathology and Laboratory Medicine Service, Pharmacy Service, Pulmonary Medicine Service (Infusion Services), Surgical, Endovascular Service and support spaces. Industry Day event registration: Forthcoming ALL INTERESTED PARTICIPANTS MUST REGISTER VIA REGISTRATION LINK PROVIDED IN ORDER TO RECEIVE EMAIL INFORMATION FOR WEBINAR ACCESS.

## Publications

- September 11, 2024: Special notice, due September 17, 2024 at 5:00 PM EDT. Notice deba5a99d5ec48ce86883f6f3dcc1ab8. https://sam.gov/workspace/contract/opp/deba5a99d5ec48ce86883f6f3dcc1ab8/view

## Points of contact

- John Scola, john.p.scola@usace.army.mil
- CAROLINE MUELLER, caroline.b.mueller@usace.army.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/deba5a99d5ec48ce86883f6f3dcc1ab8.
