# Aerospace Readiness Enterprise System (ARES)_Draft_Amendment 1

Canonical: https://abierto.us/opportunities/aresprototypeopportunitydraft

- Solicitation number: ARES_PROTOTYPE_OPPORTUNITY_DRAFT
- Notice type: Presolicitation
- Status: Closed. Deadline was October 31, 2025 at 4:00 PM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA8730 Kessel Run Aflcmc/Hbbk (FA8730)
- NAICS: 541519 Other Computer Related Services
- Product or service code: AC13 National Defense R&D Services; Department Of Defense - Military; Experimental Development
- Place of performance: Hanscom AFB, Massachusetts
- County: Middlesex County (FIPS 25017). https://abierto.us/counties/middlesex-county-ma-25017
- City: Hanscom AFB. https://abierto.us/cities/hanscom-afb-ma-2528425
- First posted: September 30, 2025
- Last posted: October 28, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/9fcef4d1298b43d5b2a2c1d10f6df1f1/view

## Description

The intent for this DRAFT posting is to recieve feedback and questions from industry; the Government does not seek nor intend to receive Draft Proposals from offeror teams.

Prototyping is a means of testing assumptions about technologies and approaches before expending significant amounts of effort or money building something that may not address the organization’s problem. Prototyping is a low-cost, rapid risk mitigation approach. As such, we propose that the first Aerospace Readiness Enterprise System (ARES) use case be built as a prototype initially, with the following capability goals.

ARES is the Air Force’s enterprise solution for scheduling, standardization and evaluation (stan/eval) and training management which is intended to replace the Patriot Excalibur (PEX), Puckboard, and Graduate/Training Integration Management System (G/TIMS) legacy software programs. Specifically, ARES will leverage commercial software to the greatest extent possible and be deployed, initially, within the Impact Level (IL) 4 partition with a path to IL-6 deployment thereafter.

Further, the Air Force, in support of the DAF BATTLE NETWORK, has an enduring requirement to deploy a robust solution which provides enterprise capabilities for scheduling, stan/eval, and training for increased readiness and lethality. Starting with the requirements of Air Education and Training Command (AETC) as the basis for this prototype, but not excluding requirements from other MAJCOMs, the prototype should meet as many of the following criteria as possible.

Final acceptance of the prototype will be based on its ability to meet the threshold requirements outlined below. The final evaluation of the prototypes will also consider objective criteria as defined below. The prototype shall be completed and available for inspection and use no later than 90 calendar days after contract award.

## Publications

- September 30, 2025: Presolicitation, due October 31, 2025 at 4:00 PM EDT. Notice c24eefbc510a4f818dcf199633553a14. https://sam.gov/workspace/contract/opp/c24eefbc510a4f818dcf199633553a14/view
- October 28, 2025: Presolicitation, due October 31, 2025 at 4:00 PM EDT. Notice 9fcef4d1298b43d5b2a2c1d10f6df1f1. https://sam.gov/workspace/contract/opp/9fcef4d1298b43d5b2a2c1d10f6df1f1/view

## Points of contact

- Evan Pomfret, evan.pomfret.1@us.af.mil
- Lauren Cheslofska, lauren.cheslofska@us.af.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/aresprototypeopportunitydraft.
