# ECS Bay Lifts

Canonical: https://abierto.us/opportunities/9cb16154c5a44112bce10f56f666b590

- Solicitation number: 77352
- Notice type: Sources sought
- Status: Closed. Deadline was August 13, 2025 at 11:00 AM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA8571 Maint Contracting AFSC Pzim (FA8571)
- Place of performance: Warner Robins, Georgia
- County: Houston County (FIPS 13153). https://abierto.us/counties/houston-county-ga-13153
- City: Warner Robins. https://abierto.us/cities/warner-robins-ga-1380508
- First posted: July 31, 2025
- Last posted: July 31, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/9cb16154c5a44112bce10f56f666b590/view

## Description

The Government is conducting market research to identify potential sources that possess the production, expertise, capabilities and experience to meet qualification requirements for the ECS Bay Lifts. The acquisition strategy is a One-Time Supply. The Bay Lift(s) allow the mechanics to safely work up inside the ECS Bay and the Ammo Bay of the F15 making it a vital versatile tool. Both the ECS Bay and the Ammo Bay can only be accessed from the bottom of the aircraft which makes any work be above their heads.

A brief consolidation of these assigned tasks for the Eagle Passive Aggressive Warning Survivability System (EPAWSS) (TCTO 889) mod include drilling, bucking rivets, sanding, grinding, removing/installing ducts, tubing, brackets ,coax, flex foam, wiring, valves, pumps, motors and classified LRUs (Line Replaceable Unit). All of the items listed are essential in accomplishing the EPAWSS mod here at Robins AFB.

The ECS Bay Lift will enable Robins AFB to streamline operations, enhance productivity, and ensure that the performance goals are met efficiently. The Contractor shall provide drawings to the Government for review prior to beginning fabrication of the ECS Bay Lifts. The Contractor shall electronically send the drawings in Adobe Portable Document Format (PDF) to the Government Point of Contacts (POCs) within six (6) weeks after contract award. The Contractor shall relinquish ownership of the designs to Robins AFB. The Government shall review the drawings and approve them within two (2) weeks of receiving the drawings.

## Publications

- July 31, 2025: Sources sought, due August 13, 2025 at 11:00 AM EDT. Notice 9cb16154c5a44112bce10f56f666b590. https://sam.gov/workspace/contract/opp/9cb16154c5a44112bce10f56f666b590/view

## Points of contact

- Jania Clater, jania.clater@us.af.mil, 4782226993
- Lasonia Anderson, lasonia.anderson@us.af.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/9cb16154c5a44112bce10f56f666b590.
