{"canonical":"https://abierto.us/opportunities/70z0g125bsyn00190","key":"70Z0G125BSYN00190","url":"https://abierto.us/opportunities/70z0g125bsyn00190","title":"REPAIR BUOY YARD","solicitation_number":"70Z0G125BSYN00190","notice_type":"a","open":false,"response_deadline":"2024-12-10T19:00:00Z","first_posted":"2024-10-31","last_posted":"2025-01-27","department":"HOMELAND SECURITY, DEPARTMENT OF","subagency":"US COAST GUARD","office":"CEU PROVIDENCE(000G1)","naics":"237990","psc":"Y1PZ","set_aside":"SBA","place_state":"NJ","place_county":"34017","place_county_name":"Hudson County","place_city":"3403580","place_city_name":"Bayonne","winner":"RENCOR INC.","award_amount":"1690000.00","publications":[{"notice_id":"62436abad8714fba9eb951e126134f3b","title":"REPAIR BUOY YARD","solicitation_number":"70Z0G125BSYN00190","notice_type":"o","base_type":"p","posted":"2024-10-31","posted_at":null,"due_at":"2024-12-03T19:00:00Z","due_date":"2024-12-03","cancelled":null,"archived":null,"archive_date":"2025-02-28","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/62436abad8714fba9eb951e126134f3b/view","enriched":false,"history":[]},{"notice_id":"37951b033d02409fb1985569d346eae2","title":"REPAIR BUOY YARD","solicitation_number":"70Z0G125BSYN00190","notice_type":"o","base_type":"o","posted":"2024-11-05","posted_at":null,"due_at":"2024-12-03T19:00:00Z","due_date":"2024-12-03","cancelled":null,"archived":null,"archive_date":"2025-02-28","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/37951b033d02409fb1985569d346eae2/view","enriched":false,"history":[]},{"notice_id":"436f1084e66c480089829fc1e5f6c710","title":"REPAIR BUOY YARD","solicitation_number":"70Z0G125BSYN00190","notice_type":"o","base_type":"o","posted":"2024-11-07","posted_at":null,"due_at":"2024-12-03T19:00:00Z","due_date":"2024-12-03","cancelled":null,"archived":null,"archive_date":"2025-02-28","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/436f1084e66c480089829fc1e5f6c710/view","enriched":false,"history":[]},{"notice_id":"2df609168b8b4b25b69b6f6da6501151","title":"REPAIR BUOY YARD","solicitation_number":"70Z0G125BSYN00190","notice_type":"o","base_type":"o","posted":"2024-11-08","posted_at":null,"due_at":"2024-12-03T19:00:00Z","due_date":"2024-12-03","cancelled":null,"archived":null,"archive_date":"2025-02-28","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2df609168b8b4b25b69b6f6da6501151/view","enriched":false,"history":[]},{"notice_id":"41ff0e1994894e7b892719387fa76098","title":"REPAIR BUOY YARD","solicitation_number":"70Z0G125BSYN00190","notice_type":"o","base_type":"o","posted":"2024-11-13","posted_at":null,"due_at":"2024-12-03T19:00:00Z","due_date":"2024-12-03","cancelled":null,"archived":null,"archive_date":"2025-02-28","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/41ff0e1994894e7b892719387fa76098/view","enriched":false,"history":[]},{"notice_id":"64f173c75ada4274b65f8fa0083769bf","title":"REPAIR BUOY YARD","solicitation_number":"70Z0G125BSYN00190","notice_type":"o","base_type":"o","posted":"2024-11-13","posted_at":null,"due_at":"2024-12-03T19:00:00Z","due_date":"2024-12-03","cancelled":null,"archived":null,"archive_date":"2025-02-28","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/64f173c75ada4274b65f8fa0083769bf/view","enriched":false,"history":[]},{"notice_id":"787c12c2c315451ab04511d938dd8cf6","title":"REPAIR BUOY YARD","solicitation_number":"70Z0G125BSYN00190","notice_type":"o","base_type":"o","posted":"2024-11-15","posted_at":null,"due_at":"2024-12-03T19:00:00Z","due_date":"2024-12-03","cancelled":null,"archived":null,"archive_date":"2025-02-28","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/787c12c2c315451ab04511d938dd8cf6/view","enriched":false,"history":[]},{"notice_id":"412b428aa0b648d984c38dbef116952a","title":"REPAIR BUOY YARD","solicitation_number":"70Z0G125BSYN00190","notice_type":"o","base_type":"o","posted":"2024-11-21","posted_at":null,"due_at":"2024-12-03T19:00:00Z","due_date":"2024-12-03","cancelled":null,"archived":null,"archive_date":"2025-02-28","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/412b428aa0b648d984c38dbef116952a/view","enriched":false,"history":[]},{"notice_id":"85d16ebb1b7e4f4db378983c9579eed0","title":"REPAIR BUOY YARD","solicitation_number":"70Z0G125BSYN00190","notice_type":"o","base_type":"o","posted":"2024-11-29","posted_at":null,"due_at":"2024-12-03T19:00:00Z","due_date":"2024-12-03","cancelled":null,"archived":null,"archive_date":"2025-02-28","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/85d16ebb1b7e4f4db378983c9579eed0/view","enriched":false,"history":[]},{"notice_id":"7839b8bd94b64a35b25e126f65ce4521","title":"REPAIR BUOY YARD","solicitation_number":"70Z0G125BSYN00190","notice_type":"o","base_type":"o","posted":"2024-12-02","posted_at":null,"due_at":"2024-12-10T19:00:00Z","due_date":"2024-12-10","cancelled":null,"archived":null,"archive_date":"2025-02-28","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7839b8bd94b64a35b25e126f65ce4521/view","enriched":false,"history":[]},{"notice_id":"f4582ef4717640cbb6d448a022a7bdbb","title":"REPAIR BUOY YARD","solicitation_number":"70Z0G125BSYN00190","notice_type":"o","base_type":"o","posted":"2024-12-10","posted_at":null,"due_at":"2024-12-10T19:00:00Z","due_date":"2024-12-10","cancelled":null,"archived":null,"archive_date":"2025-02-28","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f4582ef4717640cbb6d448a022a7bdbb/view","enriched":false,"history":[]},{"notice_id":"b3381daa784f4de1bdc9d1a463447489","title":"REPAIR BUOY YARD","solicitation_number":"70Z0G125CSNY00001","notice_type":"a","base_type":"o","posted":"2025-01-27","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2025-02-28","award_number":"70Z0G125CSNY00001","awardee_name":"RENCOR INC. Somerville","amount":"1690000.00","link_sam":"https://sam.gov/workspace/contract/opp/b3381daa784f4de1bdc9d1a463447489/view","enriched":false,"history":[]}],"latest_notice_id":"b3381daa784f4de1bdc9d1a463447489","first_type":"o","notices":[{"dates":{"posted":"2024-10-31","response_deadline":{"raw":"2024-12-03T14:00:00-05:00","utc":"2024-12-03T19:00:00Z","date":"2024-12-03","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/62436abad8714fba9eb951e126134f3b/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"REPAIR BUOY YARD","agency":{"office":{"code":"70Z0G1","name":"CEU PROVIDENCE(000G1)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02886","city":"WARWICK","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-28","archive_type":"auto_custom"},"contacts":[{"name":"Nadine Provost","role":"primary","email":"Nadine.M.Provost@uscg.mil","phone":"4017361766"},{"name":"Simon W. Leung","role":"secondary","email":"simon.w.leung@uscg.mil","phone":"4017361785"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"62436abad8714fba9eb951e126134f3b","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"e0c7c4de46d002b7166b13cd447fdf34427f879964edb1593a5ffdcfd1fb0255","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"REPAIR BUOY YARD This is a construction (service) requirement to perform a topographic survey and prepare the specified grading plan; temporarily relocate/demo storage sheds/containers; demo the HAZMAT area; demo perimeter fencing and vegetation; strip and stockpile RCA and RAP surface treatments for reuse; strip existing asphalt and remove, regrade and repair area per the grading plan; compact the subgrade; demo and relocate the storage container underground electrical service; place geotextile and geogrid reinforcement; backfill with compacted imported base course and grade; install asphalt and concrete pavement; install stockpiled RCA and RAP surfaces; install replacement perimeter fencing and HAZMAT fencing, load and seed disturbed areas; and reinstall storage sheds/containers. Construction of the Buoy Yard will be performed in two phases to provide continued U.S. Coast Guard access to the Buoy Yard equipment laydown and storage areas. Phase 1 will occur first and includes all work specified as outlined in the drawings. Phase 2 will begin after the completion of Phase 1 and will consist of the remaining portions of the work. Mobilization will not occur until April, 2025 at the earliest in order to help minimize impacts associated with cold weather concreting. This requirement is not part of the USCG Standardization Program.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"70Z0G125BSYN00190","place_of_performance":{"zip":"07002","city":{"name":"Bayonne"},"state":{"code":"NJ"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2024-11-05","response_deadline":{"raw":"2024-12-03T14:00:00-05:00","utc":"2024-12-03T19:00:00Z","date":"2024-12-03","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/37951b033d02409fb1985569d346eae2/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"REPAIR BUOY YARD","agency":{"office":{"code":"70Z0G1","name":"CEU PROVIDENCE(000G1)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02886","city":"WARWICK","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-28","archive_type":"auto_custom"},"contacts":[{"name":"Nadine Provost","role":"primary","email":"Nadine.M.Provost@uscg.mil","phone":"4017361766"},{"name":"Simon W. Leung","role":"secondary","email":"simon.w.leung@uscg.mil","phone":"4017361785"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"37951b033d02409fb1985569d346eae2","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"88bcdd4d7d175c88aec137492cfcce4d7311eaf1272e06d88cb5f273ed777493","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"REPAIR BUOY YARD This is a construction (service) requirement to perform a topographic survey and prepare the specified grading plan; temporarily relocate/demo storage sheds/containers; demo the HAZMAT area; demo perimeter fencing and vegetation; strip and stockpile RCA and RAP surface treatments for reuse; strip existing asphalt and remove, regrade and repair area per the grading plan; compact the subgrade; demo and relocate the storage container underground electrical service; place geotextile and geogrid reinforcement; backfill with compacted imported base course and grade; install asphalt and concrete pavement; install stockpiled RCA and RAP surfaces; install replacement perimeter fencing and HAZMAT fencing, load and seed disturbed areas; and reinstall storage sheds/containers. Construction of the Buoy Yard will be performed in two phases to provide continued U.S. Coast Guard access to the Buoy Yard equipment laydown and storage areas. Phase 1 will occur first and includes all work specified as outlined in the drawings. Phase 2 will begin after the completion of Phase 1 and will consist of the remaining portions of the work. Mobilization will not occur until April, 2025 at the earliest in order to help minimize impacts associated with cold weather concreting. This requirement is not part of the USCG Standardization Program.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"70Z0G125BSYN00190","place_of_performance":{"zip":"07002","city":{"name":"Bayonne"},"state":{"code":"NJ"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2024-11-07","response_deadline":{"raw":"2024-12-03T14:00:00-05:00","utc":"2024-12-03T19:00:00Z","date":"2024-12-03","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/436f1084e66c480089829fc1e5f6c710/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"REPAIR BUOY YARD","agency":{"office":{"code":"70Z0G1","name":"CEU PROVIDENCE(000G1)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02886","city":"WARWICK","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-28","archive_type":"auto_custom"},"contacts":[{"name":"Nadine Provost","role":"primary","email":"Nadine.M.Provost@uscg.mil","phone":"4017361766"},{"name":"Simon W. Leung","role":"secondary","email":"simon.w.leung@uscg.mil","phone":"4017361785"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"436f1084e66c480089829fc1e5f6c710","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"49b014d60313ee7af039b7b1620fc134d060098141098455ea024e000230a925","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"REPAIR BUOY YARD This is a construction (service) requirement to perform a topographic survey and prepare the specified grading plan; temporarily relocate/demo storage sheds/containers; demo the HAZMAT area; demo perimeter fencing and vegetation; strip and stockpile RCA and RAP surface treatments for reuse; strip existing asphalt and remove, regrade and repair area per the grading plan; compact the subgrade; demo and relocate the storage container underground electrical service; place geotextile and geogrid reinforcement; backfill with compacted imported base course and grade; install asphalt and concrete pavement; install stockpiled RCA and RAP surfaces; install replacement perimeter fencing and HAZMAT fencing, load and seed disturbed areas; and reinstall storage sheds/containers. Construction of the Buoy Yard will be performed in two phases to provide continued U.S. Coast Guard access to the Buoy Yard equipment laydown and storage areas. Phase 1 will occur first and includes all work specified as outlined in the drawings. Phase 2 will begin after the completion of Phase 1 and will consist of the remaining portions of the work. Mobilization will not occur until April, 2025 at the earliest in order to help minimize impacts associated with cold weather concreting. This requirement is not part of the USCG Standardization Program.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"70Z0G125BSYN00190","place_of_performance":{"zip":"07002","city":{"name":"Bayonne"},"state":{"code":"NJ"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2024-11-08","response_deadline":{"raw":"2024-12-03T14:00:00-05:00","utc":"2024-12-03T19:00:00Z","date":"2024-12-03","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2df609168b8b4b25b69b6f6da6501151/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"REPAIR BUOY YARD","agency":{"office":{"code":"70Z0G1","name":"CEU PROVIDENCE(000G1)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02886","city":"WARWICK","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-28","archive_type":"auto_custom"},"contacts":[{"name":"Nadine Provost","role":"primary","email":"Nadine.M.Provost@uscg.mil","phone":"4017361766"},{"name":"Simon W. Leung","role":"secondary","email":"simon.w.leung@uscg.mil","phone":"4017361785"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"2df609168b8b4b25b69b6f6da6501151","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"b64e0878fb7712ed691d53a7f7be5fc2aa041a1ec6639cabd1a06e767f510228","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"REPAIR BUOY YARD This is a construction (service) requirement to perform a topographic survey and prepare the specified grading plan; temporarily relocate/demo storage sheds/containers; demo the HAZMAT area; demo perimeter fencing and vegetation; strip and stockpile RCA and RAP surface treatments for reuse; strip existing asphalt and remove, regrade and repair area per the grading plan; compact the subgrade; demo and relocate the storage container underground electrical service; place geotextile and geogrid reinforcement; backfill with compacted imported base course and grade; install asphalt and concrete pavement; install stockpiled RCA and RAP surfaces; install replacement perimeter fencing and HAZMAT fencing, load and seed disturbed areas; and reinstall storage sheds/containers. Construction of the Buoy Yard will be performed in two phases to provide continued U.S. Coast Guard access to the Buoy Yard equipment laydown and storage areas. Phase 1 will occur first and includes all work specified as outlined in the drawings. Phase 2 will begin after the completion of Phase 1 and will consist of the remaining portions of the work. Mobilization will not occur until April, 2025 at the earliest in order to help minimize impacts associated with cold weather concreting. This requirement is not part of the USCG Standardization Program.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"70Z0G125BSYN00190","place_of_performance":{"zip":"07002","city":{"name":"Bayonne"},"state":{"code":"NJ"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2024-11-13","response_deadline":{"raw":"2024-12-03T14:00:00-05:00","utc":"2024-12-03T19:00:00Z","date":"2024-12-03","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/41ff0e1994894e7b892719387fa76098/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"REPAIR BUOY YARD","agency":{"office":{"code":"70Z0G1","name":"CEU PROVIDENCE(000G1)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02886","city":"WARWICK","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-28","archive_type":"auto_custom"},"contacts":[{"name":"Nadine Provost","role":"primary","email":"Nadine.M.Provost@uscg.mil","phone":"4017361766"},{"name":"Simon W. Leung","role":"secondary","email":"simon.w.leung@uscg.mil","phone":"4017361785"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"41ff0e1994894e7b892719387fa76098","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"cf3ed5b02181eb58513b1f552c5ea4e031c3acb0cb6e1685a465d6ac040523da","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"REPAIR BUOY YARD This is a construction (service) requirement to perform a topographic survey and prepare the specified grading plan; temporarily relocate/demo storage sheds/containers; demo the HAZMAT area; demo perimeter fencing and vegetation; strip and stockpile RCA and RAP surface treatments for reuse; strip existing asphalt and remove, regrade and repair area per the grading plan; compact the subgrade; demo and relocate the storage container underground electrical service; place geotextile and geogrid reinforcement; backfill with compacted imported base course and grade; install asphalt and concrete pavement; install stockpiled RCA and RAP surfaces; install replacement perimeter fencing and HAZMAT fencing, load and seed disturbed areas; and reinstall storage sheds/containers. Construction of the Buoy Yard will be performed in two phases to provide continued U.S. Coast Guard access to the Buoy Yard equipment laydown and storage areas. Phase 1 will occur first and includes all work specified as outlined in the drawings. Phase 2 will begin after the completion of Phase 1 and will consist of the remaining portions of the work. Mobilization will not occur until April, 2025 at the earliest in order to help minimize impacts associated with cold weather concreting. This requirement is not part of the USCG Standardization Program.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"70Z0G125BSYN00190","place_of_performance":{"zip":"07002","city":{"name":"Bayonne"},"state":{"code":"NJ"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2024-11-13","response_deadline":{"raw":"2024-12-03T14:00:00-05:00","utc":"2024-12-03T19:00:00Z","date":"2024-12-03","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/64f173c75ada4274b65f8fa0083769bf/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"REPAIR BUOY YARD","agency":{"office":{"code":"70Z0G1","name":"CEU PROVIDENCE(000G1)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02886","city":"WARWICK","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-28","archive_type":"auto_custom"},"contacts":[{"name":"Nadine Provost","role":"primary","email":"Nadine.M.Provost@uscg.mil","phone":"4017361766"},{"name":"Simon W. Leung","role":"secondary","email":"simon.w.leung@uscg.mil","phone":"4017361785"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"64f173c75ada4274b65f8fa0083769bf","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"b0b8eb2d5a78e2818b2e6d6f354e81e6900d58bfc53672c41cbd4177a8eed08a","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"REPAIR BUOY YARD This is a construction (service) requirement to perform a topographic survey and prepare the specified grading plan; temporarily relocate/demo storage sheds/containers; demo the HAZMAT area; demo perimeter fencing and vegetation; strip and stockpile RCA and RAP surface treatments for reuse; strip existing asphalt and remove, regrade and repair area per the grading plan; compact the subgrade; demo and relocate the storage container underground electrical service; place geotextile and geogrid reinforcement; backfill with compacted imported base course and grade; install asphalt and concrete pavement; install stockpiled RCA and RAP surfaces; install replacement perimeter fencing and HAZMAT fencing, load and seed disturbed areas; and reinstall storage sheds/containers. Construction of the Buoy Yard will be performed in two phases to provide continued U.S. Coast Guard access to the Buoy Yard equipment laydown and storage areas. Phase 1 will occur first and includes all work specified as outlined in the drawings. Phase 2 will begin after the completion of Phase 1 and will consist of the remaining portions of the work. Mobilization will not occur until April, 2025 at the earliest in order to help minimize impacts associated with cold weather concreting. This requirement is not part of the USCG Standardization Program.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"70Z0G125BSYN00190","place_of_performance":{"zip":"07002","city":{"name":"Bayonne"},"state":{"code":"NJ"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2024-11-15","response_deadline":{"raw":"2024-12-03T14:00:00-05:00","utc":"2024-12-03T19:00:00Z","date":"2024-12-03","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/787c12c2c315451ab04511d938dd8cf6/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"REPAIR BUOY YARD","agency":{"office":{"code":"70Z0G1","name":"CEU PROVIDENCE(000G1)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02886","city":"WARWICK","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-28","archive_type":"auto_custom"},"contacts":[{"name":"Nadine Provost","role":"primary","email":"Nadine.M.Provost@uscg.mil","phone":"4017361766"},{"name":"Simon W. Leung","role":"secondary","email":"simon.w.leung@uscg.mil","phone":"4017361785"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"787c12c2c315451ab04511d938dd8cf6","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"e341e3eb08b3cae5a8c263ca175388e652db59f13b6052fc11ec7b38864ce600","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"REPAIR BUOY YARD This is a construction (service) requirement to perform a topographic survey and prepare the specified grading plan; temporarily relocate/demo storage sheds/containers; demo the HAZMAT area; demo perimeter fencing and vegetation; strip and stockpile RCA and RAP surface treatments for reuse; strip existing asphalt and remove, regrade and repair area per the grading plan; compact the subgrade; demo and relocate the storage container underground electrical service; place geotextile and geogrid reinforcement; backfill with compacted imported base course and grade; install asphalt and concrete pavement; install stockpiled RCA and RAP surfaces; install replacement perimeter fencing and HAZMAT fencing, load and seed disturbed areas; and reinstall storage sheds/containers. Construction of the Buoy Yard will be performed in two phases to provide continued U.S. Coast Guard access to the Buoy Yard equipment laydown and storage areas. Phase 1 will occur first and includes all work specified as outlined in the drawings. Phase 2 will begin after the completion of Phase 1 and will consist of the remaining portions of the work. Mobilization will not occur until April, 2025 at the earliest in order to help minimize impacts associated with cold weather concreting. This requirement is not part of the USCG Standardization Program.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"70Z0G125BSYN00190","place_of_performance":{"zip":"07002","city":{"name":"Bayonne"},"state":{"code":"NJ"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2024-11-21","response_deadline":{"raw":"2024-12-03T14:00:00-05:00","utc":"2024-12-03T19:00:00Z","date":"2024-12-03","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/412b428aa0b648d984c38dbef116952a/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"REPAIR BUOY YARD","agency":{"office":{"code":"70Z0G1","name":"CEU PROVIDENCE(000G1)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02886","city":"WARWICK","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-28","archive_type":"auto_custom"},"contacts":[{"name":"Nadine Provost","role":"primary","email":"Nadine.M.Provost@uscg.mil","phone":"4017361766"},{"name":"Simon W. Leung","role":"secondary","email":"simon.w.leung@uscg.mil","phone":"4017361785"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"412b428aa0b648d984c38dbef116952a","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"bd2644ba7198f656888a6f088d95ab42c610de9e9e72b9b860af3cdf260b43f8","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"REPAIR BUOY YARD This is a construction (service) requirement to perform a topographic survey and prepare the specified grading plan; temporarily relocate/demo storage sheds/containers; demo the HAZMAT area; demo perimeter fencing and vegetation; strip and stockpile RCA and RAP surface treatments for reuse; strip existing asphalt and remove, regrade and repair area per the grading plan; compact the subgrade; demo and relocate the storage container underground electrical service; place geotextile and geogrid reinforcement; backfill with compacted imported base course and grade; install asphalt and concrete pavement; install stockpiled RCA and RAP surfaces; install replacement perimeter fencing and HAZMAT fencing, load and seed disturbed areas; and reinstall storage sheds/containers. Construction of the Buoy Yard will be performed in two phases to provide continued U.S. Coast Guard access to the Buoy Yard equipment laydown and storage areas. Phase 1 will occur first and includes all work specified as outlined in the drawings. Phase 2 will begin after the completion of Phase 1 and will consist of the remaining portions of the work. Mobilization will not occur until April, 2025 at the earliest in order to help minimize impacts associated with cold weather concreting. This requirement is not part of the USCG Standardization Program.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"70Z0G125BSYN00190","place_of_performance":{"zip":"07002","city":{"name":"Bayonne"},"state":{"code":"NJ"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2024-11-29","response_deadline":{"raw":"2024-12-03T14:00:00-05:00","utc":"2024-12-03T19:00:00Z","date":"2024-12-03","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/85d16ebb1b7e4f4db378983c9579eed0/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"REPAIR BUOY YARD","agency":{"office":{"code":"70Z0G1","name":"CEU PROVIDENCE(000G1)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02886","city":"WARWICK","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-28","archive_type":"auto_custom"},"contacts":[{"name":"Nadine Provost","role":"primary","email":"Nadine.M.Provost@uscg.mil","phone":"4017361766"},{"name":"Simon W. Leung","role":"secondary","email":"simon.w.leung@uscg.mil","phone":"4017361785"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"85d16ebb1b7e4f4db378983c9579eed0","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"de544a5b415fe6129807f52c102c115ab0399b5d125764df788738981a624081","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"REPAIR BUOY YARD This is a construction (service) requirement to perform a topographic survey and prepare the specified grading plan; temporarily relocate/demo storage sheds/containers; demo the HAZMAT area; demo perimeter fencing and vegetation; strip and stockpile RCA and RAP surface treatments for reuse; strip existing asphalt and remove, regrade and repair area per the grading plan; compact the subgrade; demo and relocate the storage container underground electrical service; place geotextile and geogrid reinforcement; backfill with compacted imported base course and grade; install asphalt and concrete pavement; install stockpiled RCA and RAP surfaces; install replacement perimeter fencing and HAZMAT fencing, load and seed disturbed areas; and reinstall storage sheds/containers. Construction of the Buoy Yard will be performed in two phases to provide continued U.S. Coast Guard access to the Buoy Yard equipment laydown and storage areas. Phase 1 will occur first and includes all work specified as outlined in the drawings. Phase 2 will begin after the completion of Phase 1 and will consist of the remaining portions of the work. Mobilization will not occur until April, 2025 at the earliest in order to help minimize impacts associated with cold weather concreting. This requirement is not part of the USCG Standardization Program.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"70Z0G125BSYN00190","place_of_performance":{"zip":"07002","city":{"name":"Bayonne"},"state":{"code":"NJ"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2024-12-02","response_deadline":{"raw":"2024-12-10T14:00:00-05:00","utc":"2024-12-10T19:00:00Z","date":"2024-12-10","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7839b8bd94b64a35b25e126f65ce4521/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"REPAIR BUOY YARD","agency":{"office":{"code":"70Z0G1","name":"CEU PROVIDENCE(000G1)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02886","city":"WARWICK","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-28","archive_type":"auto_custom"},"contacts":[{"name":"Nadine Provost","role":"primary","email":"Nadine.M.Provost@uscg.mil","phone":"4017361766"},{"name":"Simon W. Leung","role":"secondary","email":"simon.w.leung@uscg.mil","phone":"4017361785"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7839b8bd94b64a35b25e126f65ce4521","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"5157b2559fd5764041a2a3913ee0cd8d64d4a806b54e806e8827260e55257236","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"REPAIR BUOY YARD This is a construction (service) requirement to perform a topographic survey and prepare the specified grading plan; temporarily relocate/demo storage sheds/containers; demo the HAZMAT area; demo perimeter fencing and vegetation; strip and stockpile RCA and RAP surface treatments for reuse; strip existing asphalt and remove, regrade and repair area per the grading plan; compact the subgrade; demo and relocate the storage container underground electrical service; place geotextile and geogrid reinforcement; backfill with compacted imported base course and grade; install asphalt and concrete pavement; install stockpiled RCA and RAP surfaces; install replacement perimeter fencing and HAZMAT fencing, load and seed disturbed areas; and reinstall storage sheds/containers. Construction of the Buoy Yard will be performed in two phases to provide continued U.S. Coast Guard access to the Buoy Yard equipment laydown and storage areas. Phase 1 will occur first and includes all work specified as outlined in the drawings. Phase 2 will begin after the completion of Phase 1 and will consist of the remaining portions of the work. Mobilization will not occur until April, 2025 at the earliest in order to help minimize impacts associated with cold weather concreting. This requirement is not part of the USCG Standardization Program.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"70Z0G125BSYN00190","place_of_performance":{"zip":"07002","city":{"name":"Bayonne"},"state":{"code":"NJ"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2024-12-10","response_deadline":{"raw":"2024-12-10T14:00:00-05:00","utc":"2024-12-10T19:00:00Z","date":"2024-12-10","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f4582ef4717640cbb6d448a022a7bdbb/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"REPAIR BUOY YARD","agency":{"office":{"code":"70Z0G1","name":"CEU PROVIDENCE(000G1)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02886","city":"WARWICK","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-28","archive_type":"auto_custom"},"contacts":[{"name":"Nadine Provost","role":"primary","email":"Nadine.M.Provost@uscg.mil","phone":"4017361766"},{"name":"Simon W. Leung","role":"secondary","email":"simon.w.leung@uscg.mil","phone":"4017361785"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"f4582ef4717640cbb6d448a022a7bdbb","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"c7dc14415f80d493bb3aeec01742145ac6ceccc98d2c681c26b212186c096692","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"REPAIR BUOY YARD This is a construction (service) requirement to perform a topographic survey and prepare the specified grading plan; temporarily relocate/demo storage sheds/containers; demo the HAZMAT area; demo perimeter fencing and vegetation; strip and stockpile RCA and RAP surface treatments for reuse; strip existing asphalt and remove, regrade and repair area per the grading plan; compact the subgrade; demo and relocate the storage container underground electrical service; place geotextile and geogrid reinforcement; backfill with compacted imported base course and grade; install asphalt and concrete pavement; install stockpiled RCA and RAP surfaces; install replacement perimeter fencing and HAZMAT fencing, load and seed disturbed areas; and reinstall storage sheds/containers. Construction of the Buoy Yard will be performed in two phases to provide continued U.S. Coast Guard access to the Buoy Yard equipment laydown and storage areas. Phase 1 will occur first and includes all work specified as outlined in the drawings. Phase 2 will begin after the completion of Phase 1 and will consist of the remaining portions of the work. Mobilization will not occur until April, 2025 at the earliest in order to help minimize impacts associated with cold weather concreting. This requirement is not part of the USCG Standardization Program.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"70Z0G125BSYN00190","place_of_performance":{"zip":"07002","city":{"name":"Bayonne"},"state":{"code":"NJ"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"award":{"date":"2025-01-27","amount":"1690000.00","number":"70Z0G125CSNY00001","awardee":{"raw":"RENCOR INC. Somerville NJ 08876 USA","name":"RENCOR INC. Somerville","location":{"zip":"08876","state":{"code":"NJ"},"country":{"code":"USA"}}}},"dates":{"posted":"2025-01-27","award_date":"2025-01-27"},"links":{"sam":"https://sam.gov/workspace/contract/opp/b3381daa784f4de1bdc9d1a463447489/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"REPAIR BUOY YARD","agency":{"office":{"code":"70Z0G1","name":"CEU PROVIDENCE(000G1)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02886","city":"WARWICK","state":"RI","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-28","archive_type":"auto_custom"},"contacts":[{"name":"Nadine Provost","role":"primary","email":"Nadine.M.Provost@uscg.mil","phone":"4017361766"},{"name":"Simon W. Leung","role":"secondary","email":"simon.w.leung@uscg.mil","phone":"4017361785"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"b3381daa784f4de1bdc9d1a463447489","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"a8e4cd4765ddb647a0f0f1939031bc931107f07cccce00ff5d8abdc4dcb655c9","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"AWARD NOTICE","origin":"extract"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"70Z0G125CSNY00001","place_of_performance":{"zip":"07002","city":{"name":"Bayonne"},"state":{"code":"NJ"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"}],"due_at":"2024-12-10T19:00:00Z","due_date":"2024-12-10","closes_at":"2024-12-10T19:00:00Z","awardable":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z0G1","office_name":"CEU PROVIDENCE(000G1)","state":"NJ","county":"34017","county_name":"Hudson County","city":"3403580","city_name":"Bayonne","country":"USA","winner_key":"L4B9W25MWGM1","amount":"1690000.00","linked_awards":12,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"b3381daa784f4de1bdc9d1a463447489","description":{"text":"AWARD NOTICE","html":null,"origin":"extract"},"contacts":[{"name":"Nadine Provost","role":"primary","email":"Nadine.M.Provost@uscg.mil","phone":"4017361766"},{"name":"Simon W. Leung","role":"secondary","email":"simon.w.leung@uscg.mil","phone":"4017361785"}],"place_of_performance":{"zip":"07002","city":{"name":"Bayonne"},"state":{"code":"NJ"},"country":{"code":"USA"}},"office_address":{"zip":"02886","city":"WARWICK","state":"RI","country":"USA"},"naics_codes":["237990"],"award":{"date":"2025-01-27","amount":"1690000.00","number":"70Z0G125CSNY00001","awardee":{"raw":"RENCOR INC. Somerville NJ 08876 USA","name":"RENCOR INC. Somerville","location":{"zip":"08876","state":{"code":"NJ"},"country":{"code":"USA"}}}},"attachments":[],"awards":[{"award_key":"CONT_AWD_70Z0G125CSNY00001_7008_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_70Z0G125CSNY00001_7008_-NONE-_-NONE-/","piid":"70Z0G125CSNY00001","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"L4B9W25MWGM1","recipient_name":"RENCOR INC.","recipient_uei":"L4B9W25MWGM1","recipient_cage":"1RFK2","recipient_city":"SOMERVILLE","recipient_state":"NJ","sub_name":"U.S. Coast Guard","office_name":"CEU PROVIDENCE(000G1)","office_key":"o-70Z0G1","first_action_date":"2025-01-29","last_action_date":"2026-07-06","actions":6,"obligated":"2074157.97","current_total_value":"2074157.97","potential_total_value":"2074157.97","naics":"238220","psc":"Y1NZ","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":12,"description":"TO AWARD REPAIR BUOY YARD AIDS TO NAVIGATION TEAM, NEW YORK, BAYONNE NEW JERSEY, PSN 16191810.","method":"piid","confidence":"high","evidence":["award number 70Z0G125CSNY00001 equals the contract number","same awarding office 70Z0G1"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"70Z0G126BSSNE1057","latest_notice_id":"02af8b2b91bf49f9967c5c1e3c0a1426","title":"Repair Aids to Navigation (ATON) - Southern Area of USCG District Northeast","solicitation_number":"70Z0G126BSSNE1057","notice_type":"p","first_type":"p","first_posted":"2026-08-25","last_posted":"2026-08-25","notices":1,"due_at":"2026-10-13T18:00:00Z","due_date":"2026-10-13","closes_at":"2026-10-13T18:00:00Z","awardable":true,"open":true,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z0G1","office_name":"CEU PROVIDENCE(000G1)","naics":"237990","psc":"Z2BC","set_aside":"SBA","state":"CT","county":"09170","county_name":"South Central Connecticut Planning Region","city":"0952000","city_name":"New Haven","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"70Z0G126BSLISSW02","latest_notice_id":"fe260fdca8fd47dd8c0513aabf02d2a3","title":"USCG Cutter Eagle New Dredging for Berthing at New London City Pier","solicitation_number":"70Z0G126BSLISSW02","notice_type":"o","first_type":"p","first_posted":"2026-07-27","last_posted":"2026-09-11","notices":2,"due_at":"2026-10-15T18:00:00Z","due_date":"2026-10-15","closes_at":"2026-10-15T18:00:00Z","awardable":true,"open":true,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z0G1","office_name":"CEU PROVIDENCE(000G1)","naics":"23799","psc":"Z1KF","set_aside":"SBA","state":"CT","county":"09180","county_name":"Southeastern Connecticut Planning Region","city":"0952280","city_name":"New London","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"}]}