{"canonical":"https://abierto.us/opportunities/70z08526q0028325","key":"70Z08526Q0028325","url":"https://abierto.us/opportunities/70z08526q0028325","title":"USCGC HEALY CO2 Pull System Upgrade","solicitation_number":"70Z08526Q0028325","notice_type":"k","open":true,"removed":false,"removed_at":null,"response_deadline":"2026-09-25T15:00:00Z","first_posted":"2026-09-21","last_posted":"2026-09-21","department":"HOMELAND SECURITY, DEPARTMENT OF","subagency":"US COAST GUARD","office":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"488390","psc":"J020","set_aside":"SBA","place_state":"WA","place_county":"53033","place_county_name":"King County","place_city":"5363000","place_city_name":"Seattle","winner":null,"award_amount":null,"publications":[{"notice_id":"f8f4e20103e242f9808a3242633a71a7","title":"USCGC HEALY CO2 Pull System Upgrade","solicitation_number":"70Z08526Q0028325","notice_type":"k","base_type":"k","posted":"2026-09-21","posted_at":"2026-09-21T16:58:33.385Z","due_at":"2026-09-25T15:00:00Z","due_date":"2026-09-25","cancelled":null,"archived":null,"archive_date":"2026-10-10","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f8f4e20103e242f9808a3242633a71a7/view","enriched":true,"history":[{"index":1,"title":"USCGC HEALY CO2 Pull System Upgrade","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-21T16:58:33.385Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"f8f4e20103e242f9808a3242633a71a7","solicitation_number":"70Z08526Q0028325"}]}],"latest_notice_id":"f8f4e20103e242f9808a3242633a71a7","first_type":"k","notices":[{"dates":{"posted":"2026-09-21","posted_at":"2026-09-21T16:58:33.385Z","created_at":"2026-09-21T16:52:57.284Z","modified_at":"2026-09-21T16:58:33.390Z","response_deadline":{"raw":"2026-09-25T08:00:00-07:00","utc":"2026-09-25T15:00:00Z","date":"2026-09-25","time":"08:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f8f4e20103e242f9808a3242633a71a7/view"},"naics":{"codes":["488390"],"primary":"488390"},"title":"USCGC HEALY CO2 Pull System Upgrade","agency":{"office":{"code":"70Z085","name":"SFLC PROCUREMENT BRANCH 2(00085)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"publication":"published","archive_date":"2026-10-10","archive_type":"auto15"},"history":[{"index":1,"title":"USCGC HEALY CO2 Pull System Upgrade","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-21T16:58:33.385Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"f8f4e20103e242f9808a3242633a71a7","solicitation_number":"70Z08526Q0028325"}],"contacts":[{"name":"Justin Wooldridge","role":"primary","email":"justin.r.wooldridge2@uscg.mil","phone":"2068205327"},{"name":"Lindsay Mongiovi","role":"secondary","email":"lindsay.n.mongiovi@uscg.mil","phone":"5716086752"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"f8f4e20103e242f9808a3242633a71a7","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"f8f4e20103e242f9808a3242633a71a7","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-23T01:04:22.967848340Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"95a38dcc808142de51137f8402e52049-29\"","fetched_at":"2026-09-24T04:21:46.782462570Z","row_sha256":"1ed8cd52a8f35f77ea6b95bba5003cccb635160d281f34e2305395d7f46615c4","last_modified":"2026-09-24T03:30:47Z"},"updated_at":"2026-09-24T04:21:46.782462570Z","first_seen_at":"2026-09-22T04:18:56.687806512Z"},"description":{"html":"<p>General Requirements<br />\n1. SCOPE<br />\n1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs<br />\nperformed by commercial contractors at a Coast Guard facility for Coast Guard vessels.<br />\n2. REFERENCES<br />\nCOAST GUARD DRAWINGS<br />\nNone<br />\nCOAST GUARD PUBLICATIONS<br />\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022,<br />\nGeneral Requirements<br />\nSurface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022,<br />\nWelding and Allied Processes<br />\nSurface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire<br />\nPrevention and Response<br />\nOTHER REFERENCES<br />\nNone<br />\n3. REQUIREMENTS<br />\n3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in<br />\nthis item, as applicable, during the performance of this availability. The requirements of this WI apply to<br />\nall work under the scope of this contract, whether explicitly stated in all following work items or not, and<br />\nto all other work subsequently authorized by changes, modifications, or extensions to the contract.<br />\n3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and<br />\nequipment.<br />\n3.3 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and<br />\nNDE in accordance with SFLC Std Spec 0740.<br />\n3.4 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with<br />\nparagraph 3.1 of SFLC Standard Spec 5550</p>\n\n<p>3.5. Period of Performance. The period of performance for this work starts on 01 Oct 26 and ends on<br />\n31 Oct 2026.<br />\n3.6. Location. The Contractor must perform the work while the USCGC HEALY is alongside the pier at<br />\nCoast Guard Base Seattle<br />\n3.7 Ship-check. It is highly recommended the Contractor conducts a ship-check to propose the best<br />\nrouting for the new pull cables. The Generator rooms have many interferences to consider during the<br />\nplanning. The cutter will be available from 21 to 25 Sep 2026 for ship-checks at Seattle WA. Interested<br />\ncontractors must contact the POC&#39;s to coordinate a ship&#39;s visit.<br />\n3.8 Ship-check will be at no cost to the government.<br />\nPoints of Contact: MKCM Armando Perez (Armando.Perez@uscg.mil) USCGC Engineer Officer: LCDR<br />\nTrey Thunborg (Trey.A.Thunborg@uscg.mil).<br />\nWORK ITEM 1: Fire Pull, Replace<br />\n1. SCOPE<br />\n1.1 Intent. This work item describes the requirements for the Contractor to replace the manual fire pulls<br />\nconnecting the Engineering Control Center (ECC) (01-105-0-C) to the CO2 system for Generator Room 1<br />\n(1-80-1-E) and Generator Room 2 (1-80-2-E). The CO2 bottles and actuation system are located in the<br />\nCO2 Room (1-65-1-K)<br />\n1.2 Government-furnished property.<br />\nNone<br />\n2. REFERENCES<br />\nCOAST GUARD DRAWINGS<br />\nCoast Guard Drawing 420-WAGB-079-002, Rev (-), Damage Control Diagrams<br />\nCoast Guard Drawing 420-WAGB-555-009, Rev B, CO2 System Piping Mods<br />\nCoast Guard Drawing 420-WAGB-635-001, Rev D, Insulation Layouts &amp; Dets<br />\nCoast Guard Drawing 420-WAGB-801-001, Rev K, Booklet of General Drawings<br />\nCOAST GUARD PUBLICATIONS</p>\n\n<p>Coast Guard Technical Publication (TP) 5207, 2003, Fire Extinguishing System, High Pressure<br />\nCarbon Dioxide<br />\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022,<br />\nGeneral Requirements<br />\nSurface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022,<br />\nWelding and Allied Processes<br />\nSurface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022,<br />\nRequirements for Preservation of Ship Structures<br />\nOTHER REFERENCES<br />\nNone<br />\n3. REQUIREMENTS CLIN 001<br />\n3.1 General.<br />\n3.1.1 CIR.<br />\nNone.<br />\n3.1.2 Tech Rep. The Contractor must provide the services of a Technical Representative who is a certified<br />\ndistributor of Kidde Products and a Factory Certified Technician for Kidde products to accomplish the<br />\nfollowing on site:<br />\n. Provide manufacturer&#39;s proprietary system/ equipment information, software, and tools.<br />\n. Assist with installation and testing of the equipment/system.<br />\n. Ensure compliance with manufacturer&#39;s procedures and standards during system installation<br />\nand testing.<br />\n3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated it<br />\non their r&eacute;sum&eacute;.<br />\n3.1.2.2 Submit the name and r&eacute;sum&eacute; of the Tech Rep with the solicitation response.<br />\n3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance<br />\nwith SFLC Std Spec 0000.<br />\n3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000,<br />\nparagraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below:<br />\n. Decks<br />\n. Bulkheads<br />\n. Machinery<br />\n. Insulation/lagging<br />\n. Piping<br />\n. Monorail trolley system<br />\n. Lighting</p>\n\n<p>. Wiring<br />\nNOTE<br />\nCoast Guard personnel will operate all shipboard machinery and equipment.<br />\n3.2 Operational test - initial. Prior to commencement of work, in the presence of the Engineering Officer<br />\nor their designee the Contractor must witness Coast Guard personnel perform an initial operational test of<br />\nall items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing<br />\noperational condition. Submit a CFR.<br />\n3.3 Pull Station Plan. The Contractor must provide the following information with the solicitation:<br />\n. An approximated route for the new pull station cables. This can be neatly hand-drawn on a<br />\ncopy of CG Drawing 420-WAGB-079-002, 420-WAGB-801-001, or with marked up<br />\nphotographs.<br />\n. An estimate for the number of corner pulleys and their locations.<br />\n. The make, model, and location of the new pull devices located in the ECC.<br />\n. The make, model, and location of any new dual pull mechanisms.<br />\n3.4 Existing Pull Station Rip-out. The Contractor must remove and dispose of the two existing ECC<br />\nGenerator #1 and #2 pull stations, their associated conduit, cable, and corner pulleys up to the Dual Pull<br />\nMechanism for the Control Heads and Control Stop Valves. Some of the conduit may be reused.<br />\n3.4.1 Any penetrations through decks or bulkheads, where the penetration will no longer be used, must be<br />\ncut to within six inches of the bulkhead/deck and have a cap or plug welded on either side of the<br />\npenetration in accordance with SFLC Std Spec 0740.<br />\n3.5 Pull Station Install. The Contractor must install the new ECC pull stations for Generator Room #1 &amp;<br />\n#2, all conduit, cables and corner pulleys to their associated Dual Pull Mechanism in accordance with TP<br />\n5207. Deviations from the plan submitted in the solicitation must be approved by the Coast Guard.<br />\n3.5.1 The Contractor must adhere to the maximum corner pulley and cable limitations outlined in TP<br />\n5207.<br />\n3.6 Boundary test, generic. The Contractor must verify the integrity of all boundaries affected by this<br />\nwork item using one of the methods described in SFLC Std Spec 0740, Appendix C in the presence of the<br />\nEngineering Officer or their designee.<br />\n3.7 Operational test &ndash; post repairs. After completion of work, in the presence of the Engineering Officer<br />\nor their designee the Contractor must observe a test of all shipboard devices that have been disturbed,<br />\nused, repaired, altered, or installed to be in satisfactory operating condition.<br />\n3.7.1 Demonstrate that the pull station will activate the CO2 bottle. If the force required for activation<br />\nexceeds 40 lbs., the contractor must adjust the system until a satisfactory pull force is reached.<br />\n3.7.2 Perform a test of the discharge indicating panels located in ECC (01-105-0-C).<br />\n3.7.3 Ensure the CO2 system for both generator rooms is fully functional in all modes of activation.<br />\n3.8 The Contractor must repair/replace any damaged insulation in accordance with CG Drawing 420-<br />\nWAGB-635-001.</p>\n\n<p>3.9 Touch-up preservation, general. The Contractor must prepare and coat all new and disturbed exterior<br />\nand interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std<br />\nSpec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)<br />\n4. Period of Performance (POP)<br />\n01 Oct 26 - 31 Oct 2026. All work to be performed at cutter&#39;s homeport in Seattle WA. Contractor must<br />\ncoordinate with the POC below for actual required days within this POP.<br />\n4.1 USCG Technical Points of Contact.<br />\nUSCG-SFLC-LREPL, Asset Manager: MKCM Armando Perez (Armando.Perez@uscg.mil) USCGC<br />\nEngineer Officer: LCDR Trey Thunborg (Trey.A.Thunborg@uscg.mil)<br />\n4.2 Place of Performance<br />\nThe place of performance will be at the Cutter&rsquo;s facility in Seattle, WA.<br />\n1539 Alaskan Way<br />\nSeattle WA 98134<br />\n5.0 CLIN 0002: Potential Repairs based on CFR not to exceed ($16,000 dollars)<br />\n5.1. Pricing for any additional travel costs, material, or field service days will be requested and handled<br />\nby the KO under the terms of the contract. Any repairs beyond the base scope identified because of the<br />\ntroubleshooting shall be documented in a Condition Found Report (CFR) with a technical description of<br />\nthe recommended repairs. The CFR shall be provided to the Technical POCs and the Contracting Officer.<br />\n5.1.2. Any additional work will be authorized only by the KO through a written contract modification.<br />\nThe contractor shall not perform any repairs beyond the base scope until specifically authorized in writing<br />\nby the KO. If the Government elects to proceed with additional repairs, the KO will issue a written<br />\ncontract modification that identifies the authorized additional work and associated firm fixed price. The<br />\ncontractor shall base any proposal for additional repairs on the findings in the CFR.<br />\n4. NOTES<br />\nNone</p>","text":"General Requirements\n\n1. SCOPE\n\n1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs\n\nperformed by commercial contractors at a Coast Guard facility for Coast Guard vessels.\n\n2. REFERENCES\n\nCOAST GUARD DRAWINGS\n\nNone\n\nCOAST GUARD PUBLICATIONS\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022,\n\nGeneral Requirements\n\nSurface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022,\n\nWelding and Allied Processes\n\nSurface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire\n\nPrevention and Response\n\nOTHER REFERENCES\n\nNone\n\n3. REQUIREMENTS\n\n3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in\n\nthis item, as applicable, during the performance of this availability. The requirements of this WI apply to\n\nall work under the scope of this contract, whether explicitly stated in all following work items or not, and\n\nto all other work subsequently authorized by changes, modifications, or extensions to the contract.\n\n3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and\n\nequipment.\n\n3.3 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and\n\nNDE in accordance with SFLC Std Spec 0740.\n\n3.4 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with\n\nparagraph 3.1 of SFLC Standard Spec 5550\n\n3.5. Period of Performance. The period of performance for this work starts on 01 Oct 26 and ends on\n\n31 Oct 2026.\n\n3.6. Location. The Contractor must perform the work while the USCGC HEALY is alongside the pier at\n\nCoast Guard Base Seattle\n\n3.7 Ship-check. It is highly recommended the Contractor conducts a ship-check to propose the best\n\nrouting for the new pull cables. The Generator rooms have many interferences to consider during the\n\nplanning. The cutter will be available from 21 to 25 Sep 2026 for ship-checks at Seattle WA. Interested\n\ncontractors must contact the POC's to coordinate a ship's visit.\n\n3.8 Ship-check will be at no cost to the government.\n\nPoints of Contact: MKCM Armando Perez (Armando.Perez@uscg.mil) USCGC Engineer Officer: LCDR\n\nTrey Thunborg (Trey.A.Thunborg@uscg.mil).\n\nWORK ITEM 1: Fire Pull, Replace\n\n1. SCOPE\n\n1.1 Intent. This work item describes the requirements for the Contractor to replace the manual fire pulls\n\nconnecting the Engineering Control Center (ECC) (01-105-0-C) to the CO2 system for Generator Room 1\n\n(1-80-1-E) and Generator Room 2 (1-80-2-E). The CO2 bottles and actuation system are located in the\n\nCO2 Room (1-65-1-K)\n\n1.2 Government-furnished property.\n\nNone\n\n2. REFERENCES\n\nCOAST GUARD DRAWINGS\n\nCoast Guard Drawing 420-WAGB-079-002, Rev (-), Damage Control Diagrams\n\nCoast Guard Drawing 420-WAGB-555-009, Rev B, CO2 System Piping Mods\n\nCoast Guard Drawing 420-WAGB-635-001, Rev D, Insulation Layouts & Dets\n\nCoast Guard Drawing 420-WAGB-801-001, Rev K, Booklet of General Drawings\n\nCOAST GUARD PUBLICATIONS\n\nCoast Guard Technical Publication (TP) 5207, 2003, Fire Extinguishing System, High Pressure\n\nCarbon Dioxide\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022,\n\nGeneral Requirements\n\nSurface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022,\n\nWelding and Allied Processes\n\nSurface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022,\n\nRequirements for Preservation of Ship Structures\n\nOTHER REFERENCES\n\nNone\n\n3. REQUIREMENTS CLIN 001\n\n3.1 General.\n\n3.1.1 CIR.\n\nNone.\n\n3.1.2 Tech Rep. The Contractor must provide the services of a Technical Representative who is a certified\n\ndistributor of Kidde Products and a Factory Certified Technician for Kidde products to accomplish the\n\nfollowing on site:\n\n. Provide manufacturer's proprietary system/ equipment information, software, and tools.\n\n. Assist with installation and testing of the equipment/system.\n\n. Ensure compliance with manufacturer's procedures and standards during system installation\n\nand testing.\n\n3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated it\n\non their résumé.\n\n3.1.2.2 Submit the name and résumé of the Tech Rep with the solicitation response.\n\n3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance\n\nwith SFLC Std Spec 0000.\n\n3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000,\n\nparagraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below:\n\n. Decks\n\n. Bulkheads\n\n. Machinery\n\n. Insulation/lagging\n\n. Piping\n\n. Monorail trolley system\n\n. Lighting\n\n. Wiring\n\nNOTE\n\nCoast Guard personnel will operate all shipboard machinery and equipment.\n\n3.2 Operational test - initial. Prior to commencement of work, in the presence of the Engineering Officer\n\nor their designee the Contractor must witness Coast Guard personnel perform an initial operational test of\n\nall items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing\n\noperational condition. Submit a CFR.\n\n3.3 Pull Station Plan. The Contractor must provide the following information with the solicitation:\n\n. An approximated route for the new pull station cables. This can be neatly hand-drawn on a\n\ncopy of CG Drawing 420-WAGB-079-002, 420-WAGB-801-001, or with marked up\n\nphotographs.\n\n. An estimate for the number of corner pulleys and their locations.\n\n. The make, model, and location of the new pull devices located in the ECC.\n\n. The make, model, and location of any new dual pull mechanisms.\n\n3.4 Existing Pull Station Rip-out. The Contractor must remove and dispose of the two existing ECC\n\nGenerator #1 and #2 pull stations, their associated conduit, cable, and corner pulleys up to the Dual Pull\n\nMechanism for the Control Heads and Control Stop Valves. Some of the conduit may be reused.\n\n3.4.1 Any penetrations through decks or bulkheads, where the penetration will no longer be used, must be\n\ncut to within six inches of the bulkhead/deck and have a cap or plug welded on either side of the\n\npenetration in accordance with SFLC Std Spec 0740.\n\n3.5 Pull Station Install. The Contractor must install the new ECC pull stations for Generator Room #1 &\n\n#2, all conduit, cables and corner pulleys to their associated Dual Pull Mechanism in accordance with TP\n\n5207. Deviations from the plan submitted in the solicitation must be approved by the Coast Guard.\n\n3.5.1 The Contractor must adhere to the maximum corner pulley and cable limitations outlined in TP\n\n5207.\n\n3.6 Boundary test, generic. The Contractor must verify the integrity of all boundaries affected by this\n\nwork item using one of the methods described in SFLC Std Spec 0740, Appendix C in the presence of the\n\nEngineering Officer or their designee.\n\n3.7 Operational test – post repairs. After completion of work, in the presence of the Engineering Officer\n\nor their designee the Contractor must observe a test of all shipboard devices that have been disturbed,\n\nused, repaired, altered, or installed to be in satisfactory operating condition.\n\n3.7.1 Demonstrate that the pull station will activate the CO2 bottle. If the force required for activation\n\nexceeds 40 lbs., the contractor must adjust the system until a satisfactory pull force is reached.\n\n3.7.2 Perform a test of the discharge indicating panels located in ECC (01-105-0-C).\n\n3.7.3 Ensure the CO2 system for both generator rooms is fully functional in all modes of activation.\n\n3.8 The Contractor must repair/replace any damaged insulation in accordance with CG Drawing 420-\n\nWAGB-635-001.\n\n3.9 Touch-up preservation, general. The Contractor must prepare and coat all new and disturbed exterior\n\nand interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std\n\nSpec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)\n\n4. Period of Performance (POP)\n\n01 Oct 26 - 31 Oct 2026. All work to be performed at cutter's homeport in Seattle WA. Contractor must\n\ncoordinate with the POC below for actual required days within this POP.\n\n4.1 USCG Technical Points of Contact.\n\nUSCG-SFLC-LREPL, Asset Manager: MKCM Armando Perez (Armando.Perez@uscg.mil) USCGC\n\nEngineer Officer: LCDR Trey Thunborg (Trey.A.Thunborg@uscg.mil)\n\n4.2 Place of Performance\n\nThe place of performance will be at the Cutter’s facility in Seattle, WA.\n\n1539 Alaskan Way\n\nSeattle WA 98134\n\n5.0 CLIN 0002: Potential Repairs based on CFR not to exceed ($16,000 dollars)\n\n5.1. Pricing for any additional travel costs, material, or field service days will be requested and handled\n\nby the KO under the terms of the contract. Any repairs beyond the base scope identified because of the\n\ntroubleshooting shall be documented in a Condition Found Report (CFR) with a technical description of\n\nthe recommended repairs. The CFR shall be provided to the Technical POCs and the Contracting Officer.\n\n5.1.2. Any additional work will be authorized only by the KO through a written contract modification.\n\nThe contractor shall not perform any repairs beyond the base scope until specifically authorized in writing\n\nby the KO. If the Government elects to proceed with additional repairs, the KO will issue a written\n\ncontract modification that identifies the authorized additional work and associated firm fixed price. The\n\ncontractor shall base any proposal for additional repairs on the findings in the CFR.\n\n4. NOTES\n\nNone","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"70Z08526Q0028325","place_of_performance":{"zip":"98134","city":{"name":"Seattle"},"state":{"code":"WA"},"country":{"code":"USA"}},"product_service_code":"J020"}],"due_at":"2026-09-25T15:00:00Z","due_date":"2026-09-25","closes_at":"2026-09-25T15:00:00Z","awardable":true,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","state":"WA","county":"53033","county_name":"King County","city":"5363000","city_name":"Seattle","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-24T03:25:58.922164Z","principal_notice_id":"f8f4e20103e242f9808a3242633a71a7","description":{"text":"General Requirements\n\n1. SCOPE\n\n1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs\n\nperformed by commercial contractors at a Coast Guard facility for Coast Guard vessels.\n\n2. REFERENCES\n\nCOAST GUARD DRAWINGS\n\nNone\n\nCOAST GUARD PUBLICATIONS\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022,\n\nGeneral Requirements\n\nSurface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022,\n\nWelding and Allied Processes\n\nSurface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire\n\nPrevention and Response\n\nOTHER REFERENCES\n\nNone\n\n3. REQUIREMENTS\n\n3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in\n\nthis item, as applicable, during the performance of this availability. The requirements of this WI apply to\n\nall work under the scope of this contract, whether explicitly stated in all following work items or not, and\n\nto all other work subsequently authorized by changes, modifications, or extensions to the contract.\n\n3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and\n\nequipment.\n\n3.3 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and\n\nNDE in accordance with SFLC Std Spec 0740.\n\n3.4 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with\n\nparagraph 3.1 of SFLC Standard Spec 5550\n\n3.5. Period of Performance. The period of performance for this work starts on 01 Oct 26 and ends on\n\n31 Oct 2026.\n\n3.6. Location. The Contractor must perform the work while the USCGC HEALY is alongside the pier at\n\nCoast Guard Base Seattle\n\n3.7 Ship-check. It is highly recommended the Contractor conducts a ship-check to propose the best\n\nrouting for the new pull cables. The Generator rooms have many interferences to consider during the\n\nplanning. The cutter will be available from 21 to 25 Sep 2026 for ship-checks at Seattle WA. Interested\n\ncontractors must contact the POC's to coordinate a ship's visit.\n\n3.8 Ship-check will be at no cost to the government.\n\nPoints of Contact: MKCM Armando Perez (Armando.Perez@uscg.mil) USCGC Engineer Officer: LCDR\n\nTrey Thunborg (Trey.A.Thunborg@uscg.mil).\n\nWORK ITEM 1: Fire Pull, Replace\n\n1. SCOPE\n\n1.1 Intent. This work item describes the requirements for the Contractor to replace the manual fire pulls\n\nconnecting the Engineering Control Center (ECC) (01-105-0-C) to the CO2 system for Generator Room 1\n\n(1-80-1-E) and Generator Room 2 (1-80-2-E). The CO2 bottles and actuation system are located in the\n\nCO2 Room (1-65-1-K)\n\n1.2 Government-furnished property.\n\nNone\n\n2. REFERENCES\n\nCOAST GUARD DRAWINGS\n\nCoast Guard Drawing 420-WAGB-079-002, Rev (-), Damage Control Diagrams\n\nCoast Guard Drawing 420-WAGB-555-009, Rev B, CO2 System Piping Mods\n\nCoast Guard Drawing 420-WAGB-635-001, Rev D, Insulation Layouts & Dets\n\nCoast Guard Drawing 420-WAGB-801-001, Rev K, Booklet of General Drawings\n\nCOAST GUARD PUBLICATIONS\n\nCoast Guard Technical Publication (TP) 5207, 2003, Fire Extinguishing System, High Pressure\n\nCarbon Dioxide\n\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022,\n\nGeneral Requirements\n\nSurface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022,\n\nWelding and Allied Processes\n\nSurface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022,\n\nRequirements for Preservation of Ship Structures\n\nOTHER REFERENCES\n\nNone\n\n3. REQUIREMENTS CLIN 001\n\n3.1 General.\n\n3.1.1 CIR.\n\nNone.\n\n3.1.2 Tech Rep. The Contractor must provide the services of a Technical Representative who is a certified\n\ndistributor of Kidde Products and a Factory Certified Technician for Kidde products to accomplish the\n\nfollowing on site:\n\n. Provide manufacturer's proprietary system/ equipment information, software, and tools.\n\n. Assist with installation and testing of the equipment/system.\n\n. Ensure compliance with manufacturer's procedures and standards during system installation\n\nand testing.\n\n3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated it\n\non their résumé.\n\n3.1.2.2 Submit the name and résumé of the Tech Rep with the solicitation response.\n\n3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance\n\nwith SFLC Std Spec 0000.\n\n3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000,\n\nparagraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below:\n\n. Decks\n\n. Bulkheads\n\n. Machinery\n\n. Insulation/lagging\n\n. Piping\n\n. Monorail trolley system\n\n. Lighting\n\n. Wiring\n\nNOTE\n\nCoast Guard personnel will operate all shipboard machinery and equipment.\n\n3.2 Operational test - initial. Prior to commencement of work, in the presence of the Engineering Officer\n\nor their designee the Contractor must witness Coast Guard personnel perform an initial operational test of\n\nall items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing\n\noperational condition. Submit a CFR.\n\n3.3 Pull Station Plan. The Contractor must provide the following information with the solicitation:\n\n. An approximated route for the new pull station cables. This can be neatly hand-drawn on a\n\ncopy of CG Drawing 420-WAGB-079-002, 420-WAGB-801-001, or with marked up\n\nphotographs.\n\n. An estimate for the number of corner pulleys and their locations.\n\n. The make, model, and location of the new pull devices located in the ECC.\n\n. The make, model, and location of any new dual pull mechanisms.\n\n3.4 Existing Pull Station Rip-out. The Contractor must remove and dispose of the two existing ECC\n\nGenerator #1 and #2 pull stations, their associated conduit, cable, and corner pulleys up to the Dual Pull\n\nMechanism for the Control Heads and Control Stop Valves. Some of the conduit may be reused.\n\n3.4.1 Any penetrations through decks or bulkheads, where the penetration will no longer be used, must be\n\ncut to within six inches of the bulkhead/deck and have a cap or plug welded on either side of the\n\npenetration in accordance with SFLC Std Spec 0740.\n\n3.5 Pull Station Install. The Contractor must install the new ECC pull stations for Generator Room #1 &\n\n#2, all conduit, cables and corner pulleys to their associated Dual Pull Mechanism in accordance with TP\n\n5207. Deviations from the plan submitted in the solicitation must be approved by the Coast Guard.\n\n3.5.1 The Contractor must adhere to the maximum corner pulley and cable limitations outlined in TP\n\n5207.\n\n3.6 Boundary test, generic. The Contractor must verify the integrity of all boundaries affected by this\n\nwork item using one of the methods described in SFLC Std Spec 0740, Appendix C in the presence of the\n\nEngineering Officer or their designee.\n\n3.7 Operational test – post repairs. After completion of work, in the presence of the Engineering Officer\n\nor their designee the Contractor must observe a test of all shipboard devices that have been disturbed,\n\nused, repaired, altered, or installed to be in satisfactory operating condition.\n\n3.7.1 Demonstrate that the pull station will activate the CO2 bottle. If the force required for activation\n\nexceeds 40 lbs., the contractor must adjust the system until a satisfactory pull force is reached.\n\n3.7.2 Perform a test of the discharge indicating panels located in ECC (01-105-0-C).\n\n3.7.3 Ensure the CO2 system for both generator rooms is fully functional in all modes of activation.\n\n3.8 The Contractor must repair/replace any damaged insulation in accordance with CG Drawing 420-\n\nWAGB-635-001.\n\n3.9 Touch-up preservation, general. The Contractor must prepare and coat all new and disturbed exterior\n\nand interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std\n\nSpec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)\n\n4. Period of Performance (POP)\n\n01 Oct 26 - 31 Oct 2026. All work to be performed at cutter's homeport in Seattle WA. Contractor must\n\ncoordinate with the POC below for actual required days within this POP.\n\n4.1 USCG Technical Points of Contact.\n\nUSCG-SFLC-LREPL, Asset Manager: MKCM Armando Perez (Armando.Perez@uscg.mil) USCGC\n\nEngineer Officer: LCDR Trey Thunborg (Trey.A.Thunborg@uscg.mil)\n\n4.2 Place of Performance\n\nThe place of performance will be at the Cutter’s facility in Seattle, WA.\n\n1539 Alaskan Way\n\nSeattle WA 98134\n\n5.0 CLIN 0002: Potential Repairs based on CFR not to exceed ($16,000 dollars)\n\n5.1. Pricing for any additional travel costs, material, or field service days will be requested and handled\n\nby the KO under the terms of the contract. Any repairs beyond the base scope identified because of the\n\ntroubleshooting shall be documented in a Condition Found Report (CFR) with a technical description of\n\nthe recommended repairs. The CFR shall be provided to the Technical POCs and the Contracting Officer.\n\n5.1.2. Any additional work will be authorized only by the KO through a written contract modification.\n\nThe contractor shall not perform any repairs beyond the base scope until specifically authorized in writing\n\nby the KO. If the Government elects to proceed with additional repairs, the KO will issue a written\n\ncontract modification that identifies the authorized additional work and associated firm fixed price. The\n\ncontractor shall base any proposal for additional repairs on the findings in the CFR.\n\n4. NOTES\n\nNone","html":"<p>General Requirements<br />\n1. SCOPE<br />\n1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs<br />\nperformed by commercial contractors at a Coast Guard facility for Coast Guard vessels.<br />\n2. REFERENCES<br />\nCOAST GUARD DRAWINGS<br />\nNone<br />\nCOAST GUARD PUBLICATIONS<br />\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022,<br />\nGeneral Requirements<br />\nSurface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022,<br />\nWelding and Allied Processes<br />\nSurface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire<br />\nPrevention and Response<br />\nOTHER REFERENCES<br />\nNone<br />\n3. REQUIREMENTS<br />\n3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in<br />\nthis item, as applicable, during the performance of this availability. The requirements of this WI apply to<br />\nall work under the scope of this contract, whether explicitly stated in all following work items or not, and<br />\nto all other work subsequently authorized by changes, modifications, or extensions to the contract.<br />\n3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and<br />\nequipment.<br />\n3.3 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and<br />\nNDE in accordance with SFLC Std Spec 0740.<br />\n3.4 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with<br />\nparagraph 3.1 of SFLC Standard Spec 5550</p>\n\n<p>3.5. Period of Performance. The period of performance for this work starts on 01 Oct 26 and ends on<br />\n31 Oct 2026.<br />\n3.6. Location. The Contractor must perform the work while the USCGC HEALY is alongside the pier at<br />\nCoast Guard Base Seattle<br />\n3.7 Ship-check. It is highly recommended the Contractor conducts a ship-check to propose the best<br />\nrouting for the new pull cables. The Generator rooms have many interferences to consider during the<br />\nplanning. The cutter will be available from 21 to 25 Sep 2026 for ship-checks at Seattle WA. Interested<br />\ncontractors must contact the POC&#39;s to coordinate a ship&#39;s visit.<br />\n3.8 Ship-check will be at no cost to the government.<br />\nPoints of Contact: MKCM Armando Perez (Armando.Perez@uscg.mil) USCGC Engineer Officer: LCDR<br />\nTrey Thunborg (Trey.A.Thunborg@uscg.mil).<br />\nWORK ITEM 1: Fire Pull, Replace<br />\n1. SCOPE<br />\n1.1 Intent. This work item describes the requirements for the Contractor to replace the manual fire pulls<br />\nconnecting the Engineering Control Center (ECC) (01-105-0-C) to the CO2 system for Generator Room 1<br />\n(1-80-1-E) and Generator Room 2 (1-80-2-E). The CO2 bottles and actuation system are located in the<br />\nCO2 Room (1-65-1-K)<br />\n1.2 Government-furnished property.<br />\nNone<br />\n2. REFERENCES<br />\nCOAST GUARD DRAWINGS<br />\nCoast Guard Drawing 420-WAGB-079-002, Rev (-), Damage Control Diagrams<br />\nCoast Guard Drawing 420-WAGB-555-009, Rev B, CO2 System Piping Mods<br />\nCoast Guard Drawing 420-WAGB-635-001, Rev D, Insulation Layouts &amp; Dets<br />\nCoast Guard Drawing 420-WAGB-801-001, Rev K, Booklet of General Drawings<br />\nCOAST GUARD PUBLICATIONS</p>\n\n<p>Coast Guard Technical Publication (TP) 5207, 2003, Fire Extinguishing System, High Pressure<br />\nCarbon Dioxide<br />\nSurface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022,<br />\nGeneral Requirements<br />\nSurface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022,<br />\nWelding and Allied Processes<br />\nSurface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022,<br />\nRequirements for Preservation of Ship Structures<br />\nOTHER REFERENCES<br />\nNone<br />\n3. REQUIREMENTS CLIN 001<br />\n3.1 General.<br />\n3.1.1 CIR.<br />\nNone.<br />\n3.1.2 Tech Rep. The Contractor must provide the services of a Technical Representative who is a certified<br />\ndistributor of Kidde Products and a Factory Certified Technician for Kidde products to accomplish the<br />\nfollowing on site:<br />\n. Provide manufacturer&#39;s proprietary system/ equipment information, software, and tools.<br />\n. Assist with installation and testing of the equipment/system.<br />\n. Ensure compliance with manufacturer&#39;s procedures and standards during system installation<br />\nand testing.<br />\n3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated it<br />\non their r&eacute;sum&eacute;.<br />\n3.1.2.2 Submit the name and r&eacute;sum&eacute; of the Tech Rep with the solicitation response.<br />\n3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance<br />\nwith SFLC Std Spec 0000.<br />\n3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000,<br />\nparagraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below:<br />\n. Decks<br />\n. Bulkheads<br />\n. Machinery<br />\n. Insulation/lagging<br />\n. Piping<br />\n. Monorail trolley system<br />\n. Lighting</p>\n\n<p>. Wiring<br />\nNOTE<br />\nCoast Guard personnel will operate all shipboard machinery and equipment.<br />\n3.2 Operational test - initial. Prior to commencement of work, in the presence of the Engineering Officer<br />\nor their designee the Contractor must witness Coast Guard personnel perform an initial operational test of<br />\nall items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing<br />\noperational condition. Submit a CFR.<br />\n3.3 Pull Station Plan. The Contractor must provide the following information with the solicitation:<br />\n. An approximated route for the new pull station cables. This can be neatly hand-drawn on a<br />\ncopy of CG Drawing 420-WAGB-079-002, 420-WAGB-801-001, or with marked up<br />\nphotographs.<br />\n. An estimate for the number of corner pulleys and their locations.<br />\n. The make, model, and location of the new pull devices located in the ECC.<br />\n. The make, model, and location of any new dual pull mechanisms.<br />\n3.4 Existing Pull Station Rip-out. The Contractor must remove and dispose of the two existing ECC<br />\nGenerator #1 and #2 pull stations, their associated conduit, cable, and corner pulleys up to the Dual Pull<br />\nMechanism for the Control Heads and Control Stop Valves. Some of the conduit may be reused.<br />\n3.4.1 Any penetrations through decks or bulkheads, where the penetration will no longer be used, must be<br />\ncut to within six inches of the bulkhead/deck and have a cap or plug welded on either side of the<br />\npenetration in accordance with SFLC Std Spec 0740.<br />\n3.5 Pull Station Install. The Contractor must install the new ECC pull stations for Generator Room #1 &amp;<br />\n#2, all conduit, cables and corner pulleys to their associated Dual Pull Mechanism in accordance with TP<br />\n5207. Deviations from the plan submitted in the solicitation must be approved by the Coast Guard.<br />\n3.5.1 The Contractor must adhere to the maximum corner pulley and cable limitations outlined in TP<br />\n5207.<br />\n3.6 Boundary test, generic. The Contractor must verify the integrity of all boundaries affected by this<br />\nwork item using one of the methods described in SFLC Std Spec 0740, Appendix C in the presence of the<br />\nEngineering Officer or their designee.<br />\n3.7 Operational test &ndash; post repairs. After completion of work, in the presence of the Engineering Officer<br />\nor their designee the Contractor must observe a test of all shipboard devices that have been disturbed,<br />\nused, repaired, altered, or installed to be in satisfactory operating condition.<br />\n3.7.1 Demonstrate that the pull station will activate the CO2 bottle. If the force required for activation<br />\nexceeds 40 lbs., the contractor must adjust the system until a satisfactory pull force is reached.<br />\n3.7.2 Perform a test of the discharge indicating panels located in ECC (01-105-0-C).<br />\n3.7.3 Ensure the CO2 system for both generator rooms is fully functional in all modes of activation.<br />\n3.8 The Contractor must repair/replace any damaged insulation in accordance with CG Drawing 420-<br />\nWAGB-635-001.</p>\n\n<p>3.9 Touch-up preservation, general. The Contractor must prepare and coat all new and disturbed exterior<br />\nand interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std<br />\nSpec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)<br />\n4. Period of Performance (POP)<br />\n01 Oct 26 - 31 Oct 2026. All work to be performed at cutter&#39;s homeport in Seattle WA. Contractor must<br />\ncoordinate with the POC below for actual required days within this POP.<br />\n4.1 USCG Technical Points of Contact.<br />\nUSCG-SFLC-LREPL, Asset Manager: MKCM Armando Perez (Armando.Perez@uscg.mil) USCGC<br />\nEngineer Officer: LCDR Trey Thunborg (Trey.A.Thunborg@uscg.mil)<br />\n4.2 Place of Performance<br />\nThe place of performance will be at the Cutter&rsquo;s facility in Seattle, WA.<br />\n1539 Alaskan Way<br />\nSeattle WA 98134<br />\n5.0 CLIN 0002: Potential Repairs based on CFR not to exceed ($16,000 dollars)<br />\n5.1. Pricing for any additional travel costs, material, or field service days will be requested and handled<br />\nby the KO under the terms of the contract. Any repairs beyond the base scope identified because of the<br />\ntroubleshooting shall be documented in a Condition Found Report (CFR) with a technical description of<br />\nthe recommended repairs. The CFR shall be provided to the Technical POCs and the Contracting Officer.<br />\n5.1.2. Any additional work will be authorized only by the KO through a written contract modification.<br />\nThe contractor shall not perform any repairs beyond the base scope until specifically authorized in writing<br />\nby the KO. If the Government elects to proceed with additional repairs, the KO will issue a written<br />\ncontract modification that identifies the authorized additional work and associated firm fixed price. The<br />\ncontractor shall base any proposal for additional repairs on the findings in the CFR.<br />\n4. NOTES<br />\nNone</p>","origin":"detail"},"contacts":[{"name":"Justin Wooldridge","role":"primary","email":"justin.r.wooldridge2@uscg.mil","phone":"2068205327"},{"name":"Lindsay Mongiovi","role":"secondary","email":"lindsay.n.mongiovi@uscg.mil","phone":"5716086752"}],"place_of_performance":{"zip":"98134","city":{"name":"Seattle"},"state":{"code":"WA"},"country":{"code":"USA"}},"office_address":{"zip":"94501","city":"ALAMEDA","state":"CA","country":"USA"},"naics_codes":["488390"],"award":null,"attachments":[{"resource_id":"9ac41ec676f54fdeab0777d0f68d49a1","name":"SOW CO2 System Fire Pull Replace.pdf","kind":"file","mime_type":".pdf","size_bytes":455432,"posted_at":"2026-09-21T16:58:33.385Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9ac41ec676f54fdeab0777d0f68d49a1/download","mirrored":false}],"awards":[],"related":[{"key":"70Z08526Q0028538","latest_notice_id":"e38b3bfd884c447faef039f703541626","title":"USCGC ALDER REPAIR OF SHIPS SERVICE DIESEL GENERATOR (SSDG)","solicitation_number":"70Z08526Q0028538","notice_type":"k","first_type":"k","first_posted":"2026-09-21","last_posted":"2026-09-21","notices":1,"due_at":"2026-09-25T15:00:00Z","due_date":"2026-09-25","closes_at":"2026-09-25T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"336611","psc":"J999","set_aside":"SBA","state":"CA","county":"06075","county_name":"San Francisco County","city":"0667000","city_name":"San Francisco","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"},{"key":"70Z08526Q0027487","latest_notice_id":"9c76d0b188934c849a5be82e455b4e75","title":"USCGC Mackinaw Steering Motor Rebuild","solicitation_number":"70Z08526Q0027487","notice_type":"k","first_type":"k","first_posted":"2026-09-23","last_posted":"2026-09-23","notices":1,"due_at":"2026-09-28T15:00:00Z","due_date":"2026-09-28","closes_at":"2026-09-28T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"336611","psc":"J020","set_aside":"SBA","state":"MI","county":"26031","county_name":"Cheboygan County","city":"2615000","city_name":"Cheboygan","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T04:24:26.592861Z"},{"key":"70Z08526Q0027952","latest_notice_id":"49a4a0b1b42f4692860f8a4c8e3d2268","title":"CGC HEALY VACUUM BREAKER VALVES","solicitation_number":"70Z08526Q0027952","notice_type":"k","first_type":"k","first_posted":"2026-09-23","last_posted":"2026-09-23","notices":1,"due_at":"2026-09-28T15:00:00Z","due_date":"2026-09-28","closes_at":"2026-09-28T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"332911","psc":"J999","set_aside":"SBA","state":"WA","county":"53061","county_name":"Snohomish County","city":"5302585","city_name":"Arlington","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T04:24:26.592861Z"},{"key":"70Z08526Q0028500","latest_notice_id":"a7ec908e302b4ed7aab4fddc43f167e5","title":"USCGC Healy Relief Valves Overhaul","solicitation_number":"70Z08526Q0028500","notice_type":"k","first_type":"k","first_posted":"2026-09-23","last_posted":"2026-09-23","notices":1,"due_at":"2026-09-28T15:00:00Z","due_date":"2026-09-28","closes_at":"2026-09-28T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"336611","psc":"J020","set_aside":"SBA","state":"WA","county":"53033","county_name":"King County","city":"5363000","city_name":"Seattle","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T04:24:26.592861Z"},{"key":"70Z08526QLREP0025","latest_notice_id":"e17526361ea540188826730ae7d980dc","title":"USCGC CALHOUN DS FQ2 FY27","solicitation_number":"70Z08526QLREP0025","notice_type":"o","first_type":"o","first_posted":"2026-08-20","last_posted":"2026-09-04","notices":2,"due_at":"2026-09-28T16:00:00Z","due_date":"2026-09-28","closes_at":"2026-09-28T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z085","office_name":"SFLC PROCUREMENT BRANCH 2(00085)","naics":"336611","psc":"J998","set_aside":"HZC","state":"SC","county":null,"county_name":null,"city":"4550875","city_name":"North Charleston","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"}]}