# ND NP THRO 204(1) Buck Hill Road - Pre-Bid Meeting

Canonical: https://abierto.us/opportunities/6982af25sn0001

- Solicitation number: 6982AF25SN0001
- Notice type: Special notice
- Status: Closed. Deadline was November 19, 2024 at 4:00 PM EST
- Department: Department of Transportation
- Agency: Federal Highway Administration
- Contracting office: 6982AF Central Federal Lands Divisi (6982AF)
- NAICS: 237310 Highway, Street, and Bridge Construction
- Product or service code: Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
- Place of performance: Medora, North Dakota
- County: Billings County (FIPS 38007). https://abierto.us/counties/billings-county-nd-38007
- City: Medora. https://abierto.us/cities/medora-nd-3851900
- First posted: November 5, 2024
- Last posted: November 5, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/b6ff77d68b394cbd81de9900bf90a2ef/view

## Description

6982AF25SN0001 ND NP THRO 204(1)

**Buck Hill Road Special Notice:** The Federal Highway Administration (FHWA) Central Federal Lands Highway Division (CFL) will be conducting a virtual Pre-Bid meeting for ND NP THRO 204(1) Buck Hill Road on November 20, 2024 at 10:00 a.m. Mountain Time. Please send an email to CFL Acquisitions, cflacquisitions@dot.gov if you would like to attend. Please ensure that ND NP THRO 204(1)

**Buck Hill Road, Attn:** Kelly Palmer is in the subject line. A link to the virtual meeting will be sent on November 19, 2024, end of day. The project site is currently accessible and available for viewing prior to the meeting and throughout the Solicitation, weather permitting. Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND.

The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet. It begins at the intersection of Buck Hill Road and the South Unit Scenic Loop Road. The route then proceeds southeasterly for approximately ¾ of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The project includes the entire length of the roadway as well as the parking lot. The route is located entirely within Theodore Roosevelt NP.

## Publications

- November 5, 2024: Special notice, due November 19, 2024 at 4:00 PM EST. Notice b6ff77d68b394cbd81de9900bf90a2ef. https://sam.gov/workspace/contract/opp/b6ff77d68b394cbd81de9900bf90a2ef/view

## Points of contact

- Kelly Palmer, cflacquisitions@dot.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/6982af25sn0001.
