{"canonical":"https://abierto.us/opportunities/6982af25b000017","key":"6982AF25B000017","url":"https://abierto.us/opportunities/6982af25b000017","title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","solicitation_number":"6982AF25B000017","notice_type":"o","open":false,"response_deadline":"2025-11-19T20:30:00Z","first_posted":"2025-09-10","last_posted":"2025-12-11","department":"TRANSPORTATION, DEPARTMENT OF","subagency":"FEDERAL HIGHWAY ADMINISTRATION","office":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":"SBA","place_state":"ND","place_county":"38083","place_county_name":"Sheridan County","place_city":"3849020","place_city_name":"McClusky","winner":"CONSTRUCTION SOLUTIONS GROUP, LLC","award_amount":null,"publications":[{"notice_id":"307f8e860357469a8c077058a7caea15","title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","solicitation_number":"6982AF25B000017","notice_type":"p","base_type":"r","posted":"2025-09-10","posted_at":null,"due_at":"2025-09-25T22:00:00Z","due_date":"2025-09-25","cancelled":null,"archived":null,"archive_date":"2025-11-24","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/307f8e860357469a8c077058a7caea15/view","enriched":false,"history":[]},{"notice_id":"0e48add5796f40d58daa39e6c8df2524","title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","solicitation_number":"6982AF25B000017","notice_type":"o","base_type":"p","posted":"2025-10-08","posted_at":null,"due_at":"2025-11-12T21:00:00Z","due_date":"2025-11-12","cancelled":null,"archived":null,"archive_date":"2025-12-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/0e48add5796f40d58daa39e6c8df2524/view","enriched":false,"history":[]},{"notice_id":"bf9090affa2d4e48a0b74da5d14612c8","title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","solicitation_number":"6982AF25B000017","notice_type":"o","base_type":"o","posted":"2025-10-09","posted_at":null,"due_at":"2025-11-12T21:00:00Z","due_date":"2025-11-12","cancelled":null,"archived":null,"archive_date":"2025-12-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/bf9090affa2d4e48a0b74da5d14612c8/view","enriched":false,"history":[]},{"notice_id":"5938d07912c84bbeb759335ef48fc581","title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","solicitation_number":"6982AF25B000017","notice_type":"o","base_type":"o","posted":"2025-11-10","posted_at":null,"due_at":"2025-11-12T21:00:00Z","due_date":"2025-11-12","cancelled":null,"archived":null,"archive_date":"2025-12-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5938d07912c84bbeb759335ef48fc581/view","enriched":false,"history":[]},{"notice_id":"29386614f0d94827b5648c278696400b","title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","solicitation_number":"6982AF25B000017","notice_type":"o","base_type":"o","posted":"2025-11-12","posted_at":null,"due_at":"2025-11-12T21:00:00Z","due_date":"2025-11-12","cancelled":null,"archived":null,"archive_date":"2025-12-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/29386614f0d94827b5648c278696400b/view","enriched":false,"history":[]},{"notice_id":"896d173e7d9b42ab98c264dc321e8818","title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","solicitation_number":"6982AF25B000017","notice_type":"o","base_type":"o","posted":"2025-11-12","posted_at":null,"due_at":"2025-11-12T21:00:00Z","due_date":"2025-11-12","cancelled":null,"archived":null,"archive_date":"2025-12-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/896d173e7d9b42ab98c264dc321e8818/view","enriched":false,"history":[]},{"notice_id":"bf1d5791dbc9481bbd647d32c06062a1","title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","solicitation_number":"6982AF25B000017","notice_type":"o","base_type":"o","posted":"2025-11-12","posted_at":null,"due_at":"2025-11-12T21:00:00Z","due_date":"2025-11-12","cancelled":null,"archived":null,"archive_date":"2025-12-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/bf1d5791dbc9481bbd647d32c06062a1/view","enriched":false,"history":[]},{"notice_id":"dde538900ca5468698f55ea6920133e4","title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","solicitation_number":"6982AF25B000017","notice_type":"o","base_type":"o","posted":"2025-11-12","posted_at":null,"due_at":"2025-11-19T20:30:00Z","due_date":"2025-11-19","cancelled":null,"archived":null,"archive_date":"2025-12-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/dde538900ca5468698f55ea6920133e4/view","enriched":false,"history":[]},{"notice_id":"c1ceb5081511426ba8cabb15ddaa4908","title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","solicitation_number":"6982AF25B000017","notice_type":"o","base_type":"o","posted":"2025-11-17","posted_at":null,"due_at":"2025-11-19T20:30:00Z","due_date":"2025-11-19","cancelled":null,"archived":null,"archive_date":"2025-12-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c1ceb5081511426ba8cabb15ddaa4908/view","enriched":false,"history":[]},{"notice_id":"351b7e3d6e2d4d99afe22114e9329ad4","title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","solicitation_number":"6982AF25B000017","notice_type":"o","base_type":"o","posted":"2025-11-19","posted_at":null,"due_at":"2025-11-19T20:30:00Z","due_date":"2025-11-19","cancelled":null,"archived":null,"archive_date":"2025-12-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/351b7e3d6e2d4d99afe22114e9329ad4/view","enriched":false,"history":[]},{"notice_id":"5f8dfa9c7176471394fb48423e874094","title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","solicitation_number":"6982AF25B000017","notice_type":"o","base_type":"o","posted":"2025-12-11","posted_at":null,"due_at":"2025-11-19T20:30:00Z","due_date":"2025-11-19","cancelled":null,"archived":null,"archive_date":"2025-12-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5f8dfa9c7176471394fb48423e874094/view","enriched":false,"history":[]}],"latest_notice_id":"5f8dfa9c7176471394fb48423e874094","first_type":"p","notices":[{"dates":{"posted":"2025-09-10","response_deadline":{"raw":"2025-09-25T16:00:00-06:00","utc":"2025-09-25T22:00:00Z","date":"2025-09-25","time":"16:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/307f8e860357469a8c077058a7caea15/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-11-24","archive_type":"auto_custom"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"cflacquisitions@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"cflacquisitions@dot.gov"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"307f8e860357469a8c077058a7caea15","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"f6419f02e39dde4d09692b869df9683de9dea753670015667e63a3ccfde767a1","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NUMBER: ND FLAP SDN 7NE(1) PROJECT NAME: Hoffer Lake Access DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM ANTICIPATED SCHEDULE: Advertisement – September 2025 Award – November 2025 NTP – November 2025 Contract Completion – September 2026 ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"6982AF25B000017","place_of_performance":{"zip":"58463","city":{"name":"McClusky"},"state":{"code":"ND"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-10-08","response_deadline":{"raw":"2025-11-12T14:00:00-07:00","utc":"2025-11-12T21:00:00Z","date":"2025-11-12","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/0e48add5796f40d58daa39e6c8df2524/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"cflacquisitions@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"cflacquisitions@dot.gov"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"0e48add5796f40d58daa39e6c8df2524","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"5717a3260db4704c187ad95b1aded65d4b9444eda2417e815ab193ff9391b21d","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T17:48:36.003679Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"text":"PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000017","place_of_performance":{"zip":"58463","city":{"name":"McClusky"},"state":{"code":"ND"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-10-09","response_deadline":{"raw":"2025-11-12T14:00:00-07:00","utc":"2025-11-12T21:00:00Z","date":"2025-11-12","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/bf9090affa2d4e48a0b74da5d14612c8/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"cflacquisitions@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"cflacquisitions@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"bf9090affa2d4e48a0b74da5d14612c8","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"e10b33cfb49ea4c17059d7cc8957e5e265654efc5a0d5376785577bf7a9b2f0d","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T17:48:36.003679Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"text":"PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000017","place_of_performance":{"zip":"58463","city":{"name":"McClusky"},"state":{"code":"ND"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-11-10","response_deadline":{"raw":"2025-11-12T14:00:00-07:00","utc":"2025-11-12T21:00:00Z","date":"2025-11-12","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5938d07912c84bbeb759335ef48fc581/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"cflacquisitions@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"cflacquisitions@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5938d07912c84bbeb759335ef48fc581","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"b83448cfa3be606637c611ee1300724788ab99284b35fbf893a137e53088c07d","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T17:48:36.003679Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"text":"PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000017","place_of_performance":{"zip":"58463","city":{"name":"McClusky"},"state":{"code":"ND"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-11-12","response_deadline":{"raw":"2025-11-12T14:00:00-07:00","utc":"2025-11-12T21:00:00Z","date":"2025-11-12","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/29386614f0d94827b5648c278696400b/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"cflacquisitions@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"cflacquisitions@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"29386614f0d94827b5648c278696400b","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"fbb0e4552e52e0b5c611174a5f05d10b39a2ee768a36fc88a192c3eb0e726c99","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T17:48:36.003679Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"text":"PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000017","place_of_performance":{"zip":"58463","city":{"name":"McClusky"},"state":{"code":"ND"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-11-12","response_deadline":{"raw":"2025-11-12T14:00:00-07:00","utc":"2025-11-12T21:00:00Z","date":"2025-11-12","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/896d173e7d9b42ab98c264dc321e8818/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"cflacquisitions@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"cflacquisitions@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"896d173e7d9b42ab98c264dc321e8818","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"9af3f0923263886109e00a9630440809b06ff2ea5f6f06ea373e051b192405c1","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T17:48:36.003679Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"text":"PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000017","place_of_performance":{"zip":"58463","city":{"name":"McClusky"},"state":{"code":"ND"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-11-12","response_deadline":{"raw":"2025-11-12T14:00:00-07:00","utc":"2025-11-12T21:00:00Z","date":"2025-11-12","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/bf1d5791dbc9481bbd647d32c06062a1/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"cflacquisitions@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"cflacquisitions@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"bf1d5791dbc9481bbd647d32c06062a1","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"3bc74d77c7370e3277db74feee4a23a79b70e284efdfa022f082c2dcdf96d409","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T17:48:36.003679Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"text":"PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000017","place_of_performance":{"zip":"58463","city":{"name":"McClusky"},"state":{"code":"ND"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-11-12","response_deadline":{"raw":"2025-11-19T13:30:00-07:00","utc":"2025-11-19T20:30:00Z","date":"2025-11-19","time":"13:30:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/dde538900ca5468698f55ea6920133e4/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"cflacquisitions@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"cflacquisitions@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"dde538900ca5468698f55ea6920133e4","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"54a5b9dc1f67c5590c1fe4845b0057ce729eab5e122d62d3611676839ba4a9fe","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T17:48:36.003679Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"text":"PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000017","place_of_performance":{"zip":"58463","city":{"name":"McClusky"},"state":{"code":"ND"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-11-17","response_deadline":{"raw":"2025-11-19T13:30:00-07:00","utc":"2025-11-19T20:30:00Z","date":"2025-11-19","time":"13:30:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c1ceb5081511426ba8cabb15ddaa4908/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"cflacquisitions@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"cflacquisitions@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c1ceb5081511426ba8cabb15ddaa4908","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"e45321cbdcd646aff47357d46c956b8e2f8d6110d7bc7a0c65eb4dd42f685790","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T17:48:36.003679Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"text":"PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000017","place_of_performance":{"zip":"58463","city":{"name":"McClusky"},"state":{"code":"ND"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-11-19","response_deadline":{"raw":"2025-11-19T13:30:00-07:00","utc":"2025-11-19T20:30:00Z","date":"2025-11-19","time":"13:30:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/351b7e3d6e2d4d99afe22114e9329ad4/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"cflacquisitions@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"cflacquisitions@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"351b7e3d6e2d4d99afe22114e9329ad4","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"7e6d9fe59d3dc65898d4b563ceb86d28ed089778b8a670d2fa0f44889c48b9d4","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T17:48:36.003679Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"text":"PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000017","place_of_performance":{"zip":"58463","city":{"name":"McClusky"},"state":{"code":"ND"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-12-11","response_deadline":{"raw":"2025-11-19T13:30:00-07:00","utc":"2025-11-19T20:30:00Z","date":"2025-11-19","time":"13:30:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5f8dfa9c7176471394fb48423e874094/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"ND FLAP SDN 7NE(1) Hoffer Lake Access","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-30","archive_type":"auto_custom"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"cflacquisitions@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"cflacquisitions@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5f8dfa9c7176471394fb48423e874094","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"473aafac76c7afc3bd114cfc14dfb4abfd30dca8ca1b9556de7b7bb8855d8fa0","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T17:48:36.003679Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"text":"PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000017","place_of_performance":{"zip":"58463","city":{"name":"McClusky"},"state":{"code":"ND"},"country":{"code":"USA"}},"product_service_code":"Y1LB"}],"due_at":"2025-11-19T20:30:00Z","due_date":"2025-11-19","closes_at":"2025-11-19T20:30:00Z","awardable":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","state":"ND","county":"38083","county_name":"Sheridan County","city":"3849020","city_name":"McClusky","country":"USA","winner_key":"MAABCKNLHTB5","amount":null,"linked_awards":11,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"5f8dfa9c7176471394fb48423e874094","description":{"text":"PROJECT DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue). SCOPE OF THE WORK: The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following: Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone. Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations. With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts. Remove reconditioning due to the project being 4R with earthwork. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 6,000 CUYD 20441-0000 Waste: 3,952 CUYD 30101-0000 Aggregate Base: 6,000 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE 63501-0000 Temporary Traffic Control: LPSM","html":null,"origin":"extract"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"cflacquisitions@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"cflacquisitions@dot.gov"}],"place_of_performance":{"zip":"58463","city":{"name":"McClusky"},"state":{"code":"ND"},"country":{"code":"USA"}},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"naics_codes":["237310"],"award":null,"attachments":[],"awards":[{"award_key":"CONT_AWD_6982AF26C000005_6925_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_6982AF26C000005_6925_-NONE-_-NONE-/","piid":"6982AF26C000005","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"MAABCKNLHTB5","recipient_name":"CONSTRUCTION SOLUTIONS GROUP, LLC","recipient_uei":"MAABCKNLHTB5","recipient_cage":"6URP3","recipient_city":"SAINT LOUIS","recipient_state":"MO","sub_name":"Federal Highway Administration","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","office_key":"o-6982AF","first_action_date":"2025-12-10","last_action_date":"2026-04-17","actions":3,"obligated":"2000043.00","current_total_value":"2000043.00","potential_total_value":"2000043.00","naics":"237310","psc":"Y1LB","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":3,"description":"ND FLAP SDN 7NE(1) HOFFER LAKE ACCESS ROAD - CONSTRUCTION CONTRACT","method":"solicitation","confidence":"high","evidence":["solicitation number 6982AF25B000017 equals the FPDS solicitation identifier","same awarding office 6982AF"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"6982AF26SS00007","latest_notice_id":"165ad750850b49d7a0f9c42b0adfa206","title":"NV BL SONV 500(3) Red Rock Trail","solicitation_number":"6982AF26SS00007","notice_type":"r","first_type":"r","first_posted":"2026-09-09","last_posted":"2026-09-09","notices":1,"due_at":"2026-09-23T20:00:00Z","due_date":"2026-09-23","closes_at":"2026-09-23T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":null,"state":"NV","county":"32003","county_name":"Clark County","city":"3240000","city_name":"Las Vegas","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"6982AF27B000005","latest_notice_id":"9c354b9dd5844ea2aaf634299dcddf9e","title":"UT NP ARCH 100(2) Bridges on Delicate Arch Road","solicitation_number":"6982AF27B000005","notice_type":"p","first_type":"p","first_posted":"2026-09-08","last_posted":"2026-09-08","notices":1,"due_at":"2026-09-23T20:00:00Z","due_date":"2026-09-23","closes_at":"2026-09-23T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":null,"state":"UT","county":"49019","county_name":"Grand County","city":"4950700","city_name":"Moab","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"6982AF27B000002","latest_notice_id":"04633d3deaa74bd9856924934d466a6d","title":"AZ BL COLO 7528(1) Burro Creek Road","solicitation_number":"6982AF27B000002","notice_type":"p","first_type":"p","first_posted":"2026-09-15","last_posted":"2026-09-15","notices":1,"due_at":"2026-09-30T20:00:00Z","due_date":"2026-09-30","closes_at":"2026-09-30T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":"SBA","state":"AZ","county":"04015","county_name":"Mohave County","city":"0437620","city_name":"Kingman","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"6982AF25B000004","latest_notice_id":"79fd783a138c4712a511e5e338872f1d","title":"ND NP THRO 204(1) Buck Hill Road","solicitation_number":"6982AF25B000004","notice_type":"p","first_type":"p","first_posted":"2026-09-15","last_posted":"2026-09-15","notices":1,"due_at":"2026-09-30T20:00:00Z","due_date":"2026-09-30","closes_at":"2026-09-30T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":null,"state":"ND","county":"38007","county_name":"Billings County","city":"3851900","city_name":"Medora","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"6982AF26Q000022","latest_notice_id":"bb67e9035828449ab88aa39f52604199","title":"CO NP BLCA 10(1) South Rim Drive","solicitation_number":"6982AF26Q000022","notice_type":"k","first_type":"o","first_posted":"2026-09-17","last_posted":"2026-09-17","notices":2,"due_at":"2026-10-08T20:00:00Z","due_date":"2026-10-08","closes_at":"2026-10-08T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":"SBA","state":"CO","county":"08085","county_name":"Montrose County","city":"0851745","city_name":"Montrose","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-18T04:00:44.545196Z"}]}