{"canonical":"https://abierto.us/opportunities/6982af25b000006","key":"6982AF25B000006","url":"https://abierto.us/opportunities/6982af25b000006","title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","solicitation_number":"6982AF25B000006","notice_type":"a","open":false,"response_deadline":"2025-08-26T20:00:00Z","first_posted":"2025-05-15","last_posted":"2025-09-15","department":"TRANSPORTATION, DEPARTMENT OF","subagency":"FEDERAL HIGHWAY ADMINISTRATION","office":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":"SBA","place_state":"AZ","place_county":"04019","place_county_name":"Pima County","place_city":null,"place_city_name":null,"winner":"CONWAY CONSTRUCTION CO","award_amount":"4986910.20","publications":[{"notice_id":"9e96009244b942fc9bfc33668dd446d3","title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","solicitation_number":"6982AF25B000006","notice_type":"p","base_type":"r","posted":"2025-05-15","posted_at":null,"due_at":"2025-05-30T20:00:00Z","due_date":"2025-05-30","cancelled":null,"archived":null,"archive_date":"2025-11-21","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9e96009244b942fc9bfc33668dd446d3/view","enriched":false,"history":[]},{"notice_id":"981e53216e08444e905251d40fec2823","title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","solicitation_number":"6982AF25B000006","notice_type":"o","base_type":"r","posted":"2025-07-15","posted_at":null,"due_at":"2025-08-19T20:00:00Z","due_date":"2025-08-19","cancelled":null,"archived":null,"archive_date":"2025-12-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/981e53216e08444e905251d40fec2823/view","enriched":false,"history":[]},{"notice_id":"ab385d9cf53c47dab6de255b765f577f","title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","solicitation_number":"6982AF25B000006","notice_type":"o","base_type":"o","posted":"2025-08-07","posted_at":null,"due_at":"2025-08-19T20:00:00Z","due_date":"2025-08-19","cancelled":null,"archived":null,"archive_date":"2025-12-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ab385d9cf53c47dab6de255b765f577f/view","enriched":false,"history":[]},{"notice_id":"e1ef89542c9741efa9f7f026fa42a710","title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","solicitation_number":"6982AF25B000006","notice_type":"o","base_type":"o","posted":"2025-08-12","posted_at":null,"due_at":"2025-08-19T20:00:00Z","due_date":"2025-08-19","cancelled":null,"archived":null,"archive_date":"2025-12-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e1ef89542c9741efa9f7f026fa42a710/view","enriched":false,"history":[]},{"notice_id":"86207eddd51c41768ede6965c69c94a4","title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","solicitation_number":"6982AF25B000006","notice_type":"o","base_type":"o","posted":"2025-08-13","posted_at":null,"due_at":"2025-08-26T20:00:00Z","due_date":"2025-08-26","cancelled":null,"archived":null,"archive_date":"2025-12-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/86207eddd51c41768ede6965c69c94a4/view","enriched":false,"history":[]},{"notice_id":"035c1ac7934148cc85fea9fffcef1df0","title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","solicitation_number":"6982AF25B000006","notice_type":"o","base_type":"o","posted":"2025-08-18","posted_at":null,"due_at":"2025-08-26T20:00:00Z","due_date":"2025-08-26","cancelled":null,"archived":null,"archive_date":"2025-12-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/035c1ac7934148cc85fea9fffcef1df0/view","enriched":false,"history":[]},{"notice_id":"52613aae5ee746e3956dd295b78cd6cd","title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","solicitation_number":"6982AF25B000006","notice_type":"o","base_type":"o","posted":"2025-08-18","posted_at":null,"due_at":"2025-08-26T20:00:00Z","due_date":"2025-08-26","cancelled":null,"archived":null,"archive_date":"2025-12-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/52613aae5ee746e3956dd295b78cd6cd/view","enriched":false,"history":[]},{"notice_id":"685c2b7eefd64b99bbac3a2065b811c8","title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","solicitation_number":"6982AF25B000006","notice_type":"o","base_type":"o","posted":"2025-08-20","posted_at":null,"due_at":"2025-08-26T20:00:00Z","due_date":"2025-08-26","cancelled":null,"archived":null,"archive_date":"2025-12-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/685c2b7eefd64b99bbac3a2065b811c8/view","enriched":false,"history":[]},{"notice_id":"fa1fc98f61d84133b24e536f5d68ecc6","title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","solicitation_number":"6982AF25B000006","notice_type":"o","base_type":"o","posted":"2025-08-22","posted_at":null,"due_at":"2025-08-26T20:00:00Z","due_date":"2025-08-26","cancelled":null,"archived":null,"archive_date":"2025-12-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/fa1fc98f61d84133b24e536f5d68ecc6/view","enriched":false,"history":[]},{"notice_id":"e8ac5d2ff9f540329ccb596177458b27","title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","solicitation_number":"6982AF25B000006","notice_type":"o","base_type":"o","posted":"2025-08-26","posted_at":null,"due_at":"2025-08-26T20:00:00Z","due_date":"2025-08-26","cancelled":null,"archived":null,"archive_date":"2025-12-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e8ac5d2ff9f540329ccb596177458b27/view","enriched":false,"history":[]},{"notice_id":"50a90ce7a36d45eab0556c32b734b8f3","title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","solicitation_number":"6982AF25B000006","notice_type":"o","base_type":"o","posted":"2025-09-05","posted_at":null,"due_at":"2025-08-26T20:00:00Z","due_date":"2025-08-26","cancelled":null,"archived":null,"archive_date":"2025-12-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/50a90ce7a36d45eab0556c32b734b8f3/view","enriched":false,"history":[]},{"notice_id":"8a2786fff3c64dbe84afbb1871ec5009","title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","solicitation_number":"6982AF25C000028","notice_type":"a","base_type":"o","posted":"2025-09-15","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2025-12-01","award_number":"6982AF25C000028","awardee_name":"CONWAY CONSTRUCTION CO Vancouver","amount":"4986910.20","link_sam":"https://sam.gov/workspace/contract/opp/8a2786fff3c64dbe84afbb1871ec5009/view","enriched":false,"history":[]}],"latest_notice_id":"8a2786fff3c64dbe84afbb1871ec5009","first_type":"p","notices":[{"dates":{"posted":"2025-05-15","response_deadline":{"raw":"2025-05-30T14:00:00-06:00","utc":"2025-05-30T20:00:00Z","date":"2025-05-30","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9e96009244b942fc9bfc33668dd446d3/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-11-21","archive_type":"auto_custom"},"contacts":[{"name":"Eric Grosskreuz","role":"primary","email":"CFLcontrats@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"9e96009244b942fc9bfc33668dd446d3","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"c99281ec97ea669c12f28fb676b9dda77dcf35cddbc71ef445390c8210eb1646","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: AZ FLAP PIM FR510(1) PROJECT NAME: Sabino Canyon Park PROJECT DESCRIPTION: Sabino Canyon Park Road, also known as Forest Road 510, is located within Pima County, Arizona, north of Tucson, Arizona. The project begins on the north at the intersection with Carter Canyon Road and ends at the Forest Service gate. The project length is approximately 0.5 mile. SCOPE OF THE WORK: The purpose of the project is to improve public access, particularly parking, in the community of Summerhaven, which is at the top of Mt. Lemmon, north of Tucson. Note that CFL built the road from Tucson to Summerhaven over several years and phases in the 90’s and 2000’s. It is very popular during the summer months to escape the Tucson heat. There is also an area where people ski slightly to the north of the project. This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement – June 2025 Award-July 2025 Construction – August 2025 through April 2026 ESTIMATED COST RANGE: Between $5,000,000 and $10,000,000","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"6982AF25B000006","place_of_performance":{"zip":"85619","city":{"name":"Mount Lemmon"},"state":{"code":"AZ"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-07-15","response_deadline":{"raw":"2025-08-19T14:00:00-06:00","utc":"2025-08-19T20:00:00Z","date":"2025-08-19","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/981e53216e08444e905251d40fec2823/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-31","archive_type":"auto_custom"},"contacts":[{"name":"Eric Grosskreuz","role":"primary","email":"CFLContracts@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"981e53216e08444e905251d40fec2823","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"14c1f177e5eefd7c2ca5d786c4005f285b7f957db7fd0061b08f177b216896cf","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement – July 2025 Award – September 2025 NTP – September 2025 Contract Completion – May 2026 The estimated price range of the project work is between $5 million and $10 million.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000006","place_of_performance":{"zip":"85619","city":{"name":"Mount Lemmon"},"state":{"code":"AZ"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-08-07","response_deadline":{"raw":"2025-08-19T14:00:00-06:00","utc":"2025-08-19T20:00:00Z","date":"2025-08-19","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ab385d9cf53c47dab6de255b765f577f/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-31","archive_type":"auto_custom"},"contacts":[{"name":"Eric Grosskreuz","role":"primary","email":"CFLContracts@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"ab385d9cf53c47dab6de255b765f577f","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"8b4c9d4946ffb21e2117b5ce6f199bce6b6b0b2726f20edb1c0fc2a3654ccf4b","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement – July 2025 Award – September 2025 NTP – September 2025 Contract Completion – May 2026 The estimated price range of the project work is between $5 million and $10 million.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000006","place_of_performance":{"zip":"85619","city":{"name":"Mount Lemmon"},"state":{"code":"AZ"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-08-12","response_deadline":{"raw":"2025-08-19T14:00:00-06:00","utc":"2025-08-19T20:00:00Z","date":"2025-08-19","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e1ef89542c9741efa9f7f026fa42a710/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-31","archive_type":"auto_custom"},"contacts":[{"name":"Eric Grosskreuz","role":"primary","email":"CFLContracts@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e1ef89542c9741efa9f7f026fa42a710","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"b5914a218dcf8032675f29b6113a0bfaf6005bf66d1069790ae9e4a945ac1f6c","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement – July 2025 Award – September 2025 NTP – September 2025 Contract Completion – May 2026 The estimated price range of the project work is between $5 million and $10 million.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000006","place_of_performance":{"zip":"85619","city":{"name":"Mount Lemmon"},"state":{"code":"AZ"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-08-13","response_deadline":{"raw":"2025-08-26T14:00:00-06:00","utc":"2025-08-26T20:00:00Z","date":"2025-08-26","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/86207eddd51c41768ede6965c69c94a4/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-31","archive_type":"auto_custom"},"contacts":[{"name":"Eric Grosskreuz","role":"primary","email":"CFLContracts@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"86207eddd51c41768ede6965c69c94a4","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"d12265bb0e15eedc769245a33d07ea0bf034a8a35608d64d7bfdf687f087a9ea","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement – July 2025 Award – September 2025 NTP – September 2025 Contract Completion – May 2026 The estimated price range of the project work is between $5 million and $10 million.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000006","place_of_performance":{"zip":"85619","city":{"name":"Mount Lemmon"},"state":{"code":"AZ"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-08-18","response_deadline":{"raw":"2025-08-26T14:00:00-06:00","utc":"2025-08-26T20:00:00Z","date":"2025-08-26","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/035c1ac7934148cc85fea9fffcef1df0/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-31","archive_type":"auto_custom"},"contacts":[{"name":"Eric Grosskreuz","role":"primary","email":"CFLContracts@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"035c1ac7934148cc85fea9fffcef1df0","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"b938719a3fc7142d20262e2673d72acb90c92b556ef19ab8db07fbb08a8a9d20","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement – July 2025 Award – September 2025 NTP – September 2025 Contract Completion – May 2026 The estimated price range of the project work is between $5 million and $10 million.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000006","place_of_performance":{"zip":"85619","city":{"name":"Mount Lemmon"},"state":{"code":"AZ"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-08-18","response_deadline":{"raw":"2025-08-26T14:00:00-06:00","utc":"2025-08-26T20:00:00Z","date":"2025-08-26","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/52613aae5ee746e3956dd295b78cd6cd/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-31","archive_type":"auto_custom"},"contacts":[{"name":"Eric Grosskreuz","role":"primary","email":"CFLContracts@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"52613aae5ee746e3956dd295b78cd6cd","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"0c8a0b4a51a1d9a29e19d65ca5490087fbddbaab84e53c8896ce0d3924ca9b24","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement – July 2025 Award – September 2025 NTP – September 2025 Contract Completion – May 2026 The estimated price range of the project work is between $5 million and $10 million.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000006","place_of_performance":{"zip":"85619","city":{"name":"Mount Lemmon"},"state":{"code":"AZ"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-08-20","response_deadline":{"raw":"2025-08-26T14:00:00-06:00","utc":"2025-08-26T20:00:00Z","date":"2025-08-26","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/685c2b7eefd64b99bbac3a2065b811c8/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-31","archive_type":"auto_custom"},"contacts":[{"name":"Eric Grosskreuz","role":"primary","email":"CFLContracts@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"685c2b7eefd64b99bbac3a2065b811c8","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"9ccd0a670234b2d6338796920d08178eb69367aae44e26e4ac79ab0a3be3ee22","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement – July 2025 Award – September 2025 NTP – September 2025 Contract Completion – May 2026 The estimated price range of the project work is between $5 million and $10 million.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000006","place_of_performance":{"zip":"85619","city":{"name":"Mount Lemmon"},"state":{"code":"AZ"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-08-22","response_deadline":{"raw":"2025-08-26T14:00:00-06:00","utc":"2025-08-26T20:00:00Z","date":"2025-08-26","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/fa1fc98f61d84133b24e536f5d68ecc6/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-31","archive_type":"auto_custom"},"contacts":[{"name":"Eric Grosskreuz","role":"primary","email":"CFLContracts@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"fa1fc98f61d84133b24e536f5d68ecc6","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"f0a42f159e3ed33e399a003e7eda3527bd0b8aeef16520b321001e1e4baa01bb","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement – July 2025 Award – September 2025 NTP – September 2025 Contract Completion – May 2026 The estimated price range of the project work is between $5 million and $10 million.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000006","place_of_performance":{"zip":"85619","city":{"name":"Mount Lemmon"},"state":{"code":"AZ"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-08-26","response_deadline":{"raw":"2025-08-26T14:00:00-06:00","utc":"2025-08-26T20:00:00Z","date":"2025-08-26","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e8ac5d2ff9f540329ccb596177458b27/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-31","archive_type":"auto_custom"},"contacts":[{"name":"Eric Grosskreuz","role":"primary","email":"CFLContracts@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e8ac5d2ff9f540329ccb596177458b27","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"26990a19988053f448ec155cde48ede3b24138cc2aa0cf181d8929dce213b487","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement – July 2025 Award – September 2025 NTP – September 2025 Contract Completion – May 2026 The estimated price range of the project work is between $5 million and $10 million.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000006","place_of_performance":{"zip":"85619","city":{"name":"Mount Lemmon"},"state":{"code":"AZ"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-09-05","response_deadline":{"raw":"2025-08-26T14:00:00-06:00","utc":"2025-08-26T20:00:00Z","date":"2025-08-26","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/50a90ce7a36d45eab0556c32b734b8f3/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-31","archive_type":"auto_custom"},"contacts":[{"name":"Eric Grosskreuz","role":"primary","email":"CFLContracts@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"50a90ce7a36d45eab0556c32b734b8f3","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"2d5310aefa89e71ad5e76f10cce9353f7f0d6aeebafcc6e268443fabfe8136fb","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement – July 2025 Award – September 2025 NTP – September 2025 Contract Completion – May 2026 The estimated price range of the project work is between $5 million and $10 million.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF25B000006","place_of_performance":{"zip":"85619","city":{"name":"Mount Lemmon"},"state":{"code":"AZ"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"award":{"date":"2025-09-15","amount":"4986910.20","number":"6982AF25C000028","awardee":{"raw":"CONWAY CONSTRUCTION CO Vancouver WA 98665 USA","name":"CONWAY CONSTRUCTION CO Vancouver","location":{"zip":"98665","state":{"code":"WA"},"country":{"code":"USA"}}}},"dates":{"posted":"2025-09-15","award_date":"2025-09-15"},"links":{"sam":"https://sam.gov/workspace/contract/opp/8a2786fff3c64dbe84afbb1871ec5009/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"AZ FLAP PIM FR510(1) Sabino Canyon Park","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-12-01","archive_type":"auto_custom"},"contacts":[{"name":"Eric Grosskreuz","role":"primary","email":"CFLContracts@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"8a2786fff3c64dbe84afbb1871ec5009","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"392c347557b63a55d1ca74325670428673b0d650b425fb7ee74d349e47a59d8a","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"6982AF25C000028","place_of_performance":{"zip":"85619","city":{"name":"Mount Lemmon"},"state":{"code":"AZ"},"country":{"code":"USA"}},"product_service_code":"Y1LB"}],"due_at":"2025-08-26T20:00:00Z","due_date":"2025-08-26","closes_at":"2025-08-26T20:00:00Z","awardable":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","state":"AZ","county":"04019","county_name":"Pima County","city":null,"city_name":null,"country":"USA","winner_key":"CB5UWYL7QX85","amount":"4986910.20","linked_awards":12,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"50a90ce7a36d45eab0556c32b734b8f3","description":{"text":"TOTAL SMALL BUSINESS SET-SIDE This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 7,000 CUYD 25902-0000 Soil Nail Retaining Wall: 8,200 SQFT 30202-2000 Roadway Aggregate, Method 2: 1,800 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON 60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT 60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT 60906-1000 Gutter, Concrete (Ditch): 750 SQYD 61501-0800 Sidewalk, Concrete: 1,100 SQYD 63501-0000 Temporary Traffic Control: LPSM 64603-1000 Fixture, Vault Toilet: 2 EACH ANTICIPATED SCHEDULE: Advertisement – July 2025 Award – September 2025 NTP – September 2025 Contract Completion – May 2026 The estimated price range of the project work is between $5 million and $10 million.","html":null,"origin":"extract"},"contacts":[{"name":"Eric Grosskreuz","role":"primary","email":"CFLContracts@dot.gov"},{"name":"Kelly Palmer","role":"secondary","email":"CFLcontracts@dot.gov"}],"place_of_performance":{"zip":"85619","city":{"name":"Mount Lemmon"},"state":{"code":"AZ"},"country":{"code":"USA"}},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"naics_codes":["237310"],"award":null,"attachments":[],"awards":[{"award_key":"CONT_AWD_6982AF25C000028_6925_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_6982AF25C000028_6925_-NONE-_-NONE-/","piid":"6982AF25C000028","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"CB5UWYL7QX85","recipient_name":"CONWAY CONSTRUCTION CO","recipient_uei":"CB5UWYL7QX85","recipient_cage":"4F0F4","recipient_city":"VANCOUVER","recipient_state":"WA","sub_name":"Federal Highway Administration","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","office_key":"o-6982AF","first_action_date":"2025-09-15","last_action_date":"2026-03-24","actions":2,"obligated":"4991910.20","current_total_value":"4991910.20","potential_total_value":"4991910.20","naics":"237310","psc":"Y1LB","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":7,"description":"AZ FLAP PIM 510(1) SABINO CANYON ROAD CONSTRUCTION CONTRACT","method":"piid","confidence":"high","evidence":["award number 6982AF25C000028 equals the contract number","same awarding office 6982AF"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"6982AF26B000014","latest_notice_id":"59b8e11f822345fe8c0b03b9292dcab7","title":"TX FW LGA 10(5) Steve Thompson Wildlife Drive","solicitation_number":"6982AF26B000014","notice_type":"p","first_type":"p","first_posted":"2026-09-01","last_posted":"2026-09-01","notices":1,"due_at":"2026-09-17T20:00:00Z","due_date":"2026-09-17","closes_at":"2026-09-17T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":"SBA","state":"TX","county":"48061","county_name":"Cameron County","city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"6982AF26SS00007","latest_notice_id":"165ad750850b49d7a0f9c42b0adfa206","title":"NV BL SONV 500(3) Red Rock Trail","solicitation_number":"6982AF26SS00007","notice_type":"r","first_type":"r","first_posted":"2026-09-09","last_posted":"2026-09-09","notices":1,"due_at":"2026-09-23T20:00:00Z","due_date":"2026-09-23","closes_at":"2026-09-23T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":null,"state":"NV","county":"32003","county_name":"Clark County","city":"3240000","city_name":"Las Vegas","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"6982AF27B000005","latest_notice_id":"9c354b9dd5844ea2aaf634299dcddf9e","title":"UT NP ARCH 100(2) Bridges on Delicate Arch Road","solicitation_number":"6982AF27B000005","notice_type":"p","first_type":"p","first_posted":"2026-09-08","last_posted":"2026-09-08","notices":1,"due_at":"2026-09-23T20:00:00Z","due_date":"2026-09-23","closes_at":"2026-09-23T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":null,"state":"UT","county":"49019","county_name":"Grand County","city":"4950700","city_name":"Moab","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"6982AF27B000002","latest_notice_id":"04633d3deaa74bd9856924934d466a6d","title":"AZ BL COLO 7528(1) Burro Creek Road","solicitation_number":"6982AF27B000002","notice_type":"p","first_type":"p","first_posted":"2026-09-15","last_posted":"2026-09-15","notices":1,"due_at":"2026-09-30T20:00:00Z","due_date":"2026-09-30","closes_at":"2026-09-30T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":"SBA","state":"AZ","county":"04015","county_name":"Mohave County","city":"0437620","city_name":"Kingman","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"6982AF25B000004","latest_notice_id":"79fd783a138c4712a511e5e338872f1d","title":"ND NP THRO 204(1) Buck Hill Road","solicitation_number":"6982AF25B000004","notice_type":"p","first_type":"p","first_posted":"2026-09-15","last_posted":"2026-09-15","notices":1,"due_at":"2026-09-30T20:00:00Z","due_date":"2026-09-30","closes_at":"2026-09-30T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":null,"state":"ND","county":"38007","county_name":"Billings County","city":"3851900","city_name":"Medora","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"}]}