{"canonical":"https://abierto.us/opportunities/6982af24b000022","key":"6982AF24B000022","url":"https://abierto.us/opportunities/6982af24b000022","title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","solicitation_number":"6982AF24B000022","notice_type":"a","open":false,"response_deadline":"2024-12-05T21:00:00Z","first_posted":"2024-09-24","last_posted":"2025-03-03","department":"TRANSPORTATION, DEPARTMENT OF","subagency":"FEDERAL HIGHWAY ADMINISTRATION","office":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":"SBA","place_state":"CO","place_county":"08069","place_county_name":"Larimer County","place_city":"0827425","place_city_name":"Fort Collins","winner":"FDT WATER INFRASTRUCTURE, LLC","award_amount":"8404492.50","publications":[{"notice_id":"bbc3ff194bf9489bb96fbcc1ca3ccf65","title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","solicitation_number":"6982AF24B000022","notice_type":"s","base_type":"r","posted":"2024-09-24","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-10-24","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/bbc3ff194bf9489bb96fbcc1ca3ccf65/view","enriched":false,"history":[]},{"notice_id":"a465d19841d740f6bfbda643177f4897","title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","solicitation_number":"6982AF24B000022","notice_type":"p","base_type":"s","posted":"2024-10-01","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-10-20","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a465d19841d740f6bfbda643177f4897/view","enriched":false,"history":[]},{"notice_id":"a20084c2c32c420bbcffc4ccdbda1c20","title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","solicitation_number":"6982AF24B000022","notice_type":"o","base_type":"p","posted":"2024-10-29","posted_at":null,"due_at":"2024-12-05T21:00:00Z","due_date":"2024-12-05","cancelled":null,"archived":null,"archive_date":"2025-01-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a20084c2c32c420bbcffc4ccdbda1c20/view","enriched":false,"history":[]},{"notice_id":"f894265a8c85436ba1cb105e905057c0","title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","solicitation_number":"6982AF24B000022","notice_type":"o","base_type":"o","posted":"2024-11-01","posted_at":null,"due_at":"2024-12-05T21:00:00Z","due_date":"2024-12-05","cancelled":null,"archived":null,"archive_date":"2025-01-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f894265a8c85436ba1cb105e905057c0/view","enriched":false,"history":[]},{"notice_id":"ba9fe8674f0b49189bbad111e48a8376","title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","solicitation_number":"6982AF24B000022","notice_type":"o","base_type":"o","posted":"2024-11-06","posted_at":null,"due_at":"2024-12-05T21:00:00Z","due_date":"2024-12-05","cancelled":null,"archived":null,"archive_date":"2025-01-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ba9fe8674f0b49189bbad111e48a8376/view","enriched":false,"history":[]},{"notice_id":"900f7aa555664ad483a764009c79adf1","title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","solicitation_number":"6982AF24B000022","notice_type":"o","base_type":"o","posted":"2024-11-18","posted_at":null,"due_at":"2024-12-05T21:00:00Z","due_date":"2024-12-05","cancelled":null,"archived":null,"archive_date":"2025-01-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/900f7aa555664ad483a764009c79adf1/view","enriched":false,"history":[]},{"notice_id":"06a003ffe95345218ec6fa22a9f83f9a","title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","solicitation_number":"6982AF24B000022","notice_type":"o","base_type":"o","posted":"2024-11-22","posted_at":null,"due_at":"2024-12-05T21:00:00Z","due_date":"2024-12-05","cancelled":null,"archived":null,"archive_date":"2025-01-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/06a003ffe95345218ec6fa22a9f83f9a/view","enriched":false,"history":[]},{"notice_id":"4eb428828ed64f21ae91167e2ec55567","title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","solicitation_number":"6982AF24B000022","notice_type":"o","base_type":"o","posted":"2024-11-25","posted_at":null,"due_at":"2024-12-05T21:00:00Z","due_date":"2024-12-05","cancelled":null,"archived":null,"archive_date":"2025-01-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/4eb428828ed64f21ae91167e2ec55567/view","enriched":false,"history":[]},{"notice_id":"1bbac56be0884420aeac2365b64638a1","title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","solicitation_number":"6982AF24B000022","notice_type":"o","base_type":"o","posted":"2024-11-29","posted_at":null,"due_at":"2024-12-05T21:00:00Z","due_date":"2024-12-05","cancelled":null,"archived":null,"archive_date":"2025-01-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1bbac56be0884420aeac2365b64638a1/view","enriched":false,"history":[]},{"notice_id":"37073b1fd9534d48bf703ccc9d266707","title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","solicitation_number":"6982AF24B000022","notice_type":"o","base_type":"o","posted":"2024-12-05","posted_at":null,"due_at":"2024-12-05T21:00:00Z","due_date":"2024-12-05","cancelled":null,"archived":null,"archive_date":"2025-01-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/37073b1fd9534d48bf703ccc9d266707/view","enriched":false,"history":[]},{"notice_id":"d92f59b14e55431b91291e7a0565ef48","title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","solicitation_number":"6982AF24B000022","notice_type":"o","base_type":"o","posted":"2025-01-03","posted_at":null,"due_at":"2024-12-05T21:00:00Z","due_date":"2024-12-05","cancelled":null,"archived":null,"archive_date":"2025-01-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d92f59b14e55431b91291e7a0565ef48/view","enriched":false,"history":[]},{"notice_id":"a7bce0236bfa4ad9843f962db106413d","title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","solicitation_number":"6982AF25C000013","notice_type":"a","base_type":"a","posted":"2025-03-03","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2025-03-13","award_number":"6982AF25C000013","awardee_name":"FDT WATER INFRASTRUCTURE, LLC Tempe","amount":"8281732.50","link_sam":"https://sam.gov/workspace/contract/opp/a7bce0236bfa4ad9843f962db106413d/view","enriched":false,"history":[]},{"notice_id":"aab3d085cb7c40409d6c96776917bfc1","title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","solicitation_number":"6982AF25C000013","notice_type":"a","base_type":"o","posted":"2025-03-03","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2025-03-13","award_number":"6982AF25C000013","awardee_name":"FDT WATER INFRASTRUCTURE, LLC Tempe","amount":"8404492.50","link_sam":"https://sam.gov/workspace/contract/opp/aab3d085cb7c40409d6c96776917bfc1/view","enriched":false,"history":[]}],"latest_notice_id":"aab3d085cb7c40409d6c96776917bfc1","first_type":"s","notices":[{"dates":{"posted":"2024-09-24"},"links":{"sam":"https://sam.gov/workspace/contract/opp/bbc3ff194bf9489bb96fbcc1ca3ccf65/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-10-24","archive_type":"auto_custom"},"contacts":[{"name":"Leslie Karsten","role":"primary","email":"CFLcontracts@dot.gov"},{"name":"Ryan Phillips","role":"secondary","email":"CFLAcquisitions@dot.gov"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"bbc3ff194bf9489bb96fbcc1ca3ccf65","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"7875c45b9060bd029604df17db3c39043d30c8feedb1d00e36f594cb23947372","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO NOTIFY THE PUBLIC OF A NECESSARY AND JUSTIFIED CONSOLIDATION OF CONTRACT REQUIREMENTS FOR THIS PROJECT. The Agency has determined that consolidation is justified and necessary in accordance with FAR 7.107-2 (a). The Senor Procurement Executive of FHWA signed off on the use of consolidation for this project on September 20, 2024. The benefits of the consolidated acquisition substantially exceed the benefits that would be derived from alternative contracting approaches. Please see the attached approved determination. This project will be advertised a TOTAL SMALL BUSINESS SET ASIDE. PROJECT NUMBER: CO FLAP LAR 10(1) PROJECT NAME: Horsetooth Res and Carter Lake PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually. SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots. The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping. Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction. PRINCIPAL WORK ITEMS: 26,000 cubic yards of roadway excavation 23,000 cubic yards of waste 120 cubic yards of rip rap 26,000 tons of aggregate base 23,000 square yards of full depth reclamation 20,000 tons asphalt concrete pavement 1300 square yards minor concrete pavement 1,100 linear feet of pipe culverts (24” to 42”) with end sections 7 each manholes 4,000 linear feet curb concrete 600 square yards sidewalk concrete 23,000 square yards placing topsoil and seeding (hydraulic method) 75 each sign system 28 miles pavement markings 1 lump sum temporary traffic control ANTICIPATED SCHEDULE: Advertisement – October 2024 Award – November 2024 Construction – April 2025 through November 2026 The estimated price range of the project work is between: $10 million and $20 million","origin":"extract"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"6982AF24B000022","place_of_performance":{"city":{"name":"Fort Collins"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-10-01"},"links":{"sam":"https://sam.gov/workspace/contract/opp/a465d19841d740f6bfbda643177f4897/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-10-20","archive_type":"auto_custom"},"contacts":[{"name":"Leslie Karsten","role":"primary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"s","label":"Special Notice"},"notice_id":"a465d19841d740f6bfbda643177f4897","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"b2300be7ff0c7a85e706afae414179fbce6049f508a5d9fd4a7964fb788a9b3a","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NUMBER: CO FLAP LAR 10(1) PROJECT NAME: Horsetooth and Carter Lake PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually. SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots. The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping. Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction. PRINCIPAL WORK ITEMS: 26,000 cubic yards of roadway excavation 23,000 cubic yards of waste 120 cubic yards of rip rap 26,000 tons of aggregate base 23,000 square yards of full depth reclamation 20,000 tons asphalt concrete pavement 1300 square yards minor concrete pavement 1,100 linear feet of pipe culverts (24” to 42”) with end sections 7 each manholes 4,000 linear feet curb concrete 600 square yards sidewalk concrete 23,000 square yards placing topsoil and seeding (hydraulic method) 75 each sign system 28 miles pavement markings 1 lump sum temporary traffic control ANTICIPATED SCHEDULE: Advertisement – October 2024 Award – December 2024 Construction – April 2025 through November 2026 ESTIMATED COST RANGE: Between $10,000,000 and $20,000,000 FUNDING SOURCE: Federal Lands Access Program (FLAP) with Partner match MISCELLANEOUS: The project is in a mountainous and high recreation use area where access to the reservoir amenities must be maintained during construction. Limitations for closures will require strategic phasing and traffic control management. The work is occurring in a cultural and natural resource sensitive area. Environmental and weather constraints may affect the construction schedule operations.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"6982AF24B000022","place_of_performance":{"city":{"name":"Fort Collins"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-10-29","response_deadline":{"raw":"2024-12-05T14:00:00-07:00","utc":"2024-12-05T21:00:00Z","date":"2024-12-05","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a20084c2c32c420bbcffc4ccdbda1c20/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-15","archive_type":"auto_custom"},"contacts":[{"name":"Leslie Karsten","role":"primary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"a20084c2c32c420bbcffc4ccdbda1c20","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"a54e99590d0927afc78a71ee7838e89a89bb6dc74702fa6e928fa6c35d91aed8","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"PROJECT NUMBER: CO FLAP LAR 10(1) PROJECT NAME: Horsetooth and Carter Lake PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually. SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots. The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping. Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000022","place_of_performance":{"city":{"name":"Fort Collins"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-11-01","response_deadline":{"raw":"2024-12-05T14:00:00-07:00","utc":"2024-12-05T21:00:00Z","date":"2024-12-05","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f894265a8c85436ba1cb105e905057c0/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-15","archive_type":"auto_custom"},"contacts":[{"name":"Leslie Karsten","role":"primary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"f894265a8c85436ba1cb105e905057c0","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"fa442a28a751b1e5451b1bab247f8eecdd19a32258e0b999defa0901f5ff4689","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"PROJECT NUMBER: CO FLAP LAR 10(1) PROJECT NAME: Horsetooth and Carter Lake PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually. SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots. The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping. Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000022","place_of_performance":{"city":{"name":"Fort Collins"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-11-06","response_deadline":{"raw":"2024-12-05T14:00:00-07:00","utc":"2024-12-05T21:00:00Z","date":"2024-12-05","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ba9fe8674f0b49189bbad111e48a8376/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-15","archive_type":"auto_custom"},"contacts":[{"name":"Leslie Karsten","role":"primary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"ba9fe8674f0b49189bbad111e48a8376","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"ab7fa73286aa6f6744e31b3b50e6a35329b921034fb8bfe26df7d23d02a2c5e1","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"PROJECT NUMBER: CO FLAP LAR 10(1) PROJECT NAME: Horsetooth and Carter Lake PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually. SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots. The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping. Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000022","place_of_performance":{"city":{"name":"Fort Collins"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-11-18","response_deadline":{"raw":"2024-12-05T14:00:00-07:00","utc":"2024-12-05T21:00:00Z","date":"2024-12-05","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/900f7aa555664ad483a764009c79adf1/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-15","archive_type":"auto_custom"},"contacts":[{"name":"Leslie Karsten","role":"primary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"900f7aa555664ad483a764009c79adf1","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"821fc6314c014349e93ef29405e7abf82693a6f1b51789309dac02c0135fe985","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"PROJECT NUMBER: CO FLAP LAR 10(1) PROJECT NAME: Horsetooth and Carter Lake PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually. SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots. The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping. Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000022","place_of_performance":{"city":{"name":"Fort Collins"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-11-22","response_deadline":{"raw":"2024-12-05T14:00:00-07:00","utc":"2024-12-05T21:00:00Z","date":"2024-12-05","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/06a003ffe95345218ec6fa22a9f83f9a/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-15","archive_type":"auto_custom"},"contacts":[{"name":"Leslie Karsten","role":"primary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"06a003ffe95345218ec6fa22a9f83f9a","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"c69892746969cd8596f4bdde96e38b807874b6417708b41a01e0bf31936e33d0","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"PROJECT NUMBER: CO FLAP LAR 10(1) PROJECT NAME: Horsetooth and Carter Lake PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually. SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots. The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping. Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000022","place_of_performance":{"city":{"name":"Fort Collins"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-11-25","response_deadline":{"raw":"2024-12-05T14:00:00-07:00","utc":"2024-12-05T21:00:00Z","date":"2024-12-05","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/4eb428828ed64f21ae91167e2ec55567/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-15","archive_type":"auto_custom"},"contacts":[{"name":"Leslie Karsten","role":"primary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"4eb428828ed64f21ae91167e2ec55567","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"b5a79b53ac632b5692206c670752df6cb9dac251de040cdc6892f8d4ee353acc","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"PROJECT NUMBER: CO FLAP LAR 10(1) PROJECT NAME: Horsetooth and Carter Lake PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually. SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots. The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping. Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000022","place_of_performance":{"city":{"name":"Fort Collins"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-11-29","response_deadline":{"raw":"2024-12-05T14:00:00-07:00","utc":"2024-12-05T21:00:00Z","date":"2024-12-05","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1bbac56be0884420aeac2365b64638a1/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-15","archive_type":"auto_custom"},"contacts":[{"name":"Leslie Karsten","role":"primary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"1bbac56be0884420aeac2365b64638a1","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"8d13c7a1e65335cac10a040188643c7642788b08ebcbeefc8637074c475bf71c","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"PROJECT NUMBER: CO FLAP LAR 10(1) PROJECT NAME: Horsetooth and Carter Lake PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually. SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots. The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping. Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000022","place_of_performance":{"city":{"name":"Fort Collins"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-12-05","response_deadline":{"raw":"2024-12-05T14:00:00-07:00","utc":"2024-12-05T21:00:00Z","date":"2024-12-05","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/37073b1fd9534d48bf703ccc9d266707/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-15","archive_type":"auto_custom"},"contacts":[{"name":"Leslie Karsten","role":"primary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"37073b1fd9534d48bf703ccc9d266707","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"11b5e2b1efe1c4b53d0c50cdafa0311f0d14435b5936e7c3d8edeb8c8944539b","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"PROJECT NUMBER: CO FLAP LAR 10(1) PROJECT NAME: Horsetooth and Carter Lake PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually. SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots. The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping. Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000022","place_of_performance":{"city":{"name":"Fort Collins"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2025-01-03","response_deadline":{"raw":"2024-12-05T14:00:00-07:00","utc":"2024-12-05T21:00:00Z","date":"2024-12-05","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d92f59b14e55431b91291e7a0565ef48/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-15","archive_type":"auto_custom"},"contacts":[{"name":"Leslie Karsten","role":"primary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d92f59b14e55431b91291e7a0565ef48","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"100e3d9a8717a3728551363c61fa9f987999a605e4776d8634d5620f6c4e391a","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"PROJECT NUMBER: CO FLAP LAR 10(1) PROJECT NAME: Horsetooth and Carter Lake PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually. SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots. The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping. Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000022","place_of_performance":{"city":{"name":"Fort Collins"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"award":{"date":"2025-02-26","amount":"8281732.50","number":"6982AF25C000013","awardee":{"raw":"FDT WATER INFRASTRUCTURE, LLC Tempe AZ 85282 USA","name":"FDT WATER INFRASTRUCTURE, LLC Tempe","location":{"zip":"85282","state":{"code":"AZ"},"country":{"code":"USA"}}}},"dates":{"posted":"2025-03-03","award_date":"2025-02-26"},"links":{"sam":"https://sam.gov/workspace/contract/opp/a7bce0236bfa4ad9843f962db106413d/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-03-13","archive_type":"auto15"},"contacts":[{"name":"Leslie Karsten","role":"primary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"a","label":"Award Notice"},"notice_id":"a7bce0236bfa4ad9843f962db106413d","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"b3e85798a9680ec75bed38fbab1e68ec157489119ea8da453a3d2134b668db98","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"6982AF25C000013","place_of_performance":{"city":{"name":"Fort Collins"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"award":{"date":"2025-02-26","amount":"8404492.50","number":"6982AF25C000013","awardee":{"raw":"FDT WATER INFRASTRUCTURE, LLC Tempe AZ 85282 USA","name":"FDT WATER INFRASTRUCTURE, LLC Tempe","location":{"zip":"85282","state":{"code":"AZ"},"country":{"code":"USA"}}}},"dates":{"posted":"2025-03-03","award_date":"2025-02-26"},"links":{"sam":"https://sam.gov/workspace/contract/opp/aab3d085cb7c40409d6c96776917bfc1/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP LAR 10(1) Horsetooth Res and Carter Lake","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-03-13","archive_type":"auto15"},"contacts":[{"name":"Leslie Karsten","role":"primary","email":"CFLcontracts@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"aab3d085cb7c40409d6c96776917bfc1","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"0dad2462be03fe4789c7aeac4f66ad921dc829cc982a4b09ef2128d3c9d3dd37","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"6982AF25C000013","place_of_performance":{"city":{"name":"Fort Collins"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"}],"due_at":"2024-12-05T21:00:00Z","due_date":"2024-12-05","closes_at":"2024-12-05T21:00:00Z","awardable":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","state":"CO","county":"08069","county_name":"Larimer County","city":"0827425","city_name":"Fort Collins","country":"USA","winner_key":"EN96R4SP4NF9","amount":"8404492.50","linked_awards":13,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"d92f59b14e55431b91291e7a0565ef48","description":{"text":"PROJECT NUMBER: CO FLAP LAR 10(1) PROJECT NAME: Horsetooth and Carter Lake PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually. SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots. The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping. Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction.","html":null,"origin":"extract"},"contacts":[{"name":"Leslie Karsten","role":"primary","email":"CFLcontracts@dot.gov"}],"place_of_performance":{"city":{"name":"Fort Collins"},"state":{"code":"CO"},"country":{"code":"USA"}},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"naics_codes":["237310"],"award":null,"attachments":[],"awards":[{"award_key":"CONT_AWD_6982AF25C000013_6925_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_6982AF25C000013_6925_-NONE-_-NONE-/","piid":"6982AF25C000013","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"EN96R4SP4NF9","recipient_name":"FDT WATER INFRASTRUCTURE, LLC","recipient_uei":"EN96R4SP4NF9","recipient_cage":"8B6V3","recipient_city":"TEMPE","recipient_state":"AZ","sub_name":"Federal Highway Administration","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","office_key":"o-6982AF","first_action_date":"2025-02-26","last_action_date":"2026-08-04","actions":5,"obligated":"11512040.00","current_total_value":"11512040.00","potential_total_value":"11512040.00","naics":"237310","psc":"Y1LB","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":5,"description":"CO FLAP LAR 10(1) HORSETOOTH RES AND CARTER LAKE ROADWAY AND PARKING LOT REHABILITATION THE PURPOSE IS TO AWARD A CONSTRUCTION CONTRACT FOR THE SUBJECT PROJECT.","method":"piid","confidence":"high","evidence":["award number 6982AF25C000013 equals the contract number","same awarding office 6982AF"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"6982AF26SS00007","latest_notice_id":"165ad750850b49d7a0f9c42b0adfa206","title":"NV BL SONV 500(3) Red Rock Trail","solicitation_number":"6982AF26SS00007","notice_type":"r","first_type":"r","first_posted":"2026-09-09","last_posted":"2026-09-09","notices":1,"due_at":"2026-09-23T20:00:00Z","due_date":"2026-09-23","closes_at":"2026-09-23T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":null,"state":"NV","county":"32003","county_name":"Clark County","city":"3240000","city_name":"Las Vegas","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"6982AF27B000005","latest_notice_id":"9c354b9dd5844ea2aaf634299dcddf9e","title":"UT NP ARCH 100(2) Bridges on Delicate Arch Road","solicitation_number":"6982AF27B000005","notice_type":"p","first_type":"p","first_posted":"2026-09-08","last_posted":"2026-09-08","notices":1,"due_at":"2026-09-23T20:00:00Z","due_date":"2026-09-23","closes_at":"2026-09-23T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":null,"state":"UT","county":"49019","county_name":"Grand County","city":"4950700","city_name":"Moab","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"6982AF27B000002","latest_notice_id":"04633d3deaa74bd9856924934d466a6d","title":"AZ BL COLO 7528(1) Burro Creek Road","solicitation_number":"6982AF27B000002","notice_type":"p","first_type":"p","first_posted":"2026-09-15","last_posted":"2026-09-15","notices":1,"due_at":"2026-09-30T20:00:00Z","due_date":"2026-09-30","closes_at":"2026-09-30T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":"SBA","state":"AZ","county":"04015","county_name":"Mohave County","city":"0437620","city_name":"Kingman","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"6982AF25B000004","latest_notice_id":"79fd783a138c4712a511e5e338872f1d","title":"ND NP THRO 204(1) Buck Hill Road","solicitation_number":"6982AF25B000004","notice_type":"p","first_type":"p","first_posted":"2026-09-15","last_posted":"2026-09-15","notices":1,"due_at":"2026-09-30T20:00:00Z","due_date":"2026-09-30","closes_at":"2026-09-30T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":null,"state":"ND","county":"38007","county_name":"Billings County","city":"3851900","city_name":"Medora","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"6982AF26Q000022","latest_notice_id":"bb67e9035828449ab88aa39f52604199","title":"CO NP BLCA 10(1) South Rim Drive","solicitation_number":"6982AF26Q000022","notice_type":"k","first_type":"o","first_posted":"2026-09-17","last_posted":"2026-09-17","notices":2,"due_at":"2026-10-08T20:00:00Z","due_date":"2026-10-08","closes_at":"2026-10-08T20:00:00Z","awardable":true,"open":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":"SBA","state":"CO","county":"08085","county_name":"Montrose County","city":"0851745","city_name":"Montrose","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-18T04:00:44.545196Z"}]}