# CA FTNP SEKI 13(2) Mineral King Road

Canonical: https://abierto.us/opportunities/6982af24b000017

- Solicitation number: 6982AF24B000017
- Notice type: Award notice (first published as presolicitation)
- Status: Awarded to Steve Manning Construction Inc. for $22,669,588.00
- Department: Department of Transportation
- Agency: Federal Highway Administration
- Contracting office: 6982AF Central Federal Lands Divisi (6982AF)
- NAICS: 237310 Highway, Street, and Bridge Construction
- Product or service code: Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
- Place of performance: California
- County: Tulare County (FIPS 06107). https://abierto.us/counties/tulare-county-ca-06107
- City: Tulare. https://abierto.us/cities/tulare-ca-0680644
- First posted: September 9, 2024
- Last posted: December 23, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/02ca7f8ca8864f4eb309f89508f69e43/view

## Description

THIS IS AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE AVAILABLE Full and Open Competition with HUBZone price preference PROJECT NUMBER: CA FTNP SEKI 13(2)

**PROJECT NAME:**

**MINERAL KING ROAD PROJECT DESCRIPTION:** The project proposes to rehabilitate up to 12.09 miles of Mineral King Road located within Sequoia and Kings Canyon National Park (SEKI). The project is located east of Visalia in Tulare County, CA.

**SCOPE OF THE WORK:** The scope includes pulverization of the existing pavement, aggregate base placement, and asphalt paving of the roadway. Parking lots will be rehabilitated or paved to improve visitor access. Soldier pile walls, soil nail walls, and areas of special rock embankment will be constructed throughout the project to stabilize the roadway. The project also includes drainage improvements such as ditch paving and grading, inlet installation, culvert replacement, and inlet and outlet protection measures.

The Mineral King Road Project is in remote mountainous terrain with areas of limited roadway bench width. Public access will have to be maintained during construction with intermittent allowable closures depending on season and time. The road is inaccessible during winter due to extreme weather and snowpack. The project is in an environmentally sensitive resource area within the National Park Service.

**PRINCIPAL WORK ITEMS:** 22,500 LF Ditch Excavation 1,900 CY Rip Rap 700 CY Special Rock Embankment 6,500 Tons Roadway Aggregate, Method 2 7.5 Miles Full Depth Reclamation, Method 2 4.5 Miles Full Depth Reclamation, Method 2 with Cement 26,000 Tons Asphalt Pavement 380 LF Steel H Piles, In Place 9,800 LF 24" to 48" Culverts 70 Each Inlet (Concrete Box Inlet) 37,000 LF Paved Ditch, Asphalt 80 Each Dry Stacked Headwall ANTICIPATED SCHEDULE: Preshow Onsite Meeting - October 2024 Advertisement - October 2024 Construction - April 2025 through October 2027 Estimated Cost Range: $25M to $35M

## Award on USAspending

- Recipient: Steve Manning Construction Inc. (UEI JMASLMNX1R55)
- Contract: 6982AF25C000009, definitive contract
- Obligated: $43,498,883.60
- Competition: Full and Open Competition, 4 offers received
- Link: solicitation number 6982AF24B000017 equals the FPDS solicitation identifier; same awarding office 6982AF (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_6982AF25C000009_6925_-NONE-_-NONE-/


## Publications

- September 9, 2024: Presolicitation, due September 24, 2024 at 4:00 PM EDT. Notice 63e3a09003e4493d96690d0f0ab42f49. https://sam.gov/workspace/contract/opp/63e3a09003e4493d96690d0f0ab42f49/view
- September 18, 2024: Presolicitation, due September 24, 2024 at 4:00 PM EDT. Notice eb49f6b29c5b41ef82548f8f2df895ff. https://sam.gov/workspace/contract/opp/eb49f6b29c5b41ef82548f8f2df895ff/view
- October 2, 2024: Solicitation, due November 6, 2024 at 4:00 PM EST. Notice 10caef42e51b41eb94b87d18937b7983. https://sam.gov/workspace/contract/opp/10caef42e51b41eb94b87d18937b7983/view
- October 21, 2024: Solicitation, due November 6, 2024 at 4:00 PM EST. Notice 157d0a6bddd9440e9e02f8da71050370. https://sam.gov/workspace/contract/opp/157d0a6bddd9440e9e02f8da71050370/view
- October 23, 2024: Solicitation, due November 6, 2024 at 4:00 PM EST. Notice 3de593190874433eb3e8c91618372262. https://sam.gov/workspace/contract/opp/3de593190874433eb3e8c91618372262/view
- October 25, 2024: Solicitation, due November 6, 2024 at 4:00 PM EST. Notice 50285e7b84b44766ad825f403740e740. https://sam.gov/workspace/contract/opp/50285e7b84b44766ad825f403740e740/view
- October 25, 2024: Solicitation, due November 6, 2024 at 4:00 PM EST. Notice 7689e9988a7343b5886bd632b8b2ab24. https://sam.gov/workspace/contract/opp/7689e9988a7343b5886bd632b8b2ab24/view
- November 4, 2024: Solicitation, due November 6, 2024 at 4:00 PM EST. Notice 456fea6852af4daba9a976ab1287ac6a. https://sam.gov/workspace/contract/opp/456fea6852af4daba9a976ab1287ac6a/view
- November 4, 2024: Solicitation, due November 6, 2024 at 4:00 PM EST. Notice d9eac53f90a44a9988e977f2e5f55884. https://sam.gov/workspace/contract/opp/d9eac53f90a44a9988e977f2e5f55884/view
- November 6, 2024: Solicitation, due November 6, 2024 at 4:00 PM EST. Notice 1cc009f2ee354ab4a2aae1bb9be14f33. https://sam.gov/workspace/contract/opp/1cc009f2ee354ab4a2aae1bb9be14f33/view
- December 11, 2024: Solicitation, due November 6, 2024 at 4:00 PM EST. Notice 1ed7a48be2204ee1bbd1044b432ff632. https://sam.gov/workspace/contract/opp/1ed7a48be2204ee1bbd1044b432ff632/view
- December 11, 2024: Solicitation, due November 6, 2024 at 4:00 PM EST. Notice cc75c24be2a94dd9b2a1141c925a12a3. https://sam.gov/workspace/contract/opp/cc75c24be2a94dd9b2a1141c925a12a3/view
- December 23, 2024: Award notice. Notice 02ca7f8ca8864f4eb309f89508f69e43. https://sam.gov/workspace/contract/opp/02ca7f8ca8864f4eb309f89508f69e43/view

## Points of contact

- Jorey Deml, cflacquisitions@dot.gov
- Ryan Phillips, cflacquisitions@dot.gov

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/6982af24b000017.
