# MT DAR MALM 2025(1), Defense Access Roads FY 2025

Canonical: https://abierto.us/opportunities/69056725ss0002

- Solicitation number: 690567-25-SS-0002
- Notice type: Sources sought
- Status: Closed. Deadline was January 15, 2025 at 5:00 PM EST
- Department: Department of Transportation
- Agency: Federal Highway Administration
- Contracting office: 690567 Western Federal Lands Div (690567)
- NAICS: 237310 Highway, Street, and Bridge Construction
- Product or service code: Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
- Place of performance: Winifred, Montana
- County: Fergus County (FIPS 30027). https://abierto.us/counties/fergus-county-mt-30027
- City: Winifred. https://abierto.us/cities/winifred-mt-3081025
- First posted: December 16, 2024
- Last posted: December 16, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/6013c6e247004a9a9bcaa45eb8701e8c/view

## Description

**Project:** MT DAR MALM 2025(1), Defense Access Roads FY 2025 This is a "REQUEST FOR INFORMATION" only for the proposed contract work. This is not a request for formal proposals or quotes. Plans and specifications are not available at this time. The intent of this Sources Sought Notice is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified businesses interested and capable of performing the proposed contract work.

**Requirement:** The proposed contract action is for a firm-fixed-priced construction contract. The primary objective of the proposed contract is to resurface existing Minuteman Missile Base Roads consistent with Transporter-Erector (T-E) Route Standards as agreed upon by the United States Air Force, Judith Basin, and Cascade Counties, and Western Federal Lands Highway Division (WFLHD).

The application of four inches of new aggregate and calcium chloride, along with isolated subexcavation and drainage improvements, is needed to improve and stabilize the roadway surfaces. This project consists of work on 8 segments of roads totaling up to 48.90 miles in Fergus County, Montana. The work includes roadway reconditioning, aggregate surfacing, aggregate stabilization, subexcavation, and drainage. The proposed acquisition has five schedules; the length of each is as follows:

Schedule A = 12.85 miles Schedule B = 23.38 miles Schedule C = 35.26 miles Schedule D = 43.99 miles Schedule E = 48.90 miles. Only one schedule will be awarded. The project is located in Fergus County, Montana. The project is anticipated to go on advertisement in Spring 2025 with construction in Summer 2025. NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $45 million.

**Estimated Price Range:**

**Between $5,000,000 and $10,000,000 Response:** Any offeror capable of providing this service shall respond to this sources sought by submitting the MS Form linked to below no later than January 15, 2025 1400 PT.

## Publications

- December 16, 2024: Sources sought, due January 15, 2025 at 5:00 PM EST. Notice 6013c6e247004a9a9bcaa45eb8701e8c. https://sam.gov/workspace/contract/opp/6013c6e247004a9a9bcaa45eb8701e8c/view

## Points of contact

- Contracts G. Office, wfl.contracts@dot.gov, 3606197520

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/69056725ss0002.
