{"canonical":"https://abierto.us/opportunities/47pb0024r0049","key":"47PB0024R0049","url":"https://abierto.us/opportunities/47pb0024r0049","title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","solicitation_number":"47PB0024R0049","notice_type":"o","open":false,"response_deadline":"2025-01-16T19:00:00Z","first_posted":"2024-09-16","last_posted":"2024-12-19","department":"GENERAL SERVICES ADMINISTRATION","subagency":"PUBLIC BUILDINGS SERVICE","office":"PBS R1 ACQ MANAGEMENT DIVISION","naics":"236220","psc":"C1AA","set_aside":null,"place_state":"ME","place_county":"23003","place_county_name":"Aroostook County","place_city":"2333945","place_city_name":"Houlton","winner":"J & J CONTRACTORS, INC.","award_amount":null,"publications":[{"notice_id":"25aa6acf38f4437fa5cae1b2f46323d9","title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","solicitation_number":"47PB0024R0049","notice_type":"p","base_type":"p","posted":"2024-09-16","posted_at":null,"due_at":"2024-12-03T19:00:00Z","due_date":"2024-12-03","cancelled":null,"archived":null,"archive_date":"2024-12-18","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/25aa6acf38f4437fa5cae1b2f46323d9/view","enriched":false,"history":[]},{"notice_id":"0bb8281a496f428ab639e2e86d85bfea","title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","solicitation_number":"47PB0024R0049","notice_type":"o","base_type":"o","posted":"2024-10-04","posted_at":null,"due_at":"2024-11-21T19:00:00Z","due_date":"2024-11-21","cancelled":null,"archived":null,"archive_date":"2024-12-06","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/0bb8281a496f428ab639e2e86d85bfea/view","enriched":false,"history":[]},{"notice_id":"d5d0d921b8624d189fe303212db36e99","title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","solicitation_number":"47PB0024R0049","notice_type":"o","base_type":"o","posted":"2024-10-08","posted_at":null,"due_at":"2024-11-21T19:00:00Z","due_date":"2024-11-21","cancelled":null,"archived":null,"archive_date":"2024-12-06","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d5d0d921b8624d189fe303212db36e99/view","enriched":false,"history":[]},{"notice_id":"d4cf39c2d8cc4cef98fe91e0f1bc361b","title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","solicitation_number":"47PB0024R0049","notice_type":"o","base_type":"o","posted":"2024-10-25","posted_at":null,"due_at":"2024-11-21T19:00:00Z","due_date":"2024-11-21","cancelled":null,"archived":null,"archive_date":"2024-12-06","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d4cf39c2d8cc4cef98fe91e0f1bc361b/view","enriched":false,"history":[]},{"notice_id":"28b8a5efbe564e4c86804dadedc8418c","title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","solicitation_number":"47PB0024R0049","notice_type":"o","base_type":"o","posted":"2024-10-31","posted_at":null,"due_at":"2024-11-21T19:00:00Z","due_date":"2024-11-21","cancelled":null,"archived":null,"archive_date":"2024-12-06","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/28b8a5efbe564e4c86804dadedc8418c/view","enriched":false,"history":[]},{"notice_id":"ba043e6be0c9448fade1096d76ac4f07","title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","solicitation_number":"47PB0024R0049","notice_type":"o","base_type":"o","posted":"2024-11-04","posted_at":null,"due_at":"2024-12-05T19:00:00Z","due_date":"2024-12-05","cancelled":null,"archived":null,"archive_date":"2024-12-20","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ba043e6be0c9448fade1096d76ac4f07/view","enriched":false,"history":[]},{"notice_id":"067b7a1c4b854ca5b2c80bcd02e76cb7","title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","solicitation_number":"47PB0024R0049","notice_type":"o","base_type":"o","posted":"2024-11-22","posted_at":null,"due_at":"2024-12-12T19:00:00Z","due_date":"2024-12-12","cancelled":null,"archived":null,"archive_date":"2024-12-27","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/067b7a1c4b854ca5b2c80bcd02e76cb7/view","enriched":false,"history":[]},{"notice_id":"d484f2e4a9234366bed0c26fa53e0451","title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","solicitation_number":"47PB0024R0049","notice_type":"o","base_type":"o","posted":"2024-12-10","posted_at":null,"due_at":"2025-01-16T19:00:00Z","due_date":"2025-01-16","cancelled":null,"archived":null,"archive_date":"2025-01-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d484f2e4a9234366bed0c26fa53e0451/view","enriched":false,"history":[]},{"notice_id":"ea1fea2981c648dca871ca3c0edd3281","title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","solicitation_number":"47PB0024R0049","notice_type":"o","base_type":"o","posted":"2024-12-19","posted_at":null,"due_at":"2025-01-16T19:00:00Z","due_date":"2025-01-16","cancelled":null,"archived":null,"archive_date":"2025-01-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ea1fea2981c648dca871ca3c0edd3281/view","enriched":false,"history":[]}],"latest_notice_id":"ea1fea2981c648dca871ca3c0edd3281","first_type":"p","notices":[{"dates":{"posted":"2024-09-16","response_deadline":{"raw":"2024-12-03T14:00:00-05:00","utc":"2024-12-03T19:00:00Z","date":"2024-12-03","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/25aa6acf38f4437fa5cae1b2f46323d9/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","agency":{"office":{"code":"47PB00","name":"PBS R1 ACQ MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"02222","city":"BOSTON","state":"MA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-18","archive_type":"auto15"},"contacts":[{"name":"Paul Murphy","role":"primary","email":"paul.murphy@gsa.gov","phone":"617-513-6954"},{"name":"Michele Valenza","role":"secondary","email":"michele.valenza@gsa.gov","phone":"617-565-8508"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"25aa6acf38f4437fa5cae1b2f46323d9","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"0d6b8a13dc7dec365e424baedba3c549ed29dff30bbfebd70d294aa17f59d8c0","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"This is a solicitation notice for acquisition is to acquire a Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry (LPOE), Interstate 95 & US/Canada Border, Houlton, Maine, ME0661BH. The requirements for this project will comply with the GSA, U.S. Customs and Border Protection (CBP) guidelines. This is a major renovation and alternation project that follow the GSA Design Excellence Guidelines, the GSA Facilities Standards for the Public Buildings Service (P-100) 2022, and the 2023 LPOE Design Guide for U.S. Customs & Border Protection (CBP). This project is categorized as a \"Repair & Alterations\" for application of the GSA P-100. The CMc shall be a member of the project development team during the design and construction phases. This project is part of the Bipartisan Infrastructure Law (BIL) program, during the design and construction phases. The CMc selected for this project shall work with the GSA and GSA’s selected Architect and Engineer (A/E) firm, Commissioning Agent (CxA), and Construction Manager as Agent (CMa). The services requested of the CMc shall cover a wide range of design and construction activities, such as: constructability reviews, cost estimating, work phasing reviews, scheduling and general construction services. During the design development (DD) and construction document (CD) phases, the A/E and the CMc will collaborate on the design, constructability issues, schedule, cost, through a process that is similar to value management. The goal of this collaboration is to establish a final Estimated Cost of Work that does not exceed the original target ECW (as set forth in the A/E Contractor’s proposal). The CMc's involvement during the project design stage offers the government the ability to identify current market conditions concerning labor and material availability, constructability issues, and any phasing and sequencing impacts. The CMc is at risk and is responsible for involvement in the project development and administration of the construction. The CMc contractor will be responsible for construction of the port should the construction option under the contract be exercised. The Magnitude of Construction is estimated within the range of $22,000,000.00 and $32,000,000.00. Offerors are cautioned that price proposals exceeding this range may be determined ineligible for award based on budgetary limitations. This range does include potential Inflation Reduction Act (IRA) funding. Due to the project magnitude, employing a CMc will reduce many of the potential project risks insofar as one central party will be responsible for managing the coordination of all contracting entities (i.e. subcontractors) necessary to complete the project within budget, on time, and most efficiently. Moreover, one responsible party will possess a better understanding of the project’s challenges and will consequently have more thorough knowledge of how to best complete the project. Finally, the CMc will be able to identify current market conditions concerning labor and material availability and the impact that has to the overall project. The Houlton Land Point of Entry (LPOE) is located at 27 Customs Loop, Houlton, ME. It is a large-scale New England crossing of about 37,561 GSF and operates 24/7 at the terminus of Interstate 95 (I-95) and occupies 7.8 acres. The corresponding Canadian border station is Woodstock Station, New Brunswick, CA. The LPOE facility consists of a group of four (4) buildings, constructed in 1985. The Main Port Building, CBP Commercial Inspection Building and FDA/GSA/APHIS Building are owned and maintained by the GSA. The NII Building is maintained by CBP, but GSA has ultimate custody and control of that structure. The buildings are not eligible to be listed on the National Register of Historic Places. The facility was constructed in 1985 and is 39 years old. In 2015, an Extra Field Investigation (EFI) study determined that there are substantial repairs needed to the entire exterior envelope. In the years since the completion of the study, the exterior walls and window systems have further deteriorated. The 2015 study only provided the assessment of envelope-related systems. In 2018, a Facility Assessment Report (FAR) was conducted providing a more thorough study of all building, systems, land and structures identified in the scope. Subsequently, the GSA Region 1 strongly emphasized that all building systems at this facility require replacement or significant reinvestment and undertook a formal Program Development Study (PDS) in 2021 to develop a project directives, budget and implementation plan to correct deficiencies that had been identified. The project will be completed as expeditiously as possible to mitigate the disruptions to both the CBP mission and general public. Planned repairs and alterations include: New building envelope components (roofing, windows, exterior wall panels, storefront systems, exterior doors and frames, building sealants) for the Main Port Building. Upgrades to life safety & fire protection systems, plumbing systems, mechanical systems (geothermal), and electrical systems for the Main Port Building. Optional - limited site civil work for items in need of repair including water service lines and underground water storage for fire suppression sprinkler systems. Optional - new primary and secondary generators. Optional - new building envelope components (roofing, windows, exterior wall panels, storefront systems, exterior doors and frames, building sealants) for the CBP Commercial Inspection and FDA/GSA/APHIS Buildings. Optional – upgrades to life safety and fire protection system for the CBP and FDA/GSA/APHIS Buildings. Meeting all accessibility standards. Incorporating sustainability features and advancing community goals per the Bipartisan Infrastructure Law (November 15, 2021). Use of low embodied carbon building materials and implementing sustainable technologies per the Inflation Reduction Act of 2022. IRA funding for this project is dependent on the Contractor’s ability to procure and utilize IRA eligible materials and equipment. For Low Embodied Carbon (LEC) Materials and Emerging & Sustainable Technologies (E&ST), the contractor shall price alternates for traditional materials. Refer to GSA 012300 ALTERNATES for additional information. In accordance with the Inflation Reduction Act of 2022 Requirements, this project is funded in part by Sections 60503 and 60504 of the Inflation Reduction Act of 2022 (IRA). Section 60503 Low Embodied Carbon (LEC) Materials provides funding for purchase of construction materials with substantially lower levels of embodied greenhouse gas emissions. Section 60504 Emerging Technologies provides funding for emerging and sustainable technology (E&ST) scope. The IRA requirements supersede LEC requirements referenced in GSA P-100 Facilities Standards. Regarding Low Embodied Carbon (LEC) Materials, this project requires the Contractor to acquire and install IRA-Eligible Materials that adhere to the global warming potential IRA Limits established in the Contract. IRA-Eligible Materials shall be purchased and properly installed per the Agreement, Scope of Work, Drawings and Specifications. Unless otherwise specified, all work requiring use of materials with a contractually established IRA Limit shall utilize materials compliant with those Limits. For each type of IRA-Eligible Material, the Contractor shall provide submittals of Environmental Product Declarations (EPD) and product information -- see Division One Specification, Submittal Procedures, 013300. IRA-Eligible Material scope item(s) shall be integrated into the project’s phasing, scheduling, reporting, and scope, to support overall project goals. Limit area of disturbance or work area for IRA-Eligible Material scope item(s) to the minimum practical area. Work area or area of disturbance shall be restored to pre-project or new condition. Regarding Emerging and Sustainable Technologies (E&ST), the work includes installation and construction of IRA-funded emerging and sustainable technology (E&ST) scope items including Photovoltaics, Heat Pumps, Networked LED Fixtures and Controls, and Advanced Insulations. IRA-funded E&ST scope items shall be constructed, installed, and certified as complete and operable. IRA-funded E&ST scope items shall be integrated into the project and conform with the overall project schedule. Limit area of disturbance or work area for E&ST scope items to the minimum practical area. Under the Cost Accounting and CLIN Structure, the Inflation Reduction Act has strict accounting and contract line-item formatting requirements. The CMc contractor must segregate and track costs applicable to the Inflation Reduction Act and work with the GSA PM and Contracting Officer to ensure compliance with the accounting requirements. Refer to Supplemental Pricing and Invoicing Instructions For Projects Funded By The Inflation Reduction Act Of 2022. As noted in the Agreement (released at time of Solicitation is issued), the CMc’s tasks are primarily separated into two distinct phases: (1) Pre-Construction Phase Services, which is a Firm Fixed Price (FFP) Contract; and (2) Construction Phase Work which is a Guaranteed Maximum Price (GMP) Fixed Price Incentive (FPI) Contract which is awarded as the construction option. A fixed-price incentive contract is a fixed-price contract that provides for adjusting profit and establishing the final contract price by application of a formula based on the relationship of total final negotiated cost to total target cost. The final price is subject to a price ceiling, negotiated at the outset. GSA intends to award the CMc contract pursuant to the Federal Acquisition Regulation (FAR) 15.101, Best Value Continuum. The scope of CMc services under this proposed contract includes Design Phase Services and Construction Phase Services. The CMc will be competitively chosen using the Source Selection (FAR Part 15) procedures. The objective of the Source Selection Process is to select a proposal the represents the best value to the Government. CMc is a Design-Assist project delivery method that allows an Owner to engage the Constructor early in the project to assist in defining the construction requirement as well as preparing construction cost estimates, schedule estimates, and constructability reviews. Both technical proposals and price proposals need to be clearly labelled so that the technical proposals can be evaluated separately by the Source Selection Evaluation Board in accordance with FAR Part 15.101. One contractor will be awarded using competitive negotiation. This procurement will be open to both large and small business firms. The firm (if not a small business) shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal. The Government reserves the right to make award on initial offers, but discussions may be held if appropriate. The Design Phase Services are anticipated to commence upon award of the contract. The solicitation (RFP) will be issued electronically via SAM at http://www.sam.gov/. GSA intends to solicit and negotiate a Construction Manager as Constructor (CMc) contract that can best demonstrate competence and qualification for contract award. At the time of the release of the Solicitation, bidders will use a bid sheet set up like this: Summary Design Phased Services Base Bid: Main Port Building - Exterior Building (Facade, Aluminum Storefronts, Windows Entrances, Roof, Exterior Hollow Metal Doors, Frames, Building Sealants) Main Port Building - Life Safety and Fire Protection Systems Main Port Building – Accessibility Main Port Building - Mechanical Systems Main Port Building - Plumbing Systems Main Port Building - Electrical Systems (plus transformer) Bid Options: Site Systems - Water Supply Primary Emergency Generator Secondary Emergency Generator FDA/GSA/APHIS Building - Exterior Building Envelope (Facade, Aluminum Storefronts, Windows Entrances, Roof, Exterior Hollow Metal Doors, Frames, Building Sealants) Commercial Inspection Building - Exterior Building Envelope (Facade, Aluminum Storefronts, Windows Entrances, Roof, Exterior Hollow Metal Doors, Frames, Building Sealants) FDA/GSA/APHIS Building - Life Safety and Fire Protection Systems Commercial Inspection Building - Life Safety and Fire Protection Systems The CMc delivery method will allow full collaboration between the CMc contractor and the Architect-Engineer contractor throughout the design and construction process. Design phase services for the CMc will include but are not limited to process design phase services for the CMC, to review and becoming familiar with the scope of services under the A/E’s contract, especially the various standards, guidelines, policies, and documents that the A/E is required to follow in developing the design and construction documents. This review and familiarization are vitally important because the main tasks of the CMc Contractor during the Design Phase Services are to provide constructability and cost estimation reviews of the A/E’s design related submissions. At its core, the CMc Contractor will help to ensure that the design and construction documents will enable the Government to exercise the Guaranteed Maximum Price (GMP) Option at a price that is at or below the GMP. Subject to the exercise of the GMP option, the CMc shall provide all supervision, labor, materials, and equipment to provide all required construction services for the preservation of significant historical aspects, construction for backfill of tenant space, and modernization of building systems to create an efficient, and comfortable working environment. The Government has hired an A/E firm who is currently working on the Concept Design. The Government has also retained an Independent Construction Manager as Advisor (CMa) to assist in procurement activities and any other activities required. A Commission Agent (CxA) has also been procured for this project. All parties will be expected to cooperate and partner with the goal of successfully completing a design and construction project on-time and on budget. A pre-proposal conference and site visit will take place, the date to be determined and will be confirmed in the solicitation. All submissions are due electronically by no later than 2:00PM Eastern Standard Time on December 3, 2024. The offeror shall submit electronic copies only. No hard copies of the RFP will be accepted. The RFP shall be sent to Michele Valenza, Contracting Officer at Michele.valenza@gsa.gov and Paul.Murphy@gsa.gov. Late responses are subject to FAR 52.208. This procurement is not set aside for Small Business; both small and large businesses are encouraged to participate. The NAICS Code is 236220 – Commercial and Institutional Building Construction. The government is not responsible for any travel, living expenses, computer time or hookups for the prime or the consultants during the selection process. This procurement will be solicited as full and open competition. The North American Industry Classification System (NAICS) code for this acquisition is 236220 (Commercial and Institutional Building Construction). The small business size standard is $39.5 million average annual receipts. Competitive proposals shall be evaluated based on the factors specified in the solicitation. It is anticipated that the non-price technical factors will be broken down, as follows: Factor 1: Experience in Providing Design Phase Services and Construction Phase Service on Similar Projects (30%) Factor 2: Management and Technical Approach (Design Phase Services and Construction Phase Services (20%) Factor 3: Qualifications and Experience of Key Personnel (15%) Factor 4: Past Performance in Providing Design Phase Services and Construction Phase Services on Similar Projects Provided under Factor #1 (15%) Factor 5: Sustainability (15%) Factor 6: Small Business Participation (5%) Important Notes: (1) A bid guarantee will be required ninety (90) calendar days prior to the exercise of the GMP Option for Construction Services. The Contractor shall furnish required performance and payment bonds within fourteen (14) calendar days of exercise of the GMP Option. (2) In accordance with FAR 30.101, Cost Accounting Standards, the Contractor must demonstrate their compliance with Cost Accounting Standards. Award shall not be made to any contractor that is not CAS compliant. The proposals may require CAS disclosures and certifications in accordance with FAR 52.230-1 and FAR 52.230-7. By participating in the competition, offerors consent to GSA sharing their suppliers’ names and the global warming potential values associated with suppliers’ materials with the successful offeror. Such information may also be disclosed publicly or used to inform other low embodied carbon procurement activities. Technical solutions, supplier pricing, and supplier-offeror terms and conditions will not be shared, in accordance with the Procurement Integrity Act. To ensure that you receive all information regarding this solicitation, please register to receive updates at www.SAM.gov, follow the procedures for notification registration. Interested Parties/How to Offer: The Solicitation will only be available electronically. The Solicitation (RFP) will be available on or about 10/03/2024. The solicitation can only be obtained by accessing SAM.gov a secure website designed to safeguard sensitive but unclassified (SBU) acquisition material. Potential offerors will be responsible for downloading the solicitation and for monitoring the website for possible amendments and/or additional information. Potential offerors must be registered in SAM.gov. Inquiries concerning the project should be directed to the following email address: michele.valenza@gsa.gov and paul.murphy@gsa.gov and reference the solicitation number in the subject line.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"47PB0024R0049","place_of_performance":{"zip":"04730","city":{"name":"Houlton"},"state":{"code":"ME"},"country":{"code":"USA"}},"product_service_code":"C1AA"},{"dates":{"posted":"2024-10-04","response_deadline":{"raw":"2024-11-21T14:00:00-05:00","utc":"2024-11-21T19:00:00Z","date":"2024-11-21","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/0bb8281a496f428ab639e2e86d85bfea/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","agency":{"office":{"code":"47PB00","name":"PBS R1 ACQ MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"02222","city":"BOSTON","state":"MA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-06","archive_type":"auto15"},"contacts":[{"name":"Paul Murphy","role":"primary","email":"paul.murphy@gsa.gov","phone":"6175136954"},{"name":"Michele Valenza","role":"secondary","email":"michele.valenza@gsa.gov","phone":"8573838973"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"0bb8281a496f428ab639e2e86d85bfea","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"dbddc49be5546c492042d944e39398aa97eaad3d7544eb52fae323c484a98ae4","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"This is a Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services for U.S. Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The CMc/CMAR services is for the Facilities Repair and Alterations project and includes requirements for Design Phase services and Construction Phase services. Design Phase services will be awarded on a Firm-Fixed Price basis. Construction Phase services will be awarded with a Guaranteed Maximum Price (GMP). This project is part of the Bipartisan Infrastructure Law (BIL) and is also targeted for Inflation Reduction Act (IRA) funding. This solicitation sets forth requirements for proposals for a contract to construct the project described in the solicitation documents. Proposals conforming to the solicitation requirements will be evaluated in accordance with the method of award set forth herein. The Government will award the contract to the selected Offeror, subject to the conditions set forth herein. The Offeror's proposal submitted in response to this solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror and delivered back to the Contractor, a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices. Offers providing less than one hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. The Magnitude of Construction is estimated within the range of $22,000,000 and $32,000,000. Offeror's are cautioned that price proposals exceeding this range may be determined ineligible for award based on budgetary limitations. This range does include potential Inflation Reduction Act (IRA funding). Price proposal exceeding this range may be eligible to have their Technical and Price Proposal evaluated unless the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted. The Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Technical and Price Proposals must be clearly labeled and must be sent as separate attachments so they can be evaluated separately. Failure to do so will determine the Offeror's submission as non-responsive and will be eliminated. The Contracting Officer and/or Contracts Specialist will not be responsible to separate any technical document that contains pricing information. This solicitation is not set aside for Small Business, however, both Small and Large Businesses are encouraged to participate. Offeror's must ensure that SAM.gov shows that the Offeror has North American Industry Classification System (NAICS) code 236220 (Commercial and Institutional Building Construction) and meets the small business size standard is $39.5 million average annual receipts. It is the responsibility of the Offeror to ensure this information is updated at the time of submission of their Proposal. See the \"A. Presolicitation in SAM 2024 08 27\" for additional details. Changes to the Presolicitation include: The Solicitation posting date has changed from September 26, 2024 to October 3, 2024. The Proposal submission date has changed from November 26, 2024, 2:00 PM EST to November 11, 2024, 2:00 PM EST. For access to Public Building Services (PBS) General Services Administration (GSA) documents, see \"B. FORM B - Request for Construction Documents 2024 08 07\" that must be completed in its entirety and signed. Failure to complete this document in a timely manner does not warrant any request for an extension to the Proposal Due Date. The document must be sent to paul.murphy@gsa.gov before access to these PBS/GSA documents are provided. Additionally, the Department of Homeland Security, U.S. Customs and Border Protection, Facilities Management and Engineering Field Operations, Facilities Program Management Office, Non-Disclosure Agreement. See \"6. CBP Non-Disclosure Agreement Form 2024 10 04\" that must be completed in its entirety and signed. This document must be sent to lawrence.a.comiskey@cbp.dhs.gov AND a copy sent to paul.murphy@gsa.gov before access to CBP Documents are provided. A PRE-PROPOSAL CONFERENCE is scheduled for Thursday, October 10, 2024, at 10:00 PM EST. A letter is attached to this solicitation \"7. Pre-Proposal Conference 2024 10 04\". A PRE-PROPOSAL SITE VISIT is scheduled for Thursday, October 17, 2024, at 01:00 PM EST. A letter is attached to this solicitation \"8. Pre-Proposal Site Visit 2024 10 04\". There are 71 attachments to this solicitation.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"47PB0024R0049","place_of_performance":{"zip":"04730","city":{"name":"Houlton"},"state":{"code":"ME"},"country":{"code":"USA"}},"product_service_code":"C1AA"},{"dates":{"posted":"2024-10-08","response_deadline":{"raw":"2024-11-21T14:00:00-05:00","utc":"2024-11-21T19:00:00Z","date":"2024-11-21","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d5d0d921b8624d189fe303212db36e99/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","agency":{"office":{"code":"47PB00","name":"PBS R1 ACQ MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"02222","city":"BOSTON","state":"MA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-06","archive_type":"auto15"},"contacts":[{"name":"Paul Murphy","role":"primary","email":"paul.murphy@gsa.gov","phone":"6175136954"},{"name":"Michele Valenza","role":"secondary","email":"michele.valenza@gsa.gov","phone":"8573838973"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d5d0d921b8624d189fe303212db36e99","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"630bbb684fb96750be52314a1944527af0130d762b3a54c5ae1f990e462902a4","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"Amendment 001 The following changes were made effective on 10/08/2024: A. Replaced 5. Form B - Request for Construction Documents 2024 10 04 with 5. Form B - Request for Construction Documents 2024 10 08 and UNLOCKED it. B. Replaced 6. CBP Non-Disclosure Agreement Form 2024 10 04 with 6. CBP Non-Disclosure Agreement Form 2024 10 08 and UNLOCKED it. C. Replaced 7. Pre-Proposal Conference R1 2024 10 04 with 7. Pre-Proposal Conference R1 2024 10 08 which provides the following clarification: 1. The Pre-proposal Conference will be held virtually on October 10, 2024 at 10:00 am. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 18, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about October 25, 2024. D. Replaced 8. Pre-Proposal Site Visit R1 2024 10 04 with Attachment - 8. Pre-Proposal Site Visit R1 2024 10 08 which provides the following clarification: 1. The Site Visit will be held on October 17, 2024 at 1:00 PM. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 25, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about November 1, 2024. E. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28. F. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051 A. The corrected Proposal Due Date is Thursday, November 21, 2024. This is a Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services for U.S. Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The CMc/CMAR services is for the Facilities Repair and Alterations project and includes requirements for Design Phase services and Construction Phase services. Design Phase services will be awarded on a Firm-Fixed Price basis. Construction Phase services will be awarded with a Guaranteed Maximum Price (GMP). This project is part of the Bipartisan Infrastructure Law (BIL) and is also targeted for Inflation Reduction Act (IRA) funding. This solicitation sets forth requirements for proposals for a contract to construct the project described in the solicitation documents. Proposals conforming to the solicitation requirements will be evaluated in accordance with the method of award set forth herein. The Government will award the contract to the selected Offeror, subject to the conditions set forth herein. The Offeror's proposal submitted in response to this solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror and delivered back to the Contractor, a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices. Offers providing less than one hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. The Magnitude of Construction is estimated within the range of $22,000,000 and $32,000,000. Offeror's are cautioned that price proposals exceeding this range may be determined ineligible for award based on budgetary limitations. This range does include potential Inflation Reduction Act (IRA funding). Price proposal exceeding this range may be eligible to have their Technical and Price Proposal evaluated unless the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted. The Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Technical and Price Proposals must be clearly labeled and must be sent as separate attachments so they can be evaluated separately. Failure to do so will determine the Offeror's submission as non-responsive and will be eliminated. The Contracting Officer and/or Contracts Specialist will not be responsible to separate any technical document that contains pricing information. This solicitation is not set aside for Small Business, however, both Small and Large Businesses are encouraged to participate. Offeror's must ensure that SAM.gov shows that the Offeror has North American Industry Classification System (NAICS) code 236220 (Commercial and Institutional Building Construction) and meets the small business size standard is $39.5 million average annual receipts. It is the responsibility of the Offeror to ensure this information is updated at the time of submission of their Proposal. See the \"A. Presolicitation in SAM 2024 08 27\" for additional details. Changes to the Presolicitation include: The Solicitation posting date has changed from September 26, 2024 to October 3, 2024. The Proposal submission date has changed from November 26, 2024, 2:00 PM EST to November 11, 2024, 2:00 PM EST. For access to Public Building Services (PBS) General Services Administration (GSA) documents, see \"B. FORM B - Request for Construction Documents 2024 08 07\" that must be completed in its entirety and signed. Failure to complete this document in a timely manner does not warrant any request for an extension to the Proposal Due Date. The document must be sent to paul.murphy@gsa.gov before access to these PBS/GSA documents are provided. Additionally, the Department of Homeland Security, U.S. Customs and Border Protection, Facilities Management and Engineering Field Operations, Facilities Program Management Office, Non-Disclosure Agreement. See \"6. CBP Non-Disclosure Agreement Form 2024 10 04\" that must be completed in its entirety and signed. This document must be sent to lawrence.a.comiskey@cbp.dhs.gov AND a copy sent to paul.murphy@gsa.gov before access to CBP Documents are provided. A PRE-PROPOSAL CONFERENCE is scheduled for Thursday, October 10, 2024, at 10:00 PM EST. A letter is attached to this solicitation \"7. Pre-Proposal Conference 2024 10 04\". A PRE-PROPOSAL SITE VISIT is scheduled for Thursday, October 17, 2024, at 01:00 PM EST. A letter is attached to this solicitation \"8. Pre-Proposal Site Visit 2024 10 04\". There are 71 attachments to this solicitation.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"47PB0024R0049","place_of_performance":{"zip":"04730","city":{"name":"Houlton"},"state":{"code":"ME"},"country":{"code":"USA"}},"product_service_code":"C1AA"},{"dates":{"posted":"2024-10-25","response_deadline":{"raw":"2024-11-21T14:00:00-05:00","utc":"2024-11-21T19:00:00Z","date":"2024-11-21","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d4cf39c2d8cc4cef98fe91e0f1bc361b/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","agency":{"office":{"code":"47PB00","name":"PBS R1 ACQ MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"02222","city":"BOSTON","state":"MA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-06","archive_type":"auto15"},"contacts":[{"name":"Paul Murphy","role":"primary","email":"paul.murphy@gsa.gov","phone":"6175136954"},{"name":"Michele Valenza","role":"secondary","email":"michele.valenza@gsa.gov","phone":"8573838973"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d4cf39c2d8cc4cef98fe91e0f1bc361b","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"807eff1505eccfa5d0b1cdc9d94bfaf407d7e0a5555facd6c1b0963eaab1d996","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"47PB0024R0049 Amendment 002 Added Attachment 72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10. A courtesy copy was sent via email to people that were on the invitation list even if they did not attend the individual meetings. It it attached here so all contractors, whether they requested attendance or not, will know of the discussions. Added clarifying Price Proposal language below: Under Volume II - Price Proposal - Part 3 - Price Proposal \"Other than Certified Cost and Pricing Data\" Documentation. Uniformate II Classification Framework. Under Volume II - Price Proposal (1) Contents · Price Proposal on SF-1442 (signed) â Solicitation, Offor, and Award. The Price Proposal shall consist of the SF-1442 and the Agreement. Indicate the Total Contract Price from the completed Contract Price Form in Block 17 of the SF 1442, which must be fully executed by the Offeror. · A completed Contract Price Form included as part of the SF-1442 and in Section II of the Agreement. · Other than Certified Cost and Pricing Dataâ Documentation. Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level. The IRA designated CLINs shall be broken out separately from the remaining requirement. Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97). NOTE: The Price Proposal must be separately bound from the Phase II Technical Proposal. IV.L. Requiring Certified Cost or Pricing Data [15.403-4] IV.L.A. FAR 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (NOV 2021), Alternate IV (OCT 2010) (a) Submission of certified cost or pricing data is not required. (b) Provide data described below: Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level. The IRA designated CLINs shall be broken out separately from the remaining requirement. Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97). Added Attachment 75 Presolicitation in SAM 2024 08 27. Added Attachment 76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17 Added Attachments 77 - 94 provide additional design information as requested. 77 Exhibit D_2325-GSA-Houlton ME LPOE_Design Options; 78 Exhibit D.1_LPOE Houlton Concept Development Design Package; 79 Exhibit E_ LPOE Houlton Concept Development Calculation Package; 80 Exhibit E.1_MPBRoof Structure; 81 Exhibit F_MEP Basis of Design Narrative; 82 Exhibit G_MEP Concept Development Design Alternates; 83 Exhibit G.1 MEPFP Equipment; 84 Exhibit H_Houlton LPOE_Facade Options & IRA LEC Materials_Concept Development MEMO; 85 Exhibit J Houlton LEED NC Scorecard; 86 Exhibit J.1_GSA Sustainable Buildings_Checklist; 87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative; 88 Exhibit U_(CUI) Houlton ME DBT_MSR_FSL; 89 Exhibit V_Houlton LPOE Pre-Renovation RBM Survey Report 2024-06-25; 90 Exhibit X_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 92 Exhibit Z_(CUI) Passwords; 93 Exhibit AA_National Operational Excellence Checklists_Concept Development; and 94 Exhibit BB_Houlton ME LPOPE_Concept Development Specifications Table of Contents. Several required a Completed Form B under Attachment 5 and a Completed CBP NDA Authorization Letter signed for access. If you have already submitted these to the Contracting Officer prior to October 24, 2024, just email again for access. NOTE: The Facade - Precast Panels and Terracotta Rainscreen - colors will be selected in the next phase by the Architecture Engineering (AE) Design Firm Marvel Architectures. Additionally, HVAC - VRF, the A/E will select the vendor that meets most of the GSA requirements (HVAC and Controls). Added Attachment 95 IRA Program Construction Solicitation Desk Guide - dated October 1, 2024. This is a revision of any previous Construction Solicitation Desk Guide that provides guidance for IRA-funded construction projects that contain low embodied carbon (LEC) materials, including pre-solicitation, solicitation, and agreement guidance, evaluation factor requirements, review and approval requirements, and post-award requirements. It also includes standard scope of work language for actions related to the construction project (design services, CMa, and CxP services) for LEC materials, high performance green buildings, and emerging and sustainable technology projects. Added Attachment 96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs containing questions asked by Offeror's and official Government Responses for the Pre-Proposal Conference only. Added Attachment 97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide reference above in Pricing Information area. 47PB0024R0049 Amendment 001 The following changes were made effective on 10/08/2024: A. Replaced 5. Form B - Request for Construction Documents 2024 10 04 with 5. Form B - Request for Construction Documents 2024 10 08 and UNLOCKED it. B. Replaced 6. CBP Non-Disclosure Agreement Form 2024 10 04 with 6. CBP Non-Disclosure Agreement Form 2024 10 08 and UNLOCKED it. C. Replaced 7. Pre-Proposal Conference R1 2024 10 04 with 7. Pre-Proposal Conference R1 2024 10 08 which provides the following clarification: 1. The Pre-proposal Conference will be held virtually on October 10, 2024 at 10:00 am. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 18, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about October 25, 2024. D. Replaced 8. Pre-Proposal Site Visit R1 2024 10 04 with Attachment - 8. Pre-Proposal Site Visit R1 2024 10 08 which provides the following clarification: 1. The Site Visit will be held on October 17, 2024 at 1:00 PM. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 25, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about November 1, 2024. E. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28. F. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051 A. The corrected Proposal Due Date is Thursday, November 21, 2024. This is a Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services for U.S. Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The CMc/CMAR services is for the Facilities Repair and Alterations project and includes requirements for Design Phase services and Construction Phase services. Design Phase services will be awarded on a Firm-Fixed Price basis. Construction Phase services will be awarded with a Guaranteed Maximum Price (GMP). This project is part of the Bipartisan Infrastructure Law (BIL) and is also targeted for Inflation Reduction Act (IRA) funding. This solicitation sets forth requirements for proposals for a contract to construct the project described in the solicitation documents. Proposals conforming to the solicitation requirements will be evaluated in accordance with the method of award set forth herein. The Government will award the contract to the selected Offeror, subject to the conditions set forth herein. The Offeror's proposal submitted in response to this solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror and delivered back to the Contractor, a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices. Offers providing less than one hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. The Magnitude of Construction is estimated within the range of $22,000,000 and $32,000,000. Offeror's are cautioned that price proposals exceeding this range may be determined ineligible for award based on budgetary limitations. This range does include potential Inflation Reduction Act (IRA funding). Price proposal exceeding this range may be eligible to have their Technical and Price Proposal evaluated unless the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted. The Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Technical and Price Proposals must be clearly labeled and must be sent as separate attachments so they can be evaluated separately. Failure to do so will determine the Offeror's submission as non-responsive and will be eliminated. The Contracting Officer and/or Contracts Specialist will not be responsible to separate any technical document that contains pricing information. This solicitation is not set aside for Small Business, however, both Small and Large Businesses are encouraged to participate. Offeror's must ensure that SAM.gov shows that the Offeror has North American Industry Classification System (NAICS) code 236220 (Commercial and Institutional Building Construction) and meets the small business size standard is $39.5 million average annual receipts. It is the responsibility of the Offeror to ensure this information is updated at the time of submission of their Proposal. See the \"A. Presolicitation in SAM 2024 08 27\" for additional details. Changes to the Presolicitation include: The Solicitation posting date has changed from September 26, 2024 to October 3, 2024. The Proposal submission date has changed from November 26, 2024, 2:00 PM EST to November 11, 2024, 2:00 PM EST. For access to Public Building Services (PBS) General Services Administration (GSA) documents, see \"B. FORM B - Request for Construction Documents 2024 08 07\" that must be completed in its entirety and signed. Failure to complete this document in a timely manner does not warrant any request for an extension to the Proposal Due Date. The document must be sent to paul.murphy@gsa.gov before access to these PBS/GSA documents are provided. Additionally, the Department of Homeland Security, U.S. Customs and Border Protection, Facilities Management and Engineering Field Operations, Facilities Program Management Office, Non-Disclosure Agreement. See \"6. CBP Non-Disclosure Agreement Form 2024 10 04\" that must be completed in its entirety and signed. This document must be sent to lawrence.a.comiskey@cbp.dhs.gov AND a copy sent to paul.murphy@gsa.gov before access to CBP Documents are provided. A PRE-PROPOSAL CONFERENCE is scheduled for Thursday, October 10, 2024, at 10:00 PM EST. A letter is attached to this solicitation \"7. Pre-Proposal Conference 2024 10 04\". A PRE-PROPOSAL SITE VISIT is scheduled for Thursday, October 17, 2024, at 01:00 PM EST. A letter is attached to this solicitation \"8. Pre-Proposal Site Visit 2024 10 04\". There are 71 attachments to this solicitation.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"47PB0024R0049","place_of_performance":{"zip":"04730","city":{"name":"Houlton"},"state":{"code":"ME"},"country":{"code":"USA"}},"product_service_code":"C1AA"},{"dates":{"posted":"2024-10-31","response_deadline":{"raw":"2024-11-21T14:00:00-05:00","utc":"2024-11-21T19:00:00Z","date":"2024-11-21","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/28b8a5efbe564e4c86804dadedc8418c/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","agency":{"office":{"code":"47PB00","name":"PBS R1 ACQ MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"02222","city":"BOSTON","state":"MA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-06","archive_type":"auto15"},"contacts":[{"name":"Paul Murphy","role":"primary","email":"paul.murphy@gsa.gov","phone":"6175136954"},{"name":"Michele Valenza","role":"secondary","email":"michele.valenza@gsa.gov","phone":"8573838973"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"28b8a5efbe564e4c86804dadedc8418c","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"e64f1cf569c01955ac18c695afba59d357d74df7278c81cf3de59864995917ce","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"47PB0024R0049 Amendment 003 Added Attachments 33. A.7 GSA P-100 2021 with 2022 Addendum Final (326), 35. D.4 P100 Submittal Matrix v10 CMc 2021, 58. GSA Program Development Study 100% PDS Report 2021 02 08 (559), and 69. Roof Moisture Analysis Report Houlton 2020 06 23 (22) did not get posted on 10/04/2024. They are added under Amendment 0003. Additionally, Attachment 98. RFI Site Visit Tracker is provided as the Government Response to RFI by Offerors. 47PB0024R0049 Amendment 002 Added Attachment 72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10. A courtesy copy was sent via email to people that were on the invitation list even if they did not attend the individual meetings. It it attached here so all contractors, whether they requested attendance or not, will know of the discussions. Added clarifying Price Proposal language below: Under Volume II - Price Proposal - Part 3 - Price Proposal \"Other than Certified Cost and Pricing Data\" Documentation. Uniformate II Classification Framework. Under Volume II - Price Proposal (1) Contents · Price Proposal on SF-1442 (signed) â Solicitation, Offor, and Award. The Price Proposal shall consist of the SF-1442 and the Agreement. Indicate the Total Contract Price from the completed Contract Price Form in Block 17 of the SF 1442, which must be fully executed by the Offeror. · A completed Contract Price Form included as part of the SF-1442 and in Section II of the Agreement. · Other than Certified Cost and Pricing Dataâ Documentation. Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level. The IRA designated CLINs shall be broken out separately from the remaining requirement. Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97). NOTE: The Price Proposal must be separately bound from the Phase II Technical Proposal. IV.L. Requiring Certified Cost or Pricing Data [15.403-4] IV.L.A. FAR 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (NOV 2021), Alternate IV (OCT 2010) (a) Submission of certified cost or pricing data is not required. (b) Provide data described below: Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level. The IRA designated CLINs shall be broken out separately from the remaining requirement. Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97). Added Attachment 75 Presolicitation in SAM 2024 08 27. Added Attachment 76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17 Added Attachments 77 - 94 provide additional design information as requested. 77 Exhibit D_2325-GSA-Houlton ME LPOE_Design Options; 78 Exhibit D.1_LPOE Houlton Concept Development Design Package; 79 Exhibit E_ LPOE Houlton Concept Development Calculation Package; 80 Exhibit E.1_MPBRoof Structure; 81 Exhibit F_MEP Basis of Design Narrative; 82 Exhibit G_MEP Concept Development Design Alternates; 83 Exhibit G.1 MEPFP Equipment; 84 Exhibit H_Houlton LPOE_Facade Options & IRA LEC Materials_Concept Development MEMO; 85 Exhibit J Houlton LEED NC Scorecard; 86 Exhibit J.1_GSA Sustainable Buildings_Checklist; 87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative; 88 Exhibit U_(CUI) Houlton ME DBT_MSR_FSL; 89 Exhibit V_Houlton LPOE Pre-Renovation RBM Survey Report 2024-06-25; 90 Exhibit X_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 92 Exhibit Z_(CUI) Passwords; 93 Exhibit AA_National Operational Excellence Checklists_Concept Development; and 94 Exhibit BB_Houlton ME LPOPE_Concept Development Specifications Table of Contents. Several required a Completed Form B under Attachment 5 and a Completed CBP NDA Authorization Letter signed for access. If you have already submitted these to the Contracting Officer prior to October 24, 2024, just email again for access. NOTE: The Facade - Precast Panels and Terracotta Rainscreen - colors will be selected in the next phase by the Architecture Engineering (AE) Design Firm Marvel Architectures. Additionally, HVAC - VRF, the A/E will select the vendor that meets most of the GSA requirements (HVAC and Controls). Added Attachment 95 IRA Program Construction Solicitation Desk Guide - dated October 1, 2024. This is a revision of any previous Construction Solicitation Desk Guide that provides guidance for IRA-funded construction projects that contain low embodied carbon (LEC) materials, including pre-solicitation, solicitation, and agreement guidance, evaluation factor requirements, review and approval requirements, and post-award requirements. It also includes standard scope of work language for actions related to the construction project (design services, CMa, and CxP services) for LEC materials, high performance green buildings, and emerging and sustainable technology projects. Added Attachment 96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs containing questions asked by Offeror's and official Government Responses for the Pre-Proposal Conference only. Added Attachment 97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide reference above in Pricing Information area. 47PB0024R0049 Amendment 001 The following changes were made effective on 10/08/2024: A. Replaced 5. Form B - Request for Construction Documents 2024 10 04 with 5. Form B - Request for Construction Documents 2024 10 08 and UNLOCKED it. B. Replaced 6. CBP Non-Disclosure Agreement Form 2024 10 04 with 6. CBP Non-Disclosure Agreement Form 2024 10 08 and UNLOCKED it. C. Replaced 7. Pre-Proposal Conference R1 2024 10 04 with 7. Pre-Proposal Conference R1 2024 10 08 which provides the following clarification: 1. The Pre-proposal Conference will be held virtually on October 10, 2024 at 10:00 am. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 18, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about October 25, 2024. D. Replaced 8. Pre-Proposal Site Visit R1 2024 10 04 with Attachment - 8. Pre-Proposal Site Visit R1 2024 10 08 which provides the following clarification: 1. The Site Visit will be held on October 17, 2024 at 1:00 PM. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 25, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about November 1, 2024. E. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28. F. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051 A. The corrected Proposal Due Date is Thursday, November 21, 2024. This is a Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services for U.S. Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The CMc/CMAR services is for the Facilities Repair and Alterations project and includes requirements for Design Phase services and Construction Phase services. Design Phase services will be awarded on a Firm-Fixed Price basis. Construction Phase services will be awarded with a Guaranteed Maximum Price (GMP). This project is part of the Bipartisan Infrastructure Law (BIL) and is also targeted for Inflation Reduction Act (IRA) funding. This solicitation sets forth requirements for proposals for a contract to construct the project described in the solicitation documents. Proposals conforming to the solicitation requirements will be evaluated in accordance with the method of award set forth herein. The Government will award the contract to the selected Offeror, subject to the conditions set forth herein. The Offeror's proposal submitted in response to this solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror and delivered back to the Contractor, a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices. Offers providing less than one hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. The Magnitude of Construction is estimated within the range of $22,000,000 and $32,000,000. Offeror's are cautioned that price proposals exceeding this range may be determined ineligible for award based on budgetary limitations. This range does include potential Inflation Reduction Act (IRA funding). Price proposal exceeding this range may be eligible to have their Technical and Price Proposal evaluated unless the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted. The Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Technical and Price Proposals must be clearly labeled and must be sent as separate attachments so they can be evaluated separately. Failure to do so will determine the Offeror's submission as non-responsive and will be eliminated. The Contracting Officer and/or Contracts Specialist will not be responsible to separate any technical document that contains pricing information. This solicitation is not set aside for Small Business, however, both Small and Large Businesses are encouraged to participate. Offeror's must ensure that SAM.gov shows that the Offeror has North American Industry Classification System (NAICS) code 236220 (Commercial and Institutional Building Construction) and meets the small business size standard is $39.5 million average annual receipts. It is the responsibility of the Offeror to ensure this information is updated at the time of submission of their Proposal. See the \"A. Presolicitation in SAM 2024 08 27\" for additional details. Changes to the Presolicitation include: The Solicitation posting date has changed from September 26, 2024 to October 3, 2024. The Proposal submission date has changed from November 26, 2024, 2:00 PM EST to November 11, 2024, 2:00 PM EST. For access to Public Building Services (PBS) General Services Administration (GSA) documents, see \"B. FORM B - Request for Construction Documents 2024 08 07\" that must be completed in its entirety and signed. Failure to complete this document in a timely manner does not warrant any request for an extension to the Proposal Due Date. The document must be sent to paul.murphy@gsa.gov before access to these PBS/GSA documents are provided. Additionally, the Department of Homeland Security, U.S. Customs and Border Protection, Facilities Management and Engineering Field Operations, Facilities Program Management Office, Non-Disclosure Agreement. See \"6. CBP Non-Disclosure Agreement Form 2024 10 04\" that must be completed in its entirety and signed. This document must be sent to lawrence.a.comiskey@cbp.dhs.gov AND a copy sent to paul.murphy@gsa.gov before access to CBP Documents are provided. A PRE-PROPOSAL CONFERENCE is scheduled for Thursday, October 10, 2024, at 10:00 PM EST. A letter is attached to this solicitation \"7. Pre-Proposal Conference 2024 10 04\". A PRE-PROPOSAL SITE VISIT is scheduled for Thursday, October 17, 2024, at 01:00 PM EST. A letter is attached to this solicitation \"8. Pre-Proposal Site Visit 2024 10 04\". There are 71 attachments to this solicitation.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"47PB0024R0049","place_of_performance":{"zip":"04730","city":{"name":"Houlton"},"state":{"code":"ME"},"country":{"code":"USA"}},"product_service_code":"C1AA"},{"dates":{"posted":"2024-11-04","response_deadline":{"raw":"2024-12-05T14:00:00-05:00","utc":"2024-12-05T19:00:00Z","date":"2024-12-05","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ba043e6be0c9448fade1096d76ac4f07/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","agency":{"office":{"code":"47PB00","name":"PBS R1 ACQ MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"02222","city":"BOSTON","state":"MA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-20","archive_type":"auto15"},"contacts":[{"name":"Paul Murphy","role":"primary","email":"paul.murphy@gsa.gov","phone":"6175136954"},{"name":"Michele Valenza","role":"secondary","email":"michele.valenza@gsa.gov","phone":"8573838973"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"ba043e6be0c9448fade1096d76ac4f07","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"f3409d9aab7b52ea3a3d620b300656194f7a27f3f2585a8539b00d9e1fdc66f9","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"47PB0024R0049 Amendment 004 The Contracting Officer has approved an extension to December 5, 2024, 2:00 PM EST for Receipt of Proposals. 47PB0024R0049 Amendment 003 Added Attachments 33. A.7 GSA P-100 2021 with 2022 Addendum Final (326), 35. D.4 P100 Submittal Matrix v10 CMc 2021, 58. GSA Program Development Study 100% PDS Report 2021 02 08 (559), and 69. Roof Moisture Analysis Report Houlton 2020 06 23 (22) did not get posted on 10/04/2024. They are added under Amendment 0003. Additionally, Attachment 98. RFI Site Visit Tracker is provided as the Government Response to RFI by Offerors. 47PB0024R0049 Amendment 002 Added Attachment 72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10. A courtesy copy was sent via email to people that were on the invitation list even if they did not attend the individual meetings. It it attached here so all contractors, whether they requested attendance or not, will know of the discussions. Added clarifying Price Proposal language below: Under Volume II - Price Proposal - Part 3 - Price Proposal \"Other than Certified Cost and Pricing Data\" Documentation. Uniformate II Classification Framework. Under Volume II - Price Proposal (1) Contents · Price Proposal on SF-1442 (signed) â Solicitation, Offor, and Award. The Price Proposal shall consist of the SF-1442 and the Agreement. Indicate the Total Contract Price from the completed Contract Price Form in Block 17 of the SF 1442, which must be fully executed by the Offeror. · A completed Contract Price Form included as part of the SF-1442 and in Section II of the Agreement. · Other than Certified Cost and Pricing Dataâ Documentation. Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level. The IRA designated CLINs shall be broken out separately from the remaining requirement. Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97). NOTE: The Price Proposal must be separately bound from the Phase II Technical Proposal. IV.L. Requiring Certified Cost or Pricing Data [15.403-4] IV.L.A. FAR 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (NOV 2021), Alternate IV (OCT 2010) (a) Submission of certified cost or pricing data is not required. (b) Provide data described below: Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level. The IRA designated CLINs shall be broken out separately from the remaining requirement. Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97). Added Attachment 75 Presolicitation in SAM 2024 08 27. Added Attachment 76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17 Added Attachments 77 - 94 provide additional design information as requested. 77 Exhibit D_2325-GSA-Houlton ME LPOE_Design Options; 78 Exhibit D.1_LPOE Houlton Concept Development Design Package; 79 Exhibit E_ LPOE Houlton Concept Development Calculation Package; 80 Exhibit E.1_MPBRoof Structure; 81 Exhibit F_MEP Basis of Design Narrative; 82 Exhibit G_MEP Concept Development Design Alternates; 83 Exhibit G.1 MEPFP Equipment; 84 Exhibit H_Houlton LPOE_Facade Options & IRA LEC Materials_Concept Development MEMO; 85 Exhibit J Houlton LEED NC Scorecard; 86 Exhibit J.1_GSA Sustainable Buildings_Checklist; 87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative; 88 Exhibit U_(CUI) Houlton ME DBT_MSR_FSL; 89 Exhibit V_Houlton LPOE Pre-Renovation RBM Survey Report 2024-06-25; 90 Exhibit X_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 92 Exhibit Z_(CUI) Passwords; 93 Exhibit AA_National Operational Excellence Checklists_Concept Development; and 94 Exhibit BB_Houlton ME LPOPE_Concept Development Specifications Table of Contents. Several required a Completed Form B under Attachment 5 and a Completed CBP NDA Authorization Letter signed for access. If you have already submitted these to the Contracting Officer prior to October 24, 2024, just email again for access. NOTE: The Facade - Precast Panels and Terracotta Rainscreen - colors will be selected in the next phase by the Architecture Engineering (AE) Design Firm Marvel Architectures. Additionally, HVAC - VRF, the A/E will select the vendor that meets most of the GSA requirements (HVAC and Controls). Added Attachment 95 IRA Program Construction Solicitation Desk Guide - dated October 1, 2024. This is a revision of any previous Construction Solicitation Desk Guide that provides guidance for IRA-funded construction projects that contain low embodied carbon (LEC) materials, including pre-solicitation, solicitation, and agreement guidance, evaluation factor requirements, review and approval requirements, and post-award requirements. It also includes standard scope of work language for actions related to the construction project (design services, CMa, and CxP services) for LEC materials, high performance green buildings, and emerging and sustainable technology projects. Added Attachment 96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs containing questions asked by Offeror's and official Government Responses for the Pre-Proposal Conference only. Added Attachment 97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide reference above in Pricing Information area. 47PB0024R0049 Amendment 001 The following changes were made effective on 10/08/2024: A. Replaced 5. Form B - Request for Construction Documents 2024 10 04 with 5. Form B - Request for Construction Documents 2024 10 08 and UNLOCKED it. B. Replaced 6. CBP Non-Disclosure Agreement Form 2024 10 04 with 6. CBP Non-Disclosure Agreement Form 2024 10 08 and UNLOCKED it. C. Replaced 7. Pre-Proposal Conference R1 2024 10 04 with 7. Pre-Proposal Conference R1 2024 10 08 which provides the following clarification: 1. The Pre-proposal Conference will be held virtually on October 10, 2024 at 10:00 am. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 18, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about October 25, 2024. D. Replaced 8. Pre-Proposal Site Visit R1 2024 10 04 with Attachment - 8. Pre-Proposal Site Visit R1 2024 10 08 which provides the following clarification: 1. The Site Visit will be held on October 17, 2024 at 1:00 PM. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 25, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about November 1, 2024. E. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28. F. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051 A. The corrected Proposal Due Date is Thursday, November 21, 2024. This is a Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services for U.S. Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The CMc/CMAR services is for the Facilities Repair and Alterations project and includes requirements for Design Phase services and Construction Phase services. Design Phase services will be awarded on a Firm-Fixed Price basis. Construction Phase services will be awarded with a Guaranteed Maximum Price (GMP). This project is part of the Bipartisan Infrastructure Law (BIL) and is also targeted for Inflation Reduction Act (IRA) funding. This solicitation sets forth requirements for proposals for a contract to construct the project described in the solicitation documents. Proposals conforming to the solicitation requirements will be evaluated in accordance with the method of award set forth herein. The Government will award the contract to the selected Offeror, subject to the conditions set forth herein. The Offeror's proposal submitted in response to this solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror and delivered back to the Contractor, a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices. Offers providing less than one hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. The Magnitude of Construction is estimated within the range of $22,000,000 and $32,000,000. Offeror's are cautioned that price proposals exceeding this range may be determined ineligible for award based on budgetary limitations. This range does include potential Inflation Reduction Act (IRA funding). Price proposal exceeding this range may be eligible to have their Technical and Price Proposal evaluated unless the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted. The Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Technical and Price Proposals must be clearly labeled and must be sent as separate attachments so they can be evaluated separately. Failure to do so will determine the Offeror's submission as non-responsive and will be eliminated. The Contracting Officer and/or Contracts Specialist will not be responsible to separate any technical document that contains pricing information. This solicitation is not set aside for Small Business, however, both Small and Large Businesses are encouraged to participate. Offeror's must ensure that SAM.gov shows that the Offeror has North American Industry Classification System (NAICS) code 236220 (Commercial and Institutional Building Construction) and meets the small business size standard is $39.5 million average annual receipts. It is the responsibility of the Offeror to ensure this information is updated at the time of submission of their Proposal. See the \"A. Presolicitation in SAM 2024 08 27\" for additional details. Changes to the Presolicitation include: The Solicitation posting date has changed from September 26, 2024 to October 3, 2024. The Proposal submission date has changed from November 26, 2024, 2:00 PM EST to November 11, 2024, 2:00 PM EST. For access to Public Building Services (PBS) General Services Administration (GSA) documents, see \"B. FORM B - Request for Construction Documents 2024 08 07\" that must be completed in its entirety and signed. Failure to complete this document in a timely manner does not warrant any request for an extension to the Proposal Due Date. The document must be sent to paul.murphy@gsa.gov before access to these PBS/GSA documents are provided. Additionally, the Department of Homeland Security, U.S. Customs and Border Protection, Facilities Management and Engineering Field Operations, Facilities Program Management Office, Non-Disclosure Agreement. See \"6. CBP Non-Disclosure Agreement Form 2024 10 04\" that must be completed in its entirety and signed. This document must be sent to lawrence.a.comiskey@cbp.dhs.gov AND a copy sent to paul.murphy@gsa.gov before access to CBP Documents are provided. A PRE-PROPOSAL CONFERENCE is scheduled for Thursday, October 10, 2024, at 10:00 PM EST. A letter is attached to this solicitation \"7. Pre-Proposal Conference 2024 10 04\". A PRE-PROPOSAL SITE VISIT is scheduled for Thursday, October 17, 2024, at 01:00 PM EST. A letter is attached to this solicitation \"8. Pre-Proposal Site Visit 2024 10 04\". There are 71 attachments to this solicitation.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"47PB0024R0049","place_of_performance":{"zip":"04730","city":{"name":"Houlton"},"state":{"code":"ME"},"country":{"code":"USA"}},"product_service_code":"C1AA"},{"dates":{"posted":"2024-11-22","response_deadline":{"raw":"2024-12-12T14:00:00-05:00","utc":"2024-12-12T19:00:00Z","date":"2024-12-12","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/067b7a1c4b854ca5b2c80bcd02e76cb7/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","agency":{"office":{"code":"47PB00","name":"PBS R1 ACQ MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"02222","city":"BOSTON","state":"MA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-27","archive_type":"auto15"},"contacts":[{"name":"Paul Murphy","role":"primary","email":"paul.murphy@gsa.gov","phone":"6175136954"},{"name":"Michele Valenza","role":"secondary","email":"michele.valenza@gsa.gov","phone":"8573838973"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"067b7a1c4b854ca5b2c80bcd02e76cb7","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"6bfbec17c064dd178e89717bb143ec4ab681bf448b48ec65f9a1eff5252a6133","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"47PB0024R0049 Amendment 005 The Contracting Officer has approved an extension to December 12, 2024, 2:00 PM EST for Receipt of Proposals. Additionally, Attachment 99. Houlton LPOE CMc RFI Tracker Sheet 2024 11 22 is provided as the Government Response to Additional Comments/Question by an Offeror and hereby shared with all Offeror's. 47PB0024R0049 Amendment 004 The Contracting Officer has approved an extension to December 5, 2024, 2:00 PM EST for Receipt of Proposals. 47PB0024R0049 Amendment 003 Added Attachments 33. A.7 GSA P-100 2021 with 2022 Addendum Final (326), 35. D.4 P100 Submittal Matrix v10 CMc 2021, 58. GSA Program Development Study 100% PDS Report 2021 02 08 (559), and 69. Roof Moisture Analysis Report Houlton 2020 06 23 (22) did not get posted on 10/04/2024. They are added under Amendment 0003. Additionally, Attachment 98. RFI Site Visit Tracker is provided as the Government Response to RFI by Offerors. 47PB0024R0049 Amendment 002 Added Attachment 72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10. A courtesy copy was sent via email to people that were on the invitation list even if they did not attend the individual meetings. It it attached here so all contractors, whether they requested attendance or not, will know of the discussions. Added clarifying Price Proposal language below: Under Volume II - Price Proposal - Part 3 - Price Proposal \"Other than Certified Cost and Pricing Data\" Documentation. Uniformate II Classification Framework. Under Volume II - Price Proposal (1) Contents · Price Proposal on SF-1442 (signed) â Solicitation, Offor, and Award. The Price Proposal shall consist of the SF-1442 and the Agreement. Indicate the Total Contract Price from the completed Contract Price Form in Block 17 of the SF 1442, which must be fully executed by the Offeror. · A completed Contract Price Form included as part of the SF-1442 and in Section II of the Agreement. · Other than Certified Cost and Pricing Dataâ Documentation. Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level. The IRA designated CLINs shall be broken out separately from the remaining requirement. Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97). NOTE: The Price Proposal must be separately bound from the Phase II Technical Proposal. IV.L. Requiring Certified Cost or Pricing Data [15.403-4] IV.L.A. FAR 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (NOV 2021), Alternate IV (OCT 2010) (a) Submission of certified cost or pricing data is not required. (b) Provide data described below: Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level. The IRA designated CLINs shall be broken out separately from the remaining requirement. Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97). Added Attachment 75 Presolicitation in SAM 2024 08 27. Added Attachment 76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17 Added Attachments 77 - 94 provide additional design information as requested. 77 Exhibit D_2325-GSA-Houlton ME LPOE_Design Options; 78 Exhibit D.1_LPOE Houlton Concept Development Design Package; 79 Exhibit E_ LPOE Houlton Concept Development Calculation Package; 80 Exhibit E.1_MPBRoof Structure; 81 Exhibit F_MEP Basis of Design Narrative; 82 Exhibit G_MEP Concept Development Design Alternates; 83 Exhibit G.1 MEPFP Equipment; 84 Exhibit H_Houlton LPOE_Facade Options & IRA LEC Materials_Concept Development MEMO; 85 Exhibit J Houlton LEED NC Scorecard; 86 Exhibit J.1_GSA Sustainable Buildings_Checklist; 87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative; 88 Exhibit U_(CUI) Houlton ME DBT_MSR_FSL; 89 Exhibit V_Houlton LPOE Pre-Renovation RBM Survey Report 2024-06-25; 90 Exhibit X_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 92 Exhibit Z_(CUI) Passwords; 93 Exhibit AA_National Operational Excellence Checklists_Concept Development; and 94 Exhibit BB_Houlton ME LPOPE_Concept Development Specifications Table of Contents. Several required a Completed Form B under Attachment 5 and a Completed CBP NDA Authorization Letter signed for access. If you have already submitted these to the Contracting Officer prior to October 24, 2024, just email again for access. NOTE: The Facade - Precast Panels and Terracotta Rainscreen - colors will be selected in the next phase by the Architecture Engineering (AE) Design Firm Marvel Architectures. Additionally, HVAC - VRF, the A/E will select the vendor that meets most of the GSA requirements (HVAC and Controls). Added Attachment 95 IRA Program Construction Solicitation Desk Guide - dated October 1, 2024. This is a revision of any previous Construction Solicitation Desk Guide that provides guidance for IRA-funded construction projects that contain low embodied carbon (LEC) materials, including pre-solicitation, solicitation, and agreement guidance, evaluation factor requirements, review and approval requirements, and post-award requirements. It also includes standard scope of work language for actions related to the construction project (design services, CMa, and CxP services) for LEC materials, high performance green buildings, and emerging and sustainable technology projects. Added Attachment 96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs containing questions asked by Offeror's and official Government Responses for the Pre-Proposal Conference only. Added Attachment 97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide reference above in Pricing Information area. 47PB0024R0049 Amendment 001 The following changes were made effective on 10/08/2024: A. Replaced 5. Form B - Request for Construction Documents 2024 10 04 with 5. Form B - Request for Construction Documents 2024 10 08 and UNLOCKED it. B. Replaced 6. CBP Non-Disclosure Agreement Form 2024 10 04 with 6. CBP Non-Disclosure Agreement Form 2024 10 08 and UNLOCKED it. C. Replaced 7. Pre-Proposal Conference R1 2024 10 04 with 7. Pre-Proposal Conference R1 2024 10 08 which provides the following clarification: 1. The Pre-proposal Conference will be held virtually on October 10, 2024 at 10:00 am. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 18, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about October 25, 2024. D. Replaced 8. Pre-Proposal Site Visit R1 2024 10 04 with Attachment - 8. Pre-Proposal Site Visit R1 2024 10 08 which provides the following clarification: 1. The Site Visit will be held on October 17, 2024 at 1:00 PM. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 25, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about November 1, 2024. E. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28. F. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051 A. The corrected Proposal Due Date is Thursday, November 21, 2024. This is a Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services for U.S. Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The CMc/CMAR services is for the Facilities Repair and Alterations project and includes requirements for Design Phase services and Construction Phase services. Design Phase services will be awarded on a Firm-Fixed Price basis. Construction Phase services will be awarded with a Guaranteed Maximum Price (GMP). This project is part of the Bipartisan Infrastructure Law (BIL) and is also targeted for Inflation Reduction Act (IRA) funding. This solicitation sets forth requirements for proposals for a contract to construct the project described in the solicitation documents. Proposals conforming to the solicitation requirements will be evaluated in accordance with the method of award set forth herein. The Government will award the contract to the selected Offeror, subject to the conditions set forth herein. The Offeror's proposal submitted in response to this solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror and delivered back to the Contractor, a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices. Offers providing less than one hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. The Magnitude of Construction is estimated within the range of $22,000,000 and $32,000,000. Offeror's are cautioned that price proposals exceeding this range may be determined ineligible for award based on budgetary limitations. This range does include potential Inflation Reduction Act (IRA funding). Price proposal exceeding this range may be eligible to have their Technical and Price Proposal evaluated unless the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted. The Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Technical and Price Proposals must be clearly labeled and must be sent as separate attachments so they can be evaluated separately. Failure to do so will determine the Offeror's submission as non-responsive and will be eliminated. The Contracting Officer and/or Contracts Specialist will not be responsible to separate any technical document that contains pricing information. This solicitation is not set aside for Small Business, however, both Small and Large Businesses are encouraged to participate. Offeror's must ensure that SAM.gov shows that the Offeror has North American Industry Classification System (NAICS) code 236220 (Commercial and Institutional Building Construction) and meets the small business size standard is $39.5 million average annual receipts. It is the responsibility of the Offeror to ensure this information is updated at the time of submission of their Proposal. See the \"A. Presolicitation in SAM 2024 08 27\" for additional details. Changes to the Presolicitation include: The Solicitation posting date has changed from September 26, 2024 to October 3, 2024. The Proposal submission date has changed from November 26, 2024, 2:00 PM EST to November 11, 2024, 2:00 PM EST. For access to Public Building Services (PBS) General Services Administration (GSA) documents, see \"B. FORM B - Request for Construction Documents 2024 08 07\" that must be completed in its entirety and signed. Failure to complete this document in a timely manner does not warrant any request for an extension to the Proposal Due Date. The document must be sent to paul.murphy@gsa.gov before access to these PBS/GSA documents are provided. Additionally, the Department of Homeland Security, U.S. Customs and Border Protection, Facilities Management and Engineering Field Operations, Facilities Program Management Office, Non-Disclosure Agreement. See \"6. CBP Non-Disclosure Agreement Form 2024 10 04\" that must be completed in its entirety and signed. This document must be sent to lawrence.a.comiskey@cbp.dhs.gov AND a copy sent to paul.murphy@gsa.gov before access to CBP Documents are provided. A PRE-PROPOSAL CONFERENCE is scheduled for Thursday, October 10, 2024, at 10:00 PM EST. A letter is attached to this solicitation \"7. Pre-Proposal Conference 2024 10 04\". A PRE-PROPOSAL SITE VISIT is scheduled for Thursday, October 17, 2024, at 01:00 PM EST. A letter is attached to this solicitation \"8. Pre-Proposal Site Visit 2024 10 04\". There are 71 attachments to this solicitation.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"47PB0024R0049","place_of_performance":{"zip":"04730","city":{"name":"Houlton"},"state":{"code":"ME"},"country":{"code":"USA"}},"product_service_code":"C1AA"},{"dates":{"posted":"2024-12-10","response_deadline":{"raw":"2025-01-16T14:00:00-05:00","utc":"2025-01-16T19:00:00Z","date":"2025-01-16","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d484f2e4a9234366bed0c26fa53e0451/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","agency":{"office":{"code":"47PB00","name":"PBS R1 ACQ MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"02222","city":"BOSTON","state":"MA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-31","archive_type":"auto15"},"contacts":[{"name":"Paul Murphy","role":"primary","email":"paul.murphy@gsa.gov","phone":"6175136954"},{"name":"Michele Valenza","role":"secondary","email":"michele.valenza@gsa.gov","phone":"8573838973"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d484f2e4a9234366bed0c26fa53e0451","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"4782d39b6c0687aa5f09724039d8f961d64ecc43515de97d24a1c3c0a40ec1cf","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"47PB0024R0049 Amendment 006 The Contracting Officer has approved an extension to January 16, 2025, 2:00 PM EST for Receipt of Proposals. The following changes have been made: Attachments 78 through 94 have been deleted in their entirety and replaced with updated Attachments from the Final Concept Development documents. The following attachments were updated and numbered 99 through 102; 104 through 108A; 110 through 123; and 125 through 129. Specifically, Attachment 126. Houlton LPOE CMc RFI Tracker Sheet is updated through December 6, 2024 only as shown under the last tab of that document. Access to these documents will be contained through the Google Drive: Houlton CMc Secure Documents that may have been granted to Offerors if already requested. If you have not completed a Form B and CBP NDA form, please do so access can be provided to these documents. If you have any problems with access, please contact Paul Murphy at paul.murphy@gsa.gov. 47PB0024R0049 Amendment 005 The Contracting Officer has approved an extension to December 12, 2024, 2:00 PM EST for Receipt of Proposals. Additionally, Attachment 99. Houlton LPOE CMc RFI Tracker Sheet 2024 11 22 is provided as the Government Response to Additional Comments/Question by an Offeror and hereby shared with all Offeror's. 47PB0024R0049 Amendment 004 The Contracting Officer has approved an extension to December 5, 2024, 2:00 PM EST for Receipt of Proposals. 47PB0024R0049 Amendment 003 Added Attachments 33. A.7 GSA P-100 2021 with 2022 Addendum Final (326), 35. D.4 P100 Submittal Matrix v10 CMc 2021, 58. GSA Program Development Study 100% PDS Report 2021 02 08 (559), and 69. Roof Moisture Analysis Report Houlton 2020 06 23 (22) did not get posted on 10/04/2024. They are added under Amendment 0003. Additionally, Attachment 98. RFI Site Visit Tracker is provided as the Government Response to RFI by Offerors. 47PB0024R0049 Amendment 002 Added Attachment 72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10. A courtesy copy was sent via email to people that were on the invitation list even if they did not attend the individual meetings. It it attached here so all contractors, whether they requested attendance or not, will know of the discussions. Added clarifying Price Proposal language below: Under Volume II - Price Proposal - Part 3 - Price Proposal \"Other than Certified Cost and Pricing Data\" Documentation. Uniformate II Classification Framework. Under Volume II - Price Proposal (1) Contents · Price Proposal on SF-1442 (signed) â Solicitation, Offor, and Award. The Price Proposal shall consist of the SF-1442 and the Agreement. Indicate the Total Contract Price from the completed Contract Price Form in Block 17 of the SF 1442, which must be fully executed by the Offeror. · A completed Contract Price Form included as part of the SF-1442 and in Section II of the Agreement. · Other than Certified Cost and Pricing Dataâ Documentation. Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level. The IRA designated CLINs shall be broken out separately from the remaining requirement. Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97). NOTE: The Price Proposal must be separately bound from the Phase II Technical Proposal. IV.L. Requiring Certified Cost or Pricing Data [15.403-4] IV.L.A. FAR 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (NOV 2021), Alternate IV (OCT 2010) (a) Submission of certified cost or pricing data is not required. (b) Provide data described below: Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level. The IRA designated CLINs shall be broken out separately from the remaining requirement. Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97). Added Attachment 75 Presolicitation in SAM 2024 08 27. Added Attachment 76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17 Added Attachments 77 - 94 provide additional design information as requested. 77 Exhibit D_2325-GSA-Houlton ME LPOE_Design Options; 78 Exhibit D.1_LPOE Houlton Concept Development Design Package; 79 Exhibit E_ LPOE Houlton Concept Development Calculation Package; 80 Exhibit E.1_MPBRoof Structure; 81 Exhibit F_MEP Basis of Design Narrative; 82 Exhibit G_MEP Concept Development Design Alternates; 83 Exhibit G.1 MEPFP Equipment; 84 Exhibit H_Houlton LPOE_Facade Options & IRA LEC Materials_Concept Development MEMO; 85 Exhibit J Houlton LEED NC Scorecard; 86 Exhibit J.1_GSA Sustainable Buildings_Checklist; 87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative; 88 Exhibit U_(CUI) Houlton ME DBT_MSR_FSL; 89 Exhibit V_Houlton LPOE Pre-Renovation RBM Survey Report 2024-06-25; 90 Exhibit X_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 92 Exhibit Z_(CUI) Passwords; 93 Exhibit AA_National Operational Excellence Checklists_Concept Development; and 94 Exhibit BB_Houlton ME LPOPE_Concept Development Specifications Table of Contents. Several required a Completed Form B under Attachment 5 and a Completed CBP NDA Authorization Letter signed for access. If you have already submitted these to the Contracting Officer prior to October 24, 2024, just email again for access. NOTE: The Facade - Precast Panels and Terracotta Rainscreen - colors will be selected in the next phase by the Architecture Engineering (AE) Design Firm Marvel Architectures. Additionally, HVAC - VRF, the A/E will select the vendor that meets most of the GSA requirements (HVAC and Controls). Added Attachment 95 IRA Program Construction Solicitation Desk Guide - dated October 1, 2024. This is a revision of any previous Construction Solicitation Desk Guide that provides guidance for IRA-funded construction projects that contain low embodied carbon (LEC) materials, including pre-solicitation, solicitation, and agreement guidance, evaluation factor requirements, review and approval requirements, and post-award requirements. It also includes standard scope of work language for actions related to the construction project (design services, CMa, and CxP services) for LEC materials, high performance green buildings, and emerging and sustainable technology projects. Added Attachment 96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs containing questions asked by Offeror's and official Government Responses for the Pre-Proposal Conference only. Added Attachment 97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide reference above in Pricing Information area. 47PB0024R0049 Amendment 001 The following changes were made effective on 10/08/2024: A. Replaced 5. Form B - Request for Construction Documents 2024 10 04 with 5. Form B - Request for Construction Documents 2024 10 08 and UNLOCKED it. B. Replaced 6. CBP Non-Disclosure Agreement Form 2024 10 04 with 6. CBP Non-Disclosure Agreement Form 2024 10 08 and UNLOCKED it. C. Replaced 7. Pre-Proposal Conference R1 2024 10 04 with 7. Pre-Proposal Conference R1 2024 10 08 which provides the following clarification: 1. The Pre-proposal Conference will be held virtually on October 10, 2024 at 10:00 am. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 18, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about October 25, 2024. D. Replaced 8. Pre-Proposal Site Visit R1 2024 10 04 with Attachment - 8. Pre-Proposal Site Visit R1 2024 10 08 which provides the following clarification: 1. The Site Visit will be held on October 17, 2024 at 1:00 PM. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 25, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about November 1, 2024. E. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28. F. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051 A. The corrected Proposal Due Date is Thursday, November 21, 2024. This is a Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services for U.S. Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The CMc/CMAR services is for the Facilities Repair and Alterations project and includes requirements for Design Phase services and Construction Phase services. Design Phase services will be awarded on a Firm-Fixed Price basis. Construction Phase services will be awarded with a Guaranteed Maximum Price (GMP). This project is part of the Bipartisan Infrastructure Law (BIL) and is also targeted for Inflation Reduction Act (IRA) funding. This solicitation sets forth requirements for proposals for a contract to construct the project described in the solicitation documents. Proposals conforming to the solicitation requirements will be evaluated in accordance with the method of award set forth herein. The Government will award the contract to the selected Offeror, subject to the conditions set forth herein. The Offeror's proposal submitted in response to this solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror and delivered back to the Contractor, a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices. Offers providing less than one hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. The Magnitude of Construction is estimated within the range of $22,000,000 and $32,000,000. Offeror's are cautioned that price proposals exceeding this range may be determined ineligible for award based on budgetary limitations. This range does include potential Inflation Reduction Act (IRA funding). Price proposal exceeding this range may be eligible to have their Technical and Price Proposal evaluated unless the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted. The Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Technical and Price Proposals must be clearly labeled and must be sent as separate attachments so they can be evaluated separately. Failure to do so will determine the Offeror's submission as non-responsive and will be eliminated. The Contracting Officer and/or Contracts Specialist will not be responsible to separate any technical document that contains pricing information. This solicitation is not set aside for Small Business, however, both Small and Large Businesses are encouraged to participate. Offeror's must ensure that SAM.gov shows that the Offeror has North American Industry Classification System (NAICS) code 236220 (Commercial and Institutional Building Construction) and meets the small business size standard is $39.5 million average annual receipts. It is the responsibility of the Offeror to ensure this information is updated at the time of submission of their Proposal. See the \"A. Presolicitation in SAM 2024 08 27\" for additional details. Changes to the Presolicitation include: The Solicitation posting date has changed from September 26, 2024 to October 3, 2024. The Proposal submission date has changed from November 26, 2024, 2:00 PM EST to November 11, 2024, 2:00 PM EST. For access to Public Building Services (PBS) General Services Administration (GSA) documents, see \"B. FORM B - Request for Construction Documents 2024 08 07\" that must be completed in its entirety and signed. Failure to complete this document in a timely manner does not warrant any request for an extension to the Proposal Due Date. The document must be sent to paul.murphy@gsa.gov before access to these PBS/GSA documents are provided. Additionally, the Department of Homeland Security, U.S. Customs and Border Protection, Facilities Management and Engineering Field Operations, Facilities Program Management Office, Non-Disclosure Agreement. See \"6. CBP Non-Disclosure Agreement Form 2024 10 04\" that must be completed in its entirety and signed. This document must be sent to lawrence.a.comiskey@cbp.dhs.gov AND a copy sent to paul.murphy@gsa.gov before access to CBP Documents are provided. A PRE-PROPOSAL CONFERENCE is scheduled for Thursday, October 10, 2024, at 10:00 PM EST. A letter is attached to this solicitation \"7. Pre-Proposal Conference 2024 10 04\". A PRE-PROPOSAL SITE VISIT is scheduled for Thursday, October 17, 2024, at 01:00 PM EST. A letter is attached to this solicitation \"8. Pre-Proposal Site Visit 2024 10 04\". There are 71 attachments to this solicitation.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"47PB0024R0049","place_of_performance":{"zip":"04730","city":{"name":"Houlton"},"state":{"code":"ME"},"country":{"code":"USA"}},"product_service_code":"C1AA"},{"dates":{"posted":"2024-12-19","response_deadline":{"raw":"2025-01-16T14:00:00-05:00","utc":"2025-01-16T19:00:00Z","date":"2025-01-16","time":"14:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ea1fea2981c648dca871ca3c0edd3281/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Construction-Manager as Constructor (CMc) for the Houlton Land Port of Entry, Houlton, ME","agency":{"office":{"code":"47PB00","name":"PBS R1 ACQ MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"02222","city":"BOSTON","state":"MA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-01-31","archive_type":"auto15"},"contacts":[{"name":"Paul Murphy","role":"primary","email":"paul.murphy@gsa.gov","phone":"6175136954"},{"name":"Michele Valenza","role":"secondary","email":"michele.valenza@gsa.gov","phone":"8573838973"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"ea1fea2981c648dca871ca3c0edd3281","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"dc2d8f7ace29ed4380452180366eb1d2ea723d895de588d490992f7ec11e8d91","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"47PB0024R0049 Amendment 007 Amendment 7 will attach three documents. Attachment 127 is the updated RFI spreadsheet. Look specifically at the last tab dated 12/17/2024 for responses to various Offeror's questions. Attachment 128 will replace Attachment 26 A.0 SOW CMc Houlton LPOE Final 2024 08 02 and is titled as \"128. A.0 SOW CMc Houlton LPOE Final Revised 2024 12 17.\" Note that the cover page incorrectly still shows the previous date of August 2, 2024. Attachment 129 will replace Attachment 77. Exhibit D 2325-GSA-Houlton ME LPOE_Design Options by specifically updating Page 2 and Page 3 in Item 77. It will be added as Attachment 129. Exhibit D 2325-GSA-Houlton ME LPOE_Design Options. As a reminder, Amendment 6 stated which attachments were deleted (78 through 94) as those are the updated files that may have been duplicated. We are not be reloading any of those files that replaced the deleted files. 47PB0024R0049 Amendment 006 The Contracting Officer has approved an extension to January 16, 2025, 2:00 PM EST for Receipt of Proposals. The following changes have been made: Attachments 78 through 94 have been deleted in their entirety and replaced with updated Attachments from the Final Concept Development documents. The following attachments were updated and numbered 99 through 102; 104 through 108A; 110 through 123; and 125 through 129. Specifically, Attachment 126. Houlton LPOE CMc RFI Tracker Sheet is updated through December 6, 2024 only as shown under the last tab of that document. Access to these documents will be contained through the Google Drive: Houlton CMc Secure Documents that may have been granted to Offerors if already requested. If you have not completed a Form B and CBP NDA form, please do so access can be provided to these documents. If you have any problems with access, please contact Paul Murphy at paul.murphy@gsa.gov. 47PB0024R0049 Amendment 005 The Contracting Officer has approved an extension to December 12, 2024, 2:00 PM EST for Receipt of Proposals. Additionally, Attachment 99. Houlton LPOE CMc RFI Tracker Sheet 2024 11 22 is provided as the Government Response to Additional Comments/Question by an Offeror and hereby shared with all Offeror's. 47PB0024R0049 Amendment 004 The Contracting Officer has approved an extension to December 5, 2024, 2:00 PM EST for Receipt of Proposals. 47PB0024R0049 Amendment 003 Added Attachments 33. A.7 GSA P-100 2021 with 2022 Addendum Final (326), 35. D.4 P100 Submittal Matrix v10 CMc 2021, 58. GSA Program Development Study 100% PDS Report 2021 02 08 (559), and 69. Roof Moisture Analysis Report Houlton 2020 06 23 (22) did not get posted on 10/04/2024. They are added under Amendment 0003. Additionally, Attachment 98. RFI Site Visit Tracker is provided as the Government Response to RFI by Offerors. 47PB0024R0049 Amendment 002 Added Attachment 72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10. A courtesy copy was sent via email to people that were on the invitation list even if they did not attend the individual meetings. It it attached here so all contractors, whether they requested attendance or not, will know of the discussions. Added clarifying Price Proposal language below: Under Volume II - Price Proposal - Part 3 - Price Proposal \"Other than Certified Cost and Pricing Data\" Documentation. Uniformate II Classification Framework. Under Volume II - Price Proposal (1) Contents · Price Proposal on SF-1442 (signed) â Solicitation, Offor, and Award. The Price Proposal shall consist of the SF-1442 and the Agreement. Indicate the Total Contract Price from the completed Contract Price Form in Block 17 of the SF 1442, which must be fully executed by the Offeror. · A completed Contract Price Form included as part of the SF-1442 and in Section II of the Agreement. · Other than Certified Cost and Pricing Dataâ Documentation. Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level. The IRA designated CLINs shall be broken out separately from the remaining requirement. Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97). NOTE: The Price Proposal must be separately bound from the Phase II Technical Proposal. IV.L. Requiring Certified Cost or Pricing Data [15.403-4] IV.L.A. FAR 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (NOV 2021), Alternate IV (OCT 2010) (a) Submission of certified cost or pricing data is not required. (b) Provide data described below: Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level. The IRA designated CLINs shall be broken out separately from the remaining requirement. Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97). Added Attachment 75 Presolicitation in SAM 2024 08 27. Added Attachment 76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17 Added Attachments 77 - 94 provide additional design information as requested. 77 Exhibit D_2325-GSA-Houlton ME LPOE_Design Options; 78 Exhibit D.1_LPOE Houlton Concept Development Design Package; 79 Exhibit E_ LPOE Houlton Concept Development Calculation Package; 80 Exhibit E.1_MPBRoof Structure; 81 Exhibit F_MEP Basis of Design Narrative; 82 Exhibit G_MEP Concept Development Design Alternates; 83 Exhibit G.1 MEPFP Equipment; 84 Exhibit H_Houlton LPOE_Facade Options & IRA LEC Materials_Concept Development MEMO; 85 Exhibit J Houlton LEED NC Scorecard; 86 Exhibit J.1_GSA Sustainable Buildings_Checklist; 87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative; 88 Exhibit U_(CUI) Houlton ME DBT_MSR_FSL; 89 Exhibit V_Houlton LPOE Pre-Renovation RBM Survey Report 2024-06-25; 90 Exhibit X_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 92 Exhibit Z_(CUI) Passwords; 93 Exhibit AA_National Operational Excellence Checklists_Concept Development; and 94 Exhibit BB_Houlton ME LPOPE_Concept Development Specifications Table of Contents. Several required a Completed Form B under Attachment 5 and a Completed CBP NDA Authorization Letter signed for access. If you have already submitted these to the Contracting Officer prior to October 24, 2024, just email again for access. NOTE: The Facade - Precast Panels and Terracotta Rainscreen - colors will be selected in the next phase by the Architecture Engineering (AE) Design Firm Marvel Architectures. Additionally, HVAC - VRF, the A/E will select the vendor that meets most of the GSA requirements (HVAC and Controls). Added Attachment 95 IRA Program Construction Solicitation Desk Guide - dated October 1, 2024. This is a revision of any previous Construction Solicitation Desk Guide that provides guidance for IRA-funded construction projects that contain low embodied carbon (LEC) materials, including pre-solicitation, solicitation, and agreement guidance, evaluation factor requirements, review and approval requirements, and post-award requirements. It also includes standard scope of work language for actions related to the construction project (design services, CMa, and CxP services) for LEC materials, high performance green buildings, and emerging and sustainable technology projects. Added Attachment 96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs containing questions asked by Offeror's and official Government Responses for the Pre-Proposal Conference only. Added Attachment 97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide reference above in Pricing Information area. 47PB0024R0049 Amendment 001 The following changes were made effective on 10/08/2024: A. Replaced 5. Form B - Request for Construction Documents 2024 10 04 with 5. Form B - Request for Construction Documents 2024 10 08 and UNLOCKED it. B. Replaced 6. CBP Non-Disclosure Agreement Form 2024 10 04 with 6. CBP Non-Disclosure Agreement Form 2024 10 08 and UNLOCKED it. C. Replaced 7. Pre-Proposal Conference R1 2024 10 04 with 7. Pre-Proposal Conference R1 2024 10 08 which provides the following clarification: 1. The Pre-proposal Conference will be held virtually on October 10, 2024 at 10:00 am. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 18, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about October 25, 2024. D. Replaced 8. Pre-Proposal Site Visit R1 2024 10 04 with Attachment - 8. Pre-Proposal Site Visit R1 2024 10 08 which provides the following clarification: 1. The Site Visit will be held on October 17, 2024 at 1:00 PM. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 25, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about November 1, 2024. E. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28. F. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051 A. The corrected Proposal Due Date is Thursday, November 21, 2024. This is a Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services for U.S. Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The CMc/CMAR services is for the Facilities Repair and Alterations project and includes requirements for Design Phase services and Construction Phase services. Design Phase services will be awarded on a Firm-Fixed Price basis. Construction Phase services will be awarded with a Guaranteed Maximum Price (GMP). This project is part of the Bipartisan Infrastructure Law (BIL) and is also targeted for Inflation Reduction Act (IRA) funding. This solicitation sets forth requirements for proposals for a contract to construct the project described in the solicitation documents. Proposals conforming to the solicitation requirements will be evaluated in accordance with the method of award set forth herein. The Government will award the contract to the selected Offeror, subject to the conditions set forth herein. The Offeror's proposal submitted in response to this solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror and delivered back to the Contractor, a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices. Offers providing less than one hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. The Magnitude of Construction is estimated within the range of $22,000,000 and $32,000,000. Offeror's are cautioned that price proposals exceeding this range may be determined ineligible for award based on budgetary limitations. This range does include potential Inflation Reduction Act (IRA funding). Price proposal exceeding this range may be eligible to have their Technical and Price Proposal evaluated unless the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted. The Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Technical and Price Proposals must be clearly labeled and must be sent as separate attachments so they can be evaluated separately. Failure to do so will determine the Offeror's submission as non-responsive and will be eliminated. The Contracting Officer and/or Contracts Specialist will not be responsible to separate any technical document that contains pricing information. This solicitation is not set aside for Small Business, however, both Small and Large Businesses are encouraged to participate. Offeror's must ensure that SAM.gov shows that the Offeror has North American Industry Classification System (NAICS) code 236220 (Commercial and Institutional Building Construction) and meets the small business size standard is $39.5 million average annual receipts. It is the responsibility of the Offeror to ensure this information is updated at the time of submission of their Proposal. See the \"A. Presolicitation in SAM 2024 08 27\" for additional details. Changes to the Presolicitation include: The Solicitation posting date has changed from September 26, 2024 to October 3, 2024. The Proposal submission date has changed from November 26, 2024, 2:00 PM EST to November 11, 2024, 2:00 PM EST. For access to Public Building Services (PBS) General Services Administration (GSA) documents, see \"B. FORM B - Request for Construction Documents 2024 08 07\" that must be completed in its entirety and signed. Failure to complete this document in a timely manner does not warrant any request for an extension to the Proposal Due Date. The document must be sent to paul.murphy@gsa.gov before access to these PBS/GSA documents are provided. Additionally, the Department of Homeland Security, U.S. Customs and Border Protection, Facilities Management and Engineering Field Operations, Facilities Program Management Office, Non-Disclosure Agreement. See \"6. CBP Non-Disclosure Agreement Form 2024 10 04\" that must be completed in its entirety and signed. This document must be sent to lawrence.a.comiskey@cbp.dhs.gov AND a copy sent to paul.murphy@gsa.gov before access to CBP Documents are provided. A PRE-PROPOSAL CONFERENCE is scheduled for Thursday, October 10, 2024, at 10:00 PM EST. A letter is attached to this solicitation \"7. Pre-Proposal Conference 2024 10 04\". A PRE-PROPOSAL SITE VISIT is scheduled for Thursday, October 17, 2024, at 01:00 PM EST. A letter is attached to this solicitation \"8. Pre-Proposal Site Visit 2024 10 04\". There are 71 attachments to this solicitation.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"47PB0024R0049","place_of_performance":{"zip":"04730","city":{"name":"Houlton"},"state":{"code":"ME"},"country":{"code":"USA"}},"product_service_code":"C1AA"}],"due_at":"2025-01-16T19:00:00Z","due_date":"2025-01-16","closes_at":"2025-01-16T19:00:00Z","awardable":false,"dept_key":"d-047","dept_name":"GENERAL SERVICES ADMINISTRATION","sub_key":"s-4740","sub_name":"PUBLIC BUILDINGS SERVICE","office_key":"o-47PB00","office_name":"PBS R1 ACQ MANAGEMENT DIVISION","state":"ME","county":"23003","county_name":"Aroostook County","city":"2333945","city_name":"Houlton","country":"USA","winner_key":"EATDZJL6JFJ5","amount":null,"linked_awards":9,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"ea1fea2981c648dca871ca3c0edd3281","description":{"text":"47PB0024R0049 Amendment 007 Amendment 7 will attach three documents. Attachment 127 is the updated RFI spreadsheet. Look specifically at the last tab dated 12/17/2024 for responses to various Offeror's questions. Attachment 128 will replace Attachment 26 A.0 SOW CMc Houlton LPOE Final 2024 08 02 and is titled as \"128. A.0 SOW CMc Houlton LPOE Final Revised 2024 12 17.\" Note that the cover page incorrectly still shows the previous date of August 2, 2024. Attachment 129 will replace Attachment 77. Exhibit D 2325-GSA-Houlton ME LPOE_Design Options by specifically updating Page 2 and Page 3 in Item 77. It will be added as Attachment 129. Exhibit D 2325-GSA-Houlton ME LPOE_Design Options. As a reminder, Amendment 6 stated which attachments were deleted (78 through 94) as those are the updated files that may have been duplicated. We are not be reloading any of those files that replaced the deleted files. 47PB0024R0049 Amendment 006 The Contracting Officer has approved an extension to January 16, 2025, 2:00 PM EST for Receipt of Proposals. The following changes have been made: Attachments 78 through 94 have been deleted in their entirety and replaced with updated Attachments from the Final Concept Development documents. The following attachments were updated and numbered 99 through 102; 104 through 108A; 110 through 123; and 125 through 129. Specifically, Attachment 126. Houlton LPOE CMc RFI Tracker Sheet is updated through December 6, 2024 only as shown under the last tab of that document. Access to these documents will be contained through the Google Drive: Houlton CMc Secure Documents that may have been granted to Offerors if already requested. If you have not completed a Form B and CBP NDA form, please do so access can be provided to these documents. If you have any problems with access, please contact Paul Murphy at paul.murphy@gsa.gov. 47PB0024R0049 Amendment 005 The Contracting Officer has approved an extension to December 12, 2024, 2:00 PM EST for Receipt of Proposals. Additionally, Attachment 99. Houlton LPOE CMc RFI Tracker Sheet 2024 11 22 is provided as the Government Response to Additional Comments/Question by an Offeror and hereby shared with all Offeror's. 47PB0024R0049 Amendment 004 The Contracting Officer has approved an extension to December 5, 2024, 2:00 PM EST for Receipt of Proposals. 47PB0024R0049 Amendment 003 Added Attachments 33. A.7 GSA P-100 2021 with 2022 Addendum Final (326), 35. D.4 P100 Submittal Matrix v10 CMc 2021, 58. GSA Program Development Study 100% PDS Report 2021 02 08 (559), and 69. Roof Moisture Analysis Report Houlton 2020 06 23 (22) did not get posted on 10/04/2024. They are added under Amendment 0003. Additionally, Attachment 98. RFI Site Visit Tracker is provided as the Government Response to RFI by Offerors. 47PB0024R0049 Amendment 002 Added Attachment 72 FINAL Houlton Pre-Proposal Meeting Presentation 2024 10 10. A courtesy copy was sent via email to people that were on the invitation list even if they did not attend the individual meetings. It it attached here so all contractors, whether they requested attendance or not, will know of the discussions. Added clarifying Price Proposal language below: Under Volume II - Price Proposal - Part 3 - Price Proposal \"Other than Certified Cost and Pricing Data\" Documentation. Uniformate II Classification Framework. Under Volume II - Price Proposal (1) Contents · Price Proposal on SF-1442 (signed) â Solicitation, Offor, and Award. The Price Proposal shall consist of the SF-1442 and the Agreement. Indicate the Total Contract Price from the completed Contract Price Form in Block 17 of the SF 1442, which must be fully executed by the Offeror. · A completed Contract Price Form included as part of the SF-1442 and in Section II of the Agreement. · Other than Certified Cost and Pricing Dataâ Documentation. Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level. The IRA designated CLINs shall be broken out separately from the remaining requirement. Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97). NOTE: The Price Proposal must be separately bound from the Phase II Technical Proposal. IV.L. Requiring Certified Cost or Pricing Data [15.403-4] IV.L.A. FAR 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (NOV 2021), Alternate IV (OCT 2010) (a) Submission of certified cost or pricing data is not required. (b) Provide data described below: Cost proposals must be organized and submitted using the Uniformat II classification framework developed by the American Society for Testing and Materials (ASTM), specifically under the designation E1557. Costs shall be provided for project work at the Level 3 Individual Elements classification (e.g. A1010 Standard Foundations), and summarized at the Level 2 classification (e.g. A10 Foundations). Any additional costs that the offeror believes must be included shall be well defined and included at the summary level. The IRA designated CLINs shall be broken out separately from the remaining requirement. Our Uniformat II â Level 3 Detail Reference Guide is provided to assist you with this documentation (see Attachment 97). Added Attachment 75 Presolicitation in SAM 2024 08 27. Added Attachment 76 Pre-Proposal Site Visit Attendance Sheet 2024 10 17 Added Attachments 77 - 94 provide additional design information as requested. 77 Exhibit D_2325-GSA-Houlton ME LPOE_Design Options; 78 Exhibit D.1_LPOE Houlton Concept Development Design Package; 79 Exhibit E_ LPOE Houlton Concept Development Calculation Package; 80 Exhibit E.1_MPBRoof Structure; 81 Exhibit F_MEP Basis of Design Narrative; 82 Exhibit G_MEP Concept Development Design Alternates; 83 Exhibit G.1 MEPFP Equipment; 84 Exhibit H_Houlton LPOE_Facade Options & IRA LEC Materials_Concept Development MEMO; 85 Exhibit J Houlton LEED NC Scorecard; 86 Exhibit J.1_GSA Sustainable Buildings_Checklist; 87 Exhibit J.2_ConceptDevelopmentEnergyAnalysisNarrative; 88 Exhibit U_(CUI) Houlton ME DBT_MSR_FSL; 89 Exhibit V_Houlton LPOE Pre-Renovation RBM Survey Report 2024-06-25; 90 Exhibit X_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 91 Exhibit Y_Flood Level Diagram from 2024-07-02_2325-GSA-Houlton ME LPOE_Mechanical-Electrical Resilience_Rev 1; 92 Exhibit Z_(CUI) Passwords; 93 Exhibit AA_National Operational Excellence Checklists_Concept Development; and 94 Exhibit BB_Houlton ME LPOPE_Concept Development Specifications Table of Contents. Several required a Completed Form B under Attachment 5 and a Completed CBP NDA Authorization Letter signed for access. If you have already submitted these to the Contracting Officer prior to October 24, 2024, just email again for access. NOTE: The Facade - Precast Panels and Terracotta Rainscreen - colors will be selected in the next phase by the Architecture Engineering (AE) Design Firm Marvel Architectures. Additionally, HVAC - VRF, the A/E will select the vendor that meets most of the GSA requirements (HVAC and Controls). Added Attachment 95 IRA Program Construction Solicitation Desk Guide - dated October 1, 2024. This is a revision of any previous Construction Solicitation Desk Guide that provides guidance for IRA-funded construction projects that contain low embodied carbon (LEC) materials, including pre-solicitation, solicitation, and agreement guidance, evaluation factor requirements, review and approval requirements, and post-award requirements. It also includes standard scope of work language for actions related to the construction project (design services, CMa, and CxP services) for LEC materials, high performance green buildings, and emerging and sustainable technology projects. Added Attachment 96 Houlton LPOE CMc RFI Tracker Sheet 2024 10 23 - Conference RFIs containing questions asked by Offeror's and official Government Responses for the Pre-Proposal Conference only. Added Attachment 97 Solicitation Document L - UNIFORMAT II - Level 3 Detail Reference Guide reference above in Pricing Information area. 47PB0024R0049 Amendment 001 The following changes were made effective on 10/08/2024: A. Replaced 5. Form B - Request for Construction Documents 2024 10 04 with 5. Form B - Request for Construction Documents 2024 10 08 and UNLOCKED it. B. Replaced 6. CBP Non-Disclosure Agreement Form 2024 10 04 with 6. CBP Non-Disclosure Agreement Form 2024 10 08 and UNLOCKED it. C. Replaced 7. Pre-Proposal Conference R1 2024 10 04 with 7. Pre-Proposal Conference R1 2024 10 08 which provides the following clarification: 1. The Pre-proposal Conference will be held virtually on October 10, 2024 at 10:00 am. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 18, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about October 25, 2024. D. Replaced 8. Pre-Proposal Site Visit R1 2024 10 04 with Attachment - 8. Pre-Proposal Site Visit R1 2024 10 08 which provides the following clarification: 1. The Site Visit will be held on October 17, 2024 at 1:00 PM. 2. Questions/Requests for Information/Clarifications from the Offerors will be due NLT October 25, 2024, at 2:00 PM. These should be sent to paul.murphy@gsa.gov. 3. The Government will post responses to the Offeror's Questions/Requests for Information/Clarifications as an Amendment to the Solicitation in SAM.gov on or about November 1, 2024. E. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28. F. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement CASB DS-1 OMB Form Number 0348-0051 A. The corrected Proposal Due Date is Thursday, November 21, 2024. This is a Construction Manager as Constructor (CMc) / Construction Manager as Risk (CMAR) services for U.S. Customs and Border Protection (CBP) Land Port of Entry (LPOE) at Houlton, Maine. The CMc/CMAR services is for the Facilities Repair and Alterations project and includes requirements for Design Phase services and Construction Phase services. Design Phase services will be awarded on a Firm-Fixed Price basis. Construction Phase services will be awarded with a Guaranteed Maximum Price (GMP). This project is part of the Bipartisan Infrastructure Law (BIL) and is also targeted for Inflation Reduction Act (IRA) funding. This solicitation sets forth requirements for proposals for a contract to construct the project described in the solicitation documents. Proposals conforming to the solicitation requirements will be evaluated in accordance with the method of award set forth herein. The Government will award the contract to the selected Offeror, subject to the conditions set forth herein. The Offeror's proposal submitted in response to this solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror and delivered back to the Contractor, a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices. Offers providing less than one hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. The Magnitude of Construction is estimated within the range of $22,000,000 and $32,000,000. Offeror's are cautioned that price proposals exceeding this range may be determined ineligible for award based on budgetary limitations. This range does include potential Inflation Reduction Act (IRA funding). Price proposal exceeding this range may be eligible to have their Technical and Price Proposal evaluated unless the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted. The Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Technical and Price Proposals must be clearly labeled and must be sent as separate attachments so they can be evaluated separately. Failure to do so will determine the Offeror's submission as non-responsive and will be eliminated. The Contracting Officer and/or Contracts Specialist will not be responsible to separate any technical document that contains pricing information. This solicitation is not set aside for Small Business, however, both Small and Large Businesses are encouraged to participate. Offeror's must ensure that SAM.gov shows that the Offeror has North American Industry Classification System (NAICS) code 236220 (Commercial and Institutional Building Construction) and meets the small business size standard is $39.5 million average annual receipts. It is the responsibility of the Offeror to ensure this information is updated at the time of submission of their Proposal. See the \"A. Presolicitation in SAM 2024 08 27\" for additional details. Changes to the Presolicitation include: The Solicitation posting date has changed from September 26, 2024 to October 3, 2024. The Proposal submission date has changed from November 26, 2024, 2:00 PM EST to November 11, 2024, 2:00 PM EST. For access to Public Building Services (PBS) General Services Administration (GSA) documents, see \"B. FORM B - Request for Construction Documents 2024 08 07\" that must be completed in its entirety and signed. Failure to complete this document in a timely manner does not warrant any request for an extension to the Proposal Due Date. The document must be sent to paul.murphy@gsa.gov before access to these PBS/GSA documents are provided. Additionally, the Department of Homeland Security, U.S. Customs and Border Protection, Facilities Management and Engineering Field Operations, Facilities Program Management Office, Non-Disclosure Agreement. See \"6. CBP Non-Disclosure Agreement Form 2024 10 04\" that must be completed in its entirety and signed. This document must be sent to lawrence.a.comiskey@cbp.dhs.gov AND a copy sent to paul.murphy@gsa.gov before access to CBP Documents are provided. A PRE-PROPOSAL CONFERENCE is scheduled for Thursday, October 10, 2024, at 10:00 PM EST. A letter is attached to this solicitation \"7. Pre-Proposal Conference 2024 10 04\". A PRE-PROPOSAL SITE VISIT is scheduled for Thursday, October 17, 2024, at 01:00 PM EST. A letter is attached to this solicitation \"8. Pre-Proposal Site Visit 2024 10 04\". There are 71 attachments to this solicitation.","html":null,"origin":"extract"},"contacts":[{"name":"Paul Murphy","role":"primary","email":"paul.murphy@gsa.gov","phone":"6175136954"},{"name":"Michele Valenza","role":"secondary","email":"michele.valenza@gsa.gov","phone":"8573838973"}],"place_of_performance":{"zip":"04730","city":{"name":"Houlton"},"state":{"code":"ME"},"country":{"code":"USA"}},"office_address":{"zip":"02222","city":"BOSTON","state":"MA","country":"USA"},"naics_codes":["236220"],"award":null,"attachments":[],"awards":[{"award_key":"CONT_AWD_47PB0025C0016_4740_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_47PB0025C0016_4740_-NONE-_-NONE-/","piid":"47PB0025C0016","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"EATDZJL6JFJ5","recipient_name":"J & J CONTRACTORS, INC.","recipient_uei":"EATDZJL6JFJ5","recipient_cage":"1GMT3","recipient_city":"NORTH BILLERICA","recipient_state":"MA","sub_name":"Public Buildings Service","office_name":"PBS R1 ACQ MANAGEMENT DIVISION","office_key":"o-47PB00","first_action_date":"2025-09-17","last_action_date":"2026-07-10","actions":5,"obligated":"592836.42","current_total_value":"592836.42","potential_total_value":"592836.42","naics":"236220","psc":"C1AA","extent_competed":"FULL AND OPEN COMPETITION","set_aside":"NO SET ASIDE USED.","offers_received":2,"description":"THIS AWARD IS FOR THE REPAIR AND ALTERATIONS, HOULTON LPOE, MAINE. THIS IS A CMC CONTRACT.","method":"solicitation","confidence":"high","evidence":["solicitation number 47PB0024R0049 equals the FPDS solicitation identifier","same awarding office 47PB00"],"opportunity_key":null,"opportunity_title":null}],"related":[]}