{"canonical":"https://abierto.us/opportunities/36c26224q1724","key":"36C26224Q1724","url":"https://abierto.us/opportunities/36c26224q1724","title":"H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025)","solicitation_number":"36C26224Q1724","notice_type":"a","open":false,"response_deadline":"2024-08-27T17:00:00Z","first_posted":"2024-08-09","last_posted":"2024-08-31","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"238210","psc":"H959","set_aside":"SDVOSBC","place_state":"CA","place_county":"06071","place_county_name":"San Bernardino County","place_city":"0642370","place_city_name":"Loma Linda","winner":"PANACEA CONSTRUCTION GROUP LLC","award_amount":"197899.00","publications":[{"notice_id":"693dd85fb5044841b61b4ec0ce653fa0","title":"H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025)","solicitation_number":"36C26224Q1724","notice_type":"k","base_type":"k","posted":"2024-08-09","posted_at":null,"due_at":"2024-08-23T17:00:00Z","due_date":"2024-08-23","cancelled":null,"archived":null,"archive_date":"2024-10-22","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/693dd85fb5044841b61b4ec0ce653fa0/view","enriched":false,"history":[]},{"notice_id":"976ed7e44b3f4cbb9cd851a38b764184","title":"H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025)","solicitation_number":"36C26224Q1724","notice_type":"k","base_type":"k","posted":"2024-08-22","posted_at":null,"due_at":"2024-08-27T17:00:00Z","due_date":"2024-08-27","cancelled":null,"archived":null,"archive_date":"2024-09-26","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/976ed7e44b3f4cbb9cd851a38b764184/view","enriched":false,"history":[]},{"notice_id":"d6b7135184a4455cbdf9665c61bed478","title":"H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025)","solicitation_number":"36C26224Q1724","notice_type":"a","base_type":"k","posted":"2024-08-31","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-09-30","award_number":"36C26224P2030","awardee_name":"PANACEA CONSTRUCTION GROUP LLC DUBOIS 82513","amount":"197899.00","link_sam":"https://sam.gov/workspace/contract/opp/d6b7135184a4455cbdf9665c61bed478/view","enriched":false,"history":[]}],"latest_notice_id":"d6b7135184a4455cbdf9665c61bed478","first_type":"k","notices":[{"dates":{"posted":"2024-08-09","response_deadline":{"raw":"2024-08-23T10:00:00-07:00","utc":"2024-08-23T17:00:00Z","date":"2024-08-23","time":"10:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/693dd85fb5044841b61b4ec0ce653fa0/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025)","agency":{"office":{"code":"36C262","name":"262-NETWORK CONTRACT OFFICE 22 (36C262)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"85297","city":"Gilbert","state":"AZ","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-10-22","archive_type":"auto_custom"},"contacts":[{"name":"Norman Napper-Rogers","role":"primary","email":"Norman.Napper-Rogers@va.gov","phone":"602-795-4170","title":"Contracting Officer"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"693dd85fb5044841b61b4ec0ce653fa0","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"88df1dc8c8c06d66779b8e7f83e1d247021111f0d3d9c442bd57c7eeafdf73da","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-05. This solicitation is set-aside for 100% Service-Disabled Veteran-Owned Small Business (SDVOSB), IAW VAAR 819.7007 VA veteran-owned small business set-aside procedures. VAAR Subpart 819.70, the Veterans First Contracting Program. The associated North American Industrial Classification System (NAICS) code for this procurement is 238210, with a small business size standard of $19.0 Million. The FSC/PSC is H959. The VA Loma Linda Healthcare System (VALLHCS), Jerry L. Pettis VA Medical Center (VAMC), located at 11201 Benton Street, Loma Linda, CA 92357-1000, is seeking to purchase an Arc Flash Analysis. All interested companies shall provide quotations for the following: Supplies/Services Line Item Description Quantity Unit of Measure Unit Price Total Price 0001 ARC Flash Study 1 YR 0002 Over and Above Services IAW SOW 1 EA $0.00 $0.00 STATEMENT OF WORK (SOW) Contract Title Arc Flash Analysis. Background The VA Loma Linda Healthcare System (VALLHCS) Facility Maintenance Services require immediate award of Arc Flash Analysis to be in compliance with required electrical inspections, of the electrical distribution system. As per the NFPA99, NFPA 70E, IEEE, and the Join Commission, the VA is required to perform inspections of all switchgears, switchboards, distribution panels, motor control centers and all related components every 5 years. The Arc Flash analysis shall be updated when a major modification or renovation takes place. It shall be reviewed periodically, not to exceed 5 years, to account for changes in the electrical distribution system that could affect the results of the Arc Flash Analysis. The services shall comply with this Statement of Work (SOW), all VA, local, state, and Federal policies, and regulations. Objective The objective of this service contract is to have a contractor to provide all labor, materials, supplies, tools, equipment, parts, software (needed for the general operation of the equipment), travel, ICRA Barriers, supervisors, and qualified personnel to complete the Arc Flash Analysis, and be in compliance with article 130.5 Arc Flash Hazard Analysis, of the NFPA 70E, at the VA Loma Linda Healthcare System. An Arc Flash Hazard Analysis shall determine the Arc Flash Boundary, the incident energy at the working distance, and the personal protective equipment that personnel within the Arc Flash Boundary shall use. Scope Requirements: Contractor shall provide all labor, test equipment, tools, contractor own service generator, materials, supplies, freight costs, and transportation to accomplish Arc Flash Analysis inspection and updating of VA Loma Linda Healthcare System (VALLHCS) electrical systems. The contractor shall complete all tasks outlined in this Statement of Work and in accordance with the follow standards: OSHA 29-CFR 1910.333, 1910.335 (a) (1) (i), 1910.132 (d)(1) and 1910.335 (b)(1) NFPA 70E 130.5, 130.7 (c) (16) NEC110.16,110.22 IEEE 1584 ANSI Z535.4 The equipment to be analyzed includes all the electrical equipment that would create a hazardous Arc Flash (arc-blast). The evaluation shall include the collection of pertinent electrical data, a detailed Arc Flash analysis, a report detailing findings, correction action plan and the placement of Arc Flash labels on every electrical component analyzed. Any equipment having the capability of creating a hazardous Arc Flash, capable of delivering at least incident energy of 1.2 cal.cm2 to the skin at 18 inches or greater per IEEE 1584. The data collected shall include transformer nameplates, conductor sizes/number per phase /lengths, motors larger than 50 hp, circuit breaker catalog numbers and settings, fuse catalog numbers and onsite generator nameplates. All data shall comply with NFPA 70E, The contractor shall place Arc Flash warning labels on all evaluated equipment as per NEC 110.16 and NFPA 70E 130.5 (C) The labels shall have the following: Name /number of the equipment Name of the feed equipment Incident energy Arc Flash boundary Arc Flash hazard category Available short circuit current Nominal system voltage Shock hazard boundaries Glove class for shock hazard Date of analysis Orange color for H/R category 0-4 per ANSI Z535.4 Red color for H/R above category 4 per ANSI Z535.4 The data collected, along with the one-line diagrams are to be analyzed by a licensed professional Electrical engineer knowledgeable in the use of electrical engineering software and Arc Flash hazard. The analysis shall meet IEEE 1584 and NFPA 70E standards. The software program utilized shall be, Easy Power, PTW or equivalent and is used to determine: Short Circuit Study Device interrupt rating and evaluation study Protective device coordination study Arc Flash analysis Provide written analysis report. Contractor shall produce power system one-line diagrams from analysis of data collected. The diagrams shall include hard copies and PDF versions. A complete report detailing all services and findings will be furnished in a timely manner once work has been completed. Reports shall contain a section covering the procedure used to make necessary tests and a description of the test equipment used. Reports shall have a section containing a summary of all test results and the contractor shall make recommendations based on a component engineering analysis of the test data. Recommendations will include areas where immediate action is required and recommended areas where additional maintenance needs to be performed. Reports shall be submitted in an original and four (total of 5) copies to the VA COR (Contracting Officer Representative within 30 days of work completion. Contractor is responsible for all subcontractors required to complete reports. Specific Requirements: Contractor shall schedule start date with POC or designee five (5) business days in advance. Contactor personnel shall have valid Loma Linda PIV badges before starting work. Contractor shall coordinate energy source LOCK OUT /TAG OUT procedures with VALLHCS Electrical Supervisor before starting work. When work is complete, Contractor shall notify the VALLHCS Electrical Supervisor that energy sources will be restored and require verification. Contractor s supervisor or lead technician are to check in with VALLHCS Electrical Supervisor, or in their absence, with Graphics Control prior to work each day. Contractor shall conform to the following standards, policies, regulations, governing agency, and any other local, state, or Federal guidelines that are not listed here. OSHA 29CFR Regulations, www.osha.gov NFPA 70E, www.nfpa.org ANSI/NETA MTS-2019 IEEE NEC Licensing Requirements: Offeror must possess a 30-hour Occupational Safety and Health Administration (OSHA) safety card. Electrical C-10 License NFPA and/ or NICET certification. Additional Information: There is an existing Arc Flash Study. We do not know the software use to produce it. One-line diagrams can be supplied upon request after award. The Arc Flash study includes 3Phase 12kv, 3 Phase 408/277v, and 3 Phase 208/120v. Transformers, power panels, load centers, and disconnects. The flash study will cover the whole campus of VA Loma Linda Hospital electrical system normal and emergency systems. All equipment would still be included in analysis, study deliverables, and final report. All equipment is to be labeled. The Arc Flash analysis shall be updated when a major modification or renovation takes place. This will be covered under the Over and Above CLIN as needed with express authorization of the Contracting Officer. VA Form 10091 and W-9 must be sent to Financial Services as this is for the processing of payment and vendor registration. There will be a site-walk on Monday August 19, 2024, at 9:00 am local time. Contact the COR Jonathan S. McWhite, (909)825-7084 x2177, Jonathan.Mcwhite@va.gov to coordinate. There are no current as-built drawings of any modifications / additions since the last current single-line. There are some add panels that are not on the one-line. Contractor is responsible for obtaining the utility data needed for the studies. There is only one meter, with two (2) feeds. The Main Switchgear only has one feed coming into the hospital. The PE Gear that is owned by SCE has 2 feeds. The contractor will only work from the switchgear to all electrical rooms on camps. Security Requirements The C&A requirements do not apply, and Security Accreditation Package is not required. This service does not involve Contractor connection of one or more contractor-owned IT devices (such as laptop computer or remote connection from a contractor system) to a VA internal trusted (i.e., non-public network) therefore Information Technology (IT) Security certification and accreditation (authorization) (C&A) requirements do not apply per VA Handbook 6500.6. Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights. Period of Performance Work Hours Normal hours of operation are Monday through Friday from 8:00 am to 4:30 pm Pacific time. All work is expected to be performed generally during normal hours of coverage unless requested or approved by the COR or his/her designee. Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building. All work performed, to include delivery of materials and equipment, shall be made with minimal interference to Government operations and personnel. Work performed outside the normal hours of coverage must be approved by the COR or his/her designee. All time shall be approved in advance by the Contracting Officer s Representative (COR). Allow 5-days for approval of any alternate working hours needed. Federal Holidays New Year s Day January 01 Martin Luther King s Birthday Third Monday in January President s Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 04 Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25 If the holiday falls on a Sunday, the following Monday will be observed as a national holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America. Identification, Check-in, Parking, and Smoking Regulations Identification The vendor's employees shall wear visible identification at all times while on VALLHCS premises. Contractor employees shall report to VA Police upon entry to the VALLHCS facility to get a visitor badge. Contractor employees are required to be escorted by the COR or designee s office once on campus prior to commencement of work. During emergencies contractor personnel shall check in with VALLHCS Police if the VALLHCS COR or designee is not available. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Parking It is the responsibility of the contract personnel to park in the appropriate designated parking areas. Parking information is available from VA Police & Security Service Office. The Contractor assumes full responsibility for any parking violations. Smoking Veterans Health Administration (VHA) Directive 1085, dated March 5, 2019, provides a comprehensive smoke-free policy for patients, visitors, contractors, volunteers, and vendors, at the Department of Veterans Affairs (VA), Veterans Health Administration (VHA) health care facilities. This updated VHA directive implements a smoke-free policy for patients, visitors, contractors, volunteers, and vendors at VA health care facilities, as defined in this directive, based on scientific evidence regarding the adverse health effects of secondhand and thirdhand smoke exposures. The Assistant Deputy Under Secretary for Health for Administrative Operations (10NA) and the Assistant Deputy Under Secretary for Health for Clinical Operations (10NC) are responsible for the contents of this directive. Questions may be referred to VHA Smoke Free: vhasmokefree@va.gov. This VHA directive is scheduled for recertification on or before the last working day of March 2024. This VHA directive will continue to serve as national VHA policy until it is recertified or rescinded. Weapons and Contraband Possession of weapons or contraband is prohibited and shall be subject to arrest and termination from future performance under this contract. Enclosed containers, including tool kits, shall be subject to search. Violations of VALLHCS regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court. Safety All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering on VALLHCS shall comply with applicable Federal, State, and VA safety and fire regulations and codes, which are in effect during the performance period of the contract. Contractor shall perform work in strict accordance with existing relevant, accredited standards and codes to minimize the possibility of injury to personnel, or damage to Government equipment. Every effort shall be made to safeguard human life and property. Contractor shall comply with all applicable Federal, State, and local requirements regarding workers health and safety. The requirements include, but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR), Parts 1910 and 1926, NFPA 70E, Article 130.7 29 CFR 1910.132(d)(1)(iii), 29CFR1910.137. Contractor shall provide all necessary tools, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Contractor Personnel Contractor s Program Manager The Contractor shall provide a contract program manager who shall be responsible for the performance of the work. The name of this person shall be designated in writing to the Contracting Officer. The Contractor s Program Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. Contractor s Employees The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Contract Personnel shall be subject to the same quality assurance standards or exceed current recognized national standards as established by the Joint Commission (JC). Contractor Qualifications & Other Responsibilities Contractor shall obtain all necessary licenses required to perform this work. Contractor shall take all precautions necessary to protect persons and property from injury or damage during the performance of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employees fault or negligence. Contractor shall maintain personal liability and property damage insurance prescribed by the laws of the Federal Government. The Government reserves the right to accept or reject Contractor s employee for the rendering of services. Complaints concerning Contract Personnel s performance or conduct will be dealt with by the Contractor and COR with the final decision being made by the Contracting Officer. Insurance Coverage The Contractor agrees to procure and maintain, while the contract is in effect, Workers Compensation and Employee s Public Liability Insurance in accordance with Federal and State of California laws. The Contractor shall be responsible for all damage to property, which may be done by him, or any employee engaged in the performance of this contract. The Government shall be held harmless against any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract. Before commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his/her insurance company indicating that the coverage specified by FAR 52.228-5 and per FAR Subpart 28.307-2 has been obtained and that it may not be changed or canceled without guaranteed thirty (30) day notice to the Contracting Officer. Contractor is required to provide copies of proof of Workers Compensation and Employee Public Liability Insurance within fifteen (15) calendar days after notification of contract award. Invoicing and Payment Overtime & Holiday Pay Any overtime and/or holiday pay that may be entitled to the Contractor s employees shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government. Contractor will bill and be paid for actual services provided by Contractor personnel. Contractor will not be paid for availability or on-call services unless otherwise provided herein. Invoices Payment of services rendered under this contract shall be made in arrears upon satisfactory completion of each service and receipt of a properly prepared invoice and submitted by the Contractor to the payment address specified by Contracting. Invoices shall reference the Contract Number and Purchase Order Number, Manifest Number(s), provide a complete and accurate description of services/ supplies delivered/ rendered, including dates of performance, amounts, unit prices, extended totals and any other data relevant for payment purposes. The Government shall not authorize payment until such time that the VALLHCS COR all properly executed and signed documentation. No advance payments shall be authorized. Payment shall be made on a monthly arrears for services provided during the billing month in arrears in accordance with FAR 52.212-4, para. (i). Upon submission of a properly prepared invoice for prices stipulated in this contract for services delivered and accepted in accordance with the terms and conditions of the contract, less any deductions stipulated in this contract. Payment of invoices may be delayed if the appropriate invoices as specified in the contract are not completed and submitted as required. The purchase order period of performance is 09/01/2024 - 08/31/2025, with an FOB of Destination. Place of Performance/Place of Delivery Address: Department of Veterans Affairs VA Loma Linda Healthcare System (VALLHCS) Jerry L. Pettis VA Medical Center (VAMC) 11201 Benton Street, 1D-01 Loma Linda, CA Postal Code: 92357-1000 Country: UNITED STATES The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html. The following solicitation provisions apply to this acquisition: FAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services Addendum to FAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services FAR 52.252-1, Solicitation Provisions Incorporated by Reference (FEB 1998) FAR 52.204-7, System for Award Management (OCT 2018) FAR 52.204-16, Commercial and Government Entity Code Reporting (AUG 2020) FAR 52.217-5, Evaluation of Options (JUL 1990) VAAR 852.239-75, Information and Communication Technology Accessibility Notice (FEB 2023) FAR 52.204-29, Federal Acquisition Supply Chain Security Act Orders Representation and Disclosures (DEC 2023) FAR 52.212-2, Evaluation Commercial Products and Commercial Services (NOV 2021) FAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services (MAY 2024) Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://www.sam.gov/portal in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services. If paragraph (j) of the provision is applicable, a written submission is required. The following contract clauses apply to this acquisition: FAR 52.212-4, Contract Terms and Conditions Commercial Products and Commercial Services (NOV 2023) ADDENDUM to FAR 52.212-4, Contract Terms and Conditions Commercial Products and Commercial Services applies to and is included with this acquisition. FAR 52.252-2, Clauses Incorporated by Reference (FEB 1998) FAR 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) FAR 52.204-9, Personal Identity Verification of Contractor Personnel (JAN 2011) FAR 52.204-13, System for Award Management Maintenance (OCT 2018) FAR 52.204-18, Commercial and Government Entity Code Maintenance (AUG 2020) VAAR 852.203-70, Commercial Advertising (MAY 2018) VAAR 852.204-70, Personal Identity Verification of Contractor Personnel (MAY 2020) FAR 52.217-8, Option to Extend Services (NOV 1999) FAR 52.217-9, Option to Extend the Term of the Contract (MAR 2000) VAAR 852.219-73, VA Notice of Total Set-Aside for Certified Service-Disabled Veteran-Owned Small Businesses (JAN 2023) VAAR 852.219-75, VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction (JAN2023)(Deviation) VAAR 852.232-72, Electronic Submission of Payment Requests (NOV 2018) VAAR 852.242-71, Administrative Contracting Officer (OCT 2020) FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders Commercial Products and Commercial Services (MAY 2024) The following subparagraphs of FAR 52.212-5 are applicable: subparagraph (b)(5), (9), (11), (12), (25), (26), (31), (33), (34), (36), (39), (46), (51), (55), (59), (c)(1), (7), and (8). All invoices from the contractor shall be submitted electronically in accordance with VAAR clause 852.232-72, Electronic Submission of Payment Requests. This is accomplished through the Tungsten Network, located at: http://www.fsc.va.gov/einvoice.asp. This is mandatory and the sole method for submitting invoices. All quoters shall submit the following: All information required by FAR 52.212-1(b) Submission of Offers. All quotes shall be sent to the Network Contracting Office (NCO), at Norman.Napper-Rogers@va.gov. Award will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government. Options will be evaluated at time of award. The following are the decision factors: Price, and past performance, with price more important. Past performance will be based on CPARS and FAPIIS ratings. No rating in CPARS is equal to a neutral rating. The award will be made to the response most advantageous to the Government. Responses should contain your best terms, conditions. To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows: \"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition.\" OR \"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:\" Quoters shall list exception(s) and rationale for the exception(s), if any. Submission of questions shall be received no later than Friday, 08/16/2024, 14:00 PDT at Norman.Napper-Rogers@va.gov only. Subject line shall include QUESTIONS TO RFQ 36C26224Q1724. Submissions shall include your quote, using the attached schedule, as well as a capabilities statement with qualifications proving all certifications and education required for the work being conducted in the SOW. Submissions not meeting all requirements of the SOW will be considered ineligible for award . Submission of your response shall be received not later than Friday, 08/23/2024, 10:00 PDT at Norman.Napper-Rogers@va.gov only. Subject line shall include RESPONSE TO RFQ 36C26224Q1724. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below. Point of Contact Norman Napper-Rogers Contracting Officer Norman.Napper-Rogers@va.gov","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"36C26224Q1724","place_of_performance":{"zip":"92357-1000","city":{"name":"Loma Linda"},"street":"Department of Veterans Affairs VA Loma Linda Healthcare System (VALLHCS) Jerry L. Pettis VA Medical Center (VAMC) 11201 Benton Street","country":{"code":"USA"}},"product_service_code":"H959"},{"dates":{"posted":"2024-08-22","response_deadline":{"raw":"2024-08-27T10:00:00-07:00","utc":"2024-08-27T17:00:00Z","date":"2024-08-27","time":"10:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/976ed7e44b3f4cbb9cd851a38b764184/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025)","agency":{"office":{"code":"36C262","name":"262-NETWORK CONTRACT OFFICE 22 (36C262)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"85297","city":"Gilbert","state":"AZ","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-09-26","archive_type":"auto_custom"},"contacts":[{"name":"Norman Napper-Rogers","role":"primary","email":"Norman.Napper-Rogers@va.gov","phone":"602-795-4170","title":"Contracting Officer"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"976ed7e44b3f4cbb9cd851a38b764184","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"edff67b8f792cbee7b68304938cebf4ae5a6d2c9ad1ad66571df3879711a2bde","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The purpose of this amendment is to provide answers to the questions received, add the diagrams requested, and extend the due date until Tuesday 08/27/2024 at 10:00 PDT. There will be no further questions. All complete and final offers are due by 08/27/2024 at 10:00 PDT. QUESTION RESPONSES Is there a cost estimate , budget or ballpark figure for the project listed? The IGCE for this contract is $159,853.00. Is there an actual start date for the project? Yes. 09/01/2024 Would VALLHCS consider waiving the requirement for a C-10 License to perform this arc flash analysis? No. We need an equipment list or Single line diagrams or a previous Arc Flash to be able to price this. I will be waiting. Added to this amendment. Section 4.4.8 - Is the site-walk on Monday, August 19th mandatory? No. Will questions be answered during the site-walk? Yes, however all questions needed to be submitted in writing. Will there be an additional period after the site-walk to submit questions based on information observed from the site-walk? Yes, there was, it was in the Solicitation. Description Section, Page 2 - Regarding the over and above scope: Are we to provide pricing for Line Item 0002? No. If so, how are we to price an unknown? N/A If so, are there potential items that can be provided that we can attempt to price? N/A Is this noted as a heads-up that there may potentially be additions to the scope to price at a later date after the award and if modifications to the contract are approved by the COR? No. This is a contracting tool for us to be able to work around emergencies, not failures to provide proper pricing in advance. This is a Firm Fixed-Price contract. Section 4.4.6, page 5 - How do you define a major modification? In the last five years the hospital has added power panels and load centers. We have also added buildings. All the additions that was added are not on the 2018 arc flash analysis. The SOW mentions that the awarded contractor will be provided the existing drawings of the facility. Â Are the drawings being provided the most current within 5 years? Yes. As an updated/refresher to an existing study that is required every 5 years, will the existing studies be provided? Yes. In what format will the existing studies be provided? Hard copy/electronic copy of the last final report? Hard copy and electronic copy. Is the existing study software files (software used is unknown) be provided that the previous study was performed/modeled? The existing software that was used is unknown. We only have books and PDF. Is SKM Systems Analysis (SKM) software acceptable to perform the study? Yes. Is the cable feeder schedules for Medium and Low Voltage being provided with the drawings? Yes. The utility service data will need to be supplied by facility owner/site and fees paid. Please confirm. The Contract starts at the main switch gear were the utility enters. Do you have any previous Arc flash study reports, or this is a new arc flash study. Last report is from 2019. Do you have any drawings that you can share with us? Yes. Is this the complete list of equipment for the Arc flash study? No. If not, could you please provide a complete list of panels and equipment on the schedule? Drawings are provided in the amendment. If that is not available, could you please provide a bid item for a unit price for equipment not shown on the bid schedule? N/A Single-Line Diagrams: The solicitation mentions that single-line diagrams can be provided after the award. Is there any chance we could get access to the most recent ones beforehand? Having these would really help us better understand the scope and prepare a precise quote. Yes. Existing Arc Flash Study: I see there s already an Arc Flash Study in place, but it s unclear what software was used. Could you share any details on this? Knowing what was used before will help us align our approach more closely with what s expected. The existing software that was used is unknown. We only have books and PDF. Site Conditions: Could you provide any insights into the current state of the electrical systems? Are there known issues or specific areas we should be particularly mindful of when conducting the analysis? Electrical is operational and tested. Modifications and Additions: The solicitation notes that there are some additional panels and modifications not reflected in the current single-line diagrams. Could you provide more information on these changes so we can make sure they re properly included in our analysis? In the last five years the hospital has added power panels and load centers. We have also added buildings. All the additions that were added are not on the 2018 arc flash analysis. Labeling Requirements: Regarding the Arc Flash warning labels, are there any specific preferences for the materials, durability, or placement of these labels? We want to ensure we meet or exceed your standards. All labeling must be clear and correct. If the label is not correct the contractor is responsible to fix all errors. Utility Data Acquisition: I noticed that we re responsible for obtaining the utility data needed for the studies. Could you clarify what specific data will be required? Any guidance on how we might best acquire this data would be greatly appreciated. This statement will be removed from the SOW as it is referring to information pulled from the meters. As-Built Drawings: I understand there aren t current as-built drawings for recent modifications or additions. Is there any plan to create these, or will it be up to us to document these changes during our analysis? Added to this amendment. Over and Above Services: The solicitation mentions \"Over and Above Services.\" Could you provide some examples of what might fall under this category? It would help us to understand how these services would be authorized and compensated. This is a contracting tool for us to be able to work around emergencies, not failures to provide proper pricing in advance. This is a Firm Fixed-Price contract. Evaluation Criteria: Could you provide more detail on how past performance and price will be weighted in the evaluation? Price is the deciding factor. Past performance will be used as a qualifying factor. Contractor Performance Assessment Reporting System (CPARS) reports are pulled to evaluate. Contractors with less than Satisfactory in any category will be deemed not eligible for award. A contractor with no CPARS will be deemed satisfactory for Past Performance. If two contractors have matching quotes, then the Past Performance will be evaluated again to determine the most Are there particular aspects of past performance that you consider especially important for this project? Any company with a negative report in the Federal Awardee Performance and Integrity Information System (FAPIIS) will be deemed ineligible for award. Any company with less than satisfactory rating in CPARS will be deemed ineligible for award. We are unable to attend the site visit for the above project.Â I was wondering if you could please share the sign in sheet from the site visit. Only one contractor showed for the site visit. Their questions are included in this list. Section 4.3 Licensing requirements 4.3.1 - The OSHA 30-hour Occupational Safet card since we are not technically an electrical contractor, would this pertain to us? Yes. 4.3.2 - Our firm is an engineering firm that specializes inÂ arcÂ flashÂ studies. We are not a contractor and therefore do not have the Electrical C-10 License. We do have a Professional Engineering license for the State of CA. Please confirm this will not be an issue. You can have both or if the company is owner is a license C-10 they must have a license Electrical Engineer or If the company is owner is a license Electrical Engineer they must get a license C-10 to help open electrical panels. 4.3.3 - The NFPA and/NICET certification can that expand on what kind of certification they mean. Typically, I see this required forÂ ArcÂ FlashÂ Training, but I didn t see the training as a part of the SOW. If they mean that the data collection technician is required to have a certain certification level, please let me know. Technician is required to have a certain certification level. NFPA and/NICET certification show the foreman and/or technician have been trained. Section 4.4 Additional Information: Our firm needs some kind of information that shows how big the electrical system is in order for us effectively price the SOW. We prefer the electrical one-line diagrams but if they are not willing to provide those, would they be willing to provide the previousÂ arcÂ flashÂ study report? Added to this amendment. Can you confirm that an amendment will be posted with the answers to the questions before tomorrow or should we provide a bid as posted? Yes. I will also amend the due date to 08/27/2024 at 10:00 PDT to allow extra time to make adjustment regarding the question responses.","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"36C26224Q1724","place_of_performance":{"zip":"92357-1000","city":{"name":"Loma Linda"},"street":"Department of Veterans Affairs VA Loma Linda Healthcare System (VALLHCS) Jerry L. Pettis VA Medical Center (VAMC) 11201 Benton Street","country":{"code":"USA"}},"product_service_code":"H959"},{"award":{"date":"2024-08-30","amount":"197899.00","number":"36C26224P2030","awardee":{"raw":"PANACEA CONSTRUCTION GROUP LLC DUBOIS 82513","name":"PANACEA CONSTRUCTION GROUP LLC DUBOIS 82513"}},"dates":{"posted":"2024-08-31","award_date":"2024-08-30"},"links":{"sam":"https://sam.gov/workspace/contract/opp/d6b7135184a4455cbdf9665c61bed478/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025)","agency":{"office":{"code":"36C262","name":"262-NETWORK CONTRACT OFFICE 22 (36C262)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"85297","city":"Gilbert","state":"AZ","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-09-30","archive_type":"auto_custom"},"contacts":[{"name":"Norman Napper-Rogers","role":"primary","email":"Norman.Napper-Rogers@va.gov","phone":"602-795-4170","title":"Contracting Officer"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"d6b7135184a4455cbdf9665c61bed478","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"846326923f21701851ba61897284c6fce1ae0e7692daf83cf3d8c3b7d283c3ae","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"36C26224Q1724","product_service_code":"H959"}],"due_at":"2024-08-27T17:00:00Z","due_date":"2024-08-27","closes_at":"2024-08-27T17:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","state":"CA","county":"06071","county_name":"San Bernardino County","city":"0642370","city_name":"Loma Linda","country":"USA","winner_key":"DARPZL19UP45","amount":"197899.00","linked_awards":3,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"976ed7e44b3f4cbb9cd851a38b764184","description":{"text":"The purpose of this amendment is to provide answers to the questions received, add the diagrams requested, and extend the due date until Tuesday 08/27/2024 at 10:00 PDT. There will be no further questions. All complete and final offers are due by 08/27/2024 at 10:00 PDT. QUESTION RESPONSES Is there a cost estimate , budget or ballpark figure for the project listed? The IGCE for this contract is $159,853.00. Is there an actual start date for the project? Yes. 09/01/2024 Would VALLHCS consider waiving the requirement for a C-10 License to perform this arc flash analysis? No. We need an equipment list or Single line diagrams or a previous Arc Flash to be able to price this. I will be waiting. Added to this amendment. Section 4.4.8 - Is the site-walk on Monday, August 19th mandatory? No. Will questions be answered during the site-walk? Yes, however all questions needed to be submitted in writing. Will there be an additional period after the site-walk to submit questions based on information observed from the site-walk? Yes, there was, it was in the Solicitation. Description Section, Page 2 - Regarding the over and above scope: Are we to provide pricing for Line Item 0002? No. If so, how are we to price an unknown? N/A If so, are there potential items that can be provided that we can attempt to price? N/A Is this noted as a heads-up that there may potentially be additions to the scope to price at a later date after the award and if modifications to the contract are approved by the COR? No. This is a contracting tool for us to be able to work around emergencies, not failures to provide proper pricing in advance. This is a Firm Fixed-Price contract. Section 4.4.6, page 5 - How do you define a major modification? In the last five years the hospital has added power panels and load centers. We have also added buildings. All the additions that was added are not on the 2018 arc flash analysis. The SOW mentions that the awarded contractor will be provided the existing drawings of the facility. Â Are the drawings being provided the most current within 5 years? Yes. As an updated/refresher to an existing study that is required every 5 years, will the existing studies be provided? Yes. In what format will the existing studies be provided? Hard copy/electronic copy of the last final report? Hard copy and electronic copy. Is the existing study software files (software used is unknown) be provided that the previous study was performed/modeled? The existing software that was used is unknown. We only have books and PDF. Is SKM Systems Analysis (SKM) software acceptable to perform the study? Yes. Is the cable feeder schedules for Medium and Low Voltage being provided with the drawings? Yes. The utility service data will need to be supplied by facility owner/site and fees paid. Please confirm. The Contract starts at the main switch gear were the utility enters. Do you have any previous Arc flash study reports, or this is a new arc flash study. Last report is from 2019. Do you have any drawings that you can share with us? Yes. Is this the complete list of equipment for the Arc flash study? No. If not, could you please provide a complete list of panels and equipment on the schedule? Drawings are provided in the amendment. If that is not available, could you please provide a bid item for a unit price for equipment not shown on the bid schedule? N/A Single-Line Diagrams: The solicitation mentions that single-line diagrams can be provided after the award. Is there any chance we could get access to the most recent ones beforehand? Having these would really help us better understand the scope and prepare a precise quote. Yes. Existing Arc Flash Study: I see there s already an Arc Flash Study in place, but it s unclear what software was used. Could you share any details on this? Knowing what was used before will help us align our approach more closely with what s expected. The existing software that was used is unknown. We only have books and PDF. Site Conditions: Could you provide any insights into the current state of the electrical systems? Are there known issues or specific areas we should be particularly mindful of when conducting the analysis? Electrical is operational and tested. Modifications and Additions: The solicitation notes that there are some additional panels and modifications not reflected in the current single-line diagrams. Could you provide more information on these changes so we can make sure they re properly included in our analysis? In the last five years the hospital has added power panels and load centers. We have also added buildings. All the additions that were added are not on the 2018 arc flash analysis. Labeling Requirements: Regarding the Arc Flash warning labels, are there any specific preferences for the materials, durability, or placement of these labels? We want to ensure we meet or exceed your standards. All labeling must be clear and correct. If the label is not correct the contractor is responsible to fix all errors. Utility Data Acquisition: I noticed that we re responsible for obtaining the utility data needed for the studies. Could you clarify what specific data will be required? Any guidance on how we might best acquire this data would be greatly appreciated. This statement will be removed from the SOW as it is referring to information pulled from the meters. As-Built Drawings: I understand there aren t current as-built drawings for recent modifications or additions. Is there any plan to create these, or will it be up to us to document these changes during our analysis? Added to this amendment. Over and Above Services: The solicitation mentions \"Over and Above Services.\" Could you provide some examples of what might fall under this category? It would help us to understand how these services would be authorized and compensated. This is a contracting tool for us to be able to work around emergencies, not failures to provide proper pricing in advance. This is a Firm Fixed-Price contract. Evaluation Criteria: Could you provide more detail on how past performance and price will be weighted in the evaluation? Price is the deciding factor. Past performance will be used as a qualifying factor. Contractor Performance Assessment Reporting System (CPARS) reports are pulled to evaluate. Contractors with less than Satisfactory in any category will be deemed not eligible for award. A contractor with no CPARS will be deemed satisfactory for Past Performance. If two contractors have matching quotes, then the Past Performance will be evaluated again to determine the most Are there particular aspects of past performance that you consider especially important for this project? Any company with a negative report in the Federal Awardee Performance and Integrity Information System (FAPIIS) will be deemed ineligible for award. Any company with less than satisfactory rating in CPARS will be deemed ineligible for award. We are unable to attend the site visit for the above project.Â I was wondering if you could please share the sign in sheet from the site visit. Only one contractor showed for the site visit. Their questions are included in this list. Section 4.3 Licensing requirements 4.3.1 - The OSHA 30-hour Occupational Safet card since we are not technically an electrical contractor, would this pertain to us? Yes. 4.3.2 - Our firm is an engineering firm that specializes inÂ arcÂ flashÂ studies. We are not a contractor and therefore do not have the Electrical C-10 License. We do have a Professional Engineering license for the State of CA. Please confirm this will not be an issue. You can have both or if the company is owner is a license C-10 they must have a license Electrical Engineer or If the company is owner is a license Electrical Engineer they must get a license C-10 to help open electrical panels. 4.3.3 - The NFPA and/NICET certification can that expand on what kind of certification they mean. Typically, I see this required forÂ ArcÂ FlashÂ Training, but I didn t see the training as a part of the SOW. If they mean that the data collection technician is required to have a certain certification level, please let me know. Technician is required to have a certain certification level. NFPA and/NICET certification show the foreman and/or technician have been trained. Section 4.4 Additional Information: Our firm needs some kind of information that shows how big the electrical system is in order for us effectively price the SOW. We prefer the electrical one-line diagrams but if they are not willing to provide those, would they be willing to provide the previousÂ arcÂ flashÂ study report? Added to this amendment. Can you confirm that an amendment will be posted with the answers to the questions before tomorrow or should we provide a bid as posted? Yes. I will also amend the due date to 08/27/2024 at 10:00 PDT to allow extra time to make adjustment regarding the question responses.","html":null,"origin":"extract"},"contacts":[{"name":"Norman Napper-Rogers","role":"primary","email":"Norman.Napper-Rogers@va.gov","phone":"602-795-4170","title":"Contracting Officer"}],"place_of_performance":{"zip":"92357-1000","city":{"name":"Loma Linda"},"street":"Department of Veterans Affairs VA Loma Linda Healthcare System (VALLHCS) Jerry L. Pettis VA Medical Center (VAMC) 11201 Benton Street","country":{"code":"USA"}},"office_address":{"zip":"85297","city":"Gilbert","state":"AZ","country":"USA"},"naics_codes":["238210"],"award":null,"attachments":[],"awards":[{"award_key":"CONT_AWD_36C26224P2030_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C26224P2030_3600_-NONE-_-NONE-/","piid":"36C26224P2030","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"DARPZL19UP45","recipient_name":"PANACEA CONSTRUCTION GROUP LLC","recipient_uei":"DARPZL19UP45","recipient_cage":"6FNU3","recipient_city":"DUBOIS","recipient_state":"WY","sub_name":"Department of Veterans Affairs","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","office_key":"o-36C262","first_action_date":"2024-08-30","last_action_date":"2024-08-30","actions":1,"obligated":"197899.00","current_total_value":"197899.00","potential_total_value":"197899.00","naics":"238210","psc":"H959","extent_competed":"COMPETED UNDER SAP","set_aside":"SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE","offers_received":11,"description":"ARC FLASH ANALYSIS","method":"piid","confidence":"high","evidence":["award number 36C26224P2030 equals the contract number","same awarding office 36C262"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C26226Q1411","latest_notice_id":"fe0e5251770845929bfae261d4772541","title":"Q301--VISN 22 Semen & Vasectomy Test Kits","solicitation_number":"36C26226Q1411_","notice_type":"k","first_type":"k","first_posted":"2026-08-26","last_posted":"2026-09-11","notices":3,"due_at":"2026-09-18T14:00:00Z","due_date":"2026-09-18","closes_at":"2026-09-18T14:00:00Z","awardable":true,"open":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"621511","psc":"Q301","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"36C26226Q14111","latest_notice_id":"1950a55da84047b3beeb28171d298835","title":"Q301--VISN 22 Semen & Vasectomy Test Kits","solicitation_number":"36C26226Q1411_1","notice_type":"k","first_type":"k","first_posted":"2026-09-03","last_posted":"2026-09-11","notices":2,"due_at":"2026-09-18T14:00:00Z","due_date":"2026-09-18","closes_at":"2026-09-18T14:00:00Z","awardable":true,"open":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"621511","psc":"Q301","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"36C26226Q1123","latest_notice_id":"71d8ab6036674cce8dbc47d0bc2ae945","title":"6810--VA Phoenix Coarse Salt Supply for Boiler Plant","solicitation_number":"36C26226Q1123","notice_type":"k","first_type":"k","first_posted":"2026-09-08","last_posted":"2026-09-16","notices":2,"due_at":"2026-09-18T17:00:00Z","due_date":"2026-09-18","closes_at":"2026-09-18T17:00:00Z","awardable":true,"open":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"325998","psc":"6810","set_aside":"SDVOSBC","state":"AZ","county":"04013","county_name":"Maricopa County","city":"0455000","city_name":"Phoenix","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-17T06:28:38.602097Z"},{"key":"36C26226Q1090","latest_notice_id":"0607ec1dca0a4216ad0d2d6248232c91","title":"J059--Generator Maintenance & load Banking Svc","solicitation_number":"36C26226Q1090","notice_type":"p","first_type":"r","first_posted":"2026-09-04","last_posted":"2026-09-16","notices":2,"due_at":"2026-09-18T19:00:00Z","due_date":"2026-09-18","closes_at":"2026-09-18T19:00:00Z","awardable":true,"open":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"811310","psc":"J059","set_aside":"SDVOSBC","state":"AZ","county":"04013","county_name":"Maricopa County","city":"0455000","city_name":"Phoenix","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-17T06:28:38.602097Z"},{"key":"36C26226Q1466","latest_notice_id":"e3f9f356417e4bec914d9a5b34ebc799","title":"6515--Vascular Surgical Trays","solicitation_number":"36C26226Q1466","notice_type":"k","first_type":"k","first_posted":"2026-09-14","last_posted":"2026-09-14","notices":1,"due_at":"2026-09-21T17:00:00Z","due_date":"2026-09-21","closes_at":"2026-09-21T17:00:00Z","awardable":true,"open":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"339112","psc":"6515","set_aside":null,"state":"AZ","county":"04013","county_name":"Maricopa County","city":"0455000","city_name":"Phoenix","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"}]}