{"canonical":"https://abierto.us/opportunities/36c25626q1365","key":"36C25626Q1365","url":"https://abierto.us/opportunities/36c25626q1365","title":"H912--Sources Sought Fire Damper Testing POP 12/31/2026-12/30/2027","solicitation_number":"36C25626Q1365","notice_type":"r","open":true,"removed":false,"removed_at":null,"response_deadline":"2026-10-06T16:00:00Z","first_posted":"2026-09-29","last_posted":"2026-09-29","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"256-NETWORK CONTRACT OFFICE 16 (36C256)","naics":"541350","psc":"H912","set_aside":null,"place_state":"MS","place_scope":"site","site":null,"place_state_source":"description","place_evidence":"ARE SYSTEM WAREHOUSE BLDG 26 400 VETERANS AVE BILOXI MS 39531","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"c241dc02517e4f109bc3c8ef29ca4cf6","title":"H912--Sources Sought Fire Damper Testing POP 12/31/2026-12/30/2027","solicitation_number":"36C25626Q1365","notice_type":"r","base_type":"r","posted":"2026-09-29","posted_at":"2026-09-29T16:41:05.293Z","due_at":"2026-10-06T16:00:00Z","due_date":"2026-10-06","cancelled":false,"archived":false,"archive_date":"2026-12-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c241dc02517e4f109bc3c8ef29ca4cf6/view","enriched":true,"history":[{"index":1,"title":"H912--Sources Sought Fire Damper Testing POP 12/31/2026-12/30/2027","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-29T16:41:05.293Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"c241dc02517e4f109bc3c8ef29ca4cf6","solicitation_number":"36C25626Q1365"}]}],"latest_notice_id":"c241dc02517e4f109bc3c8ef29ca4cf6","first_type":"r","notices":[{"dates":{"posted":"2026-09-29","posted_at":"2026-09-29T16:41:05.293Z","created_at":"2026-09-29T16:41:02.008Z","modified_at":"2026-09-29T16:41:05.293Z","response_deadline":{"raw":"2026-10-06T12:00:00-04:00","utc":"2026-10-06T16:00:00Z","date":"2026-10-06","time":"12:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c241dc02517e4f109bc3c8ef29ca4cf6/view"},"naics":{"codes":["541350"],"primary":"541350"},"title":"H912--Sources Sought Fire Damper Testing POP 12/31/2026-12/30/2027","agency":{"office":{"code":"36C256","name":"256-NETWORK CONTRACT OFFICE 16 (36C256)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"39157","city":"RIDGELAND","state":"MS","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-12-05","archive_type":"auto_custom"},"history":[{"index":1,"title":"H912--Sources Sought Fire Damper Testing POP 12/31/2026-12/30/2027","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-29T16:41:05.293Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"c241dc02517e4f109bc3c8ef29ca4cf6","solicitation_number":"36C25626Q1365"}],"contacts":[{"name":"Jacqueline Ambala","role":"primary","email":"Jacqueline.Ambala@va.gov","phone":"757-251-4054","title":"Contract Specialist"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"c241dc02517e4f109bc3c8ef29ca4cf6","lineage_id":"c241dc02517e4f109bc3c8ef29ca4cf6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-30T04:49:24.889621995Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"61d48ea1a565394e13a52756fdaf0a96-26\"","fetched_at":"2026-10-03T03:46:48.862698055Z","row_sha256":"c403548e61973669697af4d8ae721f38afff7d67b23e327102eb1ad369688188","last_modified":"2026-10-03T03:30:32Z"},"updated_at":"2026-10-03T03:46:48.862698055Z","first_seen_at":"2026-09-30T04:12:42.529040938Z"},"description":{"html":"STATEMENT OF WORK\nFIRE DAMPER INSPECTION AND TESTING\n1. Scope.  The intent of this one-time service is to inspect and test multiple building s Fire Dampers (247 dampers) for regulatory compliance  on the Biloxi VA Campus as described below within the 90 days following the Notice to Proceed.\n2. Specifications/Characteristics: \nMinimum technical specs must be provided to meet the requirements of the GCVHCS.\n\nCampus Overview - The 247 Fire Dampers for inspection and testing are in the Patient Buildings of 3, 30, 14, 15, and 25 and the Non-Patient Buildings of 1, 2, 5, 19, and 28 on the Biloxi VAMC Campus. See Chart 1.  These Fire Dampers assist fire prevention  from the buildings and communicates with the current installed Fire Alarm System. See Table 1.\n\nAll painted or damaged fusible links must be replaced with a link of same size, temperature, and load rating.\n\nThe location of each fire damper and access panel to be verified on each drawing and then updated on each drawing in accordance with NFPA guidelines.\n\nAll inspected fire dampers must have a visible label that corresponds to an Item number on the list, inspection date, condition, and inspector. \n\nEach building inspected will have its own inspection documentation with 2 pictures minimum per damper showing damper itself and general comments affecting damper operation.\n\nEach damper on the final report at a minimum shall state Pass / Fail.\n\nContractor shall furnish within the 90 days, the red-lined AutoCAD 2000 / Adobe PDF drawing for each building on a CD and on 11  x 17  sheet.  All pictures taken are to be labeled, organized by building and floor, and provided on a CD.\n\nContractor shall furnish a formal Fire Damper Report on CD by building of all dampers inspected with inspectors signature.\n3.0 Applicable Codes, Standards and Regulations \n3.1. All work shall be done in accordance with the current National Fire Protection Agency (NFPA) Code requirements. \n3.2. The Joint Commission, the latest applicable National Fire Protection Association (NFPA)Â  standards, and Occupational Safety and Health Administration (OSHA) regulatory requirements.Â  Testing is specific to 4 year frequency test for fire pump/smoke pump in facility.\n3.2.1. NFPA 80   Standard for Fire Doors and Other Opening Protectives \n3.2.2. NFPA 90A   Standard for the Installation of Air Conditioning and Ventilating Systems \n3.2.3. NFPA 101   Life Safety Code \n3.2.4. NFPA 105   Standard for Smoke Door Assemblies and Other Opening Protectives \n3.2.5. NFPA 5000   Building Construction & Safety Code \n4. Comprehensive Fire/Smoke Damper Inspection TasksÂ  \nContractor shall: \n4.1. Furnish all labor, tools, and equipment to inspect fire and smoke dampers at Biloxi VAMC Campus. \n4.2. Use commercially reasonable efforts to locate and, once located, operate all dampers provided in list by Contracting Officer s Representative (COR) upon commencement of inspection.Â  \n4.3. Include documentation of all tested devices and must identify as a minimum which includes date inspected, unique device identification, device location, status (Pass or Fail), the type and quantity of devices tested in each building, and a consolidated deficiency finding list per building.Â  \n4.4. Coordinate with the COR, Air Conditioning Equipment Mechanic, Electronics Mechanic and notify local fire department that the fire alarm system is in  test mode  due to the inspection of the smoke and/or combination dampers. \n4.5. Locate, access and survey area of dampers.Â  \n4.6. Clear each damper of any debris that would impede such dampers normal operation.Â  \n4.7. Check for penetrations. \n4.8. Ensure no interference to operation due to: (rusted, bent, misaligned, or damaged frame or blades, or defective hinges or other moving parts). \n4.9. Inspect all linkage and pivot points for freedom of movement and condition.Â  \n4.10. Manually activate actuators on electric smoke and/or combination dampers to verify proper operation. \n4.11. Lubricate all moving parts on each damper. \n4.12. Check operation of the latch if damper is provided with a latch. \n4.13. Reset fusible links on fire dampers, to verify such fire damper fully closes and if necessary, replace any fusible link that is compromised (per NFPA code requirements). \n4.14. Replace springs and/or access handles for the fire/smoke dampers as necessary. \n4.15. Identify each unidentified unit location with a ceiling grid damper label. \n4.16. Identify on drawings the location of each damper, along with placement of identification stickers on ceilings or other location to assist in future location of such dampers; \n4.17. Authenticate compliance utilizing a customized Universal Product Code (UPC) label applied directly to all damper units, specifying reference number and inspection date. \n4.18. Create a comprehensive inventory and repair list for all inspected damper locations. \n4.19 Thoroughly clean all areas with a high-density high efficiency particulate air (HEPA) filtration system. \n4.20. Complete all pertinent damper unit repairs as deemed necessary (linkage adjustments, damper unit mounts, flex installations). \n4.21. Contractor shall be able to perform such repair or replacement if dampers are in need of either replacement or repair, the scope of repair or replacement shall be determined by the project manager and/or contractor technician. A list of defective dampers shall be generated by the contractor and provided to the COR and Contracting Officer for approval. \n4.22. Provide a report on conclusion of performance of evidence of inspection, repair, or replacement to include a listing of the location of each damper, damper s VA established ID number, and whether such damper passed or failed; if a damper failed, a detailed explanation of such failure. Â Â \n4.23. Repair exceptions pertain to access door installations and new damper unit installations as determined by Fire and Smoke Damper Inspection. \n4.24. Summary of 4 year fire/smoke damper testing: \na) Physically access each damper\nb) Remove fusible link in damper\nc) Cycle the damper to verify full closure\nd) Test smoke damper actuators\ne) Replace fusible link with new one\nf) Document pass/fail results\n4.25. Purpose of testing ensures that each damper will close to stop fire/smoke from traveling through ducts or walls.\n5. Repair WorkÂ  \n5.1. The contractor shall inspect and provide documentation of fire damper functionality. The contractor shall make any adjustments necessary to the fire damper linkages and brackets to correct operation of the damper. Replace any links found to be damaged, painted or otherwise compromised or unacceptable with a link of the same size, load and temperature rating. \n5.2. Repairs beyond the scope of fusible links: If additional repairs are required to make a damper operational, provide the nature of the repair and a cost estimate in the inspection summary report. \n5.3. Any work that will result in additional charges MUST be approved by the Contracting Officer, in writing, BEFORE such work begins.Â  Any additional work performed by the Contractor without the prior, written approval of the Contracting Officer shall be at no additional \n6. Delivery   \n\nGulf Coast Veterans Health Care System\nWarehouse Bldg 26\n400 Veterans Ave\nBiloxi MS 39531\nMon-Fri 7:00am- 3:30pm\n7. Period of Performance is 12/31/2026   12/30/2027.\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\nTable 1: Fire Dampers to be Inspected and Tested\n\nBuilding  1\nDamper Number\nDepartment or Area\nDamper Location\n\n\nÂ \n1\nBSMT\nEx Duct by AHU 9 RM BAC 9\n\n2\nBSMT\nOutside of RM BC 101\n\n1\n1\n1A135\n\n3\n1\n1C114\n\n11\n1\n1C114\n\n12\n1\n1C114\n\n4\n2\nMech RM across from 2C115\n\n22\n2\n2B104\n\n23\n2\n2A108\n\n24\n2\n2C109\n\n25\n2\n2C109\n\n26\n2\n2C109\n\n27\n2\n2C109\n\n28\n2\n2C113B\n\n29\n2\n2C113B\n\n1\nAttic 2\nAHU 3 Supply\n\n2\nAttic 2\nAHU 3 \n\n4\nAttic 2\nAHU 4\n\n5\nAttic 2\nAHU 4\n\n6\nAttic 2\nAHU 4\n\n7\nAttic 2\nAHU 4 Supply\n\n8\nAttic 2\nAHU 4\n\n9\nAttic 2\nAHU 4\n\n10\nAttic 2\nAHU 4\n\n11\nAttic 2\nAHU 4\n\n12\nAttic 2\nAHU 4\n\n13\nAttic 2\nAHU 4\n\n14\nAttic 2\nAHU 2 Supply\n\n15\nAttic 2\nAHU 2 \n\n16\nAttic 2\nAHU 2\n\n17\nAttic 2\nAHU 1 Return\n\n18\nAttic 2\nAHU 1 Return\n\n19\nAttic 2\nAHU 1\n\n20\nAttic 2\nAHU 1 Supply\n\n22\nAttic 2\nExhaust 13\n\n23\nAttic 2\nAHU 11\n\n24\nAttic 2\nAHU 11\n\n25\nAttic 2\nAHU 11\n\n26\nAttic 2\nAHU 11\n\n27\nAttic 2\nEF-9\n\nBuilding  2\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \nFD-1\n1E\n1B119\n\nFD-2\n1E\n1B119\n\nFD-3\n1E\n1B119\n\nFD-4\n1W\n1A112\n\nFD-5\n1W\n1A112\n\nFD-6\n1W\n1A112\n\nFD-7\n2E\n2B111\n\nFD-8\n2E\n2B111\n\nFD-9\n2E\n2B111\n\nFD-10\n2W\n2A106\n\nFD-11\n2W\n2A106\n\nFD-12\n2W\n2A106\n\nFD-13\n3E\n3B116\n\nFD-14\n3E\n3B116\n\nFD-15\n3E\n3B116\n\nFD-16\n3W\n3A105\n\nFD-17\n3W\n3A105\n\nFD-18\n3W\n3A105\n\nBuilding  3 / 30\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \n12\n2\nAHU 2 Supply  RM 2D140\n\n1\n1A\n1H100\n\n2\n1A\n1H100\n\n3\n1A\n1H100\n\n10\n1G\n1G116\n\n11\n1G\n1G119\n\n12\n1G\n1G121\n\n13\n1G\n1G121\n\n14\n1G\n1G128\n\n15\n1G\n1G125\n\n16\n1G\n1G125\n\n17\n1G\n1G125\n\n18\n1G\n1G125\n\n19\n1G\n1G128 Hallway\n\n20\n1G\n1G129\n\n21\n1G\n1G132\n\n22\n1G\n1G132\n\n23\n1G\n1G132\n\n24\n1G\n1G134 in chase\n\n25\n1G\n1G134 in chase\n\n26\n1G\n1G134 in chase\n\n27\n1G\n1G140\n\n28\n1G\n1G148 Double Doors\n\n29\n1G\n1G143\n\n30\n1G\n1G143\n\n31\n1G\n1G143\n\n32\n1G\n1G143\n\n33\n1G\n1G135 in chase\n\n1\n1H\n1H103 Main Corridor\n\n2\n1H\n1H102\n\n3\n1H\n1H102\n\n4\n1H\n1H100 Hallway\n\n6\n1H\n1H100  \n\n7\n1H\n1H100\n\n1\n1J\nC1-44\n\n2\n1J\nC1-44\n\n3\n1J\nC1-44\n\n4\n1J\nC1-44\n\n5\n1J\nC1-44\n\n6\n1J\n1J141\n\n7\n1J\n1J142\n\n8\n1J\n1J143\n\n9\n1J\nC1-47 Above Door\n\n10\n1J\nC1-38\n\n11\n1J\n1J127\n\n12\n1J\n1J127\n\n13\n1J\n1J145\n\n14\n1J\n1J145\n\n15\n1J\nC1-51\n\n1\n2H\n2H106 Hallway\n\n2\n2H\n2H106 Hallway\n\n3\n2H\n2H104\n\n4\n2F\n2F112 Above Door\n\n5\n2F\n2F112   \n\n6\n2G\n2G100\n\n7\n2G\n2G100 Above Door\n\n16\n1J\nAbove ceiling of 1st floor RM 1J102\n\n9\n2F\n2C-23 Above Door\n\n1\n3F\nC2-19 Between 3F128 & 3F126A\n\n2\n3F\nAbove Door Bldg 3 meets Bldg 30\n\n3\n3G\n3G105C\n\n4\n3G\n3G135\n\n1\n4F\n4F115\n\n2\n4F\n4F127\n\n3\n4F\nC4-115 Above Door\n\n4\n4G\nC4-22 in front of 4G110\n\n5\n4G\nC4-22 in front of 4G110\n\n1\nAttic\n5G103\n\n2\nAttic\n5G103\n\n3\nAttic\n5G104\n\n4\nAttic\n5G104\n\n5\nAttic\n5G104\n\n6\nAttic\nAHU 6\n\n7\nAttic\nAHU 6\n\n8\nAttic\nAHU 1\n\n10\nAttic\nAHU 5\n\n11\nAttic\nAHU 5 Supply\n\n13\nAttic\nAHU 3\n\n14\nAttic\nAHU 4 Supply\n\n15\nAttic\nAHU 4   \n\n18\nAttic\n5F101\n\nBuilding  5\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \n1\n1\nRm 1A-106\n\n2\n1\nRm 1A-107\n\n3\n1\nRm 1A-107\n\n4\n1\nRm 1A-108\n\n5\n1\nRm 1A-112 \n\n6\n1\nRm 1A-112 \n\n7\n1\nRm 1A-113\n\n8\n2\nRm 2A-10\n\n9\n2\nRm 2A-107\n\n10\n2\nRm 2A-108\n\n11\n2\nRm 2A-108\n\nBuilding  14\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \n1\n1\nC1-15 Above Double Doors\n\n2\n1\nC1-15 Above Double Doors\n\n12\n1\nC1-9\n\n13\n1\nC1-9\n\n14\n1\nC1-9\n\n1\nAttic\nAHU 2\n\n2\nAttic\nAHU 2\n\n3\nAttic\nAHU 1\n\n4\nAttic\nAHU 1\n\n5\nAttic\nAHU 3\n\n6\nAttic\nAHU 3\n\nBuilding  15\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \n10\n1B\n1B106\n\n1\n1D\n1D100\n\n9\n2B\n2B108\n\n1\n2G\n2G102\n\n15\n2\nSupply Air up/down near 2G100\n\n16\n2\nExhaust Air down to 1st Fl up to EF-5 on roof\n\n17\n2\nReturn Air duct down\n\n18\n2\nExhaust Air down to 1st Fl up to roof\n\n19\n2\nExhaust Air down to 1st Fl up to EF-5 on roof\n\n1\nAttic\nAHU 2 Supply\n\n2\nAttic\nAhu 2 Return\n\n3\nAttic\nAHU 2 Exhaust\n\n5\nAttic\nAHU 3 Supply\n\n6\nAttic\nAHU 3 Return\n\n7\nAttic\nAHU 3 Exhaust\n\n8\nAttic\nAHU 3 Supply\n\n9\nAttic\nAHU 3 Return\n\n11\nAttic\nAHU 1 Exhaust\n\n12\nAttic\nAHU 1 Supply\n\n13\nAttic\nAHU 1 Supply\n\n14\nAttic\nAHU 1 Return\n\nBuilding  19\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \n1\n1A\n1A117\n\n2\n1A\nC1-5/1A117\n\n5\n1A\n1A117\n\n6\n1A\n1A117\n\n1\n1B\n1B127\n\n2\n1B\n1B127\n\n3\n1B\n Corridor next to 1B127\n\n7\n2A\n2A104 in floor\n\n8\n2A\n2A104 in floor\n\n1\n2B\n2B126 in floor\n\n4\n2B\n2B126  \n\n1\n3A\n3A105 in floor\n\n4\n3A\n3A105 in floor\n\n15\n3B\n3B123 in floor\n\n16\n3B\n3B123 in floor\n\n1\nAttic\nAHU 2  (A area)\n\n2\nAttic\nAHU 2  (A area)\n\n3\nAttic\nAHU 1  (B area)\n\n4\nAttic\nAHU 1  (B area)\n\nBuilding  25\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \n8\n1B\n1B156\n\n9\n1B\n1B156\n\n42\n1B\n1B153\n\n43\n1B\n1B153\n\n15\n1C\n1C122\n\n16\n1C\n1C122\n\n17\n1C\n1C123\n\n18\n1C\n1C122\n\n21\n1C\n1C125\n\n22\n1C\n1C125\n\n47\n2A\nC2-11\n\n48\n2A\n2A122\n\n49\n2A\nC2-11\n\n50\n2A\n2A122\n\n51\n2A\nC2-11\n\n55\nMEZZ\nAHU 1\n\n                              56A\nMEZZ\nAHU 1\n\n                              56B\nMEZZ\nAHU 1\n\n57\nMEZZ\nAHU 1\n\n35\nMEZZ\nAHU 2\n\n36\n2B\nC2-20 By 2B133\n\n                              37A\nMEZZ\nAHU 2 Return\n\n                              37B\nMEZZ\nAHU 2 Return\n\n38\nMEZZ\n2B134\n\n39\nMEZZ\n2B134\n\n                               40C\nMEZZ\nAHU 2 Supply\n\n41\n2B\n2B133\n\n53\n2B\n2B134\n\n12\n2C\n2C138\n\n13\n2C\n2C121 (Hall)\n\n14\n2C\n2C145 (Hall)\n\n27\n2C\n2C132\n\n30\nMEZZ\nAHU 3 Exhaust\n\n31\nMEZZ\nAHU 3 Supply\n\n                              32A\nMEZZ\nAHU 3 Return\n\n                              32B\nMEZZ\nAHU 3 Return\n\nBuilding  28\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \n1\nNW \n1A100 - Lobby Elevator P1 Side\n\n2\nNW \n1A100 - Lobby Elevator P2 Side\n\n3\nSW \n1A103 - Lobby Elevator P3 Side\n\n4\nSW \n1A103 - Lobby East Side\n\n5\nSW \n2A102 - Lobby Elevator P3 Side\n\n6\nSW \n2A102 - Lobby East Side\n\n7\nNW \n5A100 - Lobby Elevator P1 Side\n\n8\nNW \n5A100 - Lobby Elevator P2 Side\n\n9\nSW \n5A102 - Lobby Elevator P3 Side\n\n10\nSW \n5A102 - Lobby East Side\n\n\n\n\n\n\n                                                                           -End of Scope of Work-","text":"STATEMENT OF WORK\nFIRE DAMPER INSPECTION AND TESTING\n1. Scope. The intent of this one-time service is to inspect and test multiple building s Fire Dampers (247 dampers) for regulatory compliance on the Biloxi VA Campus as described below within the 90 days following the Notice to Proceed.\n2. Specifications/Characteristics:\nMinimum technical specs must be provided to meet the requirements of the GCVHCS.\n\nCampus Overview - The 247 Fire Dampers for inspection and testing are in the Patient Buildings of 3, 30, 14, 15, and 25 and the Non-Patient Buildings of 1, 2, 5, 19, and 28 on the Biloxi VAMC Campus. See Chart 1. These Fire Dampers assist fire prevention from the buildings and communicates with the current installed Fire Alarm System. See Table 1.\n\nAll painted or damaged fusible links must be replaced with a link of same size, temperature, and load rating.\n\nThe location of each fire damper and access panel to be verified on each drawing and then updated on each drawing in accordance with NFPA guidelines.\n\nAll inspected fire dampers must have a visible label that corresponds to an Item number on the list, inspection date, condition, and inspector.\n\nEach building inspected will have its own inspection documentation with 2 pictures minimum per damper showing damper itself and general comments affecting damper operation.\n\nEach damper on the final report at a minimum shall state Pass / Fail.\n\nContractor shall furnish within the 90 days, the red-lined AutoCAD 2000 / Adobe PDF drawing for each building on a CD and on 11 x 17 sheet. All pictures taken are to be labeled, organized by building and floor, and provided on a CD.\n\nContractor shall furnish a formal Fire Damper Report on CD by building of all dampers inspected with inspectors signature.\n3.0 Applicable Codes, Standards and Regulations\n3.1. All work shall be done in accordance with the current National Fire Protection Agency (NFPA) Code requirements.\n3.2. The Joint Commission, the latest applicable National Fire Protection Association (NFPA)Â standards, and Occupational Safety and Health Administration (OSHA) regulatory requirements.Â Testing is specific to 4 year frequency test for fire pump/smoke pump in facility.\n3.2.1. NFPA 80 Standard for Fire Doors and Other Opening Protectives\n3.2.2. NFPA 90A Standard for the Installation of Air Conditioning and Ventilating Systems\n3.2.3. NFPA 101 Life Safety Code\n3.2.4. NFPA 105 Standard for Smoke Door Assemblies and Other Opening Protectives\n3.2.5. NFPA 5000 Building Construction & Safety Code\n4. Comprehensive Fire/Smoke Damper Inspection TasksÂ\nContractor shall:\n4.1. Furnish all labor, tools, and equipment to inspect fire and smoke dampers at Biloxi VAMC Campus.\n4.2. Use commercially reasonable efforts to locate and, once located, operate all dampers provided in list by Contracting Officer s Representative (COR) upon commencement of inspection.Â\n4.3. Include documentation of all tested devices and must identify as a minimum which includes date inspected, unique device identification, device location, status (Pass or Fail), the type and quantity of devices tested in each building, and a consolidated deficiency finding list per building.Â\n4.4. Coordinate with the COR, Air Conditioning Equipment Mechanic, Electronics Mechanic and notify local fire department that the fire alarm system is in test mode due to the inspection of the smoke and/or combination dampers.\n4.5. Locate, access and survey area of dampers.Â\n4.6. Clear each damper of any debris that would impede such dampers normal operation.Â\n4.7. Check for penetrations.\n4.8. Ensure no interference to operation due to: (rusted, bent, misaligned, or damaged frame or blades, or defective hinges or other moving parts).\n4.9. Inspect all linkage and pivot points for freedom of movement and condition.Â\n4.10. Manually activate actuators on electric smoke and/or combination dampers to verify proper operation.\n4.11. Lubricate all moving parts on each damper.\n4.12. Check operation of the latch if damper is provided with a latch.\n4.13. Reset fusible links on fire dampers, to verify such fire damper fully closes and if necessary, replace any fusible link that is compromised (per NFPA code requirements).\n4.14. Replace springs and/or access handles for the fire/smoke dampers as necessary.\n4.15. Identify each unidentified unit location with a ceiling grid damper label.\n4.16. Identify on drawings the location of each damper, along with placement of identification stickers on ceilings or other location to assist in future location of such dampers;\n4.17. Authenticate compliance utilizing a customized Universal Product Code (UPC) label applied directly to all damper units, specifying reference number and inspection date.\n4.18. Create a comprehensive inventory and repair list for all inspected damper locations.\n4.19 Thoroughly clean all areas with a high-density high efficiency particulate air (HEPA) filtration system.\n4.20. Complete all pertinent damper unit repairs as deemed necessary (linkage adjustments, damper unit mounts, flex installations).\n4.21. Contractor shall be able to perform such repair or replacement if dampers are in need of either replacement or repair, the scope of repair or replacement shall be determined by the project manager and/or contractor technician. A list of defective dampers shall be generated by the contractor and provided to the COR and Contracting Officer for approval.\n4.22. Provide a report on conclusion of performance of evidence of inspection, repair, or replacement to include a listing of the location of each damper, damper s VA established ID number, and whether such damper passed or failed; if a damper failed, a detailed explanation of such failure. Â Â\n4.23. Repair exceptions pertain to access door installations and new damper unit installations as determined by Fire and Smoke Damper Inspection.\n4.24. Summary of 4 year fire/smoke damper testing:\na) Physically access each damper\nb) Remove fusible link in damper\nc) Cycle the damper to verify full closure\nd) Test smoke damper actuators\ne) Replace fusible link with new one\nf) Document pass/fail results\n4.25. Purpose of testing ensures that each damper will close to stop fire/smoke from traveling through ducts or walls.\n5. Repair WorkÂ\n5.1. The contractor shall inspect and provide documentation of fire damper functionality. The contractor shall make any adjustments necessary to the fire damper linkages and brackets to correct operation of the damper. Replace any links found to be damaged, painted or otherwise compromised or unacceptable with a link of the same size, load and temperature rating.\n5.2. Repairs beyond the scope of fusible links: If additional repairs are required to make a damper operational, provide the nature of the repair and a cost estimate in the inspection summary report.\n5.3. Any work that will result in additional charges MUST be approved by the Contracting Officer, in writing, BEFORE such work begins.Â Any additional work performed by the Contractor without the prior, written approval of the Contracting Officer shall be at no additional\n6. Delivery\n\nGulf Coast Veterans Health Care System\nWarehouse Bldg 26\n400 Veterans Ave\nBiloxi MS 39531\nMon-Fri 7:00am- 3:30pm\n7. Period of Performance is 12/31/2026 12/30/2027.\n\nTable 1: Fire Dampers to be Inspected and Tested\n\nBuilding 1\nDamper Number\nDepartment or Area\nDamper Location\n\nÂ\n1\nBSMT\nEx Duct by AHU 9 RM BAC 9\n\n2\nBSMT\nOutside of RM BC 101\n\n1\n1\n1A135\n\n3\n1\n1C114\n\n11\n1\n1C114\n\n12\n1\n1C114\n\n4\n2\nMech RM across from 2C115\n\n22\n2\n2B104\n\n23\n2\n2A108\n\n24\n2\n2C109\n\n25\n2\n2C109\n\n26\n2\n2C109\n\n27\n2\n2C109\n\n28\n2\n2C113B\n\n29\n2\n2C113B\n\n1\nAttic 2\nAHU 3 Supply\n\n2\nAttic 2\nAHU 3\n\n4\nAttic 2\nAHU 4\n\n5\nAttic 2\nAHU 4\n\n6\nAttic 2\nAHU 4\n\n7\nAttic 2\nAHU 4 Supply\n\n8\nAttic 2\nAHU 4\n\n9\nAttic 2\nAHU 4\n\n10\nAttic 2\nAHU 4\n\n11\nAttic 2\nAHU 4\n\n12\nAttic 2\nAHU 4\n\n13\nAttic 2\nAHU 4\n\n14\nAttic 2\nAHU 2 Supply\n\n15\nAttic 2\nAHU 2\n\n16\nAttic 2\nAHU 2\n\n17\nAttic 2\nAHU 1 Return\n\n18\nAttic 2\nAHU 1 Return\n\n19\nAttic 2\nAHU 1\n\n20\nAttic 2\nAHU 1 Supply\n\n22\nAttic 2\nExhaust 13\n\n23\nAttic 2\nAHU 11\n\n24\nAttic 2\nAHU 11\n\n25\nAttic 2\nAHU 11\n\n26\nAttic 2\nAHU 11\n\n27\nAttic 2\nEF-9\n\nBuilding 2\nDamper Number\nFloor\nDamper Location\n\nÂ\nFD-1\n1E\n1B119\n\nFD-2\n1E\n1B119\n\nFD-3\n1E\n1B119\n\nFD-4\n1W\n1A112\n\nFD-5\n1W\n1A112\n\nFD-6\n1W\n1A112\n\nFD-7\n2E\n2B111\n\nFD-8\n2E\n2B111\n\nFD-9\n2E\n2B111\n\nFD-10\n2W\n2A106\n\nFD-11\n2W\n2A106\n\nFD-12\n2W\n2A106\n\nFD-13\n3E\n3B116\n\nFD-14\n3E\n3B116\n\nFD-15\n3E\n3B116\n\nFD-16\n3W\n3A105\n\nFD-17\n3W\n3A105\n\nFD-18\n3W\n3A105\n\nBuilding 3 / 30\nDamper Number\nFloor\nDamper Location\n\nÂ\n12\n2\nAHU 2 Supply RM 2D140\n\n1\n1A\n1H100\n\n2\n1A\n1H100\n\n3\n1A\n1H100\n\n10\n1G\n1G116\n\n11\n1G\n1G119\n\n12\n1G\n1G121\n\n13\n1G\n1G121\n\n14\n1G\n1G128\n\n15\n1G\n1G125\n\n16\n1G\n1G125\n\n17\n1G\n1G125\n\n18\n1G\n1G125\n\n19\n1G\n1G128 Hallway\n\n20\n1G\n1G129\n\n21\n1G\n1G132\n\n22\n1G\n1G132\n\n23\n1G\n1G132\n\n24\n1G\n1G134 in chase\n\n25\n1G\n1G134 in chase\n\n26\n1G\n1G134 in chase\n\n27\n1G\n1G140\n\n28\n1G\n1G148 Double Doors\n\n29\n1G\n1G143\n\n30\n1G\n1G143\n\n31\n1G\n1G143\n\n32\n1G\n1G143\n\n33\n1G\n1G135 in chase\n\n1\n1H\n1H103 Main Corridor\n\n2\n1H\n1H102\n\n3\n1H\n1H102\n\n4\n1H\n1H100 Hallway\n\n6\n1H\n1H100\n\n7\n1H\n1H100\n\n1\n1J\nC1-44\n\n2\n1J\nC1-44\n\n3\n1J\nC1-44\n\n4\n1J\nC1-44\n\n5\n1J\nC1-44\n\n6\n1J\n1J141\n\n7\n1J\n1J142\n\n8\n1J\n1J143\n\n9\n1J\nC1-47 Above Door\n\n10\n1J\nC1-38\n\n11\n1J\n1J127\n\n12\n1J\n1J127\n\n13\n1J\n1J145\n\n14\n1J\n1J145\n\n15\n1J\nC1-51\n\n1\n2H\n2H106 Hallway\n\n2\n2H\n2H106 Hallway\n\n3\n2H\n2H104\n\n4\n2F\n2F112 Above Door\n\n5\n2F\n2F112\n\n6\n2G\n2G100\n\n7\n2G\n2G100 Above Door\n\n16\n1J\nAbove ceiling of 1st floor RM 1J102\n\n9\n2F\n2C-23 Above Door\n\n1\n3F\nC2-19 Between 3F128 & 3F126A\n\n2\n3F\nAbove Door Bldg 3 meets Bldg 30\n\n3\n3G\n3G105C\n\n4\n3G\n3G135\n\n1\n4F\n4F115\n\n2\n4F\n4F127\n\n3\n4F\nC4-115 Above Door\n\n4\n4G\nC4-22 in front of 4G110\n\n5\n4G\nC4-22 in front of 4G110\n\n1\nAttic\n5G103\n\n2\nAttic\n5G103\n\n3\nAttic\n5G104\n\n4\nAttic\n5G104\n\n5\nAttic\n5G104\n\n6\nAttic\nAHU 6\n\n7\nAttic\nAHU 6\n\n8\nAttic\nAHU 1\n\n10\nAttic\nAHU 5\n\n11\nAttic\nAHU 5 Supply\n\n13\nAttic\nAHU 3\n\n14\nAttic\nAHU 4 Supply\n\n15\nAttic\nAHU 4\n\n18\nAttic\n5F101\n\nBuilding 5\nDamper Number\nFloor\nDamper Location\n\nÂ\n1\n1\nRm 1A-106\n\n2\n1\nRm 1A-107\n\n3\n1\nRm 1A-107\n\n4\n1\nRm 1A-108\n\n5\n1\nRm 1A-112\n\n6\n1\nRm 1A-112\n\n7\n1\nRm 1A-113\n\n8\n2\nRm 2A-10\n\n9\n2\nRm 2A-107\n\n10\n2\nRm 2A-108\n\n11\n2\nRm 2A-108\n\nBuilding 14\nDamper Number\nFloor\nDamper Location\n\nÂ\n1\n1\nC1-15 Above Double Doors\n\n2\n1\nC1-15 Above Double Doors\n\n12\n1\nC1-9\n\n13\n1\nC1-9\n\n14\n1\nC1-9\n\n1\nAttic\nAHU 2\n\n2\nAttic\nAHU 2\n\n3\nAttic\nAHU 1\n\n4\nAttic\nAHU 1\n\n5\nAttic\nAHU 3\n\n6\nAttic\nAHU 3\n\nBuilding 15\nDamper Number\nFloor\nDamper Location\n\nÂ\n10\n1B\n1B106\n\n1\n1D\n1D100\n\n9\n2B\n2B108\n\n1\n2G\n2G102\n\n15\n2\nSupply Air up/down near 2G100\n\n16\n2\nExhaust Air down to 1st Fl up to EF-5 on roof\n\n17\n2\nReturn Air duct down\n\n18\n2\nExhaust Air down to 1st Fl up to roof\n\n19\n2\nExhaust Air down to 1st Fl up to EF-5 on roof\n\n1\nAttic\nAHU 2 Supply\n\n2\nAttic\nAhu 2 Return\n\n3\nAttic\nAHU 2 Exhaust\n\n5\nAttic\nAHU 3 Supply\n\n6\nAttic\nAHU 3 Return\n\n7\nAttic\nAHU 3 Exhaust\n\n8\nAttic\nAHU 3 Supply\n\n9\nAttic\nAHU 3 Return\n\n11\nAttic\nAHU 1 Exhaust\n\n12\nAttic\nAHU 1 Supply\n\n13\nAttic\nAHU 1 Supply\n\n14\nAttic\nAHU 1 Return\n\nBuilding 19\nDamper Number\nFloor\nDamper Location\n\nÂ\n1\n1A\n1A117\n\n2\n1A\nC1-5/1A117\n\n5\n1A\n1A117\n\n6\n1A\n1A117\n\n1\n1B\n1B127\n\n2\n1B\n1B127\n\n3\n1B\nCorridor next to 1B127\n\n7\n2A\n2A104 in floor\n\n8\n2A\n2A104 in floor\n\n1\n2B\n2B126 in floor\n\n4\n2B\n2B126\n\n1\n3A\n3A105 in floor\n\n4\n3A\n3A105 in floor\n\n15\n3B\n3B123 in floor\n\n16\n3B\n3B123 in floor\n\n1\nAttic\nAHU 2 (A area)\n\n2\nAttic\nAHU 2 (A area)\n\n3\nAttic\nAHU 1 (B area)\n\n4\nAttic\nAHU 1 (B area)\n\nBuilding 25\nDamper Number\nFloor\nDamper Location\n\nÂ\n8\n1B\n1B156\n\n9\n1B\n1B156\n\n42\n1B\n1B153\n\n43\n1B\n1B153\n\n15\n1C\n1C122\n\n16\n1C\n1C122\n\n17\n1C\n1C123\n\n18\n1C\n1C122\n\n21\n1C\n1C125\n\n22\n1C\n1C125\n\n47\n2A\nC2-11\n\n48\n2A\n2A122\n\n49\n2A\nC2-11\n\n50\n2A\n2A122\n\n51\n2A\nC2-11\n\n55\nMEZZ\nAHU 1\n\n56A\nMEZZ\nAHU 1\n\n56B\nMEZZ\nAHU 1\n\n57\nMEZZ\nAHU 1\n\n35\nMEZZ\nAHU 2\n\n36\n2B\nC2-20 By 2B133\n\n37A\nMEZZ\nAHU 2 Return\n\n37B\nMEZZ\nAHU 2 Return\n\n38\nMEZZ\n2B134\n\n39\nMEZZ\n2B134\n\n40C\nMEZZ\nAHU 2 Supply\n\n41\n2B\n2B133\n\n53\n2B\n2B134\n\n12\n2C\n2C138\n\n13\n2C\n2C121 (Hall)\n\n14\n2C\n2C145 (Hall)\n\n27\n2C\n2C132\n\n30\nMEZZ\nAHU 3 Exhaust\n\n31\nMEZZ\nAHU 3 Supply\n\n32A\nMEZZ\nAHU 3 Return\n\n32B\nMEZZ\nAHU 3 Return\n\nBuilding 28\nDamper Number\nFloor\nDamper Location\n\nÂ\n1\nNW\n1A100 - Lobby Elevator P1 Side\n\n2\nNW\n1A100 - Lobby Elevator P2 Side\n\n3\nSW\n1A103 - Lobby Elevator P3 Side\n\n4\nSW\n1A103 - Lobby East Side\n\n5\nSW\n2A102 - Lobby Elevator P3 Side\n\n6\nSW\n2A102 - Lobby East Side\n\n7\nNW\n5A100 - Lobby Elevator P1 Side\n\n8\nNW\n5A100 - Lobby Elevator P2 Side\n\n9\nSW\n5A102 - Lobby Elevator P3 Side\n\n10\nSW\n5A102 - Lobby East Side\n\n-End of Scope of Work-","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C25626Q1365","place_of_performance":{"zip":"39531","city":{"name":"BILOXI"},"street":"Department of Veterans Affairs Golf Coast Veterans Healthcare Systems 400 VETERANS AVE"},"product_service_code":"H912"}],"due_at":"2026-10-06T16:00:00Z","due_date":"2026-10-06","closes_at":"2026-10-06T16:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C256","office_name":"256-NETWORK CONTRACT OFFICE 16 (36C256)","state":"MS","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":"description","state_evidence":"ARE SYSTEM WAREHOUSE BLDG 26 400 VETERANS AVE BILOXI MS 39531","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-10-02T08:08:23.148393Z","principal_notice_id":"c241dc02517e4f109bc3c8ef29ca4cf6","description":{"text":"STATEMENT OF WORK\nFIRE DAMPER INSPECTION AND TESTING\n1. Scope. The intent of this one-time service is to inspect and test multiple building s Fire Dampers (247 dampers) for regulatory compliance on the Biloxi VA Campus as described below within the 90 days following the Notice to Proceed.\n2. Specifications/Characteristics:\nMinimum technical specs must be provided to meet the requirements of the GCVHCS.\n\nCampus Overview - The 247 Fire Dampers for inspection and testing are in the Patient Buildings of 3, 30, 14, 15, and 25 and the Non-Patient Buildings of 1, 2, 5, 19, and 28 on the Biloxi VAMC Campus. See Chart 1. These Fire Dampers assist fire prevention from the buildings and communicates with the current installed Fire Alarm System. See Table 1.\n\nAll painted or damaged fusible links must be replaced with a link of same size, temperature, and load rating.\n\nThe location of each fire damper and access panel to be verified on each drawing and then updated on each drawing in accordance with NFPA guidelines.\n\nAll inspected fire dampers must have a visible label that corresponds to an Item number on the list, inspection date, condition, and inspector.\n\nEach building inspected will have its own inspection documentation with 2 pictures minimum per damper showing damper itself and general comments affecting damper operation.\n\nEach damper on the final report at a minimum shall state Pass / Fail.\n\nContractor shall furnish within the 90 days, the red-lined AutoCAD 2000 / Adobe PDF drawing for each building on a CD and on 11 x 17 sheet. All pictures taken are to be labeled, organized by building and floor, and provided on a CD.\n\nContractor shall furnish a formal Fire Damper Report on CD by building of all dampers inspected with inspectors signature.\n3.0 Applicable Codes, Standards and Regulations\n3.1. All work shall be done in accordance with the current National Fire Protection Agency (NFPA) Code requirements.\n3.2. The Joint Commission, the latest applicable National Fire Protection Association (NFPA)Â standards, and Occupational Safety and Health Administration (OSHA) regulatory requirements.Â Testing is specific to 4 year frequency test for fire pump/smoke pump in facility.\n3.2.1. NFPA 80 Standard for Fire Doors and Other Opening Protectives\n3.2.2. NFPA 90A Standard for the Installation of Air Conditioning and Ventilating Systems\n3.2.3. NFPA 101 Life Safety Code\n3.2.4. NFPA 105 Standard for Smoke Door Assemblies and Other Opening Protectives\n3.2.5. NFPA 5000 Building Construction & Safety Code\n4. Comprehensive Fire/Smoke Damper Inspection TasksÂ\nContractor shall:\n4.1. Furnish all labor, tools, and equipment to inspect fire and smoke dampers at Biloxi VAMC Campus.\n4.2. Use commercially reasonable efforts to locate and, once located, operate all dampers provided in list by Contracting Officer s Representative (COR) upon commencement of inspection.Â\n4.3. Include documentation of all tested devices and must identify as a minimum which includes date inspected, unique device identification, device location, status (Pass or Fail), the type and quantity of devices tested in each building, and a consolidated deficiency finding list per building.Â\n4.4. Coordinate with the COR, Air Conditioning Equipment Mechanic, Electronics Mechanic and notify local fire department that the fire alarm system is in test mode due to the inspection of the smoke and/or combination dampers.\n4.5. Locate, access and survey area of dampers.Â\n4.6. Clear each damper of any debris that would impede such dampers normal operation.Â\n4.7. Check for penetrations.\n4.8. Ensure no interference to operation due to: (rusted, bent, misaligned, or damaged frame or blades, or defective hinges or other moving parts).\n4.9. Inspect all linkage and pivot points for freedom of movement and condition.Â\n4.10. Manually activate actuators on electric smoke and/or combination dampers to verify proper operation.\n4.11. Lubricate all moving parts on each damper.\n4.12. Check operation of the latch if damper is provided with a latch.\n4.13. Reset fusible links on fire dampers, to verify such fire damper fully closes and if necessary, replace any fusible link that is compromised (per NFPA code requirements).\n4.14. Replace springs and/or access handles for the fire/smoke dampers as necessary.\n4.15. Identify each unidentified unit location with a ceiling grid damper label.\n4.16. Identify on drawings the location of each damper, along with placement of identification stickers on ceilings or other location to assist in future location of such dampers;\n4.17. Authenticate compliance utilizing a customized Universal Product Code (UPC) label applied directly to all damper units, specifying reference number and inspection date.\n4.18. Create a comprehensive inventory and repair list for all inspected damper locations.\n4.19 Thoroughly clean all areas with a high-density high efficiency particulate air (HEPA) filtration system.\n4.20. Complete all pertinent damper unit repairs as deemed necessary (linkage adjustments, damper unit mounts, flex installations).\n4.21. Contractor shall be able to perform such repair or replacement if dampers are in need of either replacement or repair, the scope of repair or replacement shall be determined by the project manager and/or contractor technician. A list of defective dampers shall be generated by the contractor and provided to the COR and Contracting Officer for approval.\n4.22. Provide a report on conclusion of performance of evidence of inspection, repair, or replacement to include a listing of the location of each damper, damper s VA established ID number, and whether such damper passed or failed; if a damper failed, a detailed explanation of such failure. Â Â\n4.23. Repair exceptions pertain to access door installations and new damper unit installations as determined by Fire and Smoke Damper Inspection.\n4.24. Summary of 4 year fire/smoke damper testing:\na) Physically access each damper\nb) Remove fusible link in damper\nc) Cycle the damper to verify full closure\nd) Test smoke damper actuators\ne) Replace fusible link with new one\nf) Document pass/fail results\n4.25. Purpose of testing ensures that each damper will close to stop fire/smoke from traveling through ducts or walls.\n5. Repair WorkÂ\n5.1. The contractor shall inspect and provide documentation of fire damper functionality. The contractor shall make any adjustments necessary to the fire damper linkages and brackets to correct operation of the damper. Replace any links found to be damaged, painted or otherwise compromised or unacceptable with a link of the same size, load and temperature rating.\n5.2. Repairs beyond the scope of fusible links: If additional repairs are required to make a damper operational, provide the nature of the repair and a cost estimate in the inspection summary report.\n5.3. Any work that will result in additional charges MUST be approved by the Contracting Officer, in writing, BEFORE such work begins.Â Any additional work performed by the Contractor without the prior, written approval of the Contracting Officer shall be at no additional\n6. Delivery\n\nGulf Coast Veterans Health Care System\nWarehouse Bldg 26\n400 Veterans Ave\nBiloxi MS 39531\nMon-Fri 7:00am- 3:30pm\n7. Period of Performance is 12/31/2026 12/30/2027.\n\nTable 1: Fire Dampers to be Inspected and Tested\n\nBuilding 1\nDamper Number\nDepartment or Area\nDamper Location\n\nÂ\n1\nBSMT\nEx Duct by AHU 9 RM BAC 9\n\n2\nBSMT\nOutside of RM BC 101\n\n1\n1\n1A135\n\n3\n1\n1C114\n\n11\n1\n1C114\n\n12\n1\n1C114\n\n4\n2\nMech RM across from 2C115\n\n22\n2\n2B104\n\n23\n2\n2A108\n\n24\n2\n2C109\n\n25\n2\n2C109\n\n26\n2\n2C109\n\n27\n2\n2C109\n\n28\n2\n2C113B\n\n29\n2\n2C113B\n\n1\nAttic 2\nAHU 3 Supply\n\n2\nAttic 2\nAHU 3\n\n4\nAttic 2\nAHU 4\n\n5\nAttic 2\nAHU 4\n\n6\nAttic 2\nAHU 4\n\n7\nAttic 2\nAHU 4 Supply\n\n8\nAttic 2\nAHU 4\n\n9\nAttic 2\nAHU 4\n\n10\nAttic 2\nAHU 4\n\n11\nAttic 2\nAHU 4\n\n12\nAttic 2\nAHU 4\n\n13\nAttic 2\nAHU 4\n\n14\nAttic 2\nAHU 2 Supply\n\n15\nAttic 2\nAHU 2\n\n16\nAttic 2\nAHU 2\n\n17\nAttic 2\nAHU 1 Return\n\n18\nAttic 2\nAHU 1 Return\n\n19\nAttic 2\nAHU 1\n\n20\nAttic 2\nAHU 1 Supply\n\n22\nAttic 2\nExhaust 13\n\n23\nAttic 2\nAHU 11\n\n24\nAttic 2\nAHU 11\n\n25\nAttic 2\nAHU 11\n\n26\nAttic 2\nAHU 11\n\n27\nAttic 2\nEF-9\n\nBuilding 2\nDamper Number\nFloor\nDamper Location\n\nÂ\nFD-1\n1E\n1B119\n\nFD-2\n1E\n1B119\n\nFD-3\n1E\n1B119\n\nFD-4\n1W\n1A112\n\nFD-5\n1W\n1A112\n\nFD-6\n1W\n1A112\n\nFD-7\n2E\n2B111\n\nFD-8\n2E\n2B111\n\nFD-9\n2E\n2B111\n\nFD-10\n2W\n2A106\n\nFD-11\n2W\n2A106\n\nFD-12\n2W\n2A106\n\nFD-13\n3E\n3B116\n\nFD-14\n3E\n3B116\n\nFD-15\n3E\n3B116\n\nFD-16\n3W\n3A105\n\nFD-17\n3W\n3A105\n\nFD-18\n3W\n3A105\n\nBuilding 3 / 30\nDamper Number\nFloor\nDamper Location\n\nÂ\n12\n2\nAHU 2 Supply RM 2D140\n\n1\n1A\n1H100\n\n2\n1A\n1H100\n\n3\n1A\n1H100\n\n10\n1G\n1G116\n\n11\n1G\n1G119\n\n12\n1G\n1G121\n\n13\n1G\n1G121\n\n14\n1G\n1G128\n\n15\n1G\n1G125\n\n16\n1G\n1G125\n\n17\n1G\n1G125\n\n18\n1G\n1G125\n\n19\n1G\n1G128 Hallway\n\n20\n1G\n1G129\n\n21\n1G\n1G132\n\n22\n1G\n1G132\n\n23\n1G\n1G132\n\n24\n1G\n1G134 in chase\n\n25\n1G\n1G134 in chase\n\n26\n1G\n1G134 in chase\n\n27\n1G\n1G140\n\n28\n1G\n1G148 Double Doors\n\n29\n1G\n1G143\n\n30\n1G\n1G143\n\n31\n1G\n1G143\n\n32\n1G\n1G143\n\n33\n1G\n1G135 in chase\n\n1\n1H\n1H103 Main Corridor\n\n2\n1H\n1H102\n\n3\n1H\n1H102\n\n4\n1H\n1H100 Hallway\n\n6\n1H\n1H100\n\n7\n1H\n1H100\n\n1\n1J\nC1-44\n\n2\n1J\nC1-44\n\n3\n1J\nC1-44\n\n4\n1J\nC1-44\n\n5\n1J\nC1-44\n\n6\n1J\n1J141\n\n7\n1J\n1J142\n\n8\n1J\n1J143\n\n9\n1J\nC1-47 Above Door\n\n10\n1J\nC1-38\n\n11\n1J\n1J127\n\n12\n1J\n1J127\n\n13\n1J\n1J145\n\n14\n1J\n1J145\n\n15\n1J\nC1-51\n\n1\n2H\n2H106 Hallway\n\n2\n2H\n2H106 Hallway\n\n3\n2H\n2H104\n\n4\n2F\n2F112 Above Door\n\n5\n2F\n2F112\n\n6\n2G\n2G100\n\n7\n2G\n2G100 Above Door\n\n16\n1J\nAbove ceiling of 1st floor RM 1J102\n\n9\n2F\n2C-23 Above Door\n\n1\n3F\nC2-19 Between 3F128 & 3F126A\n\n2\n3F\nAbove Door Bldg 3 meets Bldg 30\n\n3\n3G\n3G105C\n\n4\n3G\n3G135\n\n1\n4F\n4F115\n\n2\n4F\n4F127\n\n3\n4F\nC4-115 Above Door\n\n4\n4G\nC4-22 in front of 4G110\n\n5\n4G\nC4-22 in front of 4G110\n\n1\nAttic\n5G103\n\n2\nAttic\n5G103\n\n3\nAttic\n5G104\n\n4\nAttic\n5G104\n\n5\nAttic\n5G104\n\n6\nAttic\nAHU 6\n\n7\nAttic\nAHU 6\n\n8\nAttic\nAHU 1\n\n10\nAttic\nAHU 5\n\n11\nAttic\nAHU 5 Supply\n\n13\nAttic\nAHU 3\n\n14\nAttic\nAHU 4 Supply\n\n15\nAttic\nAHU 4\n\n18\nAttic\n5F101\n\nBuilding 5\nDamper Number\nFloor\nDamper Location\n\nÂ\n1\n1\nRm 1A-106\n\n2\n1\nRm 1A-107\n\n3\n1\nRm 1A-107\n\n4\n1\nRm 1A-108\n\n5\n1\nRm 1A-112\n\n6\n1\nRm 1A-112\n\n7\n1\nRm 1A-113\n\n8\n2\nRm 2A-10\n\n9\n2\nRm 2A-107\n\n10\n2\nRm 2A-108\n\n11\n2\nRm 2A-108\n\nBuilding 14\nDamper Number\nFloor\nDamper Location\n\nÂ\n1\n1\nC1-15 Above Double Doors\n\n2\n1\nC1-15 Above Double Doors\n\n12\n1\nC1-9\n\n13\n1\nC1-9\n\n14\n1\nC1-9\n\n1\nAttic\nAHU 2\n\n2\nAttic\nAHU 2\n\n3\nAttic\nAHU 1\n\n4\nAttic\nAHU 1\n\n5\nAttic\nAHU 3\n\n6\nAttic\nAHU 3\n\nBuilding 15\nDamper Number\nFloor\nDamper Location\n\nÂ\n10\n1B\n1B106\n\n1\n1D\n1D100\n\n9\n2B\n2B108\n\n1\n2G\n2G102\n\n15\n2\nSupply Air up/down near 2G100\n\n16\n2\nExhaust Air down to 1st Fl up to EF-5 on roof\n\n17\n2\nReturn Air duct down\n\n18\n2\nExhaust Air down to 1st Fl up to roof\n\n19\n2\nExhaust Air down to 1st Fl up to EF-5 on roof\n\n1\nAttic\nAHU 2 Supply\n\n2\nAttic\nAhu 2 Return\n\n3\nAttic\nAHU 2 Exhaust\n\n5\nAttic\nAHU 3 Supply\n\n6\nAttic\nAHU 3 Return\n\n7\nAttic\nAHU 3 Exhaust\n\n8\nAttic\nAHU 3 Supply\n\n9\nAttic\nAHU 3 Return\n\n11\nAttic\nAHU 1 Exhaust\n\n12\nAttic\nAHU 1 Supply\n\n13\nAttic\nAHU 1 Supply\n\n14\nAttic\nAHU 1 Return\n\nBuilding 19\nDamper Number\nFloor\nDamper Location\n\nÂ\n1\n1A\n1A117\n\n2\n1A\nC1-5/1A117\n\n5\n1A\n1A117\n\n6\n1A\n1A117\n\n1\n1B\n1B127\n\n2\n1B\n1B127\n\n3\n1B\nCorridor next to 1B127\n\n7\n2A\n2A104 in floor\n\n8\n2A\n2A104 in floor\n\n1\n2B\n2B126 in floor\n\n4\n2B\n2B126\n\n1\n3A\n3A105 in floor\n\n4\n3A\n3A105 in floor\n\n15\n3B\n3B123 in floor\n\n16\n3B\n3B123 in floor\n\n1\nAttic\nAHU 2 (A area)\n\n2\nAttic\nAHU 2 (A area)\n\n3\nAttic\nAHU 1 (B area)\n\n4\nAttic\nAHU 1 (B area)\n\nBuilding 25\nDamper Number\nFloor\nDamper Location\n\nÂ\n8\n1B\n1B156\n\n9\n1B\n1B156\n\n42\n1B\n1B153\n\n43\n1B\n1B153\n\n15\n1C\n1C122\n\n16\n1C\n1C122\n\n17\n1C\n1C123\n\n18\n1C\n1C122\n\n21\n1C\n1C125\n\n22\n1C\n1C125\n\n47\n2A\nC2-11\n\n48\n2A\n2A122\n\n49\n2A\nC2-11\n\n50\n2A\n2A122\n\n51\n2A\nC2-11\n\n55\nMEZZ\nAHU 1\n\n56A\nMEZZ\nAHU 1\n\n56B\nMEZZ\nAHU 1\n\n57\nMEZZ\nAHU 1\n\n35\nMEZZ\nAHU 2\n\n36\n2B\nC2-20 By 2B133\n\n37A\nMEZZ\nAHU 2 Return\n\n37B\nMEZZ\nAHU 2 Return\n\n38\nMEZZ\n2B134\n\n39\nMEZZ\n2B134\n\n40C\nMEZZ\nAHU 2 Supply\n\n41\n2B\n2B133\n\n53\n2B\n2B134\n\n12\n2C\n2C138\n\n13\n2C\n2C121 (Hall)\n\n14\n2C\n2C145 (Hall)\n\n27\n2C\n2C132\n\n30\nMEZZ\nAHU 3 Exhaust\n\n31\nMEZZ\nAHU 3 Supply\n\n32A\nMEZZ\nAHU 3 Return\n\n32B\nMEZZ\nAHU 3 Return\n\nBuilding 28\nDamper Number\nFloor\nDamper Location\n\nÂ\n1\nNW\n1A100 - Lobby Elevator P1 Side\n\n2\nNW\n1A100 - Lobby Elevator P2 Side\n\n3\nSW\n1A103 - Lobby Elevator P3 Side\n\n4\nSW\n1A103 - Lobby East Side\n\n5\nSW\n2A102 - Lobby Elevator P3 Side\n\n6\nSW\n2A102 - Lobby East Side\n\n7\nNW\n5A100 - Lobby Elevator P1 Side\n\n8\nNW\n5A100 - Lobby Elevator P2 Side\n\n9\nSW\n5A102 - Lobby Elevator P3 Side\n\n10\nSW\n5A102 - Lobby East Side\n\n-End of Scope of Work-","html":"STATEMENT OF WORK\nFIRE DAMPER INSPECTION AND TESTING\n1. Scope.  The intent of this one-time service is to inspect and test multiple building s Fire Dampers (247 dampers) for regulatory compliance  on the Biloxi VA Campus as described below within the 90 days following the Notice to Proceed.\n2. Specifications/Characteristics: \nMinimum technical specs must be provided to meet the requirements of the GCVHCS.\n\nCampus Overview - The 247 Fire Dampers for inspection and testing are in the Patient Buildings of 3, 30, 14, 15, and 25 and the Non-Patient Buildings of 1, 2, 5, 19, and 28 on the Biloxi VAMC Campus. See Chart 1.  These Fire Dampers assist fire prevention  from the buildings and communicates with the current installed Fire Alarm System. See Table 1.\n\nAll painted or damaged fusible links must be replaced with a link of same size, temperature, and load rating.\n\nThe location of each fire damper and access panel to be verified on each drawing and then updated on each drawing in accordance with NFPA guidelines.\n\nAll inspected fire dampers must have a visible label that corresponds to an Item number on the list, inspection date, condition, and inspector. \n\nEach building inspected will have its own inspection documentation with 2 pictures minimum per damper showing damper itself and general comments affecting damper operation.\n\nEach damper on the final report at a minimum shall state Pass / Fail.\n\nContractor shall furnish within the 90 days, the red-lined AutoCAD 2000 / Adobe PDF drawing for each building on a CD and on 11  x 17  sheet.  All pictures taken are to be labeled, organized by building and floor, and provided on a CD.\n\nContractor shall furnish a formal Fire Damper Report on CD by building of all dampers inspected with inspectors signature.\n3.0 Applicable Codes, Standards and Regulations \n3.1. All work shall be done in accordance with the current National Fire Protection Agency (NFPA) Code requirements. \n3.2. The Joint Commission, the latest applicable National Fire Protection Association (NFPA)Â  standards, and Occupational Safety and Health Administration (OSHA) regulatory requirements.Â  Testing is specific to 4 year frequency test for fire pump/smoke pump in facility.\n3.2.1. NFPA 80   Standard for Fire Doors and Other Opening Protectives \n3.2.2. NFPA 90A   Standard for the Installation of Air Conditioning and Ventilating Systems \n3.2.3. NFPA 101   Life Safety Code \n3.2.4. NFPA 105   Standard for Smoke Door Assemblies and Other Opening Protectives \n3.2.5. NFPA 5000   Building Construction & Safety Code \n4. Comprehensive Fire/Smoke Damper Inspection TasksÂ  \nContractor shall: \n4.1. Furnish all labor, tools, and equipment to inspect fire and smoke dampers at Biloxi VAMC Campus. \n4.2. Use commercially reasonable efforts to locate and, once located, operate all dampers provided in list by Contracting Officer s Representative (COR) upon commencement of inspection.Â  \n4.3. Include documentation of all tested devices and must identify as a minimum which includes date inspected, unique device identification, device location, status (Pass or Fail), the type and quantity of devices tested in each building, and a consolidated deficiency finding list per building.Â  \n4.4. Coordinate with the COR, Air Conditioning Equipment Mechanic, Electronics Mechanic and notify local fire department that the fire alarm system is in  test mode  due to the inspection of the smoke and/or combination dampers. \n4.5. Locate, access and survey area of dampers.Â  \n4.6. Clear each damper of any debris that would impede such dampers normal operation.Â  \n4.7. Check for penetrations. \n4.8. Ensure no interference to operation due to: (rusted, bent, misaligned, or damaged frame or blades, or defective hinges or other moving parts). \n4.9. Inspect all linkage and pivot points for freedom of movement and condition.Â  \n4.10. Manually activate actuators on electric smoke and/or combination dampers to verify proper operation. \n4.11. Lubricate all moving parts on each damper. \n4.12. Check operation of the latch if damper is provided with a latch. \n4.13. Reset fusible links on fire dampers, to verify such fire damper fully closes and if necessary, replace any fusible link that is compromised (per NFPA code requirements). \n4.14. Replace springs and/or access handles for the fire/smoke dampers as necessary. \n4.15. Identify each unidentified unit location with a ceiling grid damper label. \n4.16. Identify on drawings the location of each damper, along with placement of identification stickers on ceilings or other location to assist in future location of such dampers; \n4.17. Authenticate compliance utilizing a customized Universal Product Code (UPC) label applied directly to all damper units, specifying reference number and inspection date. \n4.18. Create a comprehensive inventory and repair list for all inspected damper locations. \n4.19 Thoroughly clean all areas with a high-density high efficiency particulate air (HEPA) filtration system. \n4.20. Complete all pertinent damper unit repairs as deemed necessary (linkage adjustments, damper unit mounts, flex installations). \n4.21. Contractor shall be able to perform such repair or replacement if dampers are in need of either replacement or repair, the scope of repair or replacement shall be determined by the project manager and/or contractor technician. A list of defective dampers shall be generated by the contractor and provided to the COR and Contracting Officer for approval. \n4.22. Provide a report on conclusion of performance of evidence of inspection, repair, or replacement to include a listing of the location of each damper, damper s VA established ID number, and whether such damper passed or failed; if a damper failed, a detailed explanation of such failure. Â Â \n4.23. Repair exceptions pertain to access door installations and new damper unit installations as determined by Fire and Smoke Damper Inspection. \n4.24. Summary of 4 year fire/smoke damper testing: \na) Physically access each damper\nb) Remove fusible link in damper\nc) Cycle the damper to verify full closure\nd) Test smoke damper actuators\ne) Replace fusible link with new one\nf) Document pass/fail results\n4.25. Purpose of testing ensures that each damper will close to stop fire/smoke from traveling through ducts or walls.\n5. Repair WorkÂ  \n5.1. The contractor shall inspect and provide documentation of fire damper functionality. The contractor shall make any adjustments necessary to the fire damper linkages and brackets to correct operation of the damper. Replace any links found to be damaged, painted or otherwise compromised or unacceptable with a link of the same size, load and temperature rating. \n5.2. Repairs beyond the scope of fusible links: If additional repairs are required to make a damper operational, provide the nature of the repair and a cost estimate in the inspection summary report. \n5.3. Any work that will result in additional charges MUST be approved by the Contracting Officer, in writing, BEFORE such work begins.Â  Any additional work performed by the Contractor without the prior, written approval of the Contracting Officer shall be at no additional \n6. Delivery   \n\nGulf Coast Veterans Health Care System\nWarehouse Bldg 26\n400 Veterans Ave\nBiloxi MS 39531\nMon-Fri 7:00am- 3:30pm\n7. Period of Performance is 12/31/2026   12/30/2027.\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\nTable 1: Fire Dampers to be Inspected and Tested\n\nBuilding  1\nDamper Number\nDepartment or Area\nDamper Location\n\n\nÂ \n1\nBSMT\nEx Duct by AHU 9 RM BAC 9\n\n2\nBSMT\nOutside of RM BC 101\n\n1\n1\n1A135\n\n3\n1\n1C114\n\n11\n1\n1C114\n\n12\n1\n1C114\n\n4\n2\nMech RM across from 2C115\n\n22\n2\n2B104\n\n23\n2\n2A108\n\n24\n2\n2C109\n\n25\n2\n2C109\n\n26\n2\n2C109\n\n27\n2\n2C109\n\n28\n2\n2C113B\n\n29\n2\n2C113B\n\n1\nAttic 2\nAHU 3 Supply\n\n2\nAttic 2\nAHU 3 \n\n4\nAttic 2\nAHU 4\n\n5\nAttic 2\nAHU 4\n\n6\nAttic 2\nAHU 4\n\n7\nAttic 2\nAHU 4 Supply\n\n8\nAttic 2\nAHU 4\n\n9\nAttic 2\nAHU 4\n\n10\nAttic 2\nAHU 4\n\n11\nAttic 2\nAHU 4\n\n12\nAttic 2\nAHU 4\n\n13\nAttic 2\nAHU 4\n\n14\nAttic 2\nAHU 2 Supply\n\n15\nAttic 2\nAHU 2 \n\n16\nAttic 2\nAHU 2\n\n17\nAttic 2\nAHU 1 Return\n\n18\nAttic 2\nAHU 1 Return\n\n19\nAttic 2\nAHU 1\n\n20\nAttic 2\nAHU 1 Supply\n\n22\nAttic 2\nExhaust 13\n\n23\nAttic 2\nAHU 11\n\n24\nAttic 2\nAHU 11\n\n25\nAttic 2\nAHU 11\n\n26\nAttic 2\nAHU 11\n\n27\nAttic 2\nEF-9\n\nBuilding  2\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \nFD-1\n1E\n1B119\n\nFD-2\n1E\n1B119\n\nFD-3\n1E\n1B119\n\nFD-4\n1W\n1A112\n\nFD-5\n1W\n1A112\n\nFD-6\n1W\n1A112\n\nFD-7\n2E\n2B111\n\nFD-8\n2E\n2B111\n\nFD-9\n2E\n2B111\n\nFD-10\n2W\n2A106\n\nFD-11\n2W\n2A106\n\nFD-12\n2W\n2A106\n\nFD-13\n3E\n3B116\n\nFD-14\n3E\n3B116\n\nFD-15\n3E\n3B116\n\nFD-16\n3W\n3A105\n\nFD-17\n3W\n3A105\n\nFD-18\n3W\n3A105\n\nBuilding  3 / 30\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \n12\n2\nAHU 2 Supply  RM 2D140\n\n1\n1A\n1H100\n\n2\n1A\n1H100\n\n3\n1A\n1H100\n\n10\n1G\n1G116\n\n11\n1G\n1G119\n\n12\n1G\n1G121\n\n13\n1G\n1G121\n\n14\n1G\n1G128\n\n15\n1G\n1G125\n\n16\n1G\n1G125\n\n17\n1G\n1G125\n\n18\n1G\n1G125\n\n19\n1G\n1G128 Hallway\n\n20\n1G\n1G129\n\n21\n1G\n1G132\n\n22\n1G\n1G132\n\n23\n1G\n1G132\n\n24\n1G\n1G134 in chase\n\n25\n1G\n1G134 in chase\n\n26\n1G\n1G134 in chase\n\n27\n1G\n1G140\n\n28\n1G\n1G148 Double Doors\n\n29\n1G\n1G143\n\n30\n1G\n1G143\n\n31\n1G\n1G143\n\n32\n1G\n1G143\n\n33\n1G\n1G135 in chase\n\n1\n1H\n1H103 Main Corridor\n\n2\n1H\n1H102\n\n3\n1H\n1H102\n\n4\n1H\n1H100 Hallway\n\n6\n1H\n1H100  \n\n7\n1H\n1H100\n\n1\n1J\nC1-44\n\n2\n1J\nC1-44\n\n3\n1J\nC1-44\n\n4\n1J\nC1-44\n\n5\n1J\nC1-44\n\n6\n1J\n1J141\n\n7\n1J\n1J142\n\n8\n1J\n1J143\n\n9\n1J\nC1-47 Above Door\n\n10\n1J\nC1-38\n\n11\n1J\n1J127\n\n12\n1J\n1J127\n\n13\n1J\n1J145\n\n14\n1J\n1J145\n\n15\n1J\nC1-51\n\n1\n2H\n2H106 Hallway\n\n2\n2H\n2H106 Hallway\n\n3\n2H\n2H104\n\n4\n2F\n2F112 Above Door\n\n5\n2F\n2F112   \n\n6\n2G\n2G100\n\n7\n2G\n2G100 Above Door\n\n16\n1J\nAbove ceiling of 1st floor RM 1J102\n\n9\n2F\n2C-23 Above Door\n\n1\n3F\nC2-19 Between 3F128 & 3F126A\n\n2\n3F\nAbove Door Bldg 3 meets Bldg 30\n\n3\n3G\n3G105C\n\n4\n3G\n3G135\n\n1\n4F\n4F115\n\n2\n4F\n4F127\n\n3\n4F\nC4-115 Above Door\n\n4\n4G\nC4-22 in front of 4G110\n\n5\n4G\nC4-22 in front of 4G110\n\n1\nAttic\n5G103\n\n2\nAttic\n5G103\n\n3\nAttic\n5G104\n\n4\nAttic\n5G104\n\n5\nAttic\n5G104\n\n6\nAttic\nAHU 6\n\n7\nAttic\nAHU 6\n\n8\nAttic\nAHU 1\n\n10\nAttic\nAHU 5\n\n11\nAttic\nAHU 5 Supply\n\n13\nAttic\nAHU 3\n\n14\nAttic\nAHU 4 Supply\n\n15\nAttic\nAHU 4   \n\n18\nAttic\n5F101\n\nBuilding  5\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \n1\n1\nRm 1A-106\n\n2\n1\nRm 1A-107\n\n3\n1\nRm 1A-107\n\n4\n1\nRm 1A-108\n\n5\n1\nRm 1A-112 \n\n6\n1\nRm 1A-112 \n\n7\n1\nRm 1A-113\n\n8\n2\nRm 2A-10\n\n9\n2\nRm 2A-107\n\n10\n2\nRm 2A-108\n\n11\n2\nRm 2A-108\n\nBuilding  14\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \n1\n1\nC1-15 Above Double Doors\n\n2\n1\nC1-15 Above Double Doors\n\n12\n1\nC1-9\n\n13\n1\nC1-9\n\n14\n1\nC1-9\n\n1\nAttic\nAHU 2\n\n2\nAttic\nAHU 2\n\n3\nAttic\nAHU 1\n\n4\nAttic\nAHU 1\n\n5\nAttic\nAHU 3\n\n6\nAttic\nAHU 3\n\nBuilding  15\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \n10\n1B\n1B106\n\n1\n1D\n1D100\n\n9\n2B\n2B108\n\n1\n2G\n2G102\n\n15\n2\nSupply Air up/down near 2G100\n\n16\n2\nExhaust Air down to 1st Fl up to EF-5 on roof\n\n17\n2\nReturn Air duct down\n\n18\n2\nExhaust Air down to 1st Fl up to roof\n\n19\n2\nExhaust Air down to 1st Fl up to EF-5 on roof\n\n1\nAttic\nAHU 2 Supply\n\n2\nAttic\nAhu 2 Return\n\n3\nAttic\nAHU 2 Exhaust\n\n5\nAttic\nAHU 3 Supply\n\n6\nAttic\nAHU 3 Return\n\n7\nAttic\nAHU 3 Exhaust\n\n8\nAttic\nAHU 3 Supply\n\n9\nAttic\nAHU 3 Return\n\n11\nAttic\nAHU 1 Exhaust\n\n12\nAttic\nAHU 1 Supply\n\n13\nAttic\nAHU 1 Supply\n\n14\nAttic\nAHU 1 Return\n\nBuilding  19\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \n1\n1A\n1A117\n\n2\n1A\nC1-5/1A117\n\n5\n1A\n1A117\n\n6\n1A\n1A117\n\n1\n1B\n1B127\n\n2\n1B\n1B127\n\n3\n1B\n Corridor next to 1B127\n\n7\n2A\n2A104 in floor\n\n8\n2A\n2A104 in floor\n\n1\n2B\n2B126 in floor\n\n4\n2B\n2B126  \n\n1\n3A\n3A105 in floor\n\n4\n3A\n3A105 in floor\n\n15\n3B\n3B123 in floor\n\n16\n3B\n3B123 in floor\n\n1\nAttic\nAHU 2  (A area)\n\n2\nAttic\nAHU 2  (A area)\n\n3\nAttic\nAHU 1  (B area)\n\n4\nAttic\nAHU 1  (B area)\n\nBuilding  25\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \n8\n1B\n1B156\n\n9\n1B\n1B156\n\n42\n1B\n1B153\n\n43\n1B\n1B153\n\n15\n1C\n1C122\n\n16\n1C\n1C122\n\n17\n1C\n1C123\n\n18\n1C\n1C122\n\n21\n1C\n1C125\n\n22\n1C\n1C125\n\n47\n2A\nC2-11\n\n48\n2A\n2A122\n\n49\n2A\nC2-11\n\n50\n2A\n2A122\n\n51\n2A\nC2-11\n\n55\nMEZZ\nAHU 1\n\n                              56A\nMEZZ\nAHU 1\n\n                              56B\nMEZZ\nAHU 1\n\n57\nMEZZ\nAHU 1\n\n35\nMEZZ\nAHU 2\n\n36\n2B\nC2-20 By 2B133\n\n                              37A\nMEZZ\nAHU 2 Return\n\n                              37B\nMEZZ\nAHU 2 Return\n\n38\nMEZZ\n2B134\n\n39\nMEZZ\n2B134\n\n                               40C\nMEZZ\nAHU 2 Supply\n\n41\n2B\n2B133\n\n53\n2B\n2B134\n\n12\n2C\n2C138\n\n13\n2C\n2C121 (Hall)\n\n14\n2C\n2C145 (Hall)\n\n27\n2C\n2C132\n\n30\nMEZZ\nAHU 3 Exhaust\n\n31\nMEZZ\nAHU 3 Supply\n\n                              32A\nMEZZ\nAHU 3 Return\n\n                              32B\nMEZZ\nAHU 3 Return\n\nBuilding  28\nDamper Number\nFloor\nDamper Location\n\n\n\nÂ \n1\nNW \n1A100 - Lobby Elevator P1 Side\n\n2\nNW \n1A100 - Lobby Elevator P2 Side\n\n3\nSW \n1A103 - Lobby Elevator P3 Side\n\n4\nSW \n1A103 - Lobby East Side\n\n5\nSW \n2A102 - Lobby Elevator P3 Side\n\n6\nSW \n2A102 - Lobby East Side\n\n7\nNW \n5A100 - Lobby Elevator P1 Side\n\n8\nNW \n5A100 - Lobby Elevator P2 Side\n\n9\nSW \n5A102 - Lobby Elevator P3 Side\n\n10\nSW \n5A102 - Lobby East Side\n\n\n\n\n\n\n                                                                           -End of Scope of Work-","origin":"detail"},"contacts":[{"name":"Jacqueline Ambala","role":"primary","email":"Jacqueline.Ambala@va.gov","phone":"757-251-4054","title":"Contract Specialist"}],"place_of_performance":{"zip":"39531","city":{"name":"BILOXI"},"street":"Department of Veterans Affairs Golf Coast Veterans Healthcare Systems 400 VETERANS AVE"},"office_address":{"zip":"39157","city":"RIDGELAND","state":"MS","country":"USA"},"naics_codes":["541350"],"award":null,"attachments":[{"resource_id":"734c1d5cb24945eaa194b921071bb6dc","name":"36C25626Q1365.docx","kind":"file","mime_type":".docx","size_bytes":524187,"posted_at":"2026-09-29T16:41:05.293Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/734c1d5cb24945eaa194b921071bb6dc/download","mirrored":false}],"awards":[],"related":[{"key":"36C25626Q0949","latest_notice_id":"ad5285889c3149b1b8afe58e9100d306","title":"G004--Transitional Housing - Health Care for Homeless Veterans (HCHV) Shreveport, Louisiana","solicitation_number":"36C25626Q0949","notice_type":"o","first_type":"r","first_posted":"2026-06-22","last_posted":"2026-09-23","notices":2,"due_at":"2026-10-07T17:00:00Z","due_date":"2026-10-07","closes_at":"2026-10-07T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C256","office_name":"256-NETWORK CONTRACT OFFICE 16 (36C256)","naics":"623220","psc":"G004","set_aside":null,"state":"LA","county":"22017","county_name":"Caddo Parish","city":"2270000","city_name":"Shreveport","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T04:24:26.592861Z"},{"key":"36C25626Q1229","latest_notice_id":"5894d5740e7641289e2e917cca48cdbb","title":"4310-- NLR Triplex Med Air Procurement","solicitation_number":"36C25626Q1229","notice_type":"k","first_type":"r","first_posted":"2026-08-17","last_posted":"2026-09-28","notices":3,"due_at":"2026-10-07T20:00:00Z","due_date":"2026-10-07","closes_at":"2026-10-07T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C256","office_name":"256-NETWORK CONTRACT OFFICE 16 (36C256)","naics":"333912","psc":"4310","set_aside":"SBA","state":"AR","county":"05119","county_name":"Pulaski County","city":"0550450","city_name":"North Little Rock","country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 4310)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-02T08:08:23.148393Z"},{"key":"36C25626R0130","latest_notice_id":"a24392fb76014de8a575c857b8160e41","title":"CON | Z1DA | REPLACE OR CHILLERS | 580-23-105 | PRESOLICITATION","solicitation_number":"36C25626R0130","notice_type":"p","first_type":"p","first_posted":"2026-09-29","last_posted":"2026-09-29","notices":1,"due_at":"2026-10-12T15:00:00Z","due_date":"2026-10-12","closes_at":"2026-10-12T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C256","office_name":"256-NETWORK CONTRACT OFFICE 16 (36C256)","naics":"238220","psc":"Z1DA","set_aside":"SDVOSBC","state":"TX","county":"48201","county_name":"Harris County","city":"4835000","city_name":"Houston","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-30T04:14:25.251125Z"},{"key":"36C25626R0131","latest_notice_id":"c5f72bd0e1e440f781d022c30a27a5e4","title":"CON | Z2DA | REPLACE CHILLER 1 B104 | 580-24-111 | PRESOLICITATION","solicitation_number":"36C25626R0131","notice_type":"p","first_type":"p","first_posted":"2026-09-29","last_posted":"2026-09-29","notices":1,"due_at":"2026-10-13T15:00:00Z","due_date":"2026-10-13","closes_at":"2026-10-13T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C256","office_name":"256-NETWORK CONTRACT OFFICE 16 (36C256)","naics":"238220","psc":"Z2DA","set_aside":"SDVOSBC","state":"TX","county":"48201","county_name":"Harris County","city":"4835000","city_name":"Houston","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-30T04:14:25.251125Z"},{"key":"36C25627Q0022","latest_notice_id":"e14aa59ff55f4802bb50820e3467a535","title":"Z1DA--B170 Window Recaulking Services","solicitation_number":"36C25627Q0022","notice_type":"o","first_type":"p","first_posted":"2026-09-30","last_posted":"2026-09-30","notices":2,"due_at":"2026-10-23T15:00:00Z","due_date":"2026-10-23","closes_at":"2026-10-23T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C256","office_name":"256-NETWORK CONTRACT OFFICE 16 (36C256)","naics":"561210","psc":"Z1DA","set_aside":"SDVOSBC","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-01T04:02:27.010479Z"}]}