{"canonical":"https://abierto.us/opportunities/36c25027q0066","key":"36C25027Q0066","url":"https://abierto.us/opportunities/36c25027q0066","title":"H312--Fire Alarm and Testing Inspection FY 2027 Services Procurement - 541 Engineering - VAMC CLEVELAND","solicitation_number":"36C25027Q0066","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-10-30T16:00:00Z","first_posted":"2026-10-23","last_posted":"2026-10-23","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"561621","psc":"H312","set_aside":null,"place_state":"OH","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"39035","place_county_name":"Cuyahoga County","place_city":"3916000","place_city_name":"Cleveland","winner":null,"award_amount":null,"publications":[{"notice_id":"d0d9fdbb57b04bf2bc9ff0da3c661a10","title":"H312--Fire Alarm and Testing Inspection FY 2027 Services Procurement - 541 Engineering - VAMC CLEVELAND","solicitation_number":"36C25027Q0066","notice_type":"r","base_type":"r","posted":"2026-10-23","posted_at":"2026-10-23T17:21:38.234Z","due_at":"2026-10-30T16:00:00Z","due_date":"2026-10-30","cancelled":false,"archived":false,"archive_date":"2026-11-29","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d0d9fdbb57b04bf2bc9ff0da3c661a10/view","enriched":true,"history":[{"index":1,"title":"H312--Fire Alarm and Testing Inspection FY 2027 Services Procurement - 541 Engineering - VAMC CLEVELAND","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-23T17:21:38.234Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"d0d9fdbb57b04bf2bc9ff0da3c661a10","solicitation_number":"36C25027Q0066"}]}],"latest_notice_id":"d0d9fdbb57b04bf2bc9ff0da3c661a10","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2026-10-23","posted_at":"2026-10-23T17:21:38.234Z","created_at":"2026-10-23T17:21:35.730Z","modified_at":"2026-10-23T17:21:38.234Z","response_deadline":{"raw":"2026-10-30T12:00:00-04:00","utc":"2026-10-30T16:00:00Z","date":"2026-10-30","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d0d9fdbb57b04bf2bc9ff0da3c661a10/view"},"naics":{"codes":["561621"],"primary":"561621"},"title":"H312--Fire Alarm and Testing Inspection FY 2027 Services Procurement - 541 Engineering - VAMC CLEVELAND","agency":{"office":{"code":"36C250","name":"250-NETWORK CONTRACT OFFICE 10 (36C250)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"organization_id":"100167099","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-11-29","archive_type":"auto_custom"},"history":[{"index":1,"title":"H312--Fire Alarm and Testing Inspection FY 2027 Services Procurement - 541 Engineering - VAMC CLEVELAND","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-23T17:21:38.234Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"d0d9fdbb57b04bf2bc9ff0da3c661a10","solicitation_number":"36C25027Q0066"}],"contacts":[{"name":"Lakeisha Jackson","role":"primary","email":"Lakeisha.Jackson@va.gov","phone":"(216) 447-8300 ext. 49622","title":"Contract Specialist"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"d0d9fdbb57b04bf2bc9ff0da3c661a10","lineage_id":"d0d9fdbb57b04bf2bc9ff0da3c661a10","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-24T04:23:00.756467669Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"711c474d84d2a28796e72d304a2edd84-26\"","fetched_at":"2026-10-24T03:53:47.621077491Z","row_sha256":"1b1e0469f96bc267a5da97e5856b3bc656ca0adeb99301cd77a2bc5e32e3b3d2","last_modified":"2026-10-24T03:30:42Z"},"updated_at":"2026-10-24T04:23:00.756467669Z","first_seen_at":"2026-10-24T03:53:47.621077491Z"},"description":{"html":"This is a Sources Sought (SS) Notice only, not a solicitation announcement and should not be considered as such. There is no solicitation available at this time. The Government will not pay for any information received in response to this SS, nor will the Government compensate any respondent for any cost incurred in developing the information provided to the Government. This SS does not constitute a commitment by the Government. Any information provided in response to this market survey will be used for informational purposes only and will not be released. Vendor participation is not a promise of future business with the Government.\nThe purpose of this Sources Sought is to conduct Market Research to determine an acquisition strategy for the acquisition of Fire Alarm Testing and Inspection, where the Contractor will provide on-site testing and inspection of government-owned Notifier fire alarm and fire suppression components required by NFPA, OSHA, TJC, and original equipment manufacturer standards and specifications necessary to maintain the current fire alarm system at top performance. \nThe NAICS code for this procurement is 56121 -  Security system services except locksmiths, PSC   H312 Inspection fire control equipment. and the small business size standard is $25,000,000.00.\n\nResponses to this notice shall be e-mailed to Lakeisha Jackson at Lakeisha.Jackson@va.gov. Telephone responses will not be accepted. Responses must be received in writing no later than  Friday, October 30, 2026 at 12:00 p.m., EDT. This notice is to assist the VA in determining sources only. A solicitation is not currently available.\n\nTHE VA IS NOT SEEKING PRICING OR OFFERS OF ANY KIND. There is no guarantee, expressed or implicit, that the market research for this acquisition will result in a particular set-aside or sole source award, or any other guarantee of award strategy. All information is to be provided on a voluntary basis at no charge to the Government.\n\nThe Cleveland Veterans Affairs Medical Center, in Cleveland, OH is seeking sources capable of complete the services described in the Performance Work Statement below: \n \nSTATEMENT OF WORK (SOW)\nFire Alarm Testing and Inspection\n1. Contracting Officer s Representative (COR): TBD\n2. Contract Title.  Fire Alarm Testing and Inspection\n3. Background.  \nThe Louis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106 is seeking a qualified contractor to provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site testing and inspection of government-owned Notifier fire alarm and fire suppression components required by NFPA, OSHA, TJC, and original equipment manufacturer standards and specifications necessary to maintain the current fire alarm system at top performance.\n4. Scope. \nContractor shall provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site Annual, Semi-Annual, and Quarterly preventative maintenance testing (PMI s), inspection and maintenance on facility Notifier Fire Alarm System and associated equipment at the Wade Park facility of the Cleveland VA Medical Center, located at 10701 East Blvd., Cleveland, Ohio 44106.  \nFire alarm testing and inspection shall meet the requirements outlined NFPA 72, 2022 edition. Testing shall include all Joint Commission requirements.  Some testing requirements will be met during off-hours or weekends.\n5. Specific Tasks.  \n5.1.  Task 1   Annual Testing  \nProvide COR with testing schedule indicating dates of required testing.\nAll Annual testing requirements (except elevator associated devices) will be started and completed in the month of January.\nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\n\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.2.  Subtask 2   Semi-Annual Testing  \nProvide COR with testing schedule indicating dates of required testing.\nAll Semi-annual testing requirements will be started and completed in the month of July.\nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.3.  Subtask 3   Quarterly Testing\nProvide COR with testing schedule indicating dates of required testing.\nAll Quarterly testing requirements will be started and completed in the months of January, April, July, and October.\nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.4 Subtask 4   Elevator Device Testing\nAll testing requirements for elevator associated devices will be started and completed in the month of February. \nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.5 Subtask 5   Kitchen Hood Testing\nProvide COR with testing schedule indicating dates of required testing.\nKitchen Hood Testing: \nCompleted two times per year after 7pm M-F, June and December\nReport on company letterhead contains\nCompany name\nDate of test\nItems tested and inspected\nPass   Fail for each item tested\nPass   Fail for each exhaust hood\nItemized requiring corrective action follow-up \n6. Deliverables: \nFire Alarm contractor shall submit a site-specific safety plan outlining how inspections and testing will safely be conducted.  This safety plan will be submitted to VA safety department for approval.\nSOW Task#\nDeliverable Title\nFormat\nNumber\nCalendar Days After Start\n1\nSite Specific Safety Plan\nWord - PDF\n\n>30 days\n2\nAnnual Testing Schedule\nEmail   Word - Excel\n\n>30 days\n3\nSemi-Annual Testing Schedule\nEmail   Word   Excel\n\n>30 days\n4\nQuarterly Testing Schedule\nEmail   Word   Excel\n\n>30 days\n5\nLive Testing Schedule\nEmail   Word   Excel\n\n>30 days\n6\nHVAC Testing Schedule\nEmail   Word - Excel\n\n>30 days\n7\nAtrium Smoke Detector Testing Schedule\nEmail   Word   Excel\n\n>30 days\n8\nAnnual Test Report\nEmail   PDF - Excel\n\n14 Days\n9\nSemi-Annual Test Report\nEmail   PDF   Excel\n\n14 Days\n10\nQuarterly Test Report\nEmail   PDF   Excel\n\n14 Days\n11\nElevator Device Test Report\nEmail   PDF   Excel\n\n14 Days\n12\nKitchen Hood Test Report\nEmail   PDF - Excel\n\n14 Days\n\n\n7. Contractor Responsibility:  \n\nPrior to bidding, it shall be the responsibility of the bidder to visit Cleveland VAMC and inspect the fire alarm system and facility to establish to their satisfaction the condition of the fire alarm equipment to be maintained and any other conditions affecting the work to be performed.  This equipment is offered in an \"as-is\" condition.  No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract. \n\nThis contract is a firm-fixed-price service contract, under which the contractor assumes the risk and full responsibility for the costs of performance and any resulting profit or loss, except to the limited extent that a valid contract change or other contractual remedy applies. Under the contract s Statement of Work (SOW), the contractor is required to provide all parts, materials, labor, supervision, test equipment, technical manuals, and transportation necessary to perform required preventive maintenance on the Government-owned Notifier fire alarm and fire suppression components at the Cleveland VAMC. \n\nThe SOW further requires the contractor to perform inspection and testing of the fire alarm system in accordance with NFPA 72-2022 and Joint Commission (TJC) standards, and to submit detailed test reports and field service documentation that meet those standards.  Test reports shall be delivered in both Microsoft Excel, with device type separated by tab and report generated from Fire Alarm System.\n\nThe existing fire system is currently being upgraded, and this contract will incorporate the maintenance and inspection of all new system equipment and devices as they are put into service to include unlisted ancillary equipment and devices, and any devices or equipment added because\nof new construction or renovation during the performance period.\n\nQuarterly meetings will be conducted with CO, COR, and contractor leadership.  Quarterly meetings may be in-person or virtual.\nContractor shall be currently engaged in maintenance, repair, inspection, and testing of Notifier Fire Alarm equipment.  At bid submission, contractor shall provide proof of a minimum of five (5) years within the last seven (7) years of successful experience testing and maintaining Notifier Fire Alarm Systems identical to or similar to the size and complexity of facilities and system covered under this SOW.    \nOfferors shall submit references for the five (5) years of experience including names, addresses, and telephone numbers of specific companies and key personnel to contact.\nThe awarded contractor shall provide a Contract Manager who shall be responsible for the performance of the work. Contractor shall provide onsite Project Manager throughout the Annual and Semi-Annual testing period.  The name of the Contract manager, alternate contract manager and onsite project manager shall be designated in writing to the CO/COR prior to the Contract start date. Changes to personnel shall be submitted to the Government within five (5) workdays of the changes. \nThe Contract Manager or alternate shall have full authority to act on all Contract matters relating to the daily operation of the Contract. The Contract Manager or alternate shall be available to speak/meet with the CO or COR within 24 hours of request during normal operating hours, and or within the next business day after Friday or a Federal holiday.\nCOR will reference the Quality Assurance Surveillance Plan to ensure contractor meets the deliverable requirements outlined in section 6 of this SOW.  \nCOR will ensure inspection reports are completed timely and uploaded into the VA maintenance records.  \n\n\n8. Check   In Requirements: The Contractor Service Personnel and/or representative must report to the Electric Shop Supervisor within the engineering department or designated point of contact (POC) to sign in with department staff before work begins. Upon completion of work, the Contractor Service Personnel and/or representative must report to the appropriate department to sign out. \n\n9. Security Requirements: The C&A requirements do not apply, and a Security Accreditation Package is not required.\n\n9.1. Dedicated personnel will be assigned solely to observe, interact, assist, and assure protection of VA sensitive information. \n\n9.2. Contractor employees providing services at VA facilities may undergo a security clearance in the form of a basic background investigation.Â \n\n10. General Security: Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.\n\n11. VA Information Custodial Language: \n\n11.1. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1). \n\n11.2. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.\n\n\n12. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI).  \n\nNo government furnished equipment will be issued to complete the requirements of this contract.\n\n13. Other Pertinent Information or Special Considerations. \n\nLouis Stokes VAMC facility covers approximately 2 million square feet distributed between the following areas:\nCares Tower\nMain Facility\nAtrium\nWomen s Health Annex \nLearning Exchange \nParking Garage\nThe fire alarm system at Louis Stokes VAMC is currently being upgraded to a new Notifier system.\nUpgrade project will not be completed within the next 12 months\nFire Alarm Reports will come from both systems to be complete.\nCoordination with fire alarm project will be required to schedule testing.\nProof of testing and inspection on Notifier systems of similar size in five (5) of the last seven (7) years.\nAll Annual testing requirements (except elevator associated devices) will be started and completed in the month of January.\nAll testing requirements for elevator associated devices will be started and completed in the month of February. \nAll Semi-annual testing requirements will be started and completed in the month of July.\nAll Quarterly testing requirements will be started and completed in the months of January, April, July, and October.\nKitchen Hood Testing: \nCompleted two times per year after 7pm M-F\nJune and December\nWeekly Fire Pump testing will be completed and documented by VA personnel\nTesting will require the following to complete:\nClimbing, bending, crawling\nLadder use\nVertical Scissor Lift.  Lift not supplied by government.\nMagnet\nNotifier Keys\nCanned Smoke\nLaptop or Tablet to access CLSS Gateway network\nAny other tools/equipment contractor determines necessary to complete testing\n\nVA personnel will assist contactor as needed to complete the following:\nGain access to secure areas\nLocate difficult to find areas.\n\nEfforts to minimize disruption to patients and patient care must be considered during scheduling and completing testing.\nMay require after hours or weekend testing to support patient care.\nFederal holidays may be utilized with proper coordination with COR, approval from engineering management, and adequate VA staff to support contractor testing.\n\nElevator shaft and mechanical testing to be conducted over an identified weekend each February in coordination with the elevator contractor and VA electronics shop.\nTesting requires 1 fire alarm contractor technician for 10 hours over two weekend days (Saturday and Sunday)\n\nLive Testing:\nContractor shall provide requested schedule for required live testing no less than 30 days before required testing month.\nLive testing will be completed during an identified weekend during the annual testing period.\nSundays are preferred testing day for live testing.\n\nPull station testing will be completed separately from other testing to minimize fire door activation and disruption to the facility.\nPull station testing schedule will be provided by contractor and routed to VA for approval no less than 30 days before required testing month.\nPull station testing can be coordinated to be completed over an approved weekend.\n\nHVAC duct detector testing:\nWill be conducted in conjunction with the HVAC shop\nTesting schedule will be generated in advance and approved by all necessary parties\nTest results must verify and document the following:\nFire damper activates\nHVAC unit shuts down\nHVAC unit able to be reset to normal after testing: Yes-No\n\nAtrium Smoke Detectors\nTested will be conducted on a scheduled Saturday (8 hours)\nRequires use of scissor lift\nContractor will provide lift and lift operator.\nCeiling height to atrium smoke detectors is 40 feet.\n\nTamper and Water Flow Testing\nUnder TJC.02.03.05 and NFPA 25\nWater Flow devices require quarterly testing (4 times per year   January, April, July, October)\nNFPA 25 requirements include requirements for water to flow during this testing.\nMust operate flow valve and flow water to activate signal \nTamper switches require semiannual testing (2 times per year   January and July)\n\nAt bid submission, contractor must provide proof of ability to access and source necessary repair parts and programming for all Notifier Fire Alarm equipment installed within Louis Stokes VAMC.\nContractor must demonstrate access to the following fire alarm system, vendor support and parts procurement:\nNotifier Dealer\nNotifier programming capability\nNotifier parts\nNotifier technical support\nGateway / CLSS\nTesting reports generated through CLSS gateway at no additional cost to the government\n\nParking: Onsite parking is not available, and all contractor personnel will be required to obtain street side parking.\n a.  Identification of Possible Follow-on Work.  \n\nAny additional repair or replacement work required outside this contract will require contractor to submit a quote to COR and receive an approved PO before beginning work. \n\n b.  Identification of Potential Conflicts of Interest (COI). \n  None\n\n c.  Identification of Non-Disclosure Requirements. \n  Not Applicable\n\n d.  Packaging, Packing and Shipping Instructions.  \n  None\n\n e.  Inspection and Acceptance Criteria.  \nContractor will be responsible for meeting all inspection and timelines listed in this SOW. \n14. Risk Control\nWork performed within the medical center may present health risks including exposure to illness and infection control. Contractor will take action to recognize and follow warning information throughout the facility.  \n15. Place of Performance. \n\nLouis Stokes VA Medical Center \n10701 East Blvd\nCleveland, Ohio\n44106\n16. Period of Performance. \nBase Year: A date of award for duration of. 365 calendar days & 4 Option Years","text":"This is a Sources Sought (SS) Notice only, not a solicitation announcement and should not be considered as such. There is no solicitation available at this time. The Government will not pay for any information received in response to this SS, nor will the Government compensate any respondent for any cost incurred in developing the information provided to the Government. This SS does not constitute a commitment by the Government. Any information provided in response to this market survey will be used for informational purposes only and will not be released. Vendor participation is not a promise of future business with the Government.\nThe purpose of this Sources Sought is to conduct Market Research to determine an acquisition strategy for the acquisition of Fire Alarm Testing and Inspection, where the Contractor will provide on-site testing and inspection of government-owned Notifier fire alarm and fire suppression components required by NFPA, OSHA, TJC, and original equipment manufacturer standards and specifications necessary to maintain the current fire alarm system at top performance.\nThe NAICS code for this procurement is 56121 - Security system services except locksmiths, PSC H312 Inspection fire control equipment. and the small business size standard is $25,000,000.00.\n\nResponses to this notice shall be e-mailed to Lakeisha Jackson at Lakeisha.Jackson@va.gov. Telephone responses will not be accepted. Responses must be received in writing no later than Friday, October 30, 2026 at 12:00 p.m., EDT. This notice is to assist the VA in determining sources only. A solicitation is not currently available.\n\nTHE VA IS NOT SEEKING PRICING OR OFFERS OF ANY KIND. There is no guarantee, expressed or implicit, that the market research for this acquisition will result in a particular set-aside or sole source award, or any other guarantee of award strategy. All information is to be provided on a voluntary basis at no charge to the Government.\n\nThe Cleveland Veterans Affairs Medical Center, in Cleveland, OH is seeking sources capable of complete the services described in the Performance Work Statement below:\n\nSTATEMENT OF WORK (SOW)\nFire Alarm Testing and Inspection\n1. Contracting Officer s Representative (COR): TBD\n2. Contract Title. Fire Alarm Testing and Inspection\n3. Background.\nThe Louis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106 is seeking a qualified contractor to provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site testing and inspection of government-owned Notifier fire alarm and fire suppression components required by NFPA, OSHA, TJC, and original equipment manufacturer standards and specifications necessary to maintain the current fire alarm system at top performance.\n4. Scope.\nContractor shall provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site Annual, Semi-Annual, and Quarterly preventative maintenance testing (PMI s), inspection and maintenance on facility Notifier Fire Alarm System and associated equipment at the Wade Park facility of the Cleveland VA Medical Center, located at 10701 East Blvd., Cleveland, Ohio 44106.\nFire alarm testing and inspection shall meet the requirements outlined NFPA 72, 2022 edition. Testing shall include all Joint Commission requirements. Some testing requirements will be met during off-hours or weekends.\n5. Specific Tasks.\n5.1. Task 1 Annual Testing\nProvide COR with testing schedule indicating dates of required testing.\nAll Annual testing requirements (except elevator associated devices) will be started and completed in the month of January.\nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\n\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.2. Subtask 2 Semi-Annual Testing\nProvide COR with testing schedule indicating dates of required testing.\nAll Semi-annual testing requirements will be started and completed in the month of July.\nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.3. Subtask 3 Quarterly Testing\nProvide COR with testing schedule indicating dates of required testing.\nAll Quarterly testing requirements will be started and completed in the months of January, April, July, and October.\nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.4 Subtask 4 Elevator Device Testing\nAll testing requirements for elevator associated devices will be started and completed in the month of February.\nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.5 Subtask 5 Kitchen Hood Testing\nProvide COR with testing schedule indicating dates of required testing.\nKitchen Hood Testing:\nCompleted two times per year after 7pm M-F, June and December\nReport on company letterhead contains\nCompany name\nDate of test\nItems tested and inspected\nPass Fail for each item tested\nPass Fail for each exhaust hood\nItemized requiring corrective action follow-up\n6. Deliverables:\nFire Alarm contractor shall submit a site-specific safety plan outlining how inspections and testing will safely be conducted. This safety plan will be submitted to VA safety department for approval.\nSOW Task#\nDeliverable Title\nFormat\nNumber\nCalendar Days After Start\n1\nSite Specific Safety Plan\nWord - PDF\n\n>30 days\n2\nAnnual Testing Schedule\nEmail Word - Excel\n\n>30 days\n3\nSemi-Annual Testing Schedule\nEmail Word Excel\n\n>30 days\n4\nQuarterly Testing Schedule\nEmail Word Excel\n\n>30 days\n5\nLive Testing Schedule\nEmail Word Excel\n\n>30 days\n6\nHVAC Testing Schedule\nEmail Word - Excel\n\n>30 days\n7\nAtrium Smoke Detector Testing Schedule\nEmail Word Excel\n\n>30 days\n8\nAnnual Test Report\nEmail PDF - Excel\n\n14 Days\n9\nSemi-Annual Test Report\nEmail PDF Excel\n\n14 Days\n10\nQuarterly Test Report\nEmail PDF Excel\n\n14 Days\n11\nElevator Device Test Report\nEmail PDF Excel\n\n14 Days\n12\nKitchen Hood Test Report\nEmail PDF - Excel\n\n14 Days\n\n7. Contractor Responsibility:\n\nPrior to bidding, it shall be the responsibility of the bidder to visit Cleveland VAMC and inspect the fire alarm system and facility to establish to their satisfaction the condition of the fire alarm equipment to be maintained and any other conditions affecting the work to be performed. This equipment is offered in an \"as-is\" condition. No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract.\n\nThis contract is a firm-fixed-price service contract, under which the contractor assumes the risk and full responsibility for the costs of performance and any resulting profit or loss, except to the limited extent that a valid contract change or other contractual remedy applies. Under the contract s Statement of Work (SOW), the contractor is required to provide all parts, materials, labor, supervision, test equipment, technical manuals, and transportation necessary to perform required preventive maintenance on the Government-owned Notifier fire alarm and fire suppression components at the Cleveland VAMC.\n\nThe SOW further requires the contractor to perform inspection and testing of the fire alarm system in accordance with NFPA 72-2022 and Joint Commission (TJC) standards, and to submit detailed test reports and field service documentation that meet those standards. Test reports shall be delivered in both Microsoft Excel, with device type separated by tab and report generated from Fire Alarm System.\n\nThe existing fire system is currently being upgraded, and this contract will incorporate the maintenance and inspection of all new system equipment and devices as they are put into service to include unlisted ancillary equipment and devices, and any devices or equipment added because\nof new construction or renovation during the performance period.\n\nQuarterly meetings will be conducted with CO, COR, and contractor leadership. Quarterly meetings may be in-person or virtual.\nContractor shall be currently engaged in maintenance, repair, inspection, and testing of Notifier Fire Alarm equipment. At bid submission, contractor shall provide proof of a minimum of five (5) years within the last seven (7) years of successful experience testing and maintaining Notifier Fire Alarm Systems identical to or similar to the size and complexity of facilities and system covered under this SOW.\nOfferors shall submit references for the five (5) years of experience including names, addresses, and telephone numbers of specific companies and key personnel to contact.\nThe awarded contractor shall provide a Contract Manager who shall be responsible for the performance of the work. Contractor shall provide onsite Project Manager throughout the Annual and Semi-Annual testing period. The name of the Contract manager, alternate contract manager and onsite project manager shall be designated in writing to the CO/COR prior to the Contract start date. Changes to personnel shall be submitted to the Government within five (5) workdays of the changes.\nThe Contract Manager or alternate shall have full authority to act on all Contract matters relating to the daily operation of the Contract. The Contract Manager or alternate shall be available to speak/meet with the CO or COR within 24 hours of request during normal operating hours, and or within the next business day after Friday or a Federal holiday.\nCOR will reference the Quality Assurance Surveillance Plan to ensure contractor meets the deliverable requirements outlined in section 6 of this SOW.\nCOR will ensure inspection reports are completed timely and uploaded into the VA maintenance records.\n\n8. Check In Requirements: The Contractor Service Personnel and/or representative must report to the Electric Shop Supervisor within the engineering department or designated point of contact (POC) to sign in with department staff before work begins. Upon completion of work, the Contractor Service Personnel and/or representative must report to the appropriate department to sign out.\n\n9. Security Requirements: The C&A requirements do not apply, and a Security Accreditation Package is not required.\n\n9.1. Dedicated personnel will be assigned solely to observe, interact, assist, and assure protection of VA sensitive information.\n\n9.2. Contractor employees providing services at VA facilities may undergo a security clearance in the form of a basic background investigation.Â\n\n10. General Security: Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.\n\n11. VA Information Custodial Language:\n\n11.1. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1).\n\n11.2. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.\n\n12. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI).\n\nNo government furnished equipment will be issued to complete the requirements of this contract.\n\n13. Other Pertinent Information or Special Considerations.\n\nLouis Stokes VAMC facility covers approximately 2 million square feet distributed between the following areas:\nCares Tower\nMain Facility\nAtrium\nWomen s Health Annex\nLearning Exchange\nParking Garage\nThe fire alarm system at Louis Stokes VAMC is currently being upgraded to a new Notifier system.\nUpgrade project will not be completed within the next 12 months\nFire Alarm Reports will come from both systems to be complete.\nCoordination with fire alarm project will be required to schedule testing.\nProof of testing and inspection on Notifier systems of similar size in five (5) of the last seven (7) years.\nAll Annual testing requirements (except elevator associated devices) will be started and completed in the month of January.\nAll testing requirements for elevator associated devices will be started and completed in the month of February.\nAll Semi-annual testing requirements will be started and completed in the month of July.\nAll Quarterly testing requirements will be started and completed in the months of January, April, July, and October.\nKitchen Hood Testing:\nCompleted two times per year after 7pm M-F\nJune and December\nWeekly Fire Pump testing will be completed and documented by VA personnel\nTesting will require the following to complete:\nClimbing, bending, crawling\nLadder use\nVertical Scissor Lift. Lift not supplied by government.\nMagnet\nNotifier Keys\nCanned Smoke\nLaptop or Tablet to access CLSS Gateway network\nAny other tools/equipment contractor determines necessary to complete testing\n\nVA personnel will assist contactor as needed to complete the following:\nGain access to secure areas\nLocate difficult to find areas.\n\nEfforts to minimize disruption to patients and patient care must be considered during scheduling and completing testing.\nMay require after hours or weekend testing to support patient care.\nFederal holidays may be utilized with proper coordination with COR, approval from engineering management, and adequate VA staff to support contractor testing.\n\nElevator shaft and mechanical testing to be conducted over an identified weekend each February in coordination with the elevator contractor and VA electronics shop.\nTesting requires 1 fire alarm contractor technician for 10 hours over two weekend days (Saturday and Sunday)\n\nLive Testing:\nContractor shall provide requested schedule for required live testing no less than 30 days before required testing month.\nLive testing will be completed during an identified weekend during the annual testing period.\nSundays are preferred testing day for live testing.\n\nPull station testing will be completed separately from other testing to minimize fire door activation and disruption to the facility.\nPull station testing schedule will be provided by contractor and routed to VA for approval no less than 30 days before required testing month.\nPull station testing can be coordinated to be completed over an approved weekend.\n\nHVAC duct detector testing:\nWill be conducted in conjunction with the HVAC shop\nTesting schedule will be generated in advance and approved by all necessary parties\nTest results must verify and document the following:\nFire damper activates\nHVAC unit shuts down\nHVAC unit able to be reset to normal after testing: Yes-No\n\nAtrium Smoke Detectors\nTested will be conducted on a scheduled Saturday (8 hours)\nRequires use of scissor lift\nContractor will provide lift and lift operator.\nCeiling height to atrium smoke detectors is 40 feet.\n\nTamper and Water Flow Testing\nUnder TJC.02.03.05 and NFPA 25\nWater Flow devices require quarterly testing (4 times per year January, April, July, October)\nNFPA 25 requirements include requirements for water to flow during this testing.\nMust operate flow valve and flow water to activate signal\nTamper switches require semiannual testing (2 times per year January and July)\n\nAt bid submission, contractor must provide proof of ability to access and source necessary repair parts and programming for all Notifier Fire Alarm equipment installed within Louis Stokes VAMC.\nContractor must demonstrate access to the following fire alarm system, vendor support and parts procurement:\nNotifier Dealer\nNotifier programming capability\nNotifier parts\nNotifier technical support\nGateway / CLSS\nTesting reports generated through CLSS gateway at no additional cost to the government\n\nParking: Onsite parking is not available, and all contractor personnel will be required to obtain street side parking.\na. Identification of Possible Follow-on Work.\n\nAny additional repair or replacement work required outside this contract will require contractor to submit a quote to COR and receive an approved PO before beginning work.\n\nb. Identification of Potential Conflicts of Interest (COI).\nNone\n\nc. Identification of Non-Disclosure Requirements.\nNot Applicable\n\nd. Packaging, Packing and Shipping Instructions.\nNone\n\ne. Inspection and Acceptance Criteria.\nContractor will be responsible for meeting all inspection and timelines listed in this SOW.\n14. Risk Control\nWork performed within the medical center may present health risks including exposure to illness and infection control. Contractor will take action to recognize and follow warning information throughout the facility.\n15. Place of Performance.\n\nLouis Stokes VA Medical Center\n10701 East Blvd\nCleveland, Ohio\n44106\n16. Period of Performance.\nBase Year: A date of award for duration of. 365 calendar days & 4 Option Years","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C25027Q0066","place_of_performance":{"zip":"44106","city":{"name":"Cleveland"},"state":{"code":"OH","name":"Ohio"},"street":"Department of Veteran Affairs Cleveland VA Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"10701 East Blvd."},"product_service_code":"H312"}],"due_at":"2026-10-30T16:00:00Z","due_date":"2026-10-30","closes_at":"2026-10-30T16:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","state":"OH","county":"39035","county_name":"Cuyahoga County","city":"3916000","city_name":"Cleveland","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-10-24T03:56:54.139438Z","principal_notice_id":"d0d9fdbb57b04bf2bc9ff0da3c661a10","description":{"text":"This is a Sources Sought (SS) Notice only, not a solicitation announcement and should not be considered as such. There is no solicitation available at this time. The Government will not pay for any information received in response to this SS, nor will the Government compensate any respondent for any cost incurred in developing the information provided to the Government. This SS does not constitute a commitment by the Government. Any information provided in response to this market survey will be used for informational purposes only and will not be released. Vendor participation is not a promise of future business with the Government.\nThe purpose of this Sources Sought is to conduct Market Research to determine an acquisition strategy for the acquisition of Fire Alarm Testing and Inspection, where the Contractor will provide on-site testing and inspection of government-owned Notifier fire alarm and fire suppression components required by NFPA, OSHA, TJC, and original equipment manufacturer standards and specifications necessary to maintain the current fire alarm system at top performance.\nThe NAICS code for this procurement is 56121 - Security system services except locksmiths, PSC H312 Inspection fire control equipment. and the small business size standard is $25,000,000.00.\n\nResponses to this notice shall be e-mailed to Lakeisha Jackson at Lakeisha.Jackson@va.gov. Telephone responses will not be accepted. Responses must be received in writing no later than Friday, October 30, 2026 at 12:00 p.m., EDT. This notice is to assist the VA in determining sources only. A solicitation is not currently available.\n\nTHE VA IS NOT SEEKING PRICING OR OFFERS OF ANY KIND. There is no guarantee, expressed or implicit, that the market research for this acquisition will result in a particular set-aside or sole source award, or any other guarantee of award strategy. All information is to be provided on a voluntary basis at no charge to the Government.\n\nThe Cleveland Veterans Affairs Medical Center, in Cleveland, OH is seeking sources capable of complete the services described in the Performance Work Statement below:\n\nSTATEMENT OF WORK (SOW)\nFire Alarm Testing and Inspection\n1. Contracting Officer s Representative (COR): TBD\n2. Contract Title. Fire Alarm Testing and Inspection\n3. Background.\nThe Louis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106 is seeking a qualified contractor to provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site testing and inspection of government-owned Notifier fire alarm and fire suppression components required by NFPA, OSHA, TJC, and original equipment manufacturer standards and specifications necessary to maintain the current fire alarm system at top performance.\n4. Scope.\nContractor shall provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site Annual, Semi-Annual, and Quarterly preventative maintenance testing (PMI s), inspection and maintenance on facility Notifier Fire Alarm System and associated equipment at the Wade Park facility of the Cleveland VA Medical Center, located at 10701 East Blvd., Cleveland, Ohio 44106.\nFire alarm testing and inspection shall meet the requirements outlined NFPA 72, 2022 edition. Testing shall include all Joint Commission requirements. Some testing requirements will be met during off-hours or weekends.\n5. Specific Tasks.\n5.1. Task 1 Annual Testing\nProvide COR with testing schedule indicating dates of required testing.\nAll Annual testing requirements (except elevator associated devices) will be started and completed in the month of January.\nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\n\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.2. Subtask 2 Semi-Annual Testing\nProvide COR with testing schedule indicating dates of required testing.\nAll Semi-annual testing requirements will be started and completed in the month of July.\nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.3. Subtask 3 Quarterly Testing\nProvide COR with testing schedule indicating dates of required testing.\nAll Quarterly testing requirements will be started and completed in the months of January, April, July, and October.\nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.4 Subtask 4 Elevator Device Testing\nAll testing requirements for elevator associated devices will be started and completed in the month of February.\nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.5 Subtask 5 Kitchen Hood Testing\nProvide COR with testing schedule indicating dates of required testing.\nKitchen Hood Testing:\nCompleted two times per year after 7pm M-F, June and December\nReport on company letterhead contains\nCompany name\nDate of test\nItems tested and inspected\nPass Fail for each item tested\nPass Fail for each exhaust hood\nItemized requiring corrective action follow-up\n6. Deliverables:\nFire Alarm contractor shall submit a site-specific safety plan outlining how inspections and testing will safely be conducted. This safety plan will be submitted to VA safety department for approval.\nSOW Task#\nDeliverable Title\nFormat\nNumber\nCalendar Days After Start\n1\nSite Specific Safety Plan\nWord - PDF\n\n>30 days\n2\nAnnual Testing Schedule\nEmail Word - Excel\n\n>30 days\n3\nSemi-Annual Testing Schedule\nEmail Word Excel\n\n>30 days\n4\nQuarterly Testing Schedule\nEmail Word Excel\n\n>30 days\n5\nLive Testing Schedule\nEmail Word Excel\n\n>30 days\n6\nHVAC Testing Schedule\nEmail Word - Excel\n\n>30 days\n7\nAtrium Smoke Detector Testing Schedule\nEmail Word Excel\n\n>30 days\n8\nAnnual Test Report\nEmail PDF - Excel\n\n14 Days\n9\nSemi-Annual Test Report\nEmail PDF Excel\n\n14 Days\n10\nQuarterly Test Report\nEmail PDF Excel\n\n14 Days\n11\nElevator Device Test Report\nEmail PDF Excel\n\n14 Days\n12\nKitchen Hood Test Report\nEmail PDF - Excel\n\n14 Days\n\n7. Contractor Responsibility:\n\nPrior to bidding, it shall be the responsibility of the bidder to visit Cleveland VAMC and inspect the fire alarm system and facility to establish to their satisfaction the condition of the fire alarm equipment to be maintained and any other conditions affecting the work to be performed. This equipment is offered in an \"as-is\" condition. No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract.\n\nThis contract is a firm-fixed-price service contract, under which the contractor assumes the risk and full responsibility for the costs of performance and any resulting profit or loss, except to the limited extent that a valid contract change or other contractual remedy applies. Under the contract s Statement of Work (SOW), the contractor is required to provide all parts, materials, labor, supervision, test equipment, technical manuals, and transportation necessary to perform required preventive maintenance on the Government-owned Notifier fire alarm and fire suppression components at the Cleveland VAMC.\n\nThe SOW further requires the contractor to perform inspection and testing of the fire alarm system in accordance with NFPA 72-2022 and Joint Commission (TJC) standards, and to submit detailed test reports and field service documentation that meet those standards. Test reports shall be delivered in both Microsoft Excel, with device type separated by tab and report generated from Fire Alarm System.\n\nThe existing fire system is currently being upgraded, and this contract will incorporate the maintenance and inspection of all new system equipment and devices as they are put into service to include unlisted ancillary equipment and devices, and any devices or equipment added because\nof new construction or renovation during the performance period.\n\nQuarterly meetings will be conducted with CO, COR, and contractor leadership. Quarterly meetings may be in-person or virtual.\nContractor shall be currently engaged in maintenance, repair, inspection, and testing of Notifier Fire Alarm equipment. At bid submission, contractor shall provide proof of a minimum of five (5) years within the last seven (7) years of successful experience testing and maintaining Notifier Fire Alarm Systems identical to or similar to the size and complexity of facilities and system covered under this SOW.\nOfferors shall submit references for the five (5) years of experience including names, addresses, and telephone numbers of specific companies and key personnel to contact.\nThe awarded contractor shall provide a Contract Manager who shall be responsible for the performance of the work. Contractor shall provide onsite Project Manager throughout the Annual and Semi-Annual testing period. The name of the Contract manager, alternate contract manager and onsite project manager shall be designated in writing to the CO/COR prior to the Contract start date. Changes to personnel shall be submitted to the Government within five (5) workdays of the changes.\nThe Contract Manager or alternate shall have full authority to act on all Contract matters relating to the daily operation of the Contract. The Contract Manager or alternate shall be available to speak/meet with the CO or COR within 24 hours of request during normal operating hours, and or within the next business day after Friday or a Federal holiday.\nCOR will reference the Quality Assurance Surveillance Plan to ensure contractor meets the deliverable requirements outlined in section 6 of this SOW.\nCOR will ensure inspection reports are completed timely and uploaded into the VA maintenance records.\n\n8. Check In Requirements: The Contractor Service Personnel and/or representative must report to the Electric Shop Supervisor within the engineering department or designated point of contact (POC) to sign in with department staff before work begins. Upon completion of work, the Contractor Service Personnel and/or representative must report to the appropriate department to sign out.\n\n9. Security Requirements: The C&A requirements do not apply, and a Security Accreditation Package is not required.\n\n9.1. Dedicated personnel will be assigned solely to observe, interact, assist, and assure protection of VA sensitive information.\n\n9.2. Contractor employees providing services at VA facilities may undergo a security clearance in the form of a basic background investigation.Â\n\n10. General Security: Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.\n\n11. VA Information Custodial Language:\n\n11.1. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1).\n\n11.2. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.\n\n12. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI).\n\nNo government furnished equipment will be issued to complete the requirements of this contract.\n\n13. Other Pertinent Information or Special Considerations.\n\nLouis Stokes VAMC facility covers approximately 2 million square feet distributed between the following areas:\nCares Tower\nMain Facility\nAtrium\nWomen s Health Annex\nLearning Exchange\nParking Garage\nThe fire alarm system at Louis Stokes VAMC is currently being upgraded to a new Notifier system.\nUpgrade project will not be completed within the next 12 months\nFire Alarm Reports will come from both systems to be complete.\nCoordination with fire alarm project will be required to schedule testing.\nProof of testing and inspection on Notifier systems of similar size in five (5) of the last seven (7) years.\nAll Annual testing requirements (except elevator associated devices) will be started and completed in the month of January.\nAll testing requirements for elevator associated devices will be started and completed in the month of February.\nAll Semi-annual testing requirements will be started and completed in the month of July.\nAll Quarterly testing requirements will be started and completed in the months of January, April, July, and October.\nKitchen Hood Testing:\nCompleted two times per year after 7pm M-F\nJune and December\nWeekly Fire Pump testing will be completed and documented by VA personnel\nTesting will require the following to complete:\nClimbing, bending, crawling\nLadder use\nVertical Scissor Lift. Lift not supplied by government.\nMagnet\nNotifier Keys\nCanned Smoke\nLaptop or Tablet to access CLSS Gateway network\nAny other tools/equipment contractor determines necessary to complete testing\n\nVA personnel will assist contactor as needed to complete the following:\nGain access to secure areas\nLocate difficult to find areas.\n\nEfforts to minimize disruption to patients and patient care must be considered during scheduling and completing testing.\nMay require after hours or weekend testing to support patient care.\nFederal holidays may be utilized with proper coordination with COR, approval from engineering management, and adequate VA staff to support contractor testing.\n\nElevator shaft and mechanical testing to be conducted over an identified weekend each February in coordination with the elevator contractor and VA electronics shop.\nTesting requires 1 fire alarm contractor technician for 10 hours over two weekend days (Saturday and Sunday)\n\nLive Testing:\nContractor shall provide requested schedule for required live testing no less than 30 days before required testing month.\nLive testing will be completed during an identified weekend during the annual testing period.\nSundays are preferred testing day for live testing.\n\nPull station testing will be completed separately from other testing to minimize fire door activation and disruption to the facility.\nPull station testing schedule will be provided by contractor and routed to VA for approval no less than 30 days before required testing month.\nPull station testing can be coordinated to be completed over an approved weekend.\n\nHVAC duct detector testing:\nWill be conducted in conjunction with the HVAC shop\nTesting schedule will be generated in advance and approved by all necessary parties\nTest results must verify and document the following:\nFire damper activates\nHVAC unit shuts down\nHVAC unit able to be reset to normal after testing: Yes-No\n\nAtrium Smoke Detectors\nTested will be conducted on a scheduled Saturday (8 hours)\nRequires use of scissor lift\nContractor will provide lift and lift operator.\nCeiling height to atrium smoke detectors is 40 feet.\n\nTamper and Water Flow Testing\nUnder TJC.02.03.05 and NFPA 25\nWater Flow devices require quarterly testing (4 times per year January, April, July, October)\nNFPA 25 requirements include requirements for water to flow during this testing.\nMust operate flow valve and flow water to activate signal\nTamper switches require semiannual testing (2 times per year January and July)\n\nAt bid submission, contractor must provide proof of ability to access and source necessary repair parts and programming for all Notifier Fire Alarm equipment installed within Louis Stokes VAMC.\nContractor must demonstrate access to the following fire alarm system, vendor support and parts procurement:\nNotifier Dealer\nNotifier programming capability\nNotifier parts\nNotifier technical support\nGateway / CLSS\nTesting reports generated through CLSS gateway at no additional cost to the government\n\nParking: Onsite parking is not available, and all contractor personnel will be required to obtain street side parking.\na. Identification of Possible Follow-on Work.\n\nAny additional repair or replacement work required outside this contract will require contractor to submit a quote to COR and receive an approved PO before beginning work.\n\nb. Identification of Potential Conflicts of Interest (COI).\nNone\n\nc. Identification of Non-Disclosure Requirements.\nNot Applicable\n\nd. Packaging, Packing and Shipping Instructions.\nNone\n\ne. Inspection and Acceptance Criteria.\nContractor will be responsible for meeting all inspection and timelines listed in this SOW.\n14. Risk Control\nWork performed within the medical center may present health risks including exposure to illness and infection control. Contractor will take action to recognize and follow warning information throughout the facility.\n15. Place of Performance.\n\nLouis Stokes VA Medical Center\n10701 East Blvd\nCleveland, Ohio\n44106\n16. Period of Performance.\nBase Year: A date of award for duration of. 365 calendar days & 4 Option Years","html":"This is a Sources Sought (SS) Notice only, not a solicitation announcement and should not be considered as such. There is no solicitation available at this time. The Government will not pay for any information received in response to this SS, nor will the Government compensate any respondent for any cost incurred in developing the information provided to the Government. This SS does not constitute a commitment by the Government. Any information provided in response to this market survey will be used for informational purposes only and will not be released. Vendor participation is not a promise of future business with the Government.\nThe purpose of this Sources Sought is to conduct Market Research to determine an acquisition strategy for the acquisition of Fire Alarm Testing and Inspection, where the Contractor will provide on-site testing and inspection of government-owned Notifier fire alarm and fire suppression components required by NFPA, OSHA, TJC, and original equipment manufacturer standards and specifications necessary to maintain the current fire alarm system at top performance. \nThe NAICS code for this procurement is 56121 -  Security system services except locksmiths, PSC   H312 Inspection fire control equipment. and the small business size standard is $25,000,000.00.\n\nResponses to this notice shall be e-mailed to Lakeisha Jackson at Lakeisha.Jackson@va.gov. Telephone responses will not be accepted. Responses must be received in writing no later than  Friday, October 30, 2026 at 12:00 p.m., EDT. This notice is to assist the VA in determining sources only. A solicitation is not currently available.\n\nTHE VA IS NOT SEEKING PRICING OR OFFERS OF ANY KIND. There is no guarantee, expressed or implicit, that the market research for this acquisition will result in a particular set-aside or sole source award, or any other guarantee of award strategy. All information is to be provided on a voluntary basis at no charge to the Government.\n\nThe Cleveland Veterans Affairs Medical Center, in Cleveland, OH is seeking sources capable of complete the services described in the Performance Work Statement below: \n \nSTATEMENT OF WORK (SOW)\nFire Alarm Testing and Inspection\n1. Contracting Officer s Representative (COR): TBD\n2. Contract Title.  Fire Alarm Testing and Inspection\n3. Background.  \nThe Louis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106 is seeking a qualified contractor to provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site testing and inspection of government-owned Notifier fire alarm and fire suppression components required by NFPA, OSHA, TJC, and original equipment manufacturer standards and specifications necessary to maintain the current fire alarm system at top performance.\n4. Scope. \nContractor shall provide all labor, materials, equipment, transportation, and supervision necessary to provide on-site Annual, Semi-Annual, and Quarterly preventative maintenance testing (PMI s), inspection and maintenance on facility Notifier Fire Alarm System and associated equipment at the Wade Park facility of the Cleveland VA Medical Center, located at 10701 East Blvd., Cleveland, Ohio 44106.  \nFire alarm testing and inspection shall meet the requirements outlined NFPA 72, 2022 edition. Testing shall include all Joint Commission requirements.  Some testing requirements will be met during off-hours or weekends.\n5. Specific Tasks.  \n5.1.  Task 1   Annual Testing  \nProvide COR with testing schedule indicating dates of required testing.\nAll Annual testing requirements (except elevator associated devices) will be started and completed in the month of January.\nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\n\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.2.  Subtask 2   Semi-Annual Testing  \nProvide COR with testing schedule indicating dates of required testing.\nAll Semi-annual testing requirements will be started and completed in the month of July.\nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.3.  Subtask 3   Quarterly Testing\nProvide COR with testing schedule indicating dates of required testing.\nAll Quarterly testing requirements will be started and completed in the months of January, April, July, and October.\nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.4 Subtask 4   Elevator Device Testing\nAll testing requirements for elevator associated devices will be started and completed in the month of February. \nInspection reports shall consist of the following:\nFire System Generated report identifying\nFirst page of report shall contain a summary of any device or system that did not pass and requires corrective follow-up.\nPass or Fail for each device\nDate and time of each device tested\nMicrosoft Excel report\nDuplicating fire system generated report in well-organized divided sheets\nReport divided into tabs by device type\nTab contents organized by device address\nFirst tab shall contain a summary of any device or system that did not pass and requires corrective action follow-up\n5.5 Subtask 5   Kitchen Hood Testing\nProvide COR with testing schedule indicating dates of required testing.\nKitchen Hood Testing: \nCompleted two times per year after 7pm M-F, June and December\nReport on company letterhead contains\nCompany name\nDate of test\nItems tested and inspected\nPass   Fail for each item tested\nPass   Fail for each exhaust hood\nItemized requiring corrective action follow-up \n6. Deliverables: \nFire Alarm contractor shall submit a site-specific safety plan outlining how inspections and testing will safely be conducted.  This safety plan will be submitted to VA safety department for approval.\nSOW Task#\nDeliverable Title\nFormat\nNumber\nCalendar Days After Start\n1\nSite Specific Safety Plan\nWord - PDF\n\n>30 days\n2\nAnnual Testing Schedule\nEmail   Word - Excel\n\n>30 days\n3\nSemi-Annual Testing Schedule\nEmail   Word   Excel\n\n>30 days\n4\nQuarterly Testing Schedule\nEmail   Word   Excel\n\n>30 days\n5\nLive Testing Schedule\nEmail   Word   Excel\n\n>30 days\n6\nHVAC Testing Schedule\nEmail   Word - Excel\n\n>30 days\n7\nAtrium Smoke Detector Testing Schedule\nEmail   Word   Excel\n\n>30 days\n8\nAnnual Test Report\nEmail   PDF - Excel\n\n14 Days\n9\nSemi-Annual Test Report\nEmail   PDF   Excel\n\n14 Days\n10\nQuarterly Test Report\nEmail   PDF   Excel\n\n14 Days\n11\nElevator Device Test Report\nEmail   PDF   Excel\n\n14 Days\n12\nKitchen Hood Test Report\nEmail   PDF - Excel\n\n14 Days\n\n\n7. Contractor Responsibility:  \n\nPrior to bidding, it shall be the responsibility of the bidder to visit Cleveland VAMC and inspect the fire alarm system and facility to establish to their satisfaction the condition of the fire alarm equipment to be maintained and any other conditions affecting the work to be performed.  This equipment is offered in an \"as-is\" condition.  No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract. \n\nThis contract is a firm-fixed-price service contract, under which the contractor assumes the risk and full responsibility for the costs of performance and any resulting profit or loss, except to the limited extent that a valid contract change or other contractual remedy applies. Under the contract s Statement of Work (SOW), the contractor is required to provide all parts, materials, labor, supervision, test equipment, technical manuals, and transportation necessary to perform required preventive maintenance on the Government-owned Notifier fire alarm and fire suppression components at the Cleveland VAMC. \n\nThe SOW further requires the contractor to perform inspection and testing of the fire alarm system in accordance with NFPA 72-2022 and Joint Commission (TJC) standards, and to submit detailed test reports and field service documentation that meet those standards.  Test reports shall be delivered in both Microsoft Excel, with device type separated by tab and report generated from Fire Alarm System.\n\nThe existing fire system is currently being upgraded, and this contract will incorporate the maintenance and inspection of all new system equipment and devices as they are put into service to include unlisted ancillary equipment and devices, and any devices or equipment added because\nof new construction or renovation during the performance period.\n\nQuarterly meetings will be conducted with CO, COR, and contractor leadership.  Quarterly meetings may be in-person or virtual.\nContractor shall be currently engaged in maintenance, repair, inspection, and testing of Notifier Fire Alarm equipment.  At bid submission, contractor shall provide proof of a minimum of five (5) years within the last seven (7) years of successful experience testing and maintaining Notifier Fire Alarm Systems identical to or similar to the size and complexity of facilities and system covered under this SOW.    \nOfferors shall submit references for the five (5) years of experience including names, addresses, and telephone numbers of specific companies and key personnel to contact.\nThe awarded contractor shall provide a Contract Manager who shall be responsible for the performance of the work. Contractor shall provide onsite Project Manager throughout the Annual and Semi-Annual testing period.  The name of the Contract manager, alternate contract manager and onsite project manager shall be designated in writing to the CO/COR prior to the Contract start date. Changes to personnel shall be submitted to the Government within five (5) workdays of the changes. \nThe Contract Manager or alternate shall have full authority to act on all Contract matters relating to the daily operation of the Contract. The Contract Manager or alternate shall be available to speak/meet with the CO or COR within 24 hours of request during normal operating hours, and or within the next business day after Friday or a Federal holiday.\nCOR will reference the Quality Assurance Surveillance Plan to ensure contractor meets the deliverable requirements outlined in section 6 of this SOW.  \nCOR will ensure inspection reports are completed timely and uploaded into the VA maintenance records.  \n\n\n8. Check   In Requirements: The Contractor Service Personnel and/or representative must report to the Electric Shop Supervisor within the engineering department or designated point of contact (POC) to sign in with department staff before work begins. Upon completion of work, the Contractor Service Personnel and/or representative must report to the appropriate department to sign out. \n\n9. Security Requirements: The C&A requirements do not apply, and a Security Accreditation Package is not required.\n\n9.1. Dedicated personnel will be assigned solely to observe, interact, assist, and assure protection of VA sensitive information. \n\n9.2. Contractor employees providing services at VA facilities may undergo a security clearance in the form of a basic background investigation.Â \n\n10. General Security: Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.\n\n11. VA Information Custodial Language: \n\n11.1. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1). \n\n11.2. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.\n\n\n12. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI).  \n\nNo government furnished equipment will be issued to complete the requirements of this contract.\n\n13. Other Pertinent Information or Special Considerations. \n\nLouis Stokes VAMC facility covers approximately 2 million square feet distributed between the following areas:\nCares Tower\nMain Facility\nAtrium\nWomen s Health Annex \nLearning Exchange \nParking Garage\nThe fire alarm system at Louis Stokes VAMC is currently being upgraded to a new Notifier system.\nUpgrade project will not be completed within the next 12 months\nFire Alarm Reports will come from both systems to be complete.\nCoordination with fire alarm project will be required to schedule testing.\nProof of testing and inspection on Notifier systems of similar size in five (5) of the last seven (7) years.\nAll Annual testing requirements (except elevator associated devices) will be started and completed in the month of January.\nAll testing requirements for elevator associated devices will be started and completed in the month of February. \nAll Semi-annual testing requirements will be started and completed in the month of July.\nAll Quarterly testing requirements will be started and completed in the months of January, April, July, and October.\nKitchen Hood Testing: \nCompleted two times per year after 7pm M-F\nJune and December\nWeekly Fire Pump testing will be completed and documented by VA personnel\nTesting will require the following to complete:\nClimbing, bending, crawling\nLadder use\nVertical Scissor Lift.  Lift not supplied by government.\nMagnet\nNotifier Keys\nCanned Smoke\nLaptop or Tablet to access CLSS Gateway network\nAny other tools/equipment contractor determines necessary to complete testing\n\nVA personnel will assist contactor as needed to complete the following:\nGain access to secure areas\nLocate difficult to find areas.\n\nEfforts to minimize disruption to patients and patient care must be considered during scheduling and completing testing.\nMay require after hours or weekend testing to support patient care.\nFederal holidays may be utilized with proper coordination with COR, approval from engineering management, and adequate VA staff to support contractor testing.\n\nElevator shaft and mechanical testing to be conducted over an identified weekend each February in coordination with the elevator contractor and VA electronics shop.\nTesting requires 1 fire alarm contractor technician for 10 hours over two weekend days (Saturday and Sunday)\n\nLive Testing:\nContractor shall provide requested schedule for required live testing no less than 30 days before required testing month.\nLive testing will be completed during an identified weekend during the annual testing period.\nSundays are preferred testing day for live testing.\n\nPull station testing will be completed separately from other testing to minimize fire door activation and disruption to the facility.\nPull station testing schedule will be provided by contractor and routed to VA for approval no less than 30 days before required testing month.\nPull station testing can be coordinated to be completed over an approved weekend.\n\nHVAC duct detector testing:\nWill be conducted in conjunction with the HVAC shop\nTesting schedule will be generated in advance and approved by all necessary parties\nTest results must verify and document the following:\nFire damper activates\nHVAC unit shuts down\nHVAC unit able to be reset to normal after testing: Yes-No\n\nAtrium Smoke Detectors\nTested will be conducted on a scheduled Saturday (8 hours)\nRequires use of scissor lift\nContractor will provide lift and lift operator.\nCeiling height to atrium smoke detectors is 40 feet.\n\nTamper and Water Flow Testing\nUnder TJC.02.03.05 and NFPA 25\nWater Flow devices require quarterly testing (4 times per year   January, April, July, October)\nNFPA 25 requirements include requirements for water to flow during this testing.\nMust operate flow valve and flow water to activate signal \nTamper switches require semiannual testing (2 times per year   January and July)\n\nAt bid submission, contractor must provide proof of ability to access and source necessary repair parts and programming for all Notifier Fire Alarm equipment installed within Louis Stokes VAMC.\nContractor must demonstrate access to the following fire alarm system, vendor support and parts procurement:\nNotifier Dealer\nNotifier programming capability\nNotifier parts\nNotifier technical support\nGateway / CLSS\nTesting reports generated through CLSS gateway at no additional cost to the government\n\nParking: Onsite parking is not available, and all contractor personnel will be required to obtain street side parking.\n a.  Identification of Possible Follow-on Work.  \n\nAny additional repair or replacement work required outside this contract will require contractor to submit a quote to COR and receive an approved PO before beginning work. \n\n b.  Identification of Potential Conflicts of Interest (COI). \n  None\n\n c.  Identification of Non-Disclosure Requirements. \n  Not Applicable\n\n d.  Packaging, Packing and Shipping Instructions.  \n  None\n\n e.  Inspection and Acceptance Criteria.  \nContractor will be responsible for meeting all inspection and timelines listed in this SOW. \n14. Risk Control\nWork performed within the medical center may present health risks including exposure to illness and infection control. Contractor will take action to recognize and follow warning information throughout the facility.  \n15. Place of Performance. \n\nLouis Stokes VA Medical Center \n10701 East Blvd\nCleveland, Ohio\n44106\n16. Period of Performance. \nBase Year: A date of award for duration of. 365 calendar days & 4 Option Years","origin":"detail"},"contacts":[{"name":"Lakeisha Jackson","role":"primary","email":"Lakeisha.Jackson@va.gov","phone":"(216) 447-8300 ext. 49622","title":"Contract Specialist"}],"place_of_performance":{"zip":"44106","city":{"name":"Cleveland"},"state":{"code":"OH","name":"Ohio"},"street":"Department of Veteran Affairs Cleveland VA Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"10701 East Blvd."},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"naics_codes":["561621"],"award":{"awardee":{}},"attachments":[{"resource_id":"16fc8476211d4718984b99c2e793958b","name":"36C25027Q0066_1.docx","kind":"file","mime_type":".docx","size_bytes":36644,"posted_at":"2026-10-23T17:21:38.234Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/16fc8476211d4718984b99c2e793958b/download","mirrored":false}],"awards":[],"related":[{"key":"36C25027R0008","latest_notice_id":"6e347dd0f37b401c9a6df8fec54a7998","title":"C1DA-- AE Replace Elevators 539-24-102","solicitation_number":"36C25027R0008","notice_type":"p","first_type":"p","first_posted":"2026-10-16","last_posted":"2026-10-16","notices":1,"due_at":"2026-11-02T16:00:00Z","due_date":"2026-11-02","closes_at":"2026-11-02T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"541330","psc":"C1DA","set_aside":"SDVOSBC","state":"OH","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"CINCINNATI VA MEDICAL CENTER 3200 VINE STREET CINCINNATI, OHIO 45220-2637","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-17T03:49:26.118050Z"},{"key":"36C25027Q0052","latest_notice_id":"15fafc99ab5b43e4afc21e7f8067d07b","title":"6505--FY27 Low Energy General Radiopharmaceuticals 36C25027Q0052","solicitation_number":"36C25027Q0052","notice_type":"r","first_type":"r","first_posted":"2026-10-19","last_posted":"2026-10-19","notices":1,"due_at":"2026-11-03T14:00:00Z","due_date":"2026-11-03","closes_at":"2026-11-03T14:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"325412","psc":"6505","set_aside":null,"state":"OH","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-20T03:49:45.611939Z"},{"key":"36C25027Q0022","latest_notice_id":"d711c95111f34b6cb80e4c1a9dc7f5d3","title":"S205--General Waste & Recycling Removal Services - Detroit PoP 04/01/2032","solicitation_number":"36C25027Q0022","notice_type":"k","first_type":"k","first_posted":"2026-10-08","last_posted":"2026-10-28","notices":2,"due_at":"2026-11-03T17:00:00Z","due_date":"2026-11-03","closes_at":"2026-11-03T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"562111","psc":"S205","set_aside":null,"state":"MI","county":"26163","county_name":"Wayne County","city":"2622000","city_name":"Detroit","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"36C25027R0010","latest_notice_id":"fbba2decdd11469d9e4039810a77a8db","title":"C1DA--AE Replace Elevators Cx 539-24-102","solicitation_number":"36C25027R0010","notice_type":"p","first_type":"p","first_posted":"2026-10-19","last_posted":"2026-10-19","notices":1,"due_at":"2026-11-03T18:00:00Z","due_date":"2026-11-03","closes_at":"2026-11-03T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"541330","psc":"C1DA","set_aside":"SDVOSBC","state":"OH","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"CINCINNATI VA MEDICAL CENTER 3200 VINE STREET CINCINNATI, OHIO 45220-2637","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-20T03:49:45.611939Z"},{"key":"36C25027R0009","latest_notice_id":"e55858d0be24443f8b48ad622db9230d","title":"C1DA--AE Replace Roofing 539-25-101","solicitation_number":"36C25027R0009","notice_type":"p","first_type":"p","first_posted":"2026-10-20","last_posted":"2026-10-20","notices":1,"due_at":"2026-11-04T16:00:00Z","due_date":"2026-11-04","closes_at":"2026-11-04T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"541330","psc":"C1DA","set_aside":"SDVOSBC","state":"OH","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":"sam_street","state_evidence":"CINCINNATI VA MEDICAL CENTER 3200 VINE STREET CINCINNATI, OHIO 45220-2637","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-21T04:01:16.865590Z"}],"similar_open":[{"key":"W91CRB27QA001","latest_notice_id":"5856f5b16fc74a97b80701719e94d1bd","title":"Security Gate Maintenance and Repair Services Aberdeen Test Center, Aberdeen Proving Ground, MD","solicitation_number":"W91CRB27QA001","notice_type":"r","first_type":"r","first_posted":"2026-10-15","last_posted":"2026-10-23","notices":3,"due_at":"2026-11-02T21:00:00Z","due_date":"2026-11-02","closes_at":"2026-11-02T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91CRB","office_name":"W6QK ACC-APG","naics":"561621","psc":"J063","set_aside":null,"state":"MD","county":"24025","county_name":"Harford County","city":"2400175","city_name":"Aberdeen Proving Ground","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Aberdeen Proving Ground","site_key":"aberdeen-proving-ground-md","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-24T03:56:54.139438Z"},{"key":"47PD5526Q0052","latest_notice_id":"af6acf1754364db29b2c39f30b00cdd0","title":"IRS Intrusion Detection System, C. Clifton Young Federal Building & US Courthouse","solicitation_number":"47PD5526Q0052","notice_type":"k","first_type":"k","first_posted":"2026-09-11","last_posted":"2026-10-22","notices":4,"due_at":"2026-11-03T00:00:00Z","due_date":"2026-11-02","closes_at":"2026-11-03T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-047","dept_name":"GENERAL SERVICES ADMINISTRATION","sub_key":"s-4740","sub_name":"PUBLIC BUILDINGS SERVICE","office_key":"o-47PD55","office_name":"PBS PROJECT DELIVERY WEST - BRANCH E","naics":"561621","psc":"N063","set_aside":"SBA","state":"NV","county":"32031","county_name":"Washoe County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-23T03:46:32.604852Z"},{"key":"36C24227Q0094","latest_notice_id":"6287ebdcb1b8474a901385a70199c48e","title":"H212-- Fire Pump Test and Alarm support","solicitation_number":"36C24227Q0094","notice_type":"r","first_type":"r","first_posted":"2026-10-27","last_posted":"2026-10-27","notices":1,"due_at":"2026-11-03T15:00:00Z","due_date":"2026-11-03","closes_at":"2026-11-03T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"561621","psc":"H212","set_aside":"SDVOSBC","state":"NY","county":"36027","county_name":"Dutchess County","city":"3678168","city_name":"Wappingers Falls","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-28T04:01:09.175983Z"}],"similar_open_total":21}