# 610 - COMPRESSORS Boiler Plant Bldg 76 - ENGINEERING, NIHCS

Canonical: https://abierto.us/opportunities/36c25026q0755

- Solicitation number: 36C25026Q0755
- Notice type: Sources sought
- Status: Closed. Deadline was July 22, 2026 at 11:00 AM EDT
- Department: Department of Veterans Affairs
- Contracting office: 250-Network Contract Office 10 (36C250)
- NAICS: 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Product or service code: 4410 Industrial Boilers
- Place of performance: Marion, Indiana
- First posted: July 17, 2026
- Last posted: July 17, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/7bf78a5787ab4f0d81c4a2cd8212bfcf/view

## Description

**STATEMENT OF WORK Introduction:** The Department of Veterans Affairs VA Northern Indiana Health Care System (VANIHCS) located at 1700 East 38th Street, Marion, Indiana, 46953 requires two (2) compressors for the Boiler Plant.

**Background:**

**Project Overview:** Purchase two (2) compressors and have them installed at the Boiler Plant in Building 76. Period of Performance:

**Start Date:** The project will commence by October 1, 2026. End Date: The project is expected to be completed by October 31, 2026. Place of Performance: Marion VA Medical Center,1700 East 38TH Street, Marion IN.

**46953-4589 Scope:**

**Project Deliverables:** The project will produce the following key deliverables:

**Deliverable 1:** Contractor will provide two (2) R4-11I- FIXED SPEED 4-11KW Compressors Deliverable 2: : Contractor will provide two (2) R4 Premium Efficiency Rotary Screw Compressor- 145 PSIg- Total Air System Deliverable 3: Contractor will provide two (2) Drive motor 208-230/460V 60Hz with Star Delta Starter Deliverable 4: Contractor will provide two (2) Coolant:

**Factory Filled with Ultra Coolant Deliverable 5:** Contractor will provide two (2) 80 Gallon Tank Mounted Deliverable 6: Contractor will provide two (2) Controller:

**XE-70M Microprocessor Controller Deliverable 7:** Contractor will provide two (2) Low sound enclosure Deliverable 8: Contractor will provide two (2) PORO Deliverable 9: Contractor will provide two (2) Start up kits Services: The following services will be provided as part of this project:

**Service 1:** Contractor will then install and start up both RA-11I-FIXED SPEED 4-11KW Compressors at the Marion Boiler Plant in Building 76.

## Publications

- July 17, 2026: Sources sought, due July 22, 2026 at 11:00 AM EDT. Notice 7bf78a5787ab4f0d81c4a2cd8212bfcf. https://sam.gov/workspace/contract/opp/7bf78a5787ab4f0d81c4a2cd8212bfcf/view

## Points of contact

- Tim Garrity, Contracting Specialist, timothy.garrity@va.gov, (480) 686-5349

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/36c25026q0755.