{"canonical":"https://abierto.us/opportunities/36c24924r0035","key":"36C24924R0035","url":"https://abierto.us/opportunities/36c24924r0035","title":"J062--596A4-24-102 - Replace Obsolete Lighting Troy Bowling Campus","solicitation_number":"36C24924R0035","notice_type":"a","open":false,"response_deadline":"2024-02-14T19:00:00Z","first_posted":"2024-01-09","last_posted":"2024-05-17","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"249-NETWORK CONTRACT OFFICE 9 (36C249)","naics":"238210","psc":"J062","set_aside":"SDVOSBC","place_state":"KY","place_county":"21067","place_county_name":"Fayette County","place_city":"2146027","place_city_name":"Lexington-Fayette","winner":"A TOTAL SOLUTION LLC","award_amount":"1989705.51","publications":[{"notice_id":"a6078fb4f59342029f385f57f57d9159","title":"6210--596A4-24-102 - Replace Obsolete Lighting","solicitation_number":"36C24924R0035","notice_type":"o","base_type":"o","posted":"2024-01-09","posted_at":null,"due_at":"2024-01-31T19:00:00Z","due_date":"2024-01-31","cancelled":null,"archived":null,"archive_date":"2024-03-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a6078fb4f59342029f385f57f57d9159/view","enriched":false,"history":[]},{"notice_id":"358c05e238ca437f833068ff379bdf8f","title":"6210--596A4-24-102 - Replace Obsolete Lighting","solicitation_number":"36C24924R0035","notice_type":"o","base_type":"o","posted":"2024-01-10","posted_at":null,"due_at":"2024-02-07T19:00:00Z","due_date":"2024-02-07","cancelled":null,"archived":null,"archive_date":"2024-03-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/358c05e238ca437f833068ff379bdf8f/view","enriched":false,"history":[]},{"notice_id":"4f91e39272234dfca30953334a4da6df","title":"6210--596A4-24-102 - Replace Obsolete Lighting","solicitation_number":"36C24924R0035","notice_type":"o","base_type":"o","posted":"2024-01-19","posted_at":null,"due_at":"2024-02-14T19:00:00Z","due_date":"2024-02-14","cancelled":null,"archived":null,"archive_date":"2024-03-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/4f91e39272234dfca30953334a4da6df/view","enriched":false,"history":[]},{"notice_id":"37f59026e6694c219c955fd9d5329cc7","title":"6210--596A4-24-102 - Replace Obsolete Lighting","solicitation_number":"36C24924R0035","notice_type":"o","base_type":"o","posted":"2024-01-23","posted_at":null,"due_at":"2024-02-14T19:00:00Z","due_date":"2024-02-14","cancelled":null,"archived":null,"archive_date":"2024-03-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/37f59026e6694c219c955fd9d5329cc7/view","enriched":false,"history":[]},{"notice_id":"96e01dfb462a490f95a7f7e9bc842279","title":"6210--596A4-24-102 - Replace Obsolete Lighting","solicitation_number":"36C24924R0035","notice_type":"o","base_type":"o","posted":"2024-01-24","posted_at":null,"due_at":"2024-02-14T19:00:00Z","due_date":"2024-02-14","cancelled":null,"archived":null,"archive_date":"2024-03-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/96e01dfb462a490f95a7f7e9bc842279/view","enriched":false,"history":[]},{"notice_id":"a05abe4107ba4a7d9084dd6570ece2ac","title":"6210--596A4-24-102 - Replace Obsolete Lighting","solicitation_number":"36C24924R0035","notice_type":"o","base_type":"o","posted":"2024-01-26","posted_at":null,"due_at":"2024-02-14T19:00:00Z","due_date":"2024-02-14","cancelled":null,"archived":null,"archive_date":"2024-03-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a05abe4107ba4a7d9084dd6570ece2ac/view","enriched":false,"history":[]},{"notice_id":"3b20dd2a29684db7805896c463ded54c","title":"6210--596A4-24-102 - Replace Obsolete Lighting","solicitation_number":"36C24924R0035","notice_type":"o","base_type":"o","posted":"2024-01-30","posted_at":null,"due_at":"2024-02-14T19:00:00Z","due_date":"2024-02-14","cancelled":null,"archived":null,"archive_date":"2024-03-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3b20dd2a29684db7805896c463ded54c/view","enriched":false,"history":[]},{"notice_id":"fac8c541e6ce46eebd86dcd2f69aeede","title":"J062--596A4-24-102 - Replace Obsolete Lighting Troy Bowling Campus","solicitation_number":"36C24924R0035","notice_type":"a","base_type":"a","posted":"2024-05-17","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-08-24","award_number":"36C24924C0054","awardee_name":"A TOTAL SOLUTION LLC FISHERVILLE 40023 KGZ","amount":"1989705.51","link_sam":"https://sam.gov/workspace/contract/opp/fac8c541e6ce46eebd86dcd2f69aeede/view","enriched":false,"history":[]}],"latest_notice_id":"fac8c541e6ce46eebd86dcd2f69aeede","first_type":"o","notices":[{"dates":{"posted":"2024-01-09","response_deadline":{"raw":"2024-01-31T13:00:00-06:00","utc":"2024-01-31T19:00:00Z","date":"2024-01-31","time":"13:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a6078fb4f59342029f385f57f57d9159/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"6210--596A4-24-102 - Replace Obsolete Lighting","agency":{"office":{"code":"36C249","name":"249-NETWORK CONTRACT OFFICE 9 (36C249)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"37129","city":"MURFREESBORO","state":"TN","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-03-31","archive_type":"auto_custom"},"contacts":[{"name":"Robert Pritchard","role":"primary","email":"robert.pritchard2@va.gov","title":"Contract Specialist"},{"name":"Jeffery A Ridenour","role":"secondary","email":"jeffery.ridenour@va.gov","phone":"6152255628"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"a6078fb4f59342029f385f57f57d9159","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"074a28abb3d14bac70c36e228efe0626b1a525d4b9f9c6f95c6b564050ea324d","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Amendment A00001 - Updated Evaluation Factors, revised FAR 52.233-2 Service of Protest, correct PSC Code, and includes updated attachments. CONSTRUCTION STATEMENT OF WORK Replace Obsolete Lighting (TBC), Troy Bowling Campus PROJECT NO: 596A4-24-102 PROJECT NAME: Replace Obsolete Lighting (TBC) Lexington-Cooper, KY **The Certification and Accreditation (C&A) does not apply, a Security Accreditation Package is not required** 1. GENERAL INTENT: The Contractor shall provide construction services to remove approximately 9300 ballast lamp fixtures, purchase replacement fixtures, and install for the Lexington VA Health Care System Troy Bowling campus in accordance with this statement of work. 2. Background: The Lexington VA has obsolete lighting infrastructure in need of replacement in accordance with VA specifications. A recent patient safety directive requires the replacement of these ballast fixtures with new LED fixtures. 3. SCOPE OF WORK: The contractor shall provide all supervision, labor, materials, tools, equipment, and construction services necessary for replacing existing ballast driven lighting devices with Buy American LED type lighting fixtures. Center basket option is preferred where allowed by the VA design guide. Fixture counts and locations are shown in Attachment 6 of the solicitation. The contractor shall work with LED manufacturing representative(s) to select the size and number of LEDs assuring the retrofit provides the necessary lighting levels (per the VA Design Guide) at the lowest possible wattage. The contractor shall submit all proposed lighting components to the COR with all photometrics showing compliance with the VA Design Guide prior to the install. Whips or wiring from junction points to the device may need replaced in certain circumstances. The contractor must replace when it is determined to be a safety concern by the COR at no additional cost to the VA. Some work will be required after standard administrative hours; work may be limited to periods shorter than a standard shift, etc. for specific locations in the project. This is a medical environment and contractor shall take into consideration Infection Control, Demolition Noise, Dust Control, Security, Safety, and Specialized facility requirements as medical environment requires. Using the available space, it may be necessary to phase the project or work shifts as required by the contract or as any coordination with patient safety is required. The medical center must always remain in continuous operation, and any utility interruptions shall be planned and executed as required, so as to minimize any disruptions. At the completion of the project, the contractor shall submit to the COR a final energy savings report showing photographic evidence of changes, itemized listing of component changes, charts showing initial energy consumption estimates, and estimated energy savings per year. The report should be tailored for the facilities utilization to request a rebate from the local utility company. 4. GENERAL CONDITIONS AND DEFINITIONS: COR: Contracting Officers Representative. V.A. employee of VAMC Facilities and Engineering Service officially assigned to act as Project Manager and Inspector on behalf of VAMC and Contracting Officer. COR shall be First Point of Contact on all matters concerning technical work for subject Project. Coordinate all administrative and construction requirements exclusively with or through assigned COR of VAMC Facilities and Engineering Service; and. neither discuss contract work with, nor take any directives concerning contract work from any person other than COR unless specifically permitted and authorized to do so. Review and sign any Infection Control Construction Permit (ICCP) that will be provided by COR. ICCP s must be always posted outside of work area. ILSM: Interim Life Safety Measures: Any series of Operational Actions taken to temporarily reduce Hazards posed by Life Safety deficiencies which have been created by demolition, renovation, or construction works, and which are to remain in place and in effect for duration of Contract work. Provide interim life safety measures (ILSM) where fire protection, fire suppression or smoke/fire partitions and egress from an area will be shutdown or rendered ineffective during construction. Coordinate with VA safety office through VA COR. ILSM must be always posted outside work area. PROVIDE: Whenever used throughout Scope of Work, term Provide is to be understood to mean -Purchase newly manufactured; Furnish delivered to VAMC work site in protective containers; Secure from tampering or theft; and install in accordance with Contract Scope of Work, Specifications, and Manufacturer s Instructions. Definition of Terms Remove and Install with respect to subject project work: Remove - shall be understood to mean that existing object or system will be disposed of properly in accordance with EPA regulations. Any recycled material information shall be furnished to the COR with type and weight. Install - shall be understood to mean to replace existing object with new object. All electrical work such as pulling-in of wires and cables, circuit-breaker work, installing electrical devices and disconnect switches, working in electrical panels, and making of all electrical connections shall be performed by qualified electricians known and formally documented to be qualified in and experienced in electrical work. Coordinate all utility shutdowns with VA COR. Remove all debris and clean work site daily. The contractor shall assume all responsibility of items/equipment/debris removed or demoed. All items must be disposed of or recycled in compliance to local, state, and federal standards. Due to the age of the existing facility the exposure to Asbestos Containing Materials can occur. It is unexpected but the work outlined in the statement of work could meet the definition of small scale, short duration activities. In such cases, compliance with Federal Regulations with regards to engineering controls and safe work practices as outlined by EPA Title 40 must be followed. 5. Other Supporting Information: C.1 Contractor Furnished Materials All labor, materials, equipment to perform the job. When \"furnish\", \"provide\", \"install\", or similar term is used it shall mean a complete installation, ready for use. C.2 Government Furnished Materials and Services. Government furnished property, if any, will be identified and will only be used for the performance of this contract unless otherwise authorized by the Contracting Officer. The Contractor shall always take all steps necessary for maintenance and preservation of all Government-furnished property. The Contractor shall comply with all reasonable requests of the Contracting Officer to enclose, or specifically protect, Government-furnished property. C.3 Qualifications of Key Personnel Contractor s employees shall be knowledgeable of standards associated with this type of work. C.4 Supervision/Communications. At all times during the performance, the Contractor's Superintendent (if applicable) shall be available by cellular phone. Prior to beginning any work, the Contractor shall supply the COR with the telephone number for the Superintendent. The Contractor's \"Competent Person\" that meets OSHA training guidelines, who can make decisions and acting on behalf of the Contractor, shall be physically located on site at all times during performance of the contract. If the Contractor's Competent Person is absent from the job site for an extended period of time, the COR may send all Contractor/sub-contractor employees off the job. C.5 Security Requirements: The Authorization requirements do not apply, and a Security Accreditation Package is not required. Contractor shall identify which employees will be working under the awarded contract. Contractor personnel shall include employees, sub-contractors, subcontractor employees, suppliers and delivery personnel entering the Medical Center. This does not apply to suppliers and delivery personnel making deliveries to the VA warehouse dock only. Those employees shall bring photo ID to obtain a VA Contractor identification badge that shall be worn above the belt at all times while on Medical Center property. Contractor's employees shall return all I.D. badges to designated personnel. C.6 The Contracting Officer's Representative (COR) is responsible for the inspection of the work called for in this contract and will be identified at the time of award. Inspections made by the COR are for the sole benefit of the Government and does not relieve the Contractor of any quality control responsibilities. C.7 The Safety Manger is responsible for safety inspections of all contract operations. C.8 Drawings General. Contract drawings (if applicable) will indicate the extent and location of work. If any departure from the contract drawings is deemed necessary by the Contractor, the details of such departure and the reasons therefore shall be submitted to the Contracting Officer for approval as soon as practical. No such departure shall be made without proper written permission of the Contracting Officer. The Contractor is responsible for all information and requirements in drawings and specifications that pertain to the contract. C.9 Verification of Dimensions The Contractor shall visit the job site to thoroughly familiarize himself with all the details of the work and working conditions. The Contractor shall also verify all dimensions in the field and shall advise the Contracting Officer of any discrepancy before performing any work. The Contractor shall be specifically responsible for the coordination and proper relation of his work to the building, structure, phasing and ensure the safety of employees and workmen. C.10 Smoking Policy No smoking on VA property. C.11 Parking/Traffic Regulations - The Contractor shall not park on grassy areas unless approved by the COR and the Contractor agrees to restore areas back to VA standards. Drivers shall be particularly concerned with pedestrian traffic and yield to pedestrians in crosswalks. Posted speed limits and all other traffic controls are to be always observed by operators. Seat belt use is mandatory on the VA grounds. 6. Records Management RECORDS MANAGEMENT OBLIGATIONS A. Â Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists. Â B. Â Definitions Federal record as defined in 44 U.S.C. Â§ 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them. Â The term Federal record: includes [Agency] records.Â does not include personal materials. applies to records created, received, or maintained by Contractors pursuant to their [Agency] contract. may include deliverables and documentation associated with deliverables. C. Â Requirements Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.Â In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.Â In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.Â [Agency] and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of [Agency] or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of Â any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to [Agency]. The agency must report promptly to NARA in accordance with 36 CFR 1230. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to [Agency] control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4). The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and [Agency] guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with [Agency] policy.Â The Contractor shall not create or maintain any records containing any non-public [Agency] information that are not specifically tied to or authorized by the contract.Â The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.Â The [Agency] owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which [Agency] shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20. Training. Â All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take [Agency]-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.Â [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.]Â D. Â Flowdown of requirements to subcontractors The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.Â Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor. GOVERNMENT POINTS OF CONTACT Name Title E-Mail [Robert Pritchard] Contracting Officer [Robert.pritchard2@va.gov] EXPECTED COMPLETION TIME from NOTICE TO PROCEED: 270 Calendar days. End of SOW","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24924R0035","place_of_performance":{"zip":"40502","city":{"name":"Lexington"},"state":{"code":"KY"},"country":{"code":"USA"}},"product_service_code":"J062"},{"dates":{"posted":"2024-01-10","response_deadline":{"raw":"2024-02-07T13:00:00-06:00","utc":"2024-02-07T19:00:00Z","date":"2024-02-07","time":"13:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/358c05e238ca437f833068ff379bdf8f/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"6210--596A4-24-102 - Replace Obsolete Lighting","agency":{"office":{"code":"36C249","name":"249-NETWORK CONTRACT OFFICE 9 (36C249)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"37129","city":"MURFREESBORO","state":"TN","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-03-31","archive_type":"auto_custom"},"contacts":[{"name":"Robert Pritchard","role":"primary","email":"robert.pritchard2@va.gov","title":"Contract Specialist"},{"name":"Jeffery A Ridenour","role":"secondary","email":"jeffery.ridenour@va.gov","phone":"6152255628"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"358c05e238ca437f833068ff379bdf8f","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"fb2d3741845acb5c02e40349b2411df5d6268c153706f2bf9209031efc645f6e","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Amendment A00002 - Extend proposal due date and reschedule pre-bid site visit. Amendment A00001 - Updated Evaluation Factors, revised FAR 52.233-2 Service of Protest, correct PSC Code, and includes updated attachments. CONSTRUCTION STATEMENT OF WORK Replace Obsolete Lighting (TBC), Troy Bowling Campus PROJECT NO: 596A4-24-102 PROJECT NAME: Replace Obsolete Lighting (TBC) Lexington-Cooper, KY **The Certification and Accreditation (C&A) does not apply, a Security Accreditation Package is not required** 1. GENERAL INTENT: The Contractor shall provide construction services to remove approximately 9300 ballast lamp fixtures, purchase replacement fixtures, and install for the Lexington VA Health Care System Troy Bowling campus in accordance with this statement of work. 2. Background: The Lexington VA has obsolete lighting infrastructure in need of replacement in accordance with VA specifications. A recent patient safety directive requires the replacement of these ballast fixtures with new LED fixtures. 3. SCOPE OF WORK: The contractor shall provide all supervision, labor, materials, tools, equipment, and construction services necessary for replacing existing ballast driven lighting devices with Buy American LED type lighting fixtures. Center basket option is preferred where allowed by the VA design guide. Fixture counts and locations are shown in Attachment 6 of the solicitation. The contractor shall work with LED manufacturing representative(s) to select the size and number of LEDs assuring the retrofit provides the necessary lighting levels (per the VA Design Guide) at the lowest possible wattage. The contractor shall submit all proposed lighting components to the COR with all photometrics showing compliance with the VA Design Guide prior to the install. Whips or wiring from junction points to the device may need replaced in certain circumstances. The contractor must replace when it is determined to be a safety concern by the COR at no additional cost to the VA. Some work will be required after standard administrative hours; work may be limited to periods shorter than a standard shift, etc. for specific locations in the project. This is a medical environment and contractor shall take into consideration Infection Control, Demolition Noise, Dust Control, Security, Safety, and Specialized facility requirements as medical environment requires. Using the available space, it may be necessary to phase the project or work shifts as required by the contract or as any coordination with patient safety is required. The medical center must always remain in continuous operation, and any utility interruptions shall be planned and executed as required, so as to minimize any disruptions. At the completion of the project, the contractor shall submit to the COR a final energy savings report showing photographic evidence of changes, itemized listing of component changes, charts showing initial energy consumption estimates, and estimated energy savings per year. The report should be tailored for the facilities utilization to request a rebate from the local utility company. 4. GENERAL CONDITIONS AND DEFINITIONS: COR: Contracting Officers Representative. V.A. employee of VAMC Facilities and Engineering Service officially assigned to act as Project Manager and Inspector on behalf of VAMC and Contracting Officer. COR shall be First Point of Contact on all matters concerning technical work for subject Project. Coordinate all administrative and construction requirements exclusively with or through assigned COR of VAMC Facilities and Engineering Service; and. neither discuss contract work with, nor take any directives concerning contract work from any person other than COR unless specifically permitted and authorized to do so. Review and sign any Infection Control Construction Permit (ICCP) that will be provided by COR. ICCP s must be always posted outside of work area. ILSM: Interim Life Safety Measures: Any series of Operational Actions taken to temporarily reduce Hazards posed by Life Safety deficiencies which have been created by demolition, renovation, or construction works, and which are to remain in place and in effect for duration of Contract work. Provide interim life safety measures (ILSM) where fire protection, fire suppression or smoke/fire partitions and egress from an area will be shutdown or rendered ineffective during construction. Coordinate with VA safety office through VA COR. ILSM must be always posted outside work area. PROVIDE: Whenever used throughout Scope of Work, term Provide is to be understood to mean -Purchase newly manufactured; Furnish delivered to VAMC work site in protective containers; Secure from tampering or theft; and install in accordance with Contract Scope of Work, Specifications, and Manufacturer s Instructions. Definition of Terms Remove and Install with respect to subject project work: Remove - shall be understood to mean that existing object or system will be disposed of properly in accordance with EPA regulations. Any recycled material information shall be furnished to the COR with type and weight. Install - shall be understood to mean to replace existing object with new object. All electrical work such as pulling-in of wires and cables, circuit-breaker work, installing electrical devices and disconnect switches, working in electrical panels, and making of all electrical connections shall be performed by qualified electricians known and formally documented to be qualified in and experienced in electrical work. Coordinate all utility shutdowns with VA COR. Remove all debris and clean work site daily. The contractor shall assume all responsibility of items/equipment/debris removed or demoed. All items must be disposed of or recycled in compliance to local, state, and federal standards. Due to the age of the existing facility the exposure to Asbestos Containing Materials can occur. It is unexpected but the work outlined in the statement of work could meet the definition of small scale, short duration activities. In such cases, compliance with Federal Regulations with regards to engineering controls and safe work practices as outlined by EPA Title 40 must be followed. 5. Other Supporting Information: C.1 Contractor Furnished Materials All labor, materials, equipment to perform the job. When \"furnish\", \"provide\", \"install\", or similar term is used it shall mean a complete installation, ready for use. C.2 Government Furnished Materials and Services. Government furnished property, if any, will be identified and will only be used for the performance of this contract unless otherwise authorized by the Contracting Officer. The Contractor shall always take all steps necessary for maintenance and preservation of all Government-furnished property. The Contractor shall comply with all reasonable requests of the Contracting Officer to enclose, or specifically protect, Government-furnished property. C.3 Qualifications of Key Personnel Contractor s employees shall be knowledgeable of standards associated with this type of work. C.4 Supervision/Communications. At all times during the performance, the Contractor's Superintendent (if applicable) shall be available by cellular phone. Prior to beginning any work, the Contractor shall supply the COR with the telephone number for the Superintendent. The Contractor's \"Competent Person\" that meets OSHA training guidelines, who can make decisions and acting on behalf of the Contractor, shall be physically located on site at all times during performance of the contract. If the Contractor's Competent Person is absent from the job site for an extended period of time, the COR may send all Contractor/sub-contractor employees off the job. C.5 Security Requirements: The Authorization requirements do not apply, and a Security Accreditation Package is not required. Contractor shall identify which employees will be working under the awarded contract. Contractor personnel shall include employees, sub-contractors, subcontractor employees, suppliers and delivery personnel entering the Medical Center. This does not apply to suppliers and delivery personnel making deliveries to the VA warehouse dock only. Those employees shall bring photo ID to obtain a VA Contractor identification badge that shall be worn above the belt at all times while on Medical Center property. Contractor's employees shall return all I.D. badges to designated personnel. C.6 The Contracting Officer's Representative (COR) is responsible for the inspection of the work called for in this contract and will be identified at the time of award. Inspections made by the COR are for the sole benefit of the Government and does not relieve the Contractor of any quality control responsibilities. C.7 The Safety Manger is responsible for safety inspections of all contract operations. C.8 Drawings General. Contract drawings (if applicable) will indicate the extent and location of work. If any departure from the contract drawings is deemed necessary by the Contractor, the details of such departure and the reasons therefore shall be submitted to the Contracting Officer for approval as soon as practical. No such departure shall be made without proper written permission of the Contracting Officer. The Contractor is responsible for all information and requirements in drawings and specifications that pertain to the contract. C.9 Verification of Dimensions The Contractor shall visit the job site to thoroughly familiarize himself with all the details of the work and working conditions. The Contractor shall also verify all dimensions in the field and shall advise the Contracting Officer of any discrepancy before performing any work. The Contractor shall be specifically responsible for the coordination and proper relation of his work to the building, structure, phasing and ensure the safety of employees and workmen. C.10 Smoking Policy No smoking on VA property. C.11 Parking/Traffic Regulations - The Contractor shall not park on grassy areas unless approved by the COR and the Contractor agrees to restore areas back to VA standards. Drivers shall be particularly concerned with pedestrian traffic and yield to pedestrians in crosswalks. Posted speed limits and all other traffic controls are to be always observed by operators. Seat belt use is mandatory on the VA grounds. 6. Records Management RECORDS MANAGEMENT OBLIGATIONS A. Â Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists. Â B. Â Definitions Federal record as defined in 44 U.S.C. Â§ 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them. Â The term Federal record: includes [Agency] records.Â does not include personal materials. applies to records created, received, or maintained by Contractors pursuant to their [Agency] contract. may include deliverables and documentation associated with deliverables. C. Â Requirements Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.Â In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.Â In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.Â [Agency] and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of [Agency] or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of Â any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to [Agency]. The agency must report promptly to NARA in accordance with 36 CFR 1230. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to [Agency] control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4). The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and [Agency] guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with [Agency] policy.Â The Contractor shall not create or maintain any records containing any non-public [Agency] information that are not specifically tied to or authorized by the contract.Â The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.Â The [Agency] owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which [Agency] shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20. Training. Â All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take [Agency]-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.Â [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.]Â D. Â Flowdown of requirements to subcontractors The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.Â Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor. GOVERNMENT POINTS OF CONTACT Name Title E-Mail [Robert Pritchard] Contracting Officer [Robert.pritchard2@va.gov] EXPECTED COMPLETION TIME from NOTICE TO PROCEED: 270 Calendar days. End of SOW","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24924R0035","place_of_performance":{"zip":"40502","city":{"name":"Lexington"},"state":{"code":"KY"},"country":{"code":"USA"}},"product_service_code":"J062"},{"dates":{"posted":"2024-01-19","response_deadline":{"raw":"2024-02-14T13:00:00-06:00","utc":"2024-02-14T19:00:00Z","date":"2024-02-14","time":"13:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/4f91e39272234dfca30953334a4da6df/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"6210--596A4-24-102 - Replace Obsolete Lighting","agency":{"office":{"code":"36C249","name":"249-NETWORK CONTRACT OFFICE 9 (36C249)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"37129","city":"MURFREESBORO","state":"TN","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-03-31","archive_type":"auto_custom"},"contacts":[{"name":"Robert Pritchard","role":"primary","email":"robert.pritchard2@va.gov","title":"Contract Specialist"},{"name":"Jeffery A Ridenour","role":"secondary","email":"jeffery.ridenour@va.gov","phone":"6152255628"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"4f91e39272234dfca30953334a4da6df","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"82d70a00c63c7b6a7d5a519aa8811904c427e8534ff9b096e1ce03af4ba8ec17","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Amendment A00003 - The purpose of this amendment is to provide the pre-bid sign-in sheet and change the RFI due date from 1/19/2024 to 1/24/2024. Amendment A00002 - Extend proposal due date and reschedule pre-bid site visit. Amendment A00001 - Updated Evaluation Factors, revised FAR 52.233-2 Service of Protest, correct PSC Code, and includes updated attachments. CONSTRUCTION STATEMENT OF WORK Replace Obsolete Lighting (TBC), Troy Bowling Campus PROJECT NO: 596A4-24-102 PROJECT NAME: Replace Obsolete Lighting (TBC) Lexington-Cooper, KY **The Certification and Accreditation (C&A) does not apply, a Security Accreditation Package is not required** 1. GENERAL INTENT: The Contractor shall provide construction services to remove approximately 9300 ballast lamp fixtures, purchase replacement fixtures, and install for the Lexington VA Health Care System Troy Bowling campus in accordance with this statement of work. 2. Background: The Lexington VA has obsolete lighting infrastructure in need of replacement in accordance with VA specifications. A recent patient safety directive requires the replacement of these ballast fixtures with new LED fixtures. 3. SCOPE OF WORK: The contractor shall provide all supervision, labor, materials, tools, equipment, and construction services necessary for replacing existing ballast driven lighting devices with Buy American LED type lighting fixtures. Center basket option is preferred where allowed by the VA design guide. Fixture counts and locations are shown in Attachment 6 of the solicitation. The contractor shall work with LED manufacturing representative(s) to select the size and number of LEDs assuring the retrofit provides the necessary lighting levels (per the VA Design Guide) at the lowest possible wattage. The contractor shall submit all proposed lighting components to the COR with all photometrics showing compliance with the VA Design Guide prior to the install. Whips or wiring from junction points to the device may need replaced in certain circumstances. The contractor must replace when it is determined to be a safety concern by the COR at no additional cost to the VA. Some work will be required after standard administrative hours; work may be limited to periods shorter than a standard shift, etc. for specific locations in the project. This is a medical environment and contractor shall take into consideration Infection Control, Demolition Noise, Dust Control, Security, Safety, and Specialized facility requirements as medical environment requires. Using the available space, it may be necessary to phase the project or work shifts as required by the contract or as any coordination with patient safety is required. The medical center must always remain in continuous operation, and any utility interruptions shall be planned and executed as required, so as to minimize any disruptions. At the completion of the project, the contractor shall submit to the COR a final energy savings report showing photographic evidence of changes, itemized listing of component changes, charts showing initial energy consumption estimates, and estimated energy savings per year. The report should be tailored for the facilities utilization to request a rebate from the local utility company. 4. GENERAL CONDITIONS AND DEFINITIONS: COR: Contracting Officers Representative. V.A. employee of VAMC Facilities and Engineering Service officially assigned to act as Project Manager and Inspector on behalf of VAMC and Contracting Officer. COR shall be First Point of Contact on all matters concerning technical work for subject Project. Coordinate all administrative and construction requirements exclusively with or through assigned COR of VAMC Facilities and Engineering Service; and. neither discuss contract work with, nor take any directives concerning contract work from any person other than COR unless specifically permitted and authorized to do so. Review and sign any Infection Control Construction Permit (ICCP) that will be provided by COR. ICCP s must be always posted outside of work area. ILSM: Interim Life Safety Measures: Any series of Operational Actions taken to temporarily reduce Hazards posed by Life Safety deficiencies which have been created by demolition, renovation, or construction works, and which are to remain in place and in effect for duration of Contract work. Provide interim life safety measures (ILSM) where fire protection, fire suppression or smoke/fire partitions and egress from an area will be shutdown or rendered ineffective during construction. Coordinate with VA safety office through VA COR. ILSM must be always posted outside work area. PROVIDE: Whenever used throughout Scope of Work, term Provide is to be understood to mean -Purchase newly manufactured; Furnish delivered to VAMC work site in protective containers; Secure from tampering or theft; and install in accordance with Contract Scope of Work, Specifications, and Manufacturer s Instructions. Definition of Terms Remove and Install with respect to subject project work: Remove - shall be understood to mean that existing object or system will be disposed of properly in accordance with EPA regulations. Any recycled material information shall be furnished to the COR with type and weight. Install - shall be understood to mean to replace existing object with new object. All electrical work such as pulling-in of wires and cables, circuit-breaker work, installing electrical devices and disconnect switches, working in electrical panels, and making of all electrical connections shall be performed by qualified electricians known and formally documented to be qualified in and experienced in electrical work. Coordinate all utility shutdowns with VA COR. Remove all debris and clean work site daily. The contractor shall assume all responsibility of items/equipment/debris removed or demoed. All items must be disposed of or recycled in compliance to local, state, and federal standards. Due to the age of the existing facility the exposure to Asbestos Containing Materials can occur. It is unexpected but the work outlined in the statement of work could meet the definition of small scale, short duration activities. In such cases, compliance with Federal Regulations with regards to engineering controls and safe work practices as outlined by EPA Title 40 must be followed. 5. Other Supporting Information: C.1 Contractor Furnished Materials All labor, materials, equipment to perform the job. When \"furnish\", \"provide\", \"install\", or similar term is used it shall mean a complete installation, ready for use. C.2 Government Furnished Materials and Services. Government furnished property, if any, will be identified and will only be used for the performance of this contract unless otherwise authorized by the Contracting Officer. The Contractor shall always take all steps necessary for maintenance and preservation of all Government-furnished property. The Contractor shall comply with all reasonable requests of the Contracting Officer to enclose, or specifically protect, Government-furnished property. C.3 Qualifications of Key Personnel Contractor s employees shall be knowledgeable of standards associated with this type of work. C.4 Supervision/Communications. At all times during the performance, the Contractor's Superintendent (if applicable) shall be available by cellular phone. Prior to beginning any work, the Contractor shall supply the COR with the telephone number for the Superintendent. The Contractor's \"Competent Person\" that meets OSHA training guidelines, who can make decisions and acting on behalf of the Contractor, shall be physically located on site at all times during performance of the contract. If the Contractor's Competent Person is absent from the job site for an extended period of time, the COR may send all Contractor/sub-contractor employees off the job. C.5 Security Requirements: The Authorization requirements do not apply, and a Security Accreditation Package is not required. Contractor shall identify which employees will be working under the awarded contract. Contractor personnel shall include employees, sub-contractors, subcontractor employees, suppliers and delivery personnel entering the Medical Center. This does not apply to suppliers and delivery personnel making deliveries to the VA warehouse dock only. Those employees shall bring photo ID to obtain a VA Contractor identification badge that shall be worn above the belt at all times while on Medical Center property. Contractor's employees shall return all I.D. badges to designated personnel. C.6 The Contracting Officer's Representative (COR) is responsible for the inspection of the work called for in this contract and will be identified at the time of award. Inspections made by the COR are for the sole benefit of the Government and does not relieve the Contractor of any quality control responsibilities. C.7 The Safety Manger is responsible for safety inspections of all contract operations. C.8 Drawings General. Contract drawings (if applicable) will indicate the extent and location of work. If any departure from the contract drawings is deemed necessary by the Contractor, the details of such departure and the reasons therefore shall be submitted to the Contracting Officer for approval as soon as practical. No such departure shall be made without proper written permission of the Contracting Officer. The Contractor is responsible for all information and requirements in drawings and specifications that pertain to the contract. C.9 Verification of Dimensions The Contractor shall visit the job site to thoroughly familiarize himself with all the details of the work and working conditions. The Contractor shall also verify all dimensions in the field and shall advise the Contracting Officer of any discrepancy before performing any work. The Contractor shall be specifically responsible for the coordination and proper relation of his work to the building, structure, phasing and ensure the safety of employees and workmen. C.10 Smoking Policy No smoking on VA property. C.11 Parking/Traffic Regulations - The Contractor shall not park on grassy areas unless approved by the COR and the Contractor agrees to restore areas back to VA standards. Drivers shall be particularly concerned with pedestrian traffic and yield to pedestrians in crosswalks. Posted speed limits and all other traffic controls are to be always observed by operators. Seat belt use is mandatory on the VA grounds. 6. Records Management RECORDS MANAGEMENT OBLIGATIONS A. Â Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists. Â B. Â Definitions Federal record as defined in 44 U.S.C. Â§ 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them. Â The term Federal record: includes [Agency] records.Â does not include personal materials. applies to records created, received, or maintained by Contractors pursuant to their [Agency] contract. may include deliverables and documentation associated with deliverables. C. Â Requirements Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.Â In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.Â In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.Â [Agency] and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of [Agency] or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of Â any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to [Agency]. The agency must report promptly to NARA in accordance with 36 CFR 1230. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to [Agency] control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4). The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and [Agency] guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with [Agency] policy.Â The Contractor shall not create or maintain any records containing any non-public [Agency] information that are not specifically tied to or authorized by the contract.Â The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.Â The [Agency] owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which [Agency] shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20. Training. Â All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take [Agency]-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.Â [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.]Â D. Â Flowdown of requirements to subcontractors The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.Â Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor. GOVERNMENT POINTS OF CONTACT Name Title E-Mail [Robert Pritchard] Contracting Officer [Robert.pritchard2@va.gov] EXPECTED COMPLETION TIME from NOTICE TO PROCEED: 270 Calendar days. End of SOW","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24924R0035","place_of_performance":{"zip":"40502","city":{"name":"Lexington"},"state":{"code":"KY"},"country":{"code":"USA"}},"product_service_code":"J062"},{"dates":{"posted":"2024-01-23","response_deadline":{"raw":"2024-02-14T13:00:00-06:00","utc":"2024-02-14T19:00:00Z","date":"2024-02-14","time":"13:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/37f59026e6694c219c955fd9d5329cc7/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"6210--596A4-24-102 - Replace Obsolete Lighting","agency":{"office":{"code":"36C249","name":"249-NETWORK CONTRACT OFFICE 9 (36C249)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"37129","city":"MURFREESBORO","state":"TN","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-03-31","archive_type":"auto_custom"},"contacts":[{"name":"Robert Pritchard","role":"primary","email":"robert.pritchard2@va.gov","title":"Contract Specialist"},{"name":"Jeffery A Ridenour","role":"secondary","email":"jeffery.ridenour@va.gov","phone":"6152255628"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"37f59026e6694c219c955fd9d5329cc7","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"97fd71b71c86b874db68f68eda2858335f391b7d30f77f26b4595a0f7e562330","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Amendment 0004 is being issued to answer RFI questions. Amendment A00003 - The purpose of this amendment is to provide the pre-bid sign-in sheet and change the RFI due date from 1/19/2024 to 1/24/2024. Amendment A00002 - Extend proposal due date and reschedule pre-bid site visit. Amendment A00001 - Updated Evaluation Factors, revised FAR 52.233-2 Service of Protest, correct PSC Code, and includes updated attachments. CONSTRUCTION STATEMENT OF WORK Replace Obsolete Lighting (TBC), Troy Bowling Campus PROJECT NO: 596A4-24-102 PROJECT NAME: Replace Obsolete Lighting (TBC) Lexington-Cooper, KY **The Certification and Accreditation (C&A) does not apply, a Security Accreditation Package is not required** 1. GENERAL INTENT: The Contractor shall provide construction services to remove approximately 9300 ballast lamp fixtures, purchase replacement fixtures, and install for the Lexington VA Health Care System Troy Bowling campus in accordance with this statement of work. 2. Background: The Lexington VA has obsolete lighting infrastructure in need of replacement in accordance with VA specifications. A recent patient safety directive requires the replacement of these ballast fixtures with new LED fixtures. 3. SCOPE OF WORK: The contractor shall provide all supervision, labor, materials, tools, equipment, and construction services necessary for replacing existing ballast driven lighting devices with Buy American LED type lighting fixtures. Center basket option is preferred where allowed by the VA design guide. Fixture counts and locations are shown in Attachment 6 of the solicitation. The contractor shall work with LED manufacturing representative(s) to select the size and number of LEDs assuring the retrofit provides the necessary lighting levels (per the VA Design Guide) at the lowest possible wattage. The contractor shall submit all proposed lighting components to the COR with all photometrics showing compliance with the VA Design Guide prior to the install. Whips or wiring from junction points to the device may need replaced in certain circumstances. The contractor must replace when it is determined to be a safety concern by the COR at no additional cost to the VA. Some work will be required after standard administrative hours; work may be limited to periods shorter than a standard shift, etc. for specific locations in the project. This is a medical environment and contractor shall take into consideration Infection Control, Demolition Noise, Dust Control, Security, Safety, and Specialized facility requirements as medical environment requires. Using the available space, it may be necessary to phase the project or work shifts as required by the contract or as any coordination with patient safety is required. The medical center must always remain in continuous operation, and any utility interruptions shall be planned and executed as required, so as to minimize any disruptions. At the completion of the project, the contractor shall submit to the COR a final energy savings report showing photographic evidence of changes, itemized listing of component changes, charts showing initial energy consumption estimates, and estimated energy savings per year. The report should be tailored for the facilities utilization to request a rebate from the local utility company. 4. GENERAL CONDITIONS AND DEFINITIONS: COR: Contracting Officers Representative. V.A. employee of VAMC Facilities and Engineering Service officially assigned to act as Project Manager and Inspector on behalf of VAMC and Contracting Officer. COR shall be First Point of Contact on all matters concerning technical work for subject Project. Coordinate all administrative and construction requirements exclusively with or through assigned COR of VAMC Facilities and Engineering Service; and. neither discuss contract work with, nor take any directives concerning contract work from any person other than COR unless specifically permitted and authorized to do so. Review and sign any Infection Control Construction Permit (ICCP) that will be provided by COR. ICCP s must be always posted outside of work area. ILSM: Interim Life Safety Measures: Any series of Operational Actions taken to temporarily reduce Hazards posed by Life Safety deficiencies which have been created by demolition, renovation, or construction works, and which are to remain in place and in effect for duration of Contract work. Provide interim life safety measures (ILSM) where fire protection, fire suppression or smoke/fire partitions and egress from an area will be shutdown or rendered ineffective during construction. Coordinate with VA safety office through VA COR. ILSM must be always posted outside work area. PROVIDE: Whenever used throughout Scope of Work, term Provide is to be understood to mean -Purchase newly manufactured; Furnish delivered to VAMC work site in protective containers; Secure from tampering or theft; and install in accordance with Contract Scope of Work, Specifications, and Manufacturer s Instructions. Definition of Terms Remove and Install with respect to subject project work: Remove - shall be understood to mean that existing object or system will be disposed of properly in accordance with EPA regulations. Any recycled material information shall be furnished to the COR with type and weight. Install - shall be understood to mean to replace existing object with new object. All electrical work such as pulling-in of wires and cables, circuit-breaker work, installing electrical devices and disconnect switches, working in electrical panels, and making of all electrical connections shall be performed by qualified electricians known and formally documented to be qualified in and experienced in electrical work. Coordinate all utility shutdowns with VA COR. Remove all debris and clean work site daily. The contractor shall assume all responsibility of items/equipment/debris removed or demoed. All items must be disposed of or recycled in compliance to local, state, and federal standards. Due to the age of the existing facility the exposure to Asbestos Containing Materials can occur. It is unexpected but the work outlined in the statement of work could meet the definition of small scale, short duration activities. In such cases, compliance with Federal Regulations with regards to engineering controls and safe work practices as outlined by EPA Title 40 must be followed. 5. Other Supporting Information: C.1 Contractor Furnished Materials All labor, materials, equipment to perform the job. When \"furnish\", \"provide\", \"install\", or similar term is used it shall mean a complete installation, ready for use. C.2 Government Furnished Materials and Services. Government furnished property, if any, will be identified and will only be used for the performance of this contract unless otherwise authorized by the Contracting Officer. The Contractor shall always take all steps necessary for maintenance and preservation of all Government-furnished property. The Contractor shall comply with all reasonable requests of the Contracting Officer to enclose, or specifically protect, Government-furnished property. C.3 Qualifications of Key Personnel Contractor s employees shall be knowledgeable of standards associated with this type of work. C.4 Supervision/Communications. At all times during the performance, the Contractor's Superintendent (if applicable) shall be available by cellular phone. Prior to beginning any work, the Contractor shall supply the COR with the telephone number for the Superintendent. The Contractor's \"Competent Person\" that meets OSHA training guidelines, who can make decisions and acting on behalf of the Contractor, shall be physically located on site at all times during performance of the contract. If the Contractor's Competent Person is absent from the job site for an extended period of time, the COR may send all Contractor/sub-contractor employees off the job. C.5 Security Requirements: The Authorization requirements do not apply, and a Security Accreditation Package is not required. Contractor shall identify which employees will be working under the awarded contract. Contractor personnel shall include employees, sub-contractors, subcontractor employees, suppliers and delivery personnel entering the Medical Center. This does not apply to suppliers and delivery personnel making deliveries to the VA warehouse dock only. Those employees shall bring photo ID to obtain a VA Contractor identification badge that shall be worn above the belt at all times while on Medical Center property. Contractor's employees shall return all I.D. badges to designated personnel. C.6 The Contracting Officer's Representative (COR) is responsible for the inspection of the work called for in this contract and will be identified at the time of award. Inspections made by the COR are for the sole benefit of the Government and does not relieve the Contractor of any quality control responsibilities. C.7 The Safety Manger is responsible for safety inspections of all contract operations. C.8 Drawings General. Contract drawings (if applicable) will indicate the extent and location of work. If any departure from the contract drawings is deemed necessary by the Contractor, the details of such departure and the reasons therefore shall be submitted to the Contracting Officer for approval as soon as practical. No such departure shall be made without proper written permission of the Contracting Officer. The Contractor is responsible for all information and requirements in drawings and specifications that pertain to the contract. C.9 Verification of Dimensions The Contractor shall visit the job site to thoroughly familiarize himself with all the details of the work and working conditions. The Contractor shall also verify all dimensions in the field and shall advise the Contracting Officer of any discrepancy before performing any work. The Contractor shall be specifically responsible for the coordination and proper relation of his work to the building, structure, phasing and ensure the safety of employees and workmen. C.10 Smoking Policy No smoking on VA property. C.11 Parking/Traffic Regulations - The Contractor shall not park on grassy areas unless approved by the COR and the Contractor agrees to restore areas back to VA standards. Drivers shall be particularly concerned with pedestrian traffic and yield to pedestrians in crosswalks. Posted speed limits and all other traffic controls are to be always observed by operators. Seat belt use is mandatory on the VA grounds. 6. Records Management RECORDS MANAGEMENT OBLIGATIONS A. Â Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists. Â B. Â Definitions Federal record as defined in 44 U.S.C. Â§ 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them. Â The term Federal record: includes [Agency] records.Â does not include personal materials. applies to records created, received, or maintained by Contractors pursuant to their [Agency] contract. may include deliverables and documentation associated with deliverables. C. Â Requirements Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.Â In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.Â In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.Â [Agency] and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of [Agency] or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of Â any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to [Agency]. The agency must report promptly to NARA in accordance with 36 CFR 1230. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to [Agency] control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4). The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and [Agency] guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with [Agency] policy.Â The Contractor shall not create or maintain any records containing any non-public [Agency] information that are not specifically tied to or authorized by the contract.Â The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.Â The [Agency] owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which [Agency] shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20. Training. Â All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take [Agency]-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.Â [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.]Â D. Â Flowdown of requirements to subcontractors The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.Â Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor. GOVERNMENT POINTS OF CONTACT Name Title E-Mail [Robert Pritchard] Contracting Officer [Robert.pritchard2@va.gov] EXPECTED COMPLETION TIME from NOTICE TO PROCEED: 270 Calendar days. End of SOW","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24924R0035","place_of_performance":{"zip":"40502","city":{"name":"Lexington"},"state":{"code":"KY"},"country":{"code":"USA"}},"product_service_code":"J062"},{"dates":{"posted":"2024-01-24","response_deadline":{"raw":"2024-02-14T13:00:00-06:00","utc":"2024-02-14T19:00:00Z","date":"2024-02-14","time":"13:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/96e01dfb462a490f95a7f7e9bc842279/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"6210--596A4-24-102 - Replace Obsolete Lighting","agency":{"office":{"code":"36C249","name":"249-NETWORK CONTRACT OFFICE 9 (36C249)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"37129","city":"MURFREESBORO","state":"TN","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-03-15","archive_type":"auto_custom"},"contacts":[{"name":"Robert Pritchard","role":"primary","email":"robert.pritchard2@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"96e01dfb462a490f95a7f7e9bc842279","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"a4d19d145e2a6e0e5bc12bae9099ebac96c69bca2ec8f402855722f68f704cd7","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"A0005 - Question and Answers This project is a lighting upgrade in an existing building. Both Subfactor 1a and Factor 3 appear to be designed to assess a multi-trade project. Please confirm that the VA is actually requesting relevant experience with interior renovations which are usually under $2,000,000. Answer - The project NAICS Code is 238210 Electrical Contractors and Other Wiring Installation Contractors. Please ensure the NAICS Code is included in your VetCert or you will not be qualified to receive the award. The specific scope for this project involves primarily one trade (electricians). To complete this project on time, most if not all SDVOSB companies will have to hire an electrical subcontractor to supplement their workforce and provide the correct lights. Due to the unique requirements of the scope, please confirm that the relevant subcontractors past performance may be considered. Answer No, Subcontractors Past Performance will not be considered. Does the VA have a team agreement form that will allow the prime contractor s teaming partner/subcontractor s past performance as relevant to the proposal or will the prime contractor s teaming form be sufficient? Answer Just the prime contractor s teaming form will be sufficient. On the site visit, they stated that they want center basket LEDs for the hallway fisstures.Â Are flat panel LED fixtures acceptable for other areas? Corrected Answer No, All should be Center Basket. No flat panels. End of Questions and Answers","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24924R0035","product_service_code":"6210"},{"dates":{"posted":"2024-01-26","response_deadline":{"raw":"2024-02-14T13:00:00-06:00","utc":"2024-02-14T19:00:00Z","date":"2024-02-14","time":"13:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a05abe4107ba4a7d9084dd6570ece2ac/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"6210--596A4-24-102 - Replace Obsolete Lighting","agency":{"office":{"code":"36C249","name":"249-NETWORK CONTRACT OFFICE 9 (36C249)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"37129","city":"MURFREESBORO","state":"TN","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-03-15","archive_type":"auto_custom"},"contacts":[{"name":"Robert Pritchard","role":"primary","email":"robert.pritchard2@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"a05abe4107ba4a7d9084dd6570ece2ac","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"d5d0d1b7ca8e8c3f3d5232be1ed1398c6566b5bd472912f34f1a658ca5c39b92","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Amendment 0006 Questions and Answers In areas with dual/bi-level switching, would Lexington VAHCS Bowling Campus consider Â½ the fixtures on one switch and Â½ on the other? Should dual drivers be required? Would a specific number of those fixtures be needed? Answer Re-use existing lighting control pattern. Fixtures with dual switching are required. Yes-see spread sheet for details. Will Attic stock required? Answer No Can the Lexington VAHCS Bowling Campus provide a copy of the latest Reflective Ceiling Plans for the campus? Answer We currently do not have a comprehensive set of these plans. All we have are the 1973 hardcopies (Tower bldg.) and the 1989 digital copies (Main bldg.) What means are used to secure the new troffer fixtures in the suspended? Could hurricane clips be used to attach to the grid? Â Or do the fixtures have to be tied to the building? Answer See Interior Lighting Specification 265100 for details. Are direct wire LED tubes acceptable on open fixtures? Or will they need to be replaced for continuity? Answer - Install Type B with Bypass Socket kits Could the Lexington VAHCS Bowling Campus provide the Surgical Suites room numbers and the fixture s specifications and counts? Answer Room numbers: A608, A610, A611, A615, A617, A622, B612, B615. 14 each per room. Could occupancy sensors be used to conserve energy costs? Answer Use existing switching-some already have occupancy sensors. How will the GC and Electrical teams get access to sections / departments? Answer Through coordination with the COR and occupants. Is there a phasing plan or sections / departments that will be prioritized? Answer The Contractor shall be specifically responsible for the coordination and proper relation of his work to the building, structure, phasing and ensure the safety of employees and workmen. The solicitation states that the contractor must replace whips or wiring from junction points if COR deems necessary and should be at no additional cost. Please provide a fixture amount to rewire and include in the price proposal? Answer We don t have a count and these will need to be identified during the work. Please confirm that the wall switches and lighting controls will not be replaced or affected under this contract. Answer Only the ones damaged during the process of this project. It looks like the due date for this project is listed on SAM.gov to be on February 14th, please confirm due date. Answer Due date is February 14th, 2024. Can you provide the quantity of recessed lights that are installed in drywall ceilings? Answer Please see SOW Attachment 1 Excel Spreadsheet for details. Is the intent of the project to replace the lights (housings included) that are installed in drywall ceilings or is it acceptable to remove the ballast and install LED lamps? Answer All obsolete, damaged, and or dirty fixtures need to be replaced. If light fixture housings are required to be removed, who is responsible for drywall patch/repair and paint? Answer The awarded Contractor. Can you provide the monthly electrical utility bills showing the consumption rates for the last 12 months, including the usage rate? Answer 16,368,000 KWH was used in 2023. Are there any areas of the building that contain any asbestos materials above the ceiling that would potentially be exposed to patient areas?Â Retrofitting the existing fixtures may be an alternative option to replacement of the fixture in those areas. Answer Due to the age of the existing facility the exposure to Asbestos Containing Materials can occur. It is unexpected but the work outlined in the statement of work could meet the definition of small scale, short duration activities. In such cases, compliance with Federal Regulations with regards to engineering controls and safe work practices as outlined by EPA Title 40 must be followed. Do any of the fixtures contain emergency battery packs to sustain lighting during the transition period of the generator transfer period? Answer Yes- all the Surgical rooms: A608, A610, A611, A615, A617, A622, B612, B615. The spreadsheet of light fixtures contains fixture descriptions PAR20-HAL-100W , MR16-HAL-40W , and A19-HAL-29W .Â What types of fixtures are these lamps installed in? Answer Track lights Can pictures of fixtures in the operating rooms please be provided? Answer Can you please specify if there are any rooms/areas where UV/disinfection fixtures are required? Answer None are required on this project. Is it possible to see any RCP of the hospital? Pictures would be acceptable. Answer We cannot provide. What is the fixture style or can we see a picture of this fixture? A009 retail storage PAR20-HAL-100W Answer Track Lights Can the kWh cost rate for the hospital be provided? Answer - $0.0832/KWH Is retro fitting fixtures permitted, this will greatly influence cost of labor. Answer See Statement of Work. Is a central control system required or in room control only? Answer Not required-use existing controls. Can you provide the quantity of recessed lights that are installed in drywall ceilings? Answer Please see SOW Attachment 1 Excel Spreadsheet for details. Is the intent of the project to replace the lights (housings included) that are installed in drywall ceilings or is it acceptable to remove the ballast and install LED lamps? Answer All obsolete, damaged, and or dirty fixtures need to be replaced. If light fixture housings are required to be removed, who is responsible for drywall patch/repair and paint? Answer The awarded Contractor. Can you provide the monthly electrical utility bills showing the consumption rates for the last 12 months, including the usage rate? Answer 16,368,000 KWH used in 2023 at a rate of $0.0832/KWH Are there any areas of the building that contain any asbestos materials above the ceiling that would potentially be exposed to patient areas?Â Retrofitting the existing fixtures may be an alternative option to replacement of the fixture in those areas. Answer Due to the age of the existing facility the exposure to Asbestos Containing Materials can occur. It is unexpected but the work outlined in the statement of work could meet the definition of small scale, short duration activities. In such cases, compliance with Federal Regulations with regards to engineering controls and safe work practices as outlined by EPA Title 40 must be followed. Do any of the fixtures contain emergency battery packs to sustain lighting during the transition period of the generator transfer period? Answer Yes- all the Surgical rooms: A608, A610, A611, A615, A617, A622, B612, B615. The spreadsheet of light fixtures contains fixture descriptions PAR20-HAL-100W , MR16-HAL-40W , and A19-HAL-29W .Â What types of fixtures are these lamps installed in? Answer Track lights Are there any requirements for fixtures in specialty areas, for example surgical rooms, MRI rooms, Behavioral health areas. I see some areas referencing MRI and surgery. The MRI rooms appear to be rooms adjacent to the MRI rooms. Behavioral health spaces are often required to be anti-ligature. Answer Both the room housing the MRI machine and the new Behavioral Health area on the 1st floor are excluded from this project. Can the elevation of the existing fixtures and the spacing between fixtures be provided for the 2x4 high bays fixtures? Answer No. This information is necessary for identify a suitable replacement fixture. Are these fixtures located in Can additional information, elevations, dimension, spacing and images be provided for - 18\" globe 2L Pl-26 (5th and 6th floor corridors) 1x6 Pendant 4L T8 (Parking garage) 1L 42-PL Pendant (A173) 3x3 Troffer 6L T12 (A029 conference M) Wall Sconce 1L PL-13 (Corridors and recovery room) Surface Drum 1L PL13 (Restrooms) Answer No information at this time. There are several fixtures that are listed as Boxes . Are these just surface mount fixtures? Can we be provided with further descriptions or pictures for the Box fixture types? 1x4 Box 2L T8 2x2 Box 3L T8 2x4 Box 3L T8 Dual 2x4 Box 4L T8 2x4 surface mount box 4L Answer These are surface mount. Are fixtures listed as PAR20 or A10 intended to be lamps only or light fixture replacements? For example ID#s 1048 and 1193. Answer Lamps only Are there photos available of the Wall mounted fixtures that are in the patient rooms? Answer see below In the event the fixture footprints are smaller than removed, who is responsible drywall and/or paint? Answer The Awarded Contractor. Are there any fixtures located in areas that are 12' AFF or higher? If so, can you provide additional information so we can determine if lifts or scaffolding is necessary? Answer Only a few areas have fixture that high- Ground Floor Electrical and Mechanical rooms, Pharmacy Break room, and 7th floor Mechanical space. Some may be 15 to 20 feet high. Can you provide an image and diameter for the surface drum fixtures? For example, ID # 134 in A0002B Answer 12 inches: There are several fixtures listed as 1x4 . Can you confirm that 1' is not the actual width of the existing fixture and that this is meant to describe a 4' linear type fixture which vary in width but most likely does not exceed 1 foot in width? Answer The measurement is 11 Â¾ inches: A 3x3 troffer is not a standard size fixture. Can you confrim that there are 3x3 fixtures and provide an image,for example, ID # 183 in A029? Answer Yes, they are 3x3: Are light fixtures noted as Tamper Proof in Behavioral Heath treatment areas? Are these anti-ligature type? Are they vandal resistant? Please provide images if possible. Answer The new Behavioral Health on the 1st floor is excluded. It already has the required fixtures.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24924R0035","product_service_code":"6210"},{"dates":{"posted":"2024-01-30","response_deadline":{"raw":"2024-02-14T13:00:00-06:00","utc":"2024-02-14T19:00:00Z","date":"2024-02-14","time":"13:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3b20dd2a29684db7805896c463ded54c/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"6210--596A4-24-102 - Replace Obsolete Lighting","agency":{"office":{"code":"36C249","name":"249-NETWORK CONTRACT OFFICE 9 (36C249)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"37129","city":"MURFREESBORO","state":"TN","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-03-15","archive_type":"auto_custom"},"contacts":[{"name":"Robert Pritchard","role":"primary","email":"robert.pritchard2@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"3b20dd2a29684db7805896c463ded54c","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"486a647ed46496d55d0cd872557decf1ba3d763110ccf7ad3cebd20b559bd604","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"QUESTIONS AND ANSWERS If the prime contractor (an SDVOSB), has a teaming agreement with another SDVOSB, can the past performance/ experience from the partnering (Not Prime) SDVOSB be accepted for Subfactor 1a and Factor 3? Answer - A small business contractor may use a past performance rating for work performed as a member of a joint venture or for work performed as a first-tier subcontractor. END OF QUESTIONS AND ANSWERS","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C24924R0035","product_service_code":"6210"},{"award":{"date":"2024-04-30","amount":"1989705.51","number":"36C24924C0054","awardee":{"raw":"A TOTAL SOLUTION LLC FISHERVILLE 40023 KGZ","name":"A TOTAL SOLUTION LLC FISHERVILLE 40023 KGZ"}},"dates":{"posted":"2024-05-17","award_date":"2024-04-30"},"links":{"sam":"https://sam.gov/workspace/contract/opp/fac8c541e6ce46eebd86dcd2f69aeede/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"J062--596A4-24-102 - Replace Obsolete Lighting Troy Bowling Campus","agency":{"office":{"code":"36C249","name":"249-NETWORK CONTRACT OFFICE 9 (36C249)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"37129","city":"MURFREESBORO","state":"TN","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-08-24","archive_type":"auto_custom"},"contacts":[{"name":"Jen Jamieson","role":"primary","email":"jen.jamieson@va.gov","phone":"(615) 867-6000 ext 20202","title":"Contract Specialist"}],"base_type":{"code":"a","label":"Award Notice"},"notice_id":"fac8c541e6ce46eebd86dcd2f69aeede","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"c2db18036c3f181fc29a0d999226e1c1b2fbafa139103f8a49f31078d34654ab","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"36C24924R0035","product_service_code":"J062"}],"due_at":"2024-02-14T19:00:00Z","due_date":"2024-02-14","closes_at":"2024-02-14T19:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C249","office_name":"249-NETWORK CONTRACT OFFICE 9 (36C249)","state":"KY","county":"21067","county_name":"Fayette County","city":"2146027","city_name":"Lexington-Fayette","country":"USA","winner_key":"MWJAUETKBQ73","amount":"1989705.51","linked_awards":8,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"3b20dd2a29684db7805896c463ded54c","description":{"text":"QUESTIONS AND ANSWERS If the prime contractor (an SDVOSB), has a teaming agreement with another SDVOSB, can the past performance/ experience from the partnering (Not Prime) SDVOSB be accepted for Subfactor 1a and Factor 3? Answer - A small business contractor may use a past performance rating for work performed as a member of a joint venture or for work performed as a first-tier subcontractor. END OF QUESTIONS AND ANSWERS","html":null,"origin":"extract"},"contacts":[{"name":"Jen Jamieson","role":"primary","email":"jen.jamieson@va.gov","phone":"(615) 867-6000 ext 20202","title":"Contract Specialist"}],"place_of_performance":null,"office_address":{"zip":"37129","city":"MURFREESBORO","state":"TN","country":"USA"},"naics_codes":["238210"],"award":null,"attachments":[],"awards":[{"award_key":"CONT_AWD_36C24924C0054_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C24924C0054_3600_-NONE-_-NONE-/","piid":"36C24924C0054","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"MWJAUETKBQ73","recipient_name":"A TOTAL SOLUTION LLC","recipient_uei":"MWJAUETKBQ73","recipient_cage":"7JAF3","recipient_city":"FISHERVILLE","recipient_state":"KY","sub_name":"Department of Veterans Affairs","office_name":"249-NETWORK CONTRACT OFFICE 9 (36C249)","office_key":"o-36C249","first_action_date":"2024-04-30","last_action_date":"2025-03-18","actions":3,"obligated":"1989705.51","current_total_value":"1989705.51","potential_total_value":"1989705.51","naics":"238210","psc":"J062","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE","offers_received":5,"description":"596A4-24-102 - REPLACE OBSOLETE LIGHTING AT THE LEXINGTON VA HEALTHCARE SYSTEM, TROY BOWLING CAMPUS","method":"piid","confidence":"high","evidence":["award number 36C24924C0054 equals the contract number","same awarding office 36C249"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C24926Q0360","latest_notice_id":"58b8a5b52c0a4305a0bf634a660484e0","title":"AHU Repairs Alvin C. York VAMC","solicitation_number":"36C24926Q0360","notice_type":"o","first_type":"o","first_posted":"2026-08-21","last_posted":"2026-09-10","notices":5,"due_at":"2026-09-17T15:00:00Z","due_date":"2026-09-17","closes_at":"2026-09-17T15:00:00Z","awardable":true,"open":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C249","office_name":"249-NETWORK CONTRACT OFFICE 9 (36C249)","naics":"238220","psc":"J041","set_aside":"SDVOSBC","state":"TN","county":"47149","county_name":"Rutherford County","city":"4751560","city_name":"Murfreesboro","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"36C24926Q0375","latest_notice_id":"c32c1ba0a63940ed9dc6b9fa95358c5f","title":"RFQ 36C24926Q0375 Simulation Kits","solicitation_number":"36C24926Q0375","notice_type":"k","first_type":"k","first_posted":"2026-09-10","last_posted":"2026-09-15","notices":3,"due_at":"2026-09-17T16:00:00Z","due_date":"2026-09-17","closes_at":"2026-09-17T16:00:00Z","awardable":true,"open":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C249","office_name":"249-NETWORK CONTRACT OFFICE 9 (36C249)","naics":"339113","psc":"6515","set_aside":"SBA","state":"TN","county":"47149","county_name":"Rutherford County","city":"4751560","city_name":"Murfreesboro","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"36C24926R0077","latest_notice_id":"7ea6b7e2123b4520ab3f8b1976902ece","title":"J045--Project # 596-26-4 Construction for FMS Boiler Replacement","solicitation_number":"36C24926R0077","notice_type":"o","first_type":"p","first_posted":"2026-07-17","last_posted":"2026-09-14","notices":4,"due_at":"2026-09-21T15:00:00Z","due_date":"2026-09-21","closes_at":"2026-09-21T15:00:00Z","awardable":true,"open":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C249","office_name":"249-NETWORK CONTRACT OFFICE 9 (36C249)","naics":"238220","psc":"J045","set_aside":"SDVOSBC","state":"KY","county":"21067","county_name":"Fayette County","city":"2146027","city_name":"Lexington-Fayette","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"}]}