# Commodity: Air Cooled Rental Chillers

Canonical: https://abierto.us/opportunities/36c24824q0552

- Solicitation number: 36C24824Q0552
- Notice type: Award notice (first published as combined synopsis and solicitation)
- Status: Awarded to Results Sales & Service, L.L.C. for $312,215.00
- Department: Department of Veterans Affairs
- Contracting office: 248-Network Contract Office 8 (36C248)
- NAICS: 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
- Product or service code: 4120 Air Conditioning Equipment
- Set-aside: Service-disabled veteran-owned small business set-aside
- Place of performance: Gainesville, Florida
- County: Alachua County (FIPS 12001). https://abierto.us/counties/alachua-county-fl-12001
- City: Gainesville. https://abierto.us/cities/gainesville-fl-1225175
- First posted: February 8, 2024
- Last posted: March 8, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/f6f4ef03ed774c07b7e99f888484c8c4/view

## Description

The purpose of this amendment is to post the answers to questions received during the solicitation process as well as correct CLIN 0001 of the cost and price schedule from a qty of 6 to a qty of 7. Questions and Answers: Utilizing the two 600-amp breakers is not an option for a single point connection style chillers. Are you ok with load limitations for that one chiller?

Utilizing one of the available 480-volt, 600 amp feeds to power one chiller and limiting the load to maximize the available power source is acceptable.

With regards to the power supply for the two 500-ton chillers, are we tying into two separate breakers (the two 600-amp breakers specified) to a single load?Â We have questions about being able to maintain the phasing and resistance this way and have spoken with our engineers about concerns with this meeting code.Â Has this been done before this way?Â Are the two 600-amp breakers the same distance from where the chiller would be parked?

Vendors in the past have provided units that can accept the feeds from two separate sources. Essentially the loads were separated and equipped with two control panels. See response for question number 1. How long of a run will you need for the cabling? One of the trailers will require 50-75 feet of lead and the 2nd will require 150 feet leads. How long of a run will you need for hoses? Estimated need 50-100 feet for each of the four hoses depending on the location of the connections on the chillers. A site visit was provided for the contractors to determine how much hose would be needed for their specific equipment.

**Cost and Price Schedule:** ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0001 7.00 MO

Qty of 2 Rental Chillers 500 Ton Air-Cooled Contract Period:

**Base POP Begin:**

**04-01-2024 POP End:**

**10-31-2024 PRINCIPAL NAICS CODE:** 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing PRODUCT/SERVICE CODE: 4120 - Air Conditioning Equipment 0002 1.00 EA

**Set Up PRINCIPAL NAICS CODE:** 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing PRODUCT/SERVICE CODE: 4120 - Air Conditioning Equipment 0003 1.00 EA

**Removal PRINCIPAL NAICS CODE:** 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing PRODUCT/SERVICE CODE: 4120 - Air Conditioning Equipment GRAND TOTAL

## Award on USAspending

- Recipient: Results Sales & Service, L.L.C. (UEI HXNZFWKKHG38)
- Contract: 36C24824P1022, purchase order
- Obligated: $312,765.00
- Competition: Competed Under SAP, 10 offers received
- Link: award number 36C24824P1022 equals the contract number; same awarding office 36C248 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_36C24824P1022_3600_-NONE-_-NONE-/


## Publications

- February 8, 2024: Combined synopsis and solicitation, due February 23, 2024 at 4:00 PM EST. Notice 713f7d180ae648858e784a8aaf8a77cc. https://sam.gov/workspace/contract/opp/713f7d180ae648858e784a8aaf8a77cc/view
- February 21, 2024: Combined synopsis and solicitation, due February 23, 2024 at 4:00 PM EST. Notice f181c6f03c7649baab361d579a5780f1. https://sam.gov/workspace/contract/opp/f181c6f03c7649baab361d579a5780f1/view
- March 8, 2024: Award notice. Notice f6f4ef03ed774c07b7e99f888484c8c4. https://sam.gov/workspace/contract/opp/f6f4ef03ed774c07b7e99f888484c8c4/view

## Points of contact

- John H. Shultzaberger, Contracting Officer, John.Shultzaberger@va.gov, 352-214-5135

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/36c24824q0552.
