# Boiler 3 Oxygen Analyzer and Steam Flow Meter

Canonical: https://abierto.us/opportunities/36c24727q0050

- Solicitation number: 36C24727Q0050
- Notice type: Combined synopsis and solicitation
- Status: Open. Offers due October 26, 2026 at 11:00 AM EDT
- Department: Department of Veterans Affairs
- Contracting office: 247-Network Contract Office 7 (36C247)
- NAICS: 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Product or service code: N045 Installation of Equipment: Plumbing, Heating, and Waste Disposal Equipment
- Set-aside: Service-disabled veteran-owned small business set-aside
- Place of performance: Dublin, Georgia
- County: Laurens County (FIPS 13175). https://abierto.us/counties/laurens-county-ga-13175
- City: Dublin. https://abierto.us/cities/dublin-ga-1324376
- First posted: October 15, 2026
- Last posted: October 22, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/fd26eac21a2a43e9afa95a8149c0c136/view

## Description

Questions and Answers
36C24727Q0050 Boiler #3 Oxygen Analyzer and Steam Flow Meter RFI Responses
Where should the output signals from the new steam flow meter and O2 analyzer terminate? For example, the existing building automation system (BAS), the existing Boiler 3 burner/boiler controls, or a local display only.
Burner 3 boiler/burner controls where applicable and local display.
Does the government require active O2 trim control to the burner fuel/air ratio, or monitoring and display of the O2 only?
Oxygen analyzer must send signals/information to combustion controls to control trim.
What is the material of construction for the stack? Is it single or double wall?
Stack is double walled. Inside material is steel; outside material is galvanized steel. Stack is 36  D Selkirk Metalbestos Model P.S.
Current operating pressure and temperature of the system for boiler #3?
Design pressure is 200 psi. Typical operating pressure is 82 psi. Typical operating temperature is about 330 degrees Fahrenheit.
What are the available outputs on the physical steam flow meter (e.g., 4-20 mA, Modbus RTU, BACnet MS/TP)?
4-20 mA analog.
Is the flow meter wired directly into an analog terminal block on the CB Hawk, or is it wired directly to the facility s Building Automation System (BMS)?
Steam flow meter is wired into local CB Hawk analog terminal block.
Please provide nameplates for the existing oxygen analyzer and steam flow meter.
Oxygen analyzer nameplate:
Steam flow meter nameplate:

## Attachments

- [36C24727Q0050.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3d52504809d04031b32d72e0aa14207f/download)

## Open now in the same industry

42 open in NAICS 238220.

- SAF FRSP GEOTHERMAL HVAC SJDS (140P4226R0023), due October 26, 2026 at 10:00 AM EDT. https://abierto.us/opportunities/140p4226r0023
- Repair Sanitary Waste Piping at the Mann-Grandstaff VA Medical Center (36C26027R0021), due October 26, 2026 at 12:00 PM EDT. https://abierto.us/opportunities/36c26027r0021
- GWMP - ARHO BUNKER HVAC (140P1326Q0033), due October 26, 2026 at 12:00 PM EDT. https://abierto.us/opportunities/140p1326q0033

## Publications

- October 15, 2026: Combined synopsis and solicitation, due October 26, 2026 at 11:00 AM EDT. Notice fce6c9ad5d7e407e9ea31cb61a6881ac. https://sam.gov/workspace/contract/opp/fce6c9ad5d7e407e9ea31cb61a6881ac/view
- October 22, 2026: Combined synopsis and solicitation, due October 26, 2026 at 11:00 AM EDT. Notice fd26eac21a2a43e9afa95a8149c0c136. https://sam.gov/workspace/contract/opp/fd26eac21a2a43e9afa95a8149c0c136/view

## Points of contact

- Sheryl Harris, Contract Specialist, sheryl.harris5@va.gov, email only

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/36c24727q0050.
