# Refurbish D wing Elevators Construction

Canonical: https://abierto.us/opportunities/36c24626b0019

- Solicitation number: 36C24626B0019
- Notice type: Award notice (first published as presolicitation)
- Status: Awarded to M2 Federal Inc. for $1,208,888.00
- Department: Department of Veterans Affairs
- Contracting office: 246-Network Contracting Office 6 (36C246)
- NAICS: 238290 Other Building Equipment Contractors
- Product or service code: J056 Maintenance, Repair and Rebuilding of Equipment: Construction and Building Materials
- Set-aside: Service-disabled veteran-owned small business set-aside
- County: Cumberland County (FIPS 37051). https://abierto.us/counties/cumberland-county-nc-37051
- City: Fayetteville. https://abierto.us/cities/fayetteville-nc-3722920
- First posted: January 21, 2026
- Last posted: April 9, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/c4b65f042128447e8e55f3aef8121250/view

## Description

Refurbish D wing Elevators Fayetteville VA Medical Center Project No. 565-24-105 2 Scope of Work Refurbish D wing Elevators Fayetteville VA Medical Center Fayetteville, NC Project No. 565-24-105 CONSTRUCTION SCOPE OF WORK Contractor shall provide all labor, supervision, materials, equipment, tools, transportation, and incidentals necessary for modernization, refurbishment, installation, commissioning, and turnover of two existing D-Wing elevators P-5 and P-6 (hydraulic; 4,000 lb; 125 fpm; B/1/2 stops; duplex selective collective) serving the Emergency Room, Imaging, Laboratory, ICU, and Operating Rooms while maintaining hospital operations and life-safety.

Work includes demolition of legacy systems, installation of non-proprietary modernization components, machine-room and pit code upgrades, cab and hoistway door refurbishments, ICRA-conforming phasing and barriers, commissioning, training, and full closeout. The finished elevators shall operate reliably and be executed in accordance with the final issued-for-construction documents, specifications, and applicable current VA, federal, state, and local codes and standards.

This project does require a site safety and health officer (SSHO) separate from the site superintendent. Contractor shall furnish, install, test, and commission work in full compliance with: ASME A17.1 (2022) Safety Code for Elevators and Escalators; acceptance test by QEI. NFPA 70 (NEC 2023), IBC 2021, IMC 2024, IPC 2024 and applicable NFPA provisions. OSHA (including asbestos and confined space standards, 29 CFR 1910/1926 as applicable).

VA directives, design manuals, and Master Specifications (PG-18-1); comply with VA safety signage, ICRA guidance, and VA Elevator design guidance. Base bid shall include all items listed on the drawings and in the specifications. Submit a detailed baseline schedule for VA approval, reflecting all phases of work, milestones, inspections, and commissioning activities. Infection Control Risk Assessment (ICRA) & work restrictions: Mechanical room: ICRA Class III.

Elevator lobbies (active work): ICRA Class III; predominantly night work; plastic barriers removed each morning and reinstated nightly. Elevator shafts: ICRA Class II with one car kept active during the other car s work scope. Provide negative air, HEPA filtration, dust-tight barriers, sticky mats, and debris management per approved ICRA plan. Schedule noisy/vibration work off-hours. Maintain egress, fire-life safety, and hospital security at all times.

Phasing & sequencing (contractor to detail means/methods): Phase 1 (60 days): Engineer/vendor submittals for long-lead equipment. Phase 2 (120 days): Material acquisition; establish ICRA barriers. Phase 3 (14 days): Demolish old equipment; begin pit work/sump base. Phase 4 (21 days): Paint half the mechanical room floor at P-5; 7-day cure; route/rough-in sump discharge to mech room; defer mech room wall paint to Phase 10. Phase 5 (60 days): Install P-5 modernization equipment (incl. lobby call stations).

Phase 6 (30 days): Paint P-5 pit walls/floor; test and turnover P-5. Phase 7 (7 days): Re-set ICRA barriers; prep P-6 for work (COR inspection/approval). Phase 8 (28 days): Demolish P-6 equipment; pit work and floor paint with 7-day cure. Phase 9 (45 days): Install P-6 modernization equipment. Phase 10 (30 days): Paint mechanical room walls and pits; test and turnover P-6; complete BMS/EMCS connections and testing. Phase 11 (30 days): Project closeout, O&M/Training; commissioning completed. Total of 445 days.

Protect adjacent finishes; cap/terminate abandoned utilities; manage, containerize, and dispose of waste per VA environmental procedures (recycle where practicable). If ACM is confirmed, perform abatement under the approved plan before disturbance.

Controls & operation: Replace relay logic with a microprocessor controller (BoD Smartrise or equivalent), providing: simplex/duplex operation as required, emergency power capability, onboard diagnostics, landing control system, FF Service Phases 1 & 2, independent service, hoistway access, car-top operation, timed lighting/fan control, and emergency-power pre-transfer signal integration (two-wire from building switchgear).

Hydraulic package: Replace/upgrade hydraulic machines and associated components (BoD EECO or equivalent): dry tanks, (Maxton/EECO or equivalent) control valves, motors, pumps, pit shut-off valves, and new Victaulic gaskets, complete with new wiring. Door equipment: Replace hall door equipment, car door operators, and car door equipment (BoD GAL or equivalent). Provide new hoistway doors with stainless steel skins; polish/renew existing stainless hall frames.

Fixtures & signaling: Replace hall pushbuttons, main COP, auxiliary COP, combination hall direction/car position indicators, and emergency power jewel; integrate jewel pre-transfer signal (two-wire from switchgear to controller). (BoD Innovation for fixtures.) Cab interiors: New cab interiors, new flooring, new covers for the existing stainless side lighting (retain system, replace covers), new car doors; polish interior stainless steel. Elevators P-5/P-6 to match the new car scheme already deployed in D-Wing.

**Machine Room:** Dedicated 110V car-light disconnect; car lights on a dedicated circuit (panel AB-2 has spares).

**Illumination:** provide 200 lux measured at floor. GFCI outlet on a dedicated source.

**Environmental:** Provide exhaust/heat to maintain 45 90°F, 95% RH.

**Sprinklers/detectors:** If sprinklers present, install heat detector within 2' of each head and a smoke detector within 2' of each heat detector per NFPA 72 coordination.

**Pits:**

**Lighting:** provide 100 lux. GFCI outlet on a dedicated circuit. Sump pump: Install new sump pump at 3,000 gph capacity with single dedicated receptacle and discharge tank/piping per drawings. Paint pit walls to finished floor level with epoxy. Elevator recall & FA interfaces: Provide addressable devices and relay logic for primary/secondary recall and flashing hat function; integrate with the building s addressable system in accordance with current code. Architectural & lobby scope: Clean, prep, and finish existing stainless elevator jambs to receive new coating.

**Vestibules (B, 1, 2):** remove corner guards/bumper rails/base; prep and install new corner guards, bumper rails, base, and paint to Level 4 finish; match D-Wing standards. Machine room walls: epoxy paint per phasing (Phase 10). Mechanical scope: Demo existing terminal unit/duct as indicated; install new constant-volume terminal unit and ductwork; coordinate clearances, access, and EMCS points.

Plumbing/sanitary scope: Cap existing sump pit and add the new sump and discharge tank/piping per drawings; coordinate penetrations and firestopping. Electrical/communications scope: Provide all new elevator power/control wiring in conduit; no exposed cabling. Coordinate normal/emergency power feeds, car-light circuit, GFCIs, FA interfaces, EMCS tie-ins, and signaling. Provide panel schedules and as-built risers.

Testing, commissioning, training: Pre-functional checklists and functional testing for each elevator; integrate controls, FA/recall, emergency power, door protection, and ride quality. Conduct A17.1-2022 Acceptance Test witnessed by licensed QEI; Contractor to schedule, provide load, and correct deficiencies. Coordinate with VA-hired CxA for plan review, point-to-point verification, performance testing, and issue resolution through turnover. Provide staff training (operator and maintenance) and furnish all manuals/tools. Deliverables & closeout:

**As-builts:** Revit/CAD + PDF; record risers and device addresses. O&M manuals: indexed, bound hard copies + editable digital (Word/Excel) and PDFs.

**Warranties:** per spec; include controller, drives, hydraulics, doors/operators, fixtures. Spare parts/special tools: per manufacturer requirements. Punch list: Correct all items within 15 working days of issuance; provide re-inspection; achieve COR acceptance.

## Award on USAspending

- Recipient: M2 Federal Inc. (UEI DJGPSGEE74Q6)
- Contract: 36C24626C0031, definitive contract
- Obligated: $1,208,888.00
- Competition: Full and Open Competition After Exclusion of Sources, 6 offers received
- Link: award number 36C24626C0031 equals the contract number; same awarding office 36C246 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_36C24626C0031_3600_-NONE-_-NONE-/


## Publications

- January 21, 2026: Presolicitation, due February 5, 2026 at 2:00 PM EST. Notice 540b89165c1a4748a67a2ec13a0224fa. https://sam.gov/workspace/contract/opp/540b89165c1a4748a67a2ec13a0224fa/view
- February 5, 2026: Solicitation, due March 23, 2026 at 2:00 PM EDT. Notice 4a14b774ec63466f8451008e22246aa6. https://sam.gov/workspace/contract/opp/4a14b774ec63466f8451008e22246aa6/view
- February 10, 2026: Solicitation, due March 23, 2026 at 2:00 PM EDT. Notice e6ebcc49b42543a289551a27b37aef46. https://sam.gov/workspace/contract/opp/e6ebcc49b42543a289551a27b37aef46/view
- April 9, 2026: Award notice. Notice c4b65f042128447e8e55f3aef8121250. https://sam.gov/workspace/contract/opp/c4b65f042128447e8e55f3aef8121250/view

## Points of contact

- Angelo Harris, Contracting Officer, angelo.harris@va.gov, 910-488-2120

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/36c24626b0019.