# SOURCES SOUGHT NOTICE - Triennial Electrical Inspection Testing and Maintenance Services Requirement - Louis A Johnson VA Medical Center 36C24527Q0039

Canonical: https://abierto.us/opportunities/36c24527q0039

- Solicitation number: 36C24527Q0039
- Notice type: Sources sought
- Status: Open. Offers due November 5, 2026 at 10:00 AM EST
- Department: Department of Veterans Affairs
- Contracting office: 245-Network Contract Office 5 (36C245)
- NAICS: 238210 Electrical Contractors and Other Wiring Installation Contractors
- Product or service code: J061 Maintenance, Repair and Rebuilding of Equipment: Electric Wire, and Power and Distribution Equipment
- Place of performance: Clarksburg, West Virginia
- County: Harrison County (FIPS 54033). https://abierto.us/counties/harrison-county-wv-54033
- City: Clarksburg. https://abierto.us/cities/clarksburg-wv-5415628
- First posted: October 20, 2026
- Last posted: October 20, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/fb2ca24dd6dd4624aeedce9089e2e478/view

## Description

SUMMARY
The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Network Contracting Office (NCO) 5, is issuing this Sources Sought Notice to identify vendors that are interested in and capable of providing the required services.
The Louis A. Johnson VA Medical Center, located in Clarksburg, WV, requires a contractor to provide Triennial Electrical System Inspection, Testing, and Maintenance for the facility. Interested vendors should review the Statement of Work (SOW) to determine the specific services required.
NCO 5 is seeking responses from firms that are interested in this procurement and possess the resources, capabilities, and qualifications necessary to perform these services.
Anticipated NAICS CODE 238210, PSC CODE J061
Please submit your capabilities statement and provide responses to all questions listed below.
SOURCES SOUGHT NOTICE: 36C24527Q0039
1. Business name (including Unique Entity ID (SAM.gov)
2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned,
Disadvantaged Small Business, 8(a), etc.), and
3. Person of contact (including telephone number & email address).
4. Capability statement and summary of previous experience providing these types of services
for the Veterans Health Administration or other similar facilities.
5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (including
applicable NAICS)
6. Brief Summary of categories of services that your company can/cannot provide.
7. Certification(s) / Licenses for meeting the local requirements to provide these services at the
DC VAMC (if applicable)
8. Confirmation that your organization has the capability and expertise to meet the performance
requirements while complying with applicable limitations in subcontracting by responding to the
questions below with your response:

a. Do you intend to self-perform this effort?
b. If you are located outside the immediate area, how will you self-perform?
c. Or do you intend to subcontract work under this contract?
If you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting?

Response Instructions:
Respond to this Notice 36C24527Q0039 by 11-05-2026 @ 10 AM ET.
Send all responses to Billie.Pratt@va.gov

Subject line on email:
36C24527Q0039   Sources Sought Notice | Company Name
STATEMENT OF WORK
Triennial Electrical System Inspection, Testing, and Maintenance
Louis A. Johnson VA Medical Center (688)
1 Medical Center Drive   Clarksburg, WV 26301
Document Number
ENG-SOW-2026-ELEC-TRI-001
Revision
Rev 1   Generator load bank, arc flash, and power quality scope removed (separate contracts)
Date Issued
May 2026
Originating Activity
Engineering Service (138), LAJ VAMC
Cognizant Official

Contracting Office
VISN 5 Network Contracting Office
Anticipated Vehicle
Firm-Fixed-Price (FFP), Single-Award
Set-Aside
To be determined by Contracting Officer (SDVOSB priority per VAAR 819.7004)
Period of Performance
180 calendar days from NTP, with mobilization NLT 30 days from award

1.0 GENERAL INFORMATION
1.1 Purpose
The Department of Veterans Affairs (VA) requires a qualified electrical testing contractor to perform the triennial inspection, testing, and preventive maintenance of the normal and Essential Electrical System (EES) distribution and support equipment at the Louis A. Johnson VA Medical Center (LAJ VAMC), Clarksburg, West Virginia. The intent of this work is to verify the integrity, reliability, and code compliance of the in-scope electrical equipment, identify and correct deficiencies, and provide the documentation required to satisfy The Joint Commission (TJC), CMS Conditions of Participation, NFPA, and VA accreditation/inspection requirements for the elements within scope.
1.2 Background
LAJ VAMC is a VHA Complexity Level 2 medical center within VISN 5. The campus electrical distribution serves Type 1 Essential Electrical Systems under NFPA 99 (Life Safety, Critical, and Equipment Branches). Buildings within scope include the main hospital, Boiler Plant, building 7, Building 20, the Clinical Addition, and supporting structures. The previous comprehensive triennial electrical inspection was performed in CY 2023; this procurement covers the CY 2026 cycle for the in-scope equipment. Generator triennial preventive maintenance and 3-year load bank testing (NFPA 110-2025 Â§8.4.2), the arc flash risk assessment / coordination study refresh, and any campus power quality / harmonics survey are being procured under separate contract vehicles and are NOT within the scope of this SOW.
1.3 Objective
Achieve and document one hundred percent (100%) compliance with all applicable codes and standards listed in Section 3.0 for the equipment categories within scope, including but not limited to NFPA 70-2023 (NEC), NFPA 70B-2023, NFPA 70E-2024, NFPA 99-2024, NFPA 101-2024, NFPA 111-2022, ANSI/NETA MTS-2023, VHA Directive 1028, and VA PG-18-10.
1.4 Definitions and Acronyms
Acronym
Definition
AHJ
Authority Having Jurisdiction
ATS
Automatic Transfer Switch
CHENG / DCE
Chief Engineer / Deputy Chief Engineer
COR
Contracting Officer's Representative
EES
Essential Electrical System (NFPA 99 Type 1)
GFCI
Ground-Fault Circuit Interrupter
IRT
Infrared Thermography
LAJ VAMC
Louis A. Johnson VA Medical Center, Clarksburg, WV
NETA
InterNational Electrical Testing Association
PM
Preventive Maintenance
SOW
Statement of Work
UAN / UAC
Utility Advisory Notice / Utility Advisory Committee
UPS
Uninterruptible Power Supply
VLF
Very Low Frequency (cable test method)
NF
2.0 SCOPE OF WORK
The Contractor shall furnish all labor, supervision, NETA-certified personnel, licensed electricians, professional engineering oversight, test equipment, calibrated instrumentation, materials, transportation, lodging, per diem, and incidentals necessary to perform the triennial inspection, testing, cleaning, and minor corrective maintenance of the in-scope electrical distribution and support equipment at LAJ VAMC, in accordance with Sections 3.0 and 4.0 of this SOW.
2.1 General Scope Summary
Work shall include, but is not limited to:
Visual, mechanical, and electrical testing of medium-voltage (MV) and low-voltage (LV) switchgear, switchboards, panelboards, motor control centers (MCCs), distribution and unit substations, dry-type and liquid-filled transformers, busway, and feeder cables.
Functional testing and exercising of all Automatic Transfer Switches (ATSs) on the Life Safety, Critical, and Equipment Branches.
Protective relay testing, calibration, and trip-curve verification on all MV and selected LV electronic-trip breakers (settings verified against the existing Government-furnished coordination study; no study revision performed under this SOW).
Insulation resistance, contact resistance, and primary injection testing of LV power circuit breakers; secondary injection where applicable.
Ground electrode and grounding system resistance testing (3-point fall-of-potential).
Energized infrared thermographic survey of all electrical equipment from service entrance through branch panelboards.
Patient care space receptacle testing in accordance with NFPA 99-2024 Â§6.3.3.3 (line voltage, polarity, grounding integrity, retention force).
UPS battery system inspection and testing in accordance with NFPA 111-2022 and IEEE 1188 (VRLA) / IEEE 450 (vented).
Documentation reconciliation of in-scope equipment maintenance records, deficiency reporting, and final triennial test report package.
2.2 Out of Scope (Procured Under Separate Contracts)
The following are EXCLUDED from this contract and are being procured under separate contract vehicles:
Generator triennial preventive maintenance and the NFPA 110-2025 Â§8.4.2 three-year load bank testing of the four (4) facility emergency standby generators.
Arc Flash Risk Assessment update and Short-Circuit / Time-Current Coordination Study refresh, including arc flash labeling. (The Contractor under this SOW shall use the Government-furnished current arc flash study and labels for PPE selection only.)
Campus Power Quality / harmonics survey, including IEEE 519 evaluation, transient capture, voltage sag/swell logging, and any related instrumentation.
Replacement of major equipment (e.g., generators, transformers, switchgear) beyond the minor consumables and corrective work allowed under CLIN 0013.
New construction, renovation, or substantial design work.
Medium-voltage cable replacement (testing only is in scope).
Lightning protection system inspection (separate NFPA 780 contract).
Fire alarm system testing (separate NFPA 72 contract).
Repairs exceeding $2,500 per item without prior written authorization from the Contracting Officer.

3.0  APPLICABLE DOCUMENTS, CODES, AND STANDARDS
All work shall conform to the latest edition adopted by the AHJ as of the date of award. Where standards conflict, the most stringent shall govern. Contractor shall verify edition currency with the COR prior to mobilization. NFPA 110 and NFPA 70E are listed for limited reference (documentation reconciliation, contractor electrical safety) only; no testing under those standards is performed under this SOW.
3.1  National Fire Protection Association (NFPA)
Standard
Title
Edition
NFPA 70
National Electrical Code (NEC)
2023
NFPA 70B
Standard for Electrical Equipment Maintenance (mandatory)
2023
NFPA 70E
Electrical Safety in the Workplace (contractor safety only)
2024
NFPA 99
Health Care Facilities Code
2024
NFPA 101
Life Safety Code
2024
NFPA 110
Emergency & Standby Power (ATS / documentation reference only)
2025
NFPA 111
Stored Electrical Energy Emergency and Standby Power Systems
2022
3.2  Department of Veterans Affairs (VA)
VHA Directive 1028 (current)   Electrical Power Distribution Systems
VA Master Construction Specifications, Division 26   Electrical (current)
VA PG-18-10   Electrical Design Manual for VA Hospital Facilities (current)
VA PG-18-3   Topic 3, Design and Construction Procedures
3.3  Industry Standards
ANSI/NETA MTS-2023   Standard for Maintenance Testing Specifications for Electrical Power Equipment and Systems
ANSI/NETA ETT-2022   Standard for Certification of Electrical Testing Technicians
IEEE 43   Recommended Practice for Testing Insulation Resistance of Electric Machinery
IEEE 80 / 81   Substation Grounding / Earth Resistance Measurement
IEEE 400.2   Field Testing of Shielded Power Cable Systems Using VLF (  0.1 Hz)
IEEE 450   Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries
IEEE 1188   Maintenance, Testing, and Replacement of VRLA Batteries
IEEE C57.12.90   Test Code for Liquid-Immersed Distribution Transformers
IEEE C57.106   Guide for Acceptance and Maintenance of Insulating Oil
IEEE C2 (NESC)   National Electrical Safety Code
ASTM D877 / D1816   Dielectric Breakdown of Insulating Liquids
3.4  Regulatory and Accreditation
The Joint Commission (TJC) Environment of Care: EC.02.05.03, EC.02.05.05, EC.02.05.07, EC.02.05.09 (in-scope elements only)
CMS Conditions of Participation, 42 CFR Â§482.41   Physical Environment
OSHA 29 CFR 1910.137   Electrical Protective Equipment
OSHA 29 CFR 1910.269   Electric Power Generation, Transmission, and Distribution
OSHA 29 CFR 1910 Subpart S   Electrical
OSHA 29 CFR 1926 Subpart K   Electrical (Construction)

4.0  TECHNICAL REQUIREMENTS
Each subsystem below corresponds to a Contract Line Item Number (CLIN) in Section 12.0. All testing shall conform to the visual, mechanical, and electrical test procedures and pass/fail acceptance criteria of ANSI/NETA MTS-2023 unless a more stringent VA or NFPA requirement applies.
4.1  Medium-Voltage (15 kV Class) Switchgear and Distribution
Applies to the campus 15 kV-class metal-clad/metal-enclosed switchgear, primary disconnects, MV cable, and step-down transformers feeding the main hospital service.
4.1.1  Visual and Mechanical (NETA MTS Â§7.1)
De-energize, lock-out / tag-out (LOTO), clean (vacuum and approved solvent) all compartments; inspect for arc tracking, contamination, corona, mechanical damage, hardware torque per manufacturer.
Verify nameplate, mechanical interlocks, key interlock schemes, racking mechanisms, shutters, and viewing windows.
Inspect grounding, bonding, and ground bus continuity.
Lubricate per manufacturer; replace consumables (filters, desiccants, indicator lamps).
4.1.2  Electrical Tests (NETA MTS Â§7.1)
Insulation resistance phase-to-phase and phase-to-ground, 1 minute (5,000 VDC for 15 kV class).
AC overpotential / VLF withstand on MV cables per IEEE 400.2 (0.1 Hz, 22 kV peak for 15 kV class), if cable age exceeds 10 years.
Contact resistance (ductor) on bus connections (  +50% of like-equipment baseline).
Vacuum bottle integrity test (DC overpotential) on vacuum interrupters.
Power factor / dissipation factor on MV bushings, CTs, and transformers (Doble M4000 or equivalent).
4.2  Low-Voltage Switchgear, Switchboards, and Panelboards
4.2.1  Visual and Mechanical (NETA MTS Â§7.1, Â§7.5, Â§7.6)
Open and inspect every switchboard, distribution panel, and lighting panelboard not exceeding 24 months since last internal inspection (priority: service entrance, EES gear, ICU, OR, ED panels).
Torque-check all bolted bus connections to manufacturer specification or NETA Table 100.12; document with calibrated torque wrench.
Verify breaker-to-bus stab integrity, bracing, and bonding.
4.2.2  Electrical Tests
Insulation resistance, phase-to-phase and phase-to-ground, 1,000 VDC minimum for 600 V class.
Primary current injection on all main, tie, and feeder LV power circuit breakers   800 A frame; secondary injection on solid-state trip units. Settings shall be verified against Government-furnished current Coordination Study; deviations shall be reported as deficiencies.
Contact / pole resistance on every LV power breaker; compare to baseline.
GFCI testing on all required circuits (operability + 6 mA trip per UL 943).
Verify and tighten neutral and ground bonding; verify single-point bonding at separately derived systems per NEC 250.30.
4.3  Distribution and Unit Substation Transformers
Includes campus dry-type transformers and any liquid-filled units within scope.
Visual inspection: enclosures, ventilation, bushings, indicators, sound level, infrared baseline.
Insulation resistance (1 min / 10 min, polarization index) per IEEE 43.
Turns-ratio test (TTR) all taps, all phases.
Winding resistance (DC) per IEEE C57.12.90.
For liquid-filled: dielectric breakdown (ASTM D877/D1816), Dissolved Gas Analysis (DGA) per IEEE C57.104, water content, acidity, IFT, and color.
Verify and torque all bolted connections.
4.4  Automatic Transfer Switches (ATS)   Life Safety, Critical, Equipment Branches
Inspect contacts, mechanism, controllers, and wiring on every ATS.
Verify timing settings: TDNE (time delay normal-to-emergency), TDEN, TDES, TDEC; document against NFPA 110 Â§6.2.6 and facility settings.
Perform load-side and source-side voltage and phase rotation checks.
Functional transfer test under no-load and (Government-coordinated) under-load; document transfer times.
Bypass-isolation operation (where equipped)   exercise both bypass and isolation positions.
Replace consumable contacts where pitting > 25% per manufacturer.
NOTE: Generator starting and the load-side EPSS performance test under NFPA 110-2025 Â§8.4.2 are excluded from this SOW (separate contract). ATS-side functional verification shall be coordinated with the generator contractor's testing window where practical.
4.5  Protective Relay Testing
Test all MV protective relays (50/51, 50/51N, 87, 27/59, 81, etc.) per ANSI C37.90 and NETA MTS Â§7.9.
Verify settings against the Government-furnished current Coordination Study   any deviation reported as a deficiency. (Study revision and arc flash incident energy recalculation are out of scope; see Â§2.2.)
Functional trip test through the breaker (system test) on at least one device per protection zone.
Provide before-and-after settings record and certified test reports.
4.6  Grounding System
Three-point fall-of-potential test on the main service ground per IEEE 81; target   5 ohms per VA PG-18-10.
Two-point bond-resistance testing on equipment grounds and lightning ground ring tie-ins (visual only for LP system).
Verify isolated ground (IG) integrity in patient care spaces and IT/data closets.
4.7  Infrared Thermographic Survey
Energized scan with calibrated radiometric camera (  0.05Â°C NETD,  50 V; permit must be approved by the DCE or CHENG.
LOTO procedures shall conform to 29 CFR 1910.147 and the LAJ VAMC LOTO program; group lockout for multi-employer work.
9.2  PPE
Arc-rated PPE selected from the Government-furnished current site-specific arc flash labels and study; if any in-scope equipment is missing a current label, work on that equipment shall STOP and the COR notified.
Voltage-rated rubber gloves (Class 0/2/4 as appropriate), tested within last 6 months.
Insulated tools rated for system voltage.
9.3  Test Equipment
All instruments shall be calibrated within the last 12 months by a NIST-traceable lab; calibration stickers and certificates shall be available on request.
Use only Cat III / Cat IV-rated meters appropriate to the system voltage.
9.4  Reporting
Any near-miss, injury, or property damage shall be reported to the COR within 1 hour.
Daily safety briefings (tailgates) documented and provided to the COR weekly.

10.0  ACCEPTANCE, WARRANTY, AND QUALITY ASSURANCE
10.1  Acceptance Criteria
All test results meet the pass/fail thresholds of ANSI/NETA MTS-2023 and the manufacturer's published values.
All deficiencies discovered are documented, classified (Priority 1 4), and either corrected within scope or reported with Class A engineering recommendations.
All required documentation submitted, accepted, and incorporated into the LAJ VAMC Engineering record set and TJC EOC binder.
Compliance crosswalk demonstrates 100% coverage of NFPA 70 / 70B / 99 / 111, TJC EC.02.05.x (in-scope elements), CMS Â§482.41, and VHA Directive 1028 line-items in scope.
10.2  Warranty
Workmanship warranty: minimum twelve (12) months from date of Government acceptance of final report.
Any retest required to validate corrected deficiencies during the warranty period shall be performed at no additional cost.
10.3  Quality Assurance Surveillance Plan (QASP)
The Government will administer the QASP through the COR, with surveillance methods including: 100% inspection of submittals, random sampling of field test data sheets (  10%), customer complaint resolution, and final acceptance review. Performance metrics:
Schedule adherence:   95% of Level-2 schedule milestones met.
Submittal quality:   5% return rate for revision.
Safety: zero recordable incidents; zero electrical-contact events.
Compliance: 100% of in-scope code requirements addressed and documented.

11.0  GOVERNMENT-FURNISHED PROPERTY AND INFORMATION
The Government will provide:
Existing single-line diagrams, prior triennial reports, current Arc Flash Study and labels, current Coordination Study, and EPSS records (electronic copies).
Access to the facility, equipment rooms, and key control during the Period of Performance.
Designated laydown / staging area outside the building footprint.
Trash/recycling and standard sanitary facilities.
PIV/contractor flash credentials following completion of background investigations.
The Government will NOT provide:
Tools, instruments, calibration services, consumables, PPE, or test equipment.
Lodging, meals, transportation, or per diem.

12.0  CONTRACT LINE ITEM NUMBER (CLIN) STRUCTURE
The IGCE issued under separate cover (ENG-IGCE-2026-ELEC-TRI-001 Rev 1) reflects the following 14-CLIN structure. Offerors shall price each CLIN as Firm-Fixed-Price (FFP) except where noted.
CLIN
Description
Type / Unit
0001
Project Management, Submittals, and Mobilization
FFP / Lot
0002
Medium-Voltage Switchgear & MV Cable Testing
FFP / Lot
0003
Low-Voltage Switchgear, Switchboards, Panelboards
FFP / Lot
0004
Distribution & Unit Substation Transformers
FFP / Lot
0005
Automatic Transfer Switches (all branches)
FFP / Lot
0006
Protective Relay Testing & Calibration
FFP / Lot
0007
Grounding System Testing
FFP / Lot
0008
Infrared Thermographic Survey
FFP / Lot
0009
Patient Care Receptacle Testing (NFPA 99 Â§6.3.3.3)
FFP / Lot
0010
UPS / Battery Systems (NFPA 111)
FFP / Lot
0011
Documentation Reconciliation & Compliance Crosswalk
FFP / Lot
0012
Final Reporting & Project Closeout
FFP / Lot
0013
Contingency for Minor Corrective Maintenance (NTE)
T&M / NTE
0014
Optional   After-Hours / Weekend Premium Pool
Option / NTE

13.0  COMPLIANCE CROSSWALK (100% MAP   IN-SCOPE ELEMENTS)
The following matrix maps each in-scope element to the governing standard. Generator/EPSS, arc flash, and power quality compliance are addressed by separate contracts.
Scope Element / CLIN
Primary Standard(s)
Accreditation Tie-In
MV Switchgear (CLIN 0002)
NETA MTS Â§7.1; NFPA 70 Art. 110, 230, 240; NFPA 70B Â§11
TJC EC.02.05.05; VHA Dir 1028
LV Distribution (CLIN 0003)
NETA MTS Â§7.5, Â§7.6; NFPA 70 Art. 408, 240; NFPA 70B Â§11
TJC EC.02.05.05; CMS Â§482.41
Transformers (CLIN 0004)
NETA MTS Â§7.2; IEEE C57; NFPA 70B Â§13
TJC EC.02.05.05
ATS (CLIN 0005)
NETA MTS Â§7.22; NFPA 110 Â§6.2; NFPA 99 Â§6.7
TJC EC.02.05.07; VHA Dir 1028
Relays (CLIN 0006)
NETA MTS Â§7.9; ANSI C37.90; IEEE C37.2
TJC EC.02.05.05
Grounding (CLIN 0007)
NETA MTS Â§7.13; IEEE 81; NEC Art. 250
VA PG-18-10
IRT (CLIN 0008)
NFPA 70B Annex L; NETA MTS Â§9
TJC EC.02.05.05
Patient Receptacles (CLIN 0009)
NFPA 99-2024 Â§6.3.3.3; NEMA WD-6
TJC EC.02.05.05; CMS Â§482.41
UPS / Batteries (CLIN 0010)
NFPA 111-2022; IEEE 450 / 1188
TJC EC.02.05.07
Documentation (CLIN 0011, 0012)
NFPA 70B Â§8
TJC EC.02.05.01

13.1  Compliance Coverage Boundary Statement
This SOW achieves 100% compliance for all in-scope equipment listed above. The complete LAJ VAMC electrical compliance posture for the CY 2026 cycle is achieved through the combined deliverables of THIS contract plus the following separate contracts: (a) Generator triennial PM and 3-year load bank (NFPA 110-2025 Â§8.4.2) covering EPSS testing; (b) Arc flash risk assessment update and short-circuit/coordination study refresh (NFPA 70E Â§130.5; IEEE 1584); and (c) Campus power quality / harmonics survey (IEEE 519). The Engineering Service is responsible for the integrated compliance crosswalk across all three procurements.

## Attachments

- [36C24527Q0039.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/407c1e9833cb400e928d76016061bf9c/download)

## Open now in the same industry

37 open in NAICS 238210.

- INTENT TO SOLE SOURCE AWARD TO EATON CORP - BASE YEAR MAINTENANCE AND SERVICE CONTRACT FOR 8 UPS HERSHEL WOODY WILLIAMS VAMC (36C24527Q0046), due November 12, 2026 at 10:00 AM EST. https://abierto.us/opportunities/36c24527q0046
- Edwards AFB Holiday Light & Decor Installation (FA930127Q0006), due November 2, 2026 at 9:30 AM EST. https://abierto.us/opportunities/fa930127q0006
- Generator Inspection Service and Routine Maintenance - (36C24627Q0090), due November 2, 2026 at 10:00 AM EST. https://abierto.us/opportunities/36c24627q0090

## Publications

- October 20, 2026: Sources sought, due November 5, 2026 at 10:00 AM EST. Notice fb2ca24dd6dd4624aeedce9089e2e478. https://sam.gov/workspace/contract/opp/fb2ca24dd6dd4624aeedce9089e2e478/view

## Points of contact

- William Pratt, Contracting Officer, billie.pratt@va.gov, 410-642-2411

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/36c24527q0039.