# Loch Raven VAMC Bldg. 6 Boiler Replacement REQUEST FOR QUOTE

Canonical: https://abierto.us/opportunities/36c24526q0118

- Solicitation number: 36C24526Q0118
- Notice type: Combined synopsis and solicitation
- Status: Awarded to Integrated Combustion Solutions LLC
- Department: Department of Veterans Affairs
- Contracting office: 245-Network Contract Office 5 (36C245)
- NAICS: 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Product or service code: N045 Installation of Equipment: Plumbing, Heating, and Waste Disposal Equipment
- Set-aside: Total small business set-aside
- Place of performance: Baltimore, Maryland
- County: City of Baltimore (FIPS 24510). https://abierto.us/counties/city-of-baltimore-md-24510
- City: Baltimore. https://abierto.us/cities/baltimore-md-2404000
- First posted: November 14, 2025
- Last posted: November 14, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/db1c8c50026d464eba2a05b417f0a918/view

## Description

Page 1 of 1 SCOPE OF WORK LR Bldg 6 Boiler Replacement Project:

**512-25-052 GENERAL SCOPE OF WORK:** The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Loch Raven Campus. Contractor is to remove the existing boiler in the Building 6 mechanical room a Weil McClain Water Tube Boiler rated at 209MBH and replace it with a CSD-1 compliant boiler on the existing equipment pad.

The old boiler should be properly disposed of after removal with disposal receipts provided to VA. New boiler should use existing utility lines for tie-in s where possible except for the existing Vent line. Per NBCI code, the vent line must be PVC and the atmospheric metal duct deteriorate. Contractor to confirm feasibility of utility line tie-ins and vent line replacement during pre-bid walk through. Utility tie-ins may require minor modifications to fit the existing space and new boiler.

Contractor to follow boiler manufacturer install instructions for proper installation. Contractor will provide materials to meet ICRA requirements set forth by safety based on the work to be completed. Contractor to provide warranty and start-up after install of new boiler to confirm proper operation. Remove and dispose of existing Weil McClain Water Tube Boiler (209MBH). Provide disposal receipts to VA. Provide and install CSD-1 compliant Boiler sized to match existing boiler.

Utilize existing utility lines for tie-ins where possible except for the vent line. New PVC vent line must be installed. Contractor to adhere to any and all local, state, federal, and VA specifications and guidelines. Work will be completed in 30 calendar days from Notice To Proceed.

## Award on USAspending

- Recipient: Integrated Combustion Solutions LLC (UEI CAB7S2EULDG8)
- Contract: 36C24526P0521, purchase order
- Obligated: $79,976.00
- Competition: Competed Under SAP, 3 offers received
- Link: solicitation number 36C24526Q0118 equals the FPDS solicitation identifier; same awarding office 36C245 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_36C24526P0521_3600_-NONE-_-NONE-/


## Publications

- November 14, 2025: Combined synopsis and solicitation, due December 3, 2025 at 11:00 AM EST. Notice db1c8c50026d464eba2a05b417f0a918. https://sam.gov/workspace/contract/opp/db1c8c50026d464eba2a05b417f0a918/view

## Points of contact

- William Chris Galletta, Contracting Officer, William.Galletta@va.gov, 410-637-1506

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/36c24526q0118.