{"canonical":"https://abierto.us/opportunities/31125pr240000138","key":"31125PR240000138","url":"https://abierto.us/opportunities/31125pr240000138","title":"Paints and Floors work for govt owned housing","solicitation_number":"31125PR240000138","notice_type":"k","open":false,"response_deadline":"2024-05-28T16:00:00Z","first_posted":"2024-04-10","last_posted":"2024-04-26","department":"HOMELAND SECURITY, DEPARTMENT OF","subagency":"US COAST GUARD","office":"BASE CAPE COD(00052)","naics":"238320","psc":"Z1EB","set_aside":"SBA","place_state":"MA","place_county":"25001","place_county_name":"Barnstable County","place_city":"2510015","place_city_name":"Buzzards Bay","winner":null,"award_amount":null,"publications":[{"notice_id":"b4d14752dd904b1d93625ae4b35906fc","title":"Paints and Floors work for govt owned housing","solicitation_number":"31125PR240000138","notice_type":"k","base_type":"k","posted":"2024-04-10","posted_at":null,"due_at":"2024-04-28T16:00:00Z","due_date":"2024-04-28","cancelled":null,"archived":null,"archive_date":"2024-05-13","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b4d14752dd904b1d93625ae4b35906fc/view","enriched":false,"history":[]},{"notice_id":"6be125b0e11843b5b1dffcd74025e8c6","title":"Paints and Floors work for govt owned housing","solicitation_number":"31125PR240000138","notice_type":"k","base_type":"k","posted":"2024-04-24","posted_at":null,"due_at":"2024-04-28T16:00:00Z","due_date":"2024-04-28","cancelled":null,"archived":null,"archive_date":"2024-05-13","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/6be125b0e11843b5b1dffcd74025e8c6/view","enriched":false,"history":[]},{"notice_id":"d85c22810d6445ed8c99bc014dd21fa4","title":"Paints and Floors work for govt owned housing","solicitation_number":"31125PR240000138","notice_type":"k","base_type":"k","posted":"2024-04-24","posted_at":null,"due_at":"2024-04-28T16:00:00Z","due_date":"2024-04-28","cancelled":null,"archived":null,"archive_date":"2024-05-13","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d85c22810d6445ed8c99bc014dd21fa4/view","enriched":false,"history":[]},{"notice_id":"a1ce24ab142c428e91c589fef778f8e3","title":"Paints and Floors work for govt owned housing","solicitation_number":"31125PR240000138","notice_type":"k","base_type":"k","posted":"2024-04-25","posted_at":null,"due_at":"2024-04-28T16:00:00Z","due_date":"2024-04-28","cancelled":null,"archived":null,"archive_date":"2024-05-13","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a1ce24ab142c428e91c589fef778f8e3/view","enriched":false,"history":[]},{"notice_id":"522fc89027f043aebccaac9d2140a538","title":"Paints and Floors work for govt owned housing","solicitation_number":"31125PR240000138","notice_type":"k","base_type":"k","posted":"2024-04-26","posted_at":null,"due_at":"2024-05-28T16:00:00Z","due_date":"2024-05-28","cancelled":null,"archived":null,"archive_date":"2024-06-12","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/522fc89027f043aebccaac9d2140a538/view","enriched":false,"history":[]}],"latest_notice_id":"522fc89027f043aebccaac9d2140a538","first_type":"k","notices":[{"dates":{"posted":"2024-04-10","response_deadline":{"raw":"2024-04-28T12:00:00-04:00","utc":"2024-04-28T16:00:00Z","date":"2024-04-28","time":"12:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b4d14752dd904b1d93625ae4b35906fc/view"},"naics":{"codes":["238320"],"primary":"238320"},"title":"Paints and Floors work for govt owned housing","agency":{"office":{"code":"70Z052","name":"BASE CAPE COD(00052)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02542","city":"BUZZARDS BAY","state":"MA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-05-13","archive_type":"auto15"},"contacts":[{"name":"ROBERT BAPTISTE","role":"primary","email":"ROBERT.D.BAPTISTE@USCG.MIL","phone":"5089686510"},{"name":"JASON L. WILLIAMS","role":"secondary","email":"JASON.L.WILLIAMS@USCG.MIL","phone":"571-608-4843"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"b4d14752dd904b1d93625ae4b35906fc","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"67c4225125d889bb190b50089a53a7162e960657ad2abe72868460c9acb3bcd1","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The Contractor shall provide all labor, equipment, materials (including paint), transportation, supervision, and disposal necessary to complete the paint and floor maintenance in the below listed units: SCOPE OF WORK: Work consists of preparing and painting, surfaces (i.e., walls, ceilings, doors, closets, kitchen, trim, and molding, on interior surfaces of the housing units, bulkhead/cellar ways, bulkhead/cellar steps, basement walls and basement floors. All exterior storm doors and all entrance doors and trim shall also be painted. Garage entry doors and walls in Flat Top units finished garages shall also be painted. Exterior doors (aluminum): White latex paint Interior doors: Eggshell Walls: Eggshell Trim: Eggshell Ceiling: Flat ceiling white Basement: The basements are to be painted to include all previously painted surfaces in basement. Walls shall be painted white with multicide additive, the deck (floor), metal poles, and bulkhead walls and steps shall be painted with gray (multicide added to paint). **SEE SCOPE OF WORK (SOW) FOR FULL DETAILS / REQUIREMENTS","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"31125PR240000138","place_of_performance":{"zip":"02542","city":{"name":"Buzzards Bay"},"state":{"code":"MA"},"country":{"code":"USA"}},"product_service_code":"Z1EB"},{"dates":{"posted":"2024-04-24","response_deadline":{"raw":"2024-04-28T12:00:00-04:00","utc":"2024-04-28T16:00:00Z","date":"2024-04-28","time":"12:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/6be125b0e11843b5b1dffcd74025e8c6/view"},"naics":{"codes":["238320"],"primary":"238320"},"title":"Paints and Floors work for govt owned housing","agency":{"office":{"code":"70Z052","name":"BASE CAPE COD(00052)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02542","city":"BUZZARDS BAY","state":"MA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-05-13","archive_type":"auto15"},"contacts":[{"name":"ROBERT BAPTISTE","role":"primary","email":"ROBERT.D.BAPTISTE@USCG.MIL","phone":"5089686510"},{"name":"JASON L. WILLIAMS","role":"secondary","email":"JASON.L.WILLIAMS@USCG.MIL","phone":"571-608-4843"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"6be125b0e11843b5b1dffcd74025e8c6","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"6b3a06b991f9045ad941f9a7e05e4735e34e66d47e53c51a780427a044ea3267","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Questions asked: Time frame for completion? - 24-30 days. Weeky Pay Possible? - No, not paid until fully complete and invoice has been submitted. Will all 8 unts be availabe at the same time? Yes. What is the actual closing date? - 4/28 at 12:00 EST. The Contractor shall provide all labor, equipment, materials (including paint), transportation, supervision, and disposal necessary to complete the paint and floor maintenance in the below listed units: SCOPE OF WORK: Work consists of preparing and painting, surfaces (i.e., walls, ceilings, doors, closets, kitchen, trim, and molding, on interior surfaces of the housing units, bulkhead/cellar ways, bulkhead/cellar steps, basement walls and basement floors. All exterior storm doors and all entrance doors and trim shall also be painted. Garage entry doors and walls in Flat Top units finished garages shall also be painted. Exterior doors (aluminum): White latex paint Interior doors: Eggshell Walls: Eggshell Trim: Eggshell Ceiling: Flat ceiling white Basement: The basements are to be painted to include all previously painted surfaces in basement. Walls shall be painted white with multicide additive, the deck (floor), metal poles, and bulkhead walls and steps shall be painted with gray (multicide added to paint). **SEE SCOPE OF WORK (SOW) FOR FULL DETAILS / REQUIREMENTS","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"31125PR240000138","place_of_performance":{"zip":"02542","city":{"name":"Buzzards Bay"},"state":{"code":"MA"},"country":{"code":"USA"}},"product_service_code":"Z1EB"},{"dates":{"posted":"2024-04-24","response_deadline":{"raw":"2024-04-28T12:00:00-04:00","utc":"2024-04-28T16:00:00Z","date":"2024-04-28","time":"12:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d85c22810d6445ed8c99bc014dd21fa4/view"},"naics":{"codes":["238320"],"primary":"238320"},"title":"Paints and Floors work for govt owned housing","agency":{"office":{"code":"70Z052","name":"BASE CAPE COD(00052)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02542","city":"BUZZARDS BAY","state":"MA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-05-13","archive_type":"auto15"},"contacts":[{"name":"ROBERT BAPTISTE","role":"primary","email":"ROBERT.D.BAPTISTE@USCG.MIL","phone":"5089686510"},{"name":"JASON L. WILLIAMS","role":"secondary","email":"JASON.L.WILLIAMS@USCG.MIL","phone":"571-608-4843"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"d85c22810d6445ed8c99bc014dd21fa4","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"4fc1e38dc0484ffea71480714372d8088de89ac99247bfc1f44a3c0137275b78","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Questions asked: Time frame for completion? - 24-30 days. Weekly Pay Possible? - No, not paid until fully complete and invoice has been submitted. Will all 8 unts be availabe at the same time? Yes. What is the actual closing date? - 4/28 at 12:00 EST. Are pictures or plans available? No. The Contractor shall provide all labor, equipment, materials (including paint), transportation, supervision, and disposal necessary to complete the paint and floor maintenance in the below listed units: SCOPE OF WORK: Work consists of preparing and painting, surfaces (i.e., walls, ceilings, doors, closets, kitchen, trim, and molding, on interior surfaces of the housing units, bulkhead/cellar ways, bulkhead/cellar steps, basement walls and basement floors. All exterior storm doors and all entrance doors and trim shall also be painted. Garage entry doors and walls in Flat Top units finished garages shall also be painted. Exterior doors (aluminum): White latex paint Interior doors: Eggshell Walls: Eggshell Trim: Eggshell Ceiling: Flat ceiling white Basement: The basements are to be painted to include all previously painted surfaces in basement. Walls shall be painted white with multicide additive, the deck (floor), metal poles, and bulkhead walls and steps shall be painted with gray (multicide added to paint). **SEE SCOPE OF WORK (SOW) FOR FULL DETAILS / REQUIREMENTS","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"31125PR240000138","place_of_performance":{"zip":"02542","city":{"name":"Buzzards Bay"},"state":{"code":"MA"},"country":{"code":"USA"}},"product_service_code":"Z1EB"},{"dates":{"posted":"2024-04-25","response_deadline":{"raw":"2024-04-28T12:00:00-04:00","utc":"2024-04-28T16:00:00Z","date":"2024-04-28","time":"12:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a1ce24ab142c428e91c589fef778f8e3/view"},"naics":{"codes":["238320"],"primary":"238320"},"title":"Paints and Floors work for govt owned housing","agency":{"office":{"code":"70Z052","name":"BASE CAPE COD(00052)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02542","city":"BUZZARDS BAY","state":"MA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-05-13","archive_type":"auto15"},"contacts":[{"name":"ROBERT BAPTISTE","role":"primary","email":"ROBERT.D.BAPTISTE@USCG.MIL","phone":"5089686510"},{"name":"JASON L. WILLIAMS","role":"secondary","email":"JASON.L.WILLIAMS@USCG.MIL","phone":"571-608-4843"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"a1ce24ab142c428e91c589fef778f8e3","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"d312754f82ce2c7a65eefd391349c552936138476833671af0e1f78733966493","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Questions asked: Time frame for completion? - 24-30 days. Weekly Pay Possible? - No, not paid until fully complete and invoice has been submitted. Will all 8 unts be availabe at the same time? Yes. What is the actual closing date? - 4/28 at 12:00 EST. Are pictures or plans available? No. The Contractor shall provide all labor, equipment, materials (including paint), transportation, supervision, and disposal necessary to complete the paint and floor maintenance in the below listed units: SCOPE OF WORK: Work consists of preparing and painting, surfaces (i.e., walls, ceilings, doors, closets, kitchen, trim, and molding, on interior surfaces of the housing units, bulkhead/cellar ways, bulkhead/cellar steps, basement walls and basement floors. All exterior storm doors and all entrance doors and trim shall also be painted. Garage entry doors and walls in Flat Top units finished garages shall also be painted. Exterior doors (aluminum): White latex paint Interior doors: Eggshell Walls: Eggshell Trim: Eggshell Ceiling: Flat ceiling white Basement: The basements are to be painted to include all previously painted surfaces in basement. Walls shall be painted white with multicide additive, the deck (floor), metal poles, and bulkhead walls and steps shall be painted with gray (multicide added to paint). **SEE SCOPE OF WORK (SOW) FOR FULL DETAILS / REQUIREMENTS","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"31125PR240000138","place_of_performance":{"zip":"02542","city":{"name":"Buzzards Bay"},"state":{"code":"MA"},"country":{"code":"USA"}},"product_service_code":"Z1EB"},{"dates":{"posted":"2024-04-26","response_deadline":{"raw":"2024-05-28T12:00:00-04:00","utc":"2024-05-28T16:00:00Z","date":"2024-05-28","time":"12:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/522fc89027f043aebccaac9d2140a538/view"},"naics":{"codes":["238320"],"primary":"238320"},"title":"Paints and Floors work for govt owned housing","agency":{"office":{"code":"70Z052","name":"BASE CAPE COD(00052)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"02542","city":"BUZZARDS BAY","state":"MA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-06-12","archive_type":"auto15"},"contacts":[{"name":"ROBERT BAPTISTE","role":"primary","email":"ROBERT.D.BAPTISTE@USCG.MIL","phone":"5089686510"},{"name":"JASON L. WILLIAMS","role":"secondary","email":"JASON.L.WILLIAMS@USCG.MIL","phone":"571-608-4843"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"522fc89027f043aebccaac9d2140a538","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"72b6527888a42b5c207e3fc1cdfe759fdf64606a95e71e8c02393046200710c0","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Questions asked: Time frame for completion? - 24-30 days. Weekly Pay Possible? - No, not paid until fully complete and invoice has been submitted. Will all 8 unts be availabe at the same time? Yes. What is the actual closing date? - 4/28 at 12:00 EST. Are pictures or plans available? No. The Contractor shall provide all labor, equipment, materials (including paint), transportation, supervision, and disposal necessary to complete the paint and floor maintenance in the below listed units: SCOPE OF WORK: Work consists of preparing and painting, surfaces (i.e., walls, ceilings, doors, closets, kitchen, trim, and molding, on interior surfaces of the housing units, bulkhead/cellar ways, bulkhead/cellar steps, basement walls and basement floors. All exterior storm doors and all entrance doors and trim shall also be painted. Garage entry doors and walls in Flat Top units finished garages shall also be painted. Exterior doors (aluminum): White latex paint Interior doors: Eggshell Walls: Eggshell Trim: Eggshell Ceiling: Flat ceiling white Basement: The basements are to be painted to include all previously painted surfaces in basement. Walls shall be painted white with multicide additive, the deck (floor), metal poles, and bulkhead walls and steps shall be painted with gray (multicide added to paint). **SEE SCOPE OF WORK (SOW) FOR FULL DETAILS / REQUIREMENTS","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"31125PR240000138","place_of_performance":{"zip":"02542","city":{"name":"Buzzards Bay"},"state":{"code":"MA"},"country":{"code":"USA"}},"product_service_code":"Z1EB"}],"due_at":"2024-05-28T16:00:00Z","due_date":"2024-05-28","closes_at":"2024-05-28T16:00:00Z","awardable":true,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z052","office_name":"BASE CAPE COD(00052)","state":"MA","county":"25001","county_name":"Barnstable County","city":"2510015","city_name":"Buzzards Bay","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"522fc89027f043aebccaac9d2140a538","description":{"text":"Questions asked: Time frame for completion? - 24-30 days. Weekly Pay Possible? - No, not paid until fully complete and invoice has been submitted. Will all 8 unts be availabe at the same time? Yes. What is the actual closing date? - 4/28 at 12:00 EST. Are pictures or plans available? No. The Contractor shall provide all labor, equipment, materials (including paint), transportation, supervision, and disposal necessary to complete the paint and floor maintenance in the below listed units: SCOPE OF WORK: Work consists of preparing and painting, surfaces (i.e., walls, ceilings, doors, closets, kitchen, trim, and molding, on interior surfaces of the housing units, bulkhead/cellar ways, bulkhead/cellar steps, basement walls and basement floors. All exterior storm doors and all entrance doors and trim shall also be painted. Garage entry doors and walls in Flat Top units finished garages shall also be painted. Exterior doors (aluminum): White latex paint Interior doors: Eggshell Walls: Eggshell Trim: Eggshell Ceiling: Flat ceiling white Basement: The basements are to be painted to include all previously painted surfaces in basement. Walls shall be painted white with multicide additive, the deck (floor), metal poles, and bulkhead walls and steps shall be painted with gray (multicide added to paint). **SEE SCOPE OF WORK (SOW) FOR FULL DETAILS / REQUIREMENTS","html":null,"origin":"extract"},"contacts":[{"name":"ROBERT BAPTISTE","role":"primary","email":"ROBERT.D.BAPTISTE@USCG.MIL","phone":"5089686510"},{"name":"JASON L. WILLIAMS","role":"secondary","email":"JASON.L.WILLIAMS@USCG.MIL","phone":"571-608-4843"}],"place_of_performance":{"zip":"02542","city":{"name":"Buzzards Bay"},"state":{"code":"MA"},"country":{"code":"USA"}},"office_address":{"zip":"02542","city":"BUZZARDS BAY","state":"MA","country":"USA"},"naics_codes":["238320"],"award":null,"attachments":[],"awards":[],"related":[]}