# Elevator Modernization

Canonical: https://abierto.us/opportunities/2031za26q00100

- Solicitation number: 2031ZA26Q00100
- Notice type: Solicitation
- Status: Closed. Deadline was July 28, 2026 at 12:00 PM EDT
- Department: Department of the Treasury
- Agency: Bureau of Engraving and Printing
- Contracting office: Office of the Chief Procurement Officer (2031ZA)
- NAICS: 541330 Engineering Services
- Product or service code: C215 A&E Production Engineering Services (including Design and Control, and Building Programming)
- Set-aside: Total small business set-aside
- Place of performance: Washington, District of Columbia
- County: District of Columbia (FIPS 11001). https://abierto.us/counties/district-of-columbia-dc-11001
- City: Washington. https://abierto.us/cities/washington-dc-1150000
- First posted: June 10, 2026
- Last posted: July 16, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/955b450cd8064ecab0bb49fee93f7db0/view

## Description

16 July 2026 - Amendment 0003 to extend proposal due date. 6 July 2026 - Issue amendment 0002 to 1. Post Responses to questions. 2. Update Attachment 1 - SOW. 3. Update Section L. 4. Attach document 2e. 5. Attach Site Visit Sign-in sheet. 18 June 2026 - Issue amendment 0001 to update Attachment 1 - Site Visit Information.

The Contractor shall develop bridging documents, consisting of conceptual design, technical specifications, and performance criteria for the complete repair of seventeen electric elevators (12 passenger and 5 freight as identified in the 2024 Elevator Assessment) replacing all components that are obsolete and/or have reached end-of-life, including MEP systems upgrades, ACM abatement, PCBs removal, structural and architectural alterations to bring the existing machine rooms and hoistways up to code.

New elevator controllers shall be integrated with BEP’s existing Supervisory Control and Data Acquisition (SCADA) system. The bridging documents should provide enough detail to allow successful solicitation of a design-build construction contract addressing complete alteration of the elevators. The Contractor shall ensure compliance with all federal, state, and local regulations, minimize disruption to building operations during installation and achieve targeted energy savings and sustainability goals.

## Publications

- June 10, 2026: Solicitation, due July 21, 2026 at 12:00 PM EDT. Notice 2bc15beae36e4487bf385dd4434024a7. https://sam.gov/workspace/contract/opp/2bc15beae36e4487bf385dd4434024a7/view
- June 18, 2026: Solicitation, due July 21, 2026 at 12:00 PM EDT. Notice 748d505cbdfd455e9b801de60bbcd1de. https://sam.gov/workspace/contract/opp/748d505cbdfd455e9b801de60bbcd1de/view
- July 6, 2026: Solicitation, due July 21, 2026 at 12:00 PM EDT. Notice 655efeacaa8e444fa993ecf17887f73a. https://sam.gov/workspace/contract/opp/655efeacaa8e444fa993ecf17887f73a/view
- July 16, 2026: Solicitation, due July 28, 2026 at 12:00 PM EDT. Notice 955b450cd8064ecab0bb49fee93f7db0. https://sam.gov/workspace/contract/opp/955b450cd8064ecab0bb49fee93f7db0/view

## Points of contact

- Marico Sellers, marico.sellers@treasury.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/2031za26q00100.
