# HAARP large scale blast testing and fragmentation characterization

Canonical: https://abierto.us/opportunities/19aqmm26q0439

- Solicitation number: 19AQMM26Q0439
- Notice type: Solicitation
- Status: Open. Offers due September 18, 2026 at 11:59 AM EDT
- Department: Department of State
- Contracting office: Acquisitions - Aqm Momentum (19AQMM)
- NAICS: 541330 Engineering Services
- Product or service code: H256 Equipment and Materials Testing: Construction and Building Materials
- Place of performance: Virginia
- County: Arlington County (FIPS 51013). https://abierto.us/counties/arlington-county-va-51013
- First posted: August 26, 2026
- Last posted: September 16, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/7f74383c5c3c4d0ba7f1de9f1a1d1f6a/view

## Description

This amendment is to extend the due date of the solicitation to 9/18/2026 submissions are now due @ noon 11:59am Eastern standard time.  As well as add a pricing template in the attachment for all proposals to follow.  Any other deviation from the attached pricing format will not be accepted.  This supersedes any previous instructions in sections L&M.  In addition, all vendors should note in their technical proposals which range site will be utilized.

Other Changes and/or clarifications:

1. Test Ranges must be able to accommodate explosive sized of 2000lbs TNT Net Explosive Weight, this is not a requirement to test using actual TNT.  ANFO is an acceptable and economic explosive to use

2. Vendors must provide a range site for testing.  When evaluating the range site, the government will give preference to proposed sites that are most easily accessablel by the government in terms of location, established agreements, and ease of business & logistics.  The government cannot provide a list of sites that is already has agreements with, but will compare those sites between proposals during evaluation and determine a high confidence or low confidence rating to each.

The POC for all proposals to be delivered to is Richard Crum @ crumrb@state.gov

Background

The Department&rsquo;s Bureau of Diplomatic Security, Physical Security Division, Research and Development Branch (DS/PSD/RD) is investigating debris generated from perimeter anti-ram barriers during a Vehicle Borne Improvised Explosive Device (VBIED) attack.

DS/PSD/RD is seeking proposals to conduct large scale blast testing and fragmentation tracking.

Government Furnished Information to Performer:

	DOS DS PSD Standard Practice for Blast Tests

	Final report and test data from previous anti-ram barrier debris characterization testing

	Physical Security Handbook (Red Book) drawing templates

Scope

This effort will be broken into two phases.  Phase 1 will be to evaluate and characterize the debris generated from a simulated VBIED attack against baseline Department anti-ram systems, identified in this document.  Phase 2 will be to evaluate and characterize debris generated from modified Department anti-ram systems.

Performers will be evaluated on:

	Ability to perform testing in accordance with Blast Testing SOP for DS/PSP/PSD

	Responders shall provide a narrative for test site setup as part of performer evaluation.

		Test facility capabilities:

			Topography suitable for instrumentation

				Large, clear, flat, and level test spaces are ideal to best characterize the debris:

					Ability to characterize dynamic debris at 75ft, 100ft, 200ft, and 300ft

					Ability to character debris at rest post test (as far as 1,500ft from initial test article location)

					Free of debris from previous tests

				Widths that can accommodate HS camera views that capture overall events

			A 2,000 lbs. TNT NEW range limit is the minimum required to conduct this testing.

			DS/PSD/RD will accept either single test article test, or if appropriate, test two test articles simultaneously as seen in Figure 1:

				Will require larger test range, ~3,000ft

Figure 1: Example of Setup to Test Two Anti-Ram Fences in One Test

		Instrumentation plan:

			Required to characterize debris generated from the anti-ram barriers:

				At 75ft, 100ft, 200ft, 300ft, and at rest

					Characterize the following from debris:

						Dimensions

						Weight

						Velocity

						Height from ground

						Dispersion

				Plan to differentiate debris from one test to the next (concrete dye, paint, etc.) and/or clear range of debris from prior tests

DS/PSD/RD has no prescribed methodology to capture the above data; The performer shall propose their instrumentation and post processing plans including the types of data acquisition equipment and any software needed to do the analysis.

	Schedule: Complete the project within 24 months, with more consideration given to condensed schedules.

		Compressed testing dates are preferred to avoid excess testing travel lengths or multiple trips.

		DS/PSD/RD Understands cost and schedule need to be balanced. Testing two anti-ram fences simultaneously saves time, explosives, and setup labor but requires duplicate instrumentation and a much larger test range.  Performer should provide their plan and justify.  Performer is also welcome to provide several; approaches and let DS/PSD/RD decide which is most advantageous to the government.

Phase 1: Initial Anti-Ram Barrier Debris Characterization:

Set up:

For planning purposes, the surrogate Vehicle Borne Improvised Explosive Device will be a charge with the NEW of 2,000lbs TNT, in a cylinder with a L/D of 1, sat atop a 32in table, centered on a 10ft x 10ft concrete pad, and placed so that there is a 24in gap between the edge of charge and the test article.  The boundary conditions of the test articles will influence the amount of debris generated during the testing, but the government needs to balance cost with real world simulation.  Therefore, the government would like the performer to provide options to build and test the test articles in lengths of 30ft, 45ft and 60ft long sections and constructed per the drawings in Appendix A.

Figure 2: Example Test Article Layout

Phase 1 Test Articles:

Test Sample

Design Being Tested

Drawings in Appendix B

Brief Description (See Appendix A for Details)

Potential to Combine tests

Length of Test sample Options

Base 1

AC-41-05 Bar Fence on top of DS-50 Knee Wall

20x20mm Bars @ 65mm OC

N

B1.1: 30ft

B1.2: 45ft

B1.3:60ft

Base 2

AC-41-06 Picket Fence on top of DS-50 Knee Wall

50mm x 6mm Pickets @200mm OC

N

B2.1: 30ft

B2.2: 45ft

B2.3:60ft

Base 3

DS-40 Anti- Climb & Ram Fence

20x20mm Bars @ 130 mm OC w/ DN250 XS Pipes @ 1,720mm OC

Yes w/ base 4 or Option 2

B3.1: 30ft

B3.2: 45ft

B3.3:60ft

Base 4

DS-44 Steel Anti- Climb & Ram Fence

100mm x 50mm x 6mm Tubes @ 175mm OC

Yes w/ base 3 or Option 2

B4.1: 30ft

B4.2: 45ft

B4.3:60ft

Option 1

AC-41-04 Tube Fence on top of DS-50 Knee Wall

38mm dia. x 3mm Tubes @150mm OC

N

O1.1: 30ft

O1.2: 45ft

O1.3:60ft

Option 2

DS-43 Steel Anti- Climb & Ram Fence with Kickers

100mm x 50mm x 6mm Tubes @ 175mm OC with Kickers @ 350mm OC

Yes w/ base 2 or base 3

O2.1: 30ft

O2.2: 45ft

O2.3:60ft

After the Phase 1 test data will be analyzed by the performer and DS/PSD will determine which test samples produced the most and least hazardous fragmentation based of level of hazardous debris produced.

Phase 2: Modified Anti-Ram Barrier Debris Characterization:

In certain scenarios the Department requires perimeters to employ opaque barriers to prevent easy external observation.  To meet this requirement the test samples that produced the least hazardous fragmentation in Phase 1 will be fitted with various opaque claddings and tested to determine which produce the least hazardous fragmentation.  The performer will research various opaque claddings that will provide concealment with preference to those that would mitigate and reduce the level of hazardous debris generated.

The performer will research and propose feasible fence and knee-wall cladding materials that can be tested in Phase 2.  The criteria for potential fence cladding are:

	Opaque

	Weather resistant

	Aesthetically pleasing

	Potential to break up in a non-hazardous way

		Large yet low mass pieces

		Small pieces

		Consumed by VBIED&rsquo;s thermal energy

		Etc.

	Readily available construction materials

		Cost effective and easily constructable

Test Sample

Design Being Tested

Example Cladding Options will be Researched and Suggested by Performer and Accepted by DS/PSD/RD

Potential to Combine tests

Length of Test sample Options

Option 3

Best Performing Fence on knee wall with opaque cladding

E.g.: 24-gauge stainless steel 316L or Alum equivalent decorative panel on fence and steel plate behind knee wall

N

O3.1: 30ft

O3.2: 45ft

O3.3:60ft

Option 4

Best Performing Fence on knee wall with opaque cladding

E.g.: Metal plate material on fence and knee wall

N

O4.1: 30ft

O4.2: 45ft

O4.3:60ft

Option 5

Best Performing Anti-Ram Fence with Opaque cladding

E.g.: Stainless steel 316L or Alum equivalent decorative panel on fence

Yes w/ Option 6

O5.1: 30ft

O5.2: 45ft

O5.3:60ft

Option 6

Best Performing Anti-Ram Fence with Opaque cladding

E.g.: Light weight material

Yes w/ Option 5

O6.1: 30ft

O6.2: 45ft

O6.3:60ft

Deliverables

Test Data:

	The performer will determine the best method to place video cameras, gauges, surveying equipment, etc. necessary to capture the desired data.  The performer shall present their instrumentation plan to DS for feedback and approval prior to the test.

	Dynamic data to be collected is as follows:

		HS Video:

			Overall Event and downrange point of view (e.g. at 1,000ft)

			At 75ft, 100ft, 200ft and 300ft

		Dimension/description of debris (steel, concrete, steel and concrete, etc.)

			At 75ft, 100ft, 200ft, and 300ft

		Estimated weight of debris

			At 75ft, 100ft, 200ft, and 300ft

		Velocity of debris

			At 75ft, 100ft, 200ft and 300ft

		Height of debris

			At 75ft, 100ft, 200ft, and 300ft

		Dispersion pattern of debris

			At 75ft, 100ft, 200ft, and 300ft

	Post blast debris assessment will be conducted to characterize the debris.  The performer shall determine the search area necessary to capture 90% of the debris weighing one pound or more (estimated to be 1,000ft to 1,500ft from originating position but performer needs to confirm).

		Data to be collected:

			Dimensions of debris/ description of debris (steel, concrete, steel and concrete, etc.)

				At final resting place

			Weight of debris

				At final resting place

			Dispersion pattern of debris

				At final resting place

Drawings:

	Provide updated and/or generate new drawings of modified anti-ram systems from Phase 2, drawings are intended to be included in the OBO Physical Security Handbook (Red Book). The updated, or new, drawings shall convey all details necessary to serve as a basis of design for OBO&rsquo;s architects, engineers, and planners.

Reports:

A quick look report will be provided within 14 days of test completion, with full written reports within 45 days.  Reports will include test descriptions, raw gauge data, processed gauge data, high resolution photos and videos, and documented descriptions of layup and witness panel condition posttest.  All final reports, photos, and full testing videos shall be delivered at the completion of all samples testing on a hard drive mailed via FedEx or UPS to:

Attention: Alec Williamson

                        1400 Wilson Blvd

                        9th Floor

                        Arlington, VA 22209

A monthly status update on progress, scheduling, delays or other information shall be provided on the 15th of the month.  Status updates shall be in the format of an email with subject &ldquo;Hazards Associated with Anti-Ram Perimeters&ndash; Month&rdquo;.  An example monthly status update template is provided in Appendix A.

Appendix A:

Example Monthly Status Report

DS/C/PSP/PSD/RD &ndash; Project Name

Task Manager: TBD

Developer PI: (Fill in name, phone number once contract is awarded)

Contract Number: (fill in)

MONTHLY STATUS REPORT

1)      TASK TITLE:  ((fill in)

2)      DESCRIPTION/REQUIREMENT:  (fill in)

3)      DEVELOPER(S):  (add any significant subcontractors)

4)      TECHNICAL APPROACH: (In five or six sentences, summarize the projectfts technical approach.)

5)      MILESTONES:  (fill in relevant milestones)

Milestone

Planned

Rescheduled

Actual

Project Plan

Kickoff Meeting

Preliminary Design Review

Operations and Maintenance Manual

Critical Design Review

Test Plan

Test Report

Etc.

6)      Funding & Costs:

Project Funding History

Funding Action

Date

Amount

Comment

Contract Award

7/15/2016

$68,000.00

Contract award, funds through Nov 2016

Mod 1

10/15/2016

$58,000.00

Incremental funding, funds through Dec 2016.

Mod 2

1/15/2017

$65,000.00

Fully funds effort

Funding

Provided to Date

Expenditures

(Current Month)

Accrued Expenditures (Cumulative)

Remaining

Obligated Funds

Funding

$100,000.00

$25,000.00

$100,000.00

$0.00

Total Funding Provided

$200,000.00

Contract Value

$300,000.00

Insert graph showing planned expenditures, current funding level, and actual expenditures here.  The graph must cover from contract start date to end date. If a revised spend plan becomes necessary, be sure to include the original plan as well.  (See sample below):

7)      TASK STATUS / MONTHLY ACTIVITIES:

a.             Report month &ndash;

                   b.         Upcoming Month &ndash;

8)      ISSUES:  (Identify any issue that affects the progress of the project, funds requirements, payment of invoices, potential schedule problems.  Include requirements for resolution of the issue.)

9)      PHOTOS/VIDEO: (Include at least two current digital images of 300 pixel/inch quality or better, in &ldquo;.jpg&rdquo;, &ldquo;.tif&rdquo;, or &ldquo;.bmp&rdquo; format that show a conceptual application, design, physical prototype, or other meaningful representation of the project progress  If applicable, provide video compatible with Windows Media Player.)

## Attachments

- [19AQMM26Q0439.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/74ee25fe484f464e820033e699507991/download)

## Publications

- August 26, 2026: Solicitation, due September 9, 2026 at 3:59 PM EDT. Notice 1ceaa650b6154278b704883dfc657a22. https://sam.gov/workspace/contract/opp/1ceaa650b6154278b704883dfc657a22/view
- September 8, 2026: Solicitation, due September 14, 2026 at 11:59 AM EDT. Notice 5fdb278a25fd47a3babcb36cefde7787. https://sam.gov/workspace/contract/opp/5fdb278a25fd47a3babcb36cefde7787/view
- September 16, 2026: Solicitation, due September 18, 2026 at 11:59 AM EDT. Notice 7f74383c5c3c4d0ba7f1de9f1a1d1f6a. https://sam.gov/workspace/contract/opp/7f74383c5c3c4d0ba7f1de9f1a1d1f6a/view

## Points of contact

- Richard Crum, crumrb@state.gov, 2025060439

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/19aqmm26q0439.