# FY24 A34 IOD- GCRFTF Oxford MS IT Build Out

Canonical: https://abierto.us/opportunities/15m10224qa4700300

- Solicitation number: 15M10224QA4700300
- Notice type: Solicitation
- Status: Closed. Deadline was August 26, 2024 at 11:00 AM EDT
- Department: Department of Justice
- Agency: US Marshals Service
- Contracting office: Department of Justice US Marshal Service (155515)
- NAICS: 238210 Electrical Contractors and Other Wiring Installation Contractors
- Product or service code: N059 Installation of Equipment: Electrical and Electronic Equipment Components
- Set-aside: Total small business set-aside
- Place of performance: Oxford, Mississippi
- County: Lafayette County (FIPS 28071). https://abierto.us/counties/lafayette-county-ms-28071
- City: Oxford. https://abierto.us/cities/oxford-ms-2854840
- First posted: August 21, 2024
- Last posted: August 27, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/ae4df4aa358a4a2f9d4c92d4ef737034/view

## Description

THIS SOLICITATION HAS BEEN CANCELLED DUE TO INSUFFIENT STATEMENT OF WORK Please see attached SF1449 for Statement of Work. If submitting a quote be sure to include completed and sign attached SF1449 NOTE in Subject of email: FY24 A34 IOD- GCRFTF Oxford MS IT Build Out - 15M10224QA4700300 Email Completed quote to renee.leaman@usdoj.gov by 26 AUGUST 2024 NOTE: Vendor MUST be IPP compliant before awarded see page 7 of SF1449 Questions/Answers What is the official location of the place of performance?

The cabling will be mainly in the new space being built out at 906 N. Lamar with a fiber connection to the main network closet located at 908 N. Lamar. Do you know the number of cables per drop? Ex. 1 - data - 1 - voice (duplex/dual drop) The required cabling, unless identified, will be 3 cables per drop location; 2 data and 1 voice. Do you have any prints of the building that show the MDF location or cable lengths? Yes, there’s a diagram showing the location of each drop for the office.

Is this a new install or is there an existing infrastructure? This is a new construction office buildout. Any diagrams showing the requested OSP work for the 12-strand SM fiber? We rely on the vendor to determine the pathway for the fiber run between the buildings. However, there is a 2.5 pipe running between buildings that would be the ideal pathway to run the fiber.

## Publications

- August 21, 2024: Solicitation, due August 26, 2024 at 11:00 AM EDT. Notice f6128a0a0c134e83b189d8334a810506. https://sam.gov/workspace/contract/opp/f6128a0a0c134e83b189d8334a810506/view
- August 22, 2024: Solicitation, due August 26, 2024 at 11:00 AM EDT. Notice 78dc27dfed4b462b8dc6197fa4c87db1. https://sam.gov/workspace/contract/opp/78dc27dfed4b462b8dc6197fa4c87db1/view
- August 27, 2024: Solicitation, due August 26, 2024 at 11:00 AM EDT. Notice ae4df4aa358a4a2f9d4c92d4ef737034. https://sam.gov/workspace/contract/opp/ae4df4aa358a4a2f9d4c92d4ef737034/view

## Points of contact

- Renee Leaman, renee.leaman@usdoj.gov
- Kate Oravitz-Weeks, Kathryn.Oravitz-Weeks@usdoj.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/15m10224qa4700300.
