# B & F Project 24Z1AIT Building 1 Interior Upgrade Sprinkler System

Canonical: https://abierto.us/opportunities/15b11124q0000022

- Solicitation number: 15B11124Q0000022
- Notice type: Solicitation
- Status: Closed. Deadline was September 17, 2024 at 11:00 AM EDT
- Department: Department of Justice
- Agency: Federal Prison System / Bureau of Prisons
- Contracting office: Fci Memphis (15B111)
- NAICS: 333998 All Other Miscellaneous General Purpose Machinery Manufacturing
- Product or service code: 1290 Miscellaneous Fire Control Equipment
- Set-aside: Total small business set-aside
- Place of performance: Bartlett, Tennessee
- County: Shelby County (FIPS 47157). https://abierto.us/counties/shelby-county-tn-47157
- City: Bartlett. https://abierto.us/cities/bartlett-tn-4703440
- First posted: September 12, 2024
- Last posted: September 12, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/2795fa9cb3f9499c83dd24004b8b1911/view

## Description

The FCI Memphis is a facility with a rated capacity of 862 low-security inmates within a secure perimeter fence. The Building I was previously utilized in a factory setting when FPI(Federal Prison Industries) used the building. The sprinkler system of Building I will need some upgrades due to the change of use for an inmate programming unit. The contractor will provide labor, equipment, and materials needed to complete the project at Building I. The work includes, but is not limited to the following:

1. The contractor will furnish and install a new backflow preventer at the base of the wet pipe system.

2. The contractor will remove existing pendant fire sprinkler heads and drops throughtout the openceiling with rotating existing pipe upward for new tees and sprinkler heads.

3. The contractor will disconnect and cap the 2-inch fire sprinkler line through the wall for the adjacent building that is being demolished.

4. The classrooms and restrooms will need the fire sprinkler heads replaced and fitted for new grid/sheetrock ceilings. See the attached approved drawings of the layout.

5. Install new fire sprinkler piping above grid/sheetrock ceilings in restrooms to add fire sprinkler coverage and adjust fire sprinkler heads for proper clearances.

6. Install sway braces, retainer straps, and flexible couplings to protect the system piping from damage due to earthquakes in accordance with NFPA 13.

7. Test all new fire sprinkler systems in accordance with NFPA 13.

## Publications

- September 12, 2024: Solicitation, due September 17, 2024 at 11:00 AM EDT. Notice 2795fa9cb3f9499c83dd24004b8b1911. https://sam.gov/workspace/contract/opp/2795fa9cb3f9499c83dd24004b8b1911/view

## Points of contact

- Yourlanda Ghoston-Williams, yghoston-williams@bop.gov, 9013725542
- Latina Barden, lbarden@bop.gov, 9013845540

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/15b11124q0000022.