# TRAIL BRIDGE BLACKLAND PRAIRIE

Canonical: https://abierto.us/opportunities/140p5225r0018

- Solicitation number: 140P5225R0018
- Notice type: Combined synopsis and solicitation
- Status: Awarded to That Makes Sense, LLC
- Department: Department of the Interior
- Agency: National Park Service
- Contracting office: Ser West (140P52)
- NAICS: 237310 Highway, Street, and Bridge Construction
- Product or service code: M1LB Operation Of Highways, Roads, Streets, Bridges, And Railways
- County: Lee County (FIPS 28081). https://abierto.us/counties/lee-county-ms-28081
- City: Tupelo. https://abierto.us/cities/tupelo-ms-2874840
- First posted: July 1, 2025
- Last posted: July 16, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/3019a95d66f64418aec37edd01017395/view

## Description

**Amendment 0002:**

Amendment 0002 We had a few questions so we are sharing the answers below. All other terms, conditions, and times remain the same. BIDS ARE DUE JULY 17,2025 AT 2:00CT. One question, I noticed the highlighted area regarding delegated design on pdf page 2. Does this mean that minor design details can be delegated to the contractor? The delegated design would be for the pre-fabricated bridges. Those are the only elements that are not ¿designed¿ since they will be built by a manufacturer.

Can the diaphragms be bolted instead of welded to the girders? Yes they can. Does the diaphragm connection bracket need to be on both sides of the diaphragm in addition to each end of the diaphragm? Yes Do the bearing plates need to be welded to the girders? Yes they do. Do the hardware, girders, bearing plates, diaphragms, nailer angle need to be coated in any way? It would be best if they were to minimize corrosion over time.

They can be galvanization (zinc coated), epoxy coated, or powder coated Do we need to include the steel angle nailer bracket if so please provide the spacing? The nailers are spaced a maximum of 5¿ oc along the length of the bridge. They can be less than 5¿ to allow for them to be evenly spaced along the length. Would these minor design alterations fall within that delegated design? Or should we maintain no deviation from the design we have now? Typically, not. It would be best to maintain no deviation from the plans

## Award on USAspending

- Recipient: That Makes Sense, LLC (UEI YDPLLJEYLNS3)
- Contract: 140P5225C0011, definitive contract
- Obligated: $49,500.00
- Competition: Competed Under SAP, 6 offers received
- Link: solicitation number 140P5225R0018 equals the FPDS solicitation identifier; same awarding office 140P52 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_140P5225C0011_1443_-NONE-_-NONE-/


## Publications

- July 1, 2025: Combined synopsis and solicitation, due July 15, 2025 at 3:00 PM EDT. Notice 7fcc7fe4f9e24c43a30661317cf90981. https://sam.gov/workspace/contract/opp/7fcc7fe4f9e24c43a30661317cf90981/view
- July 2, 2025: Combined synopsis and solicitation, due July 17, 2025 at 3:00 PM EDT. Notice d4b016f52ce24fd387070d6bd22f003d. https://sam.gov/workspace/contract/opp/d4b016f52ce24fd387070d6bd22f003d/view
- July 16, 2025: Combined synopsis and solicitation, due July 17, 2025 at 3:00 PM EDT. Notice 3019a95d66f64418aec37edd01017395. https://sam.gov/workspace/contract/opp/3019a95d66f64418aec37edd01017395/view

## Points of contact

- Clark, Tara, Tara_Clark@nps.gov, 6623720363

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/140p5225r0018.