{"canonical":"https://abierto.us/opportunities/1333mf26q0110","key":"1333MF26Q0110","url":"https://abierto.us/opportunities/1333mf26q0110","title":"Galveston HVAC Repair/Replacement","solicitation_number":"1333MF26Q0110","notice_type":"k","open":true,"response_deadline":"2026-09-16T16:00:00Z","first_posted":"2026-09-04","last_posted":"2026-09-10","department":"COMMERCE, DEPARTMENT OF","subagency":"NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION","office":"DEPT OF COMMERCE NOAA","naics":"238220","psc":"J041","set_aside":"SBA","place_state":"TX","winner":null,"award_amount":null,"publications":[{"notice_id":"c16dfd69f3fb4a7dbe6913b9a6784c8c","title":"Galveston HVAC Repair/Replacement","solicitation_number":"1333MF26Q0110","notice_type":"k","base_type":"k","posted":"2026-09-04","posted_at":null,"due_at":"2026-09-16T16:00:00Z","due_date":"2026-09-16","cancelled":null,"archived":null,"archive_date":"2026-09-17","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c16dfd69f3fb4a7dbe6913b9a6784c8c/view","enriched":false,"history":[]},{"notice_id":"fb2d0875b9114f6388520a7a1013c011","title":"Galveston HVAC Repair/Replacement","solicitation_number":"1333MF26Q0110","notice_type":"k","base_type":"k","posted":"2026-09-10","posted_at":"2026-09-10T20:16:42.365Z","due_at":"2026-09-16T16:00:00Z","due_date":"2026-09-16","cancelled":false,"archived":false,"archive_date":"2026-09-17","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/fb2d0875b9114f6388520a7a1013c011/view","enriched":true,"history":[{"index":2,"title":"Galveston HVAC Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T20:16:42.365Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"fb2d0875b9114f6388520a7a1013c011","solicitation_number":"1333MF26Q0110","parent_opportunity_id":"c16dfd69f3fb4a7dbe6913b9a6784c8c"},{"index":1,"title":"Galveston HVAC Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-04T23:29:21.359Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"c16dfd69f3fb4a7dbe6913b9a6784c8c","solicitation_number":"1333MF26Q0110"}]}],"latest_notice_id":"fb2d0875b9114f6388520a7a1013c011","first_type":"k","notices":[{"dates":{"posted":"2026-09-04","response_deadline":{"raw":"2026-09-16T12:00:00-04:00","utc":"2026-09-16T16:00:00Z","date":"2026-09-16","time":"12:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c16dfd69f3fb4a7dbe6913b9a6784c8c/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Galveston HVAC Repair/Replacement","agency":{"office":{"code":"1333MF","name":"DEPT OF COMMERCE NOAA"},"subtier":{"code":"1330","name":"NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION"},"department":{"code":"013","name":"COMMERCE, DEPARTMENT OF"},"office_address":{"zip":"64106","city":"KANSAS CITY","state":"MO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2026-09-17","archive_type":"auto_custom"},"contacts":[{"name":"Suzanne Johnston","role":"primary","email":"Suzanne.Johnston@noaa.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"c16dfd69f3fb4a7dbe6913b9a6784c8c","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"70184f9563955f1f36f9ae6e90770e67bc8de10e733f5ea8dde43603af9b65ec","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T07:50:12.777658Z","first_seen_at":"2026-09-15T22:52:52.472456Z"},"description":{"text":"COMBINED SYNOPSIS/SOLICITATION - SEE ATTACHMENTS FOR COMPLETE SOLICITATION WITH SF18 The purpose of this requirement is for Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for non-personal services to furnish all labor, supervision, materials, equipment, permits, tools, transportation, and incidentals necessary to install five (5) new ductless mini-split HVAC systems in the Wet Lab area at the NOAA facility located at 4900 Fort Crockett Boulevard, Galveston, Texas 77551. The systems are to be placed as follows: four (4) to replace failing systems in the Turtle Hospital and the Wet Lab Area, the fifth is a new installation that will go in the Turtle Barn; this unit will have dual internal heads. The installation shall provide reliable temperature control to support laboratory operations while complying with all applicable federal, state, and local codes. (i) This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. Solicitation number 1333MF26Q0110 is issued as a request for quotation (RFQ), for non-personal services to furnish all labor, supervision, materials, equipment, permits, tools, transportation, and incidentals necessary to install five (5) new ductless mini-split HVAC systems in the Wet Lab area at the NOAA facility located at 4900 Fort Crockett Boulevard, Galveston, Texas 77551. The systems are to be placed as follows: four (4) to replace failing systems in the Turtle Hospital and the Wet Lab Area, the fifth is a new installation that will go in the Turtle Barn; this unit will have dual internal heads. The installation shall provide reliable temperature control to support laboratory operations while complying with all applicable federal, state, and local codes. This acquisition is set-aside for small business concerns. The associated NAICS code is 238220. The small business size standard is $19 Million. The Government intends to award a trade-off, single award firm fixed-price purchase order on an all or none with payment terms of Net 30. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. (ii) A list of line-item number(s) and items, quantities, and units of measure (including option(s), if applicable). CLIN 0001 – Non-personal services to furnish all labor, supervision, materials, equipment, permits, tools, transportation, and incidentals necessary to install five (5) new ductless mini-split HVAC systems in the Wet Lab area at the NOAA facility located at 4900 Fort Crockett Boulevard, Galveston, Texas 77551. The systems are to be placed as follows: four (4) to replace failing systems in the Turtle Hospital and the Wet Lab Area, the fifth is a new installation that will go in the Turtle Barn; this unit will have dual internal heads. The installation shall provide reliable temperature control to support laboratory operations while complying with all applicable federal, state, and local codes. CLIN 1001 – Option Year 1 Option year 1 -Non-personal services to provide quarterly preventive maintenance (PM) services for all five (5) installed mini-split HVAC systems per the original statement of work: Preventive maintenance shall include, at a minimum: Four (4) quarterly preventive maintenance visits. Inspection and cleaning of indoor evaporator coils and outdoor condenser coils. Cleaning or replacement of air filters as recommended by the manufacturer. Inspection and cleaning of condensate drain pans and drain lines. Inspection of refrigerant piping, insulation, and fittings for leaks or damage. Verification of refrigerant pressures and operating temperatures. Inspection and tightening of electrical connections. Inspection of disconnect switches, breakers, and electrical components. Verification of thermostat and control operation. Inspection of condenser fan motors, blower motors, and associated components. Inspection of equipment mounting hardware and vibration isolation components. Inspection of coastal corrosion protection coating for deterioration or damage, with touch-up or repair as recommended by the coating manufacturer. Verification of proper heating and cooling operation. Documentation of equipment condition, maintenance performed, and recommendations for corrective action. The contractor shall submit a written preventive maintenance report to the Galveston Facility Manager within five (5) business days following each service visit. Reports shall identify all maintenance performed, deficiencies observed, corrective actions taken, and recommendations for repairs not covered under this contract. Period of Performance for one year following the base year. CLIN 2001 – Option Year 2 Option year 2 -Non-personal services to provide quarterly preventive maintenance (PM) services for all five (5) installed mini-split HVAC systems per the original statement of work: Preventive maintenance shall include, at a minimum: Four (4) quarterly preventive maintenance visits. Inspection and cleaning of indoor evaporator coils and outdoor condenser coils. Cleaning or replacement of air filters as recommended by the manufacturer. Inspection and cleaning of condensate drain pans and drain lines. Inspection of refrigerant piping, insulation, and fittings for leaks or damage. Verification of refrigerant pressures and operating temperatures. Inspection and tightening of electrical connections. Inspection of disconnect switches, breakers, and electrical components. Verification of thermostat and control operation. Inspection of condenser fan motors, blower motors, and associated components. Inspection of equipment mounting hardware and vibration isolation components. Inspection of coastal corrosion protection coating for deterioration or damage, with touch-up or repair as recommended by the coating manufacturer. Verification of proper heating and cooling operation. Documentation of equipment condition, maintenance performed, and recommendations for corrective action. The contractor shall submit a written preventive maintenance report to the Galveston Facility Manager within five (5) business days following each service visit. Reports shall identify all maintenance performed, deficiencies observed, corrective actions taken, and recommendations for repairs not covered under this contract. Period of Performance for one year following option year one. CLIN 3001 – Option Year 3 Option year 3 -Non-personal services to provide quarterly preventive maintenance (PM) services for all five (5) installed mini-split HVAC systems per the original statement of work: Preventive maintenance shall include, at a minimum: Four (4) quarterly preventive maintenance visits. Inspection and cleaning of indoor evaporator coils and outdoor condenser coils. Cleaning or replacement of air filters as recommended by the manufacturer. Inspection and cleaning of condensate drain pans and drain lines. Inspection of refrigerant piping, insulation, and fittings for leaks or damage. Verification of refrigerant pressures and operating temperatures. Inspection and tightening of electrical connections. Inspection of disconnect switches, breakers, and electrical components. Verification of thermostat and control operation. Inspection of condenser fan motors, blower motors, and associated components. Inspection of equipment mounting hardware and vibration isolation components. Inspection of coastal corrosion protection coating for deterioration or damage, with touch-up or repair as recommended by the coating manufacturer. Verification of proper heating and cooling operation. Documentation of equipment condition, maintenance performed, and recommendations for corrective action. The contractor shall submit a written preventive maintenance report to the Galveston Facility Manager within five (5) business days following each service visit. Reports shall identify all maintenance performed, deficiencies observed, corrective actions taken, and recommendations for repairs not covered under this contract.Period of Performance for one year following option year two. CLIN 4001 – Option Year 4 Option year 4 -Non-personal services to provide quarterly preventive maintenance (PM) services for all five (5) installed mini-split HVAC systems per the original statement of work: reventive maintenance shall include, at a minimum: Four (4) quarterly preventive maintenance visits. Inspection and cleaning of indoor evaporator coils and outdoor condenser coils. Cleaning or replacement of air filters as recommended by the manufacturer. Inspection and cleaning of condensate drain pans and drain lines. Inspection of refrigerant piping, insulation, and fittings for leaks or damage. Verification of refrigerant pressures and operating temperatures. Inspection and tightening of electrical connections. Inspection of disconnect switches, breakers, and electrical components. Verification of thermostat and control operation. Inspection of condenser fan motors, blower motors, and associated components. Inspection of equipment mounting hardware and vibration isolation components. Inspection of coastal corrosion protection coating for deterioration or damage, with touch-up or repair as recommended by the coating manufacturer. Verification of proper heating and cooling operation. Documentation of equipment condition, maintenance performed, and recommendations for corrective action. The contractor shall submit a written preventive maintenance report to the Galveston Facility Manager within five (5) business days following each service visit. Reports shall identify all maintenance performed, deficiencies observed, corrective actions taken, and recommendations for repairs not covered under this contract. Period of Performance for one year following option year three. (iii) Description of requirements for the items to be acquired, including documentation supporting any brand name descriptions (see 12.102). See attached Statement of Work which applies to Base Year and all Option Years 1 – 4, and Department of Labor Wage Rates: WD 2015-5233, Revision No 35, dated Aug 22, 2026 , which can be found on: https://sam.gov/content/wage-determinations INVOICES TO BE BILLED IN ARREARS VIA IPP. PROVIDE MONTHLY AND ANNUAL PRICING FOR EACH BASE AND OPTION YEAR. QUOTE PRICING MAY BE PROVIDED ON ATTACHED SF18 FORM OR ON COMPANY LETTERHEAD. (iv) Date(s) and place(s) of delivery and acceptance and f.o.b. Point are National Oceanic and Atmospheric Administration (NOAA), Wet Lab Area, 4900 Fort Crockett Boulevard, Galveston, Texas 77551 The start date is estimated at the date of award. The base period for this contract shall be from the date of award, for one year. Initial HVAC repairs and replacements identified in the Scope of Work section shall be performed by 12/31/2026. Preventive maintenance shall be performed quarterly within the base year (from date of install & government acceptance of the initial appliance repairs/replacements and through each successive, exercised option year, if exercised. Place of Performance is .Performance will occur onsite at the National Oceanic and Atmospheric Administration (NOAA), Wet Lab Area, 4900 Fort Crockett Boulevard, Galveston, Texas 77551 (v) A list of solicitation provisions that apply to the acquisition (see 12.205(a)) can be found on the Request for Quote Form SF18 attachment in Section 5 Other Contract Terms and Conditions. RFO 52.237-1 Site Visit (Apr 1984) (Deviation Jan 2026) Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. A site visit is highly recommended but not required. Vendors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Only one site visit will be conducted, all interested parties should plan to attend. Site visit is scheduled for Wednesday September 9, 2026 at 8am CST. Prospective site visit attendees need to contact michael.cordova@noaa.gov to confirm attendance prior to arrival. Meet at NOAA, NMFS Southeast Fisheries Science Center, Galveston Lab campus located at: 4900 Fort Crockett BLVD, Galveston, Texas 77551 . Attendees should arrive at least 10 minutes prior to start time. The site tour will begin promptly at 8am and should be less than 60 minutes. Attendees must park on the street outside the gate. Meet outside of Wetlab Building with on-site POC . Prospective attendees shall not ask any questions during the site visit, but should capture all questions and email them to the Contracting Officer, Suzanne.Johnston@noaa.gov, by 10am EST 9/10/2026. Questions received after this time can not be answered. Q&A will be posted as an Amendment to the solicitation. Vendors should monitor SAM.gov for any updates. (End of provision) (vi) A list of contract clauses that apply to the acquisition (see 12.205(b)) can be found on the Request for Quote Form SF18 attachment in Section titled Contract Terms and Conditions. (vii) Quotes are required to be received in the contracting office no later than 12pm EST/EDT on 9/16/2026. All quotes must be submitted electronically via email to Suzanne.Johnston@noaa.gov. THE GOVERNMENT DOES NOT ACCEPT RESPONSIBILITY FOR NON-RECEIPT OF QUOTES. IT IS THE CONTRACTOR’S RESPONSIBILITY TO REQUEST AND RECEIVE A CONFIRMATION OF THE QUOTE RECEIPT. (viii) Any other additional information required by 5.101(c). Per NOAA Deviation 2025-02/03: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Contracting officers will not consider those representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM. Instructions to Offerors See RFO 52.212-1 Instructions to Offerors-Commercial Products and Commercial Services. (SEP 2023) (Deviation JAN 2026) And RFO 52.212-2 Evaluation- Commercial Products and Commercial Services (Nov 2021) (Deviation Jan 2026)","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"1333MF26Q0110","place_of_performance":{"zip":"77551","city":{"name":"Galveston"},"state":{"code":"TX"},"country":{"code":"USA"}},"product_service_code":"J041"},{"dates":{"posted":"2026-09-10","posted_at":"2026-09-10T20:16:42.365Z","created_at":"2026-09-10T20:02:43.510Z","modified_at":"2026-09-10T20:16:42.373Z","response_deadline":{"raw":"2026-09-16T12:00:00-04:00","utc":"2026-09-16T16:00:00Z","date":"2026-09-16","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/fb2d0875b9114f6388520a7a1013c011/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Galveston HVAC Repair/Replacement","agency":{"office":{"code":"1333MF","name":"DEPT OF COMMERCE NOAA"},"subtier":{"code":"1330","name":"NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION"},"department":{"code":"013","name":"COMMERCE, DEPARTMENT OF"},"office_address":{"zip":"64106","city":"KANSAS CITY","state":"MO","country":"USA"},"organization_id":"100185743","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-09-17","archive_type":"auto_custom"},"history":[{"index":2,"title":"Galveston HVAC Repair/Replacement","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T20:16:42.365Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"fb2d0875b9114f6388520a7a1013c011","solicitation_number":"1333MF26Q0110","parent_opportunity_id":"c16dfd69f3fb4a7dbe6913b9a6784c8c"},{"index":1,"title":"Galveston HVAC Repair/Replacement","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-04T23:29:21.359Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"c16dfd69f3fb4a7dbe6913b9a6784c8c","solicitation_number":"1333MF26Q0110"}],"contacts":[{"name":"Suzanne Johnston","role":"primary","email":"Suzanne.Johnston@noaa.gov"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"fb2d0875b9114f6388520a7a1013c011","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"c16dfd69f3fb4a7dbe6913b9a6784c8c","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-16T12:17:26.959490313Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"929d463d370df73f6f7e7af9d2d98cd615ab00a9ae784a6d1e005f726c9c5ada","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T12:17:26.959490313Z","first_seen_at":"2026-09-15T22:52:52.472456Z"},"description":{"html":"<p>The purpose of this amendment 0001 is to clarify CAR 1352.246-70, as well as provide an updated revised SOW and respond to the questions received for Solicitation No. 1333MF26Q0110.<br />\n<br />\nCombined Synopsis Solicitation: 1333MF26Q0110<br />\n<br />\nCAR 1352.246-70&nbsp; final inspection and acceptance will occur at the NOAA Galveston facility<br />\n<br />\nAn updated Revised Statement of Work is included in this amendment 0001 as an attachment to the amended solicitation.&nbsp; Revisions are clearly identified in &ldquo;red font&rdquo;.<br />\n<br />\nResponse to Questions:&nbsp;<br />\n<br />\nQ&amp;A #1 Solicitation_1333MF26Q0110_FD-26-517 (Galveston HVAC repairs/Replacements)<br />\nAll questions were due from vendors by 10am EST 9/10<br />\n<br />\n<strong>Q1</strong>-Please confirm the required nominal capacity for the three Mitsubishi PKA-A30KA6 replacements. The SOW describes these as 2-ton systems, while the model designation appears to indicate a different nominal capacity.<br />\nA1 - There are two (2) 2 &frac12; ton and one (1) 2 ton machines in the Turtle Hospital. Clarified in more detail for question 14.<br />\n<br />\n<strong>Q2-</strong>Please provide the required capacity of each indoor head serving the new 3-ton dual-head system in the Turtle Barn Aquaculture Area.<br />\nA2- should be a (2) two ton unit with each head being a one (1) ton unit<br />\n<br />\n<strong>Q3-</strong>Please confirm the voltage, phase, available breaker capacity, and whether the existing electrical circuits may be reused.<br />\nA3 - Existing circuits will be reused. The new breaker for the turtle barn will be added by NOAA, it will be a 208volt<br />\n<br />\n<strong>Q4</strong>-Please clarify whether the base-year CLIN must include all four quarterly preventive-maintenance visits in addition to the five-system installation.<br />\nA4 - Yes, base year must include quarterly preventive maintenance.<br />\n<br />\n<strong>Q5</strong>-Please confirm the correct option-year CLIN numbering. The solicitation identifies the option CLINs as 0002&ndash;0005 in one section and 1001&ndash;4001 in another.<br />\nA5) Option CLINS will either be 0002-0005 or 1001-4001, no final decision has been made<br />\n<br />\n<strong>Q6-</strong>Please identify the acceptable coastal-corrosion coating standards, approved products, and required manufacturer or warranty documentation.<br />\nA6 - Both the interior and exterior units must have appropriate coastal coating to meet the Galveston Climate and proximity to the ocean/sea air.<br />\n<br />\n<strong>Q7</strong>-Please confirm that final inspection and acceptance will occur at the NOAA Galveston facility. CAR 1352.246-70 currently identifies the NMFS Miami campus as the place of acceptance.<br />\nA7) Final inspection will occur at the Galveston Facility<br />\n<br />\n<strong>Q8</strong>-Please provide any site-visit measurements, photographs, attendance notes, or other information available to prospective offerors who could not attend the scheduled walkthrough.<br />\nA8)&nbsp; All Q&amp;A from the site visit is located within this Q&amp;A document and Amendment to the solicitation<br />\n<br />\n<strong>Q9</strong>-Please clarify whether NOAA will issue tax-exempt purchasing documentation for materials incorporated into the project.<br />\nA9) The Federal government does not pay taxes, however we can not dictate state and local tax requirements on vendors. NOAA will not be issuing tax exempt purchasing documentation for material purchasing, however the contract itself will be tax exempt as the Federal Government does not pay taxes.<br />\n<br />\n<strong>Q10</strong>-Please confirm whether monthly-equivalent pricing is required only for preventive-maintenance services or also for the one-time installation under the base CLIN.<br />\nA10 - Monthly pricing is not needed for the base one time installation, that should be FFP.<br />\n<br />\n<strong>Q11</strong>-Would the facility like the option, on the mini split systems, to turn the heat on during the winter months, or would like the systems to be cool only?<br />\nA11 - Yes, all units installed will be dual use (Cooling and Heating) as they currently are.<br />\n<br />\n<strong>Q12</strong>-Is there a particular brand of choice for the systems? would they like direct replacements or will a different brand work like Daikin Systems?<br />\nA12:&nbsp; The government is relying on proposals to recommend the best solution to meet the requirements as outlined in the solicitation, statement of work and Q&amp;A.<br />\n<br />\n<strong>Q13</strong>-Would the facility be ok with swapping the voltage of the systems from 110v to 208/230v in the case of the 110v/2Ton systems are not in stock. These units are particularly hard to find in a 2 ton system.<br />\nA13 - The government is relying on proposals to recommend the best solution to meet the requirements as outlined in the solicitation, statement of work and Q&amp;A.&nbsp;<br />\n<br />\n<strong>Q14</strong>-Can we get verification of the correct tonnage of each of the units? There were some discrepancy`s during the site visit.&nbsp;<br />\nA14 - The following is the final equipment configuration by location. It supersedes the equipment descriptions in the original Statement of Work, the CLIN 0001 description, and the combined synopsis, and is incorporated by this amendment.<br />\nTurtle Hospital: Three (3) ductless mini-split systems. Two (2) at 2.5-ton nominal capacity and one (1) at 2-ton nominal capacity.<br />\nWet Lab Observers Area: One (1) 3-ton split system tying into the existing ductwork. This system is not ductless. The existing ductwork will be reused. The existing coil is presumed unserviceable and shall be replaced with an indoor unit matched to the new condensing unit.<br />\nTurtle Barn Aquaculture Area: One (1) new ductless mini-split at 2-ton nominal capacity with two (2) 1-ton indoor heads, one head serving each room.<br />\nAll five (5) systems shall be heat pumps providing both heating and cooling. All equipment shall meet the coastal corrosion protection and materials requirements of the Statement of Work as modified by A39.<br />\nWhere the original Statement of Work, CLIN 0001, or the combined synopsis conflicts with the above, this answer governs.<br />\n<br />\n<strong>Q15</strong>&nbsp;- Please confirm required size of each condenser and head unit for the Turtle Hospital building. There was some confusion on what was requested vs what we were told.&nbsp;<br />\nA15 - Answered in question 1 and 14 above<br />\n<br />\n<strong>Q16</strong>&nbsp;- Do we need to replace all lines between inside and outside unit?<br />\nA16 - The government is relying on proposals to recommend the best solution to meet the requirements&nbsp;<br />\n<br />\n<strong>Q17</strong>&nbsp;- Please confirm a size on outdoor unit at the observation building. It doesn&#39;t&nbsp; have a tag.&nbsp;<br />\nA17 - Based on future use it is recommended a three ton split unit. That will tie into the existing duct work.<br />\n<br />\n<strong>Q18</strong>&nbsp;- Please confirm that duct and coil will be reused inside of observation building.<br />\nA18 - The duct yes, the coil is presumed to be unserviceable. The Split unit should have an internal unit that will tie into the duct work.<br />\n<br />\n<strong>Q19</strong>&nbsp;- New unit for Turtle Barn - does the supply power need to be included, or will it be provided by others during office construction?<br />\nA19- NOAA will provide connection<br />\n<br />\n<strong>Q20&nbsp;</strong>- Could you provide site-visit photos, equipment photos, measurements, or field notes available for review?<br />\nA20 - The government does not have existing photos available for review.&nbsp; Vendors were advised to attend the one scheduled site visit to acquire necessary photos etc.<br />\n<br />\n<strong>Q21</strong>&nbsp;- For the four replacement systems, should the existing refrigerant line sets be reused or replaced? If replacement is required, can approximate lengths and routes be provided?<br />\nA21 - The government is relying on proposals to recommend the best solution to meet the requirements&nbsp;<br />\n<br />\n<strong>Q22</strong>&nbsp;- Please confirm the existing electrical service for each system, including voltage, phase, breaker size, disconnect location, and whether the existing circuits may be reused.<br />\nA22 - Existing circuits and disconnects will be reused. Vendors were advised to attend the one scheduled site visit to acquire necessary photos etc, opportunities were given throughout the site visit.<br />\n<br />\n<strong>Q23</strong>&nbsp;- For the new 3-ton dual-head system in the Turtle Barn/Aquaculture Area, are the locations of the outdoor condenser and two indoor heads predetermined?<br />\nA23 - The general locations are established. The outdoor condensing unit will be located on the exterior of the Turtle Barn, and one indoor head will serve each of the two rooms in the Aquaculture Area, each approximately 150 square feet. Exact mounting positions will be finalized with the NOAA project lead prior to installation. Offerors shall price a complete installation at these locations.&nbsp;<br />\n<br />\n<strong>Q24</strong>&nbsp;- Can approximate distances and routes be provided for the refrigerant piping, condensate piping, and electrical runs for the new 3-ton system?<br />\nA24 - The government does not have measured distances for the Turtle Barn installation. Offerors shall state the line-set, condensate, and electrical run lengths assumed in their pricing. Vendors were encouraged to attend the site visit to take any pictures, measurements and confirm all requirements prior to proposal.<br />\n<br />\n<strong>Q25</strong>&nbsp;- Is gravity condensate drainage available at each indoor-unit location, or should bidders include condensate pumps?<br />\nA25 - Gravity condensate lines are in use and should continue to be used.<br />\n<br />\n<strong>Q26</strong>&nbsp;- Were any unusual access conditions, penetration requirements, mounting restrictions, or lift/scaffold requirements identified during the site visit?<br />\nA26 - None<br />\n<br />\n<strong>Q27</strong>&nbsp;- Are the existing outdoor-unit brackets, pads, and supports suitable for reuse, or should bidders include new supports?<br />\nA27 - Stainless Steel material will be used IAW with the solicitation, based on the inspection/site visit solicitors should recommend proposals to meet the best requirements for each installation.<br />\n<br />\n<strong>Q28&nbsp;</strong>- Were any additional deficiencies or site conditions identified during the site visit that are not included in the solicitation documents?<br />\nA28 - All information was put out during the joint site visit, this information included the units that are not operational, such as the Observer Area unit, the non-working one at the Turtle Hospital plus the two that are going out at the same location.<br />\n<br />\n<strong>Q29.</strong>&nbsp;Are we expected to reuse the existing refrigerate lines if possible?<br />\nA29 - Existing refrigerant line sets shall not be reused. The SOW lists new refrigerant line sets with UV-resistant insulation among the materials to be furnished. Offerors shall price new line sets for all systems.<br />\n&nbsp;<br />\n<strong>Q30.&nbsp;</strong>Are we expected to reuse the existing electrical disconnects if in good condition?<br />\nA30 - New electrical disconnects shall be provided at each unit. The SOW requires the contractor to provide and install electrical disconnects, circuit protection, wiring, conduit, and associated electrical components, and lists electrical disconnects among the materials to be furnished. Existing branch circuits may be reused where adequate to serve the new equipment.<br />\n<strong>&nbsp;</strong><br />\n<strong>Q31</strong>.&nbsp; Are we expected to reuse the existing wall bracket mounts if they are in good condition?<br />\nA31 - Existing wall brackets, pads, and supports shall not be reused. The SOW requires galvanized or stainless steel brackets, mounting supports, and hardware, and prohibits untreated or bare steel. Offerors shall price new supports at each outdoor unit location.<br />\n&nbsp;<br />\n<strong>Q32.</strong>&nbsp; There was a little discussion on sizing on site is there going to be a final list produced of what size units to provide for each location?<br />\nA32 -&nbsp; Yes. See A14 for the final equipment list by location.<br />\n<br />\n<br />\n<strong>Q33&nbsp;</strong>- Existing Equipment Type &ndash; Turtle Hospital/Wet Lab Observers Area<br />\nThe SOW identifies four (4) failing systems in the Turtle Hospital/Wet Lab area for replacement with ductless mini-split systems. During the site inspection, we observed that three (3) of the existing units are ductless mini-split systems, while the fourth unit, located in the long room within the Wet Lab/Observers Area, is a conventional split system utilizing existing trunk-line ductwork and supply vents.<br />\nQuestion:<br />\nDoes the Government require this fourth system to be replaced with a ductless mini-split system as specified in the SOW, or would the Government accept a like-for-like replacement using a conventional split system that utilizes the existing ductwork?<br />\nBased on the observed configuration, a single ductless indoor head may not provide uniform air distribution throughout the length of the room, whereas the existing ducted configuration may provide more effective coverage.<br />\nA33 - The Wet Lab Observers Area system shall be a conventional split system tying into the existing ductwork. The existing ductwork will be reused. The existing coil is presumed unserviceable and shall be replaced with an indoor unit matched to the new condensing unit. The ductless mini-split requirement does not apply to this system. See A14.<br />\n<br />\n<strong>Q34&nbsp;</strong>-Existing Equipment Specifications and Electrical Requirements<br />\nThe SOW identifies three (3) failing Mitsubishi 2-ton units, Model PKA-A30KA6, in the Turtle Hospital. The model number of the existing unit in the Wet Lab/Observers Area was illegible during the site inspection.<br />\nQuestion:<br />\nCan the Government provide the existing unit&#39;s electrical requirements, including voltage, phase, and available electrical capacity, as well as any relevant equipment dimensions or installation requirements for the Wet Lab/Observers Area? Alternatively, should offerors base their pricing on standard electrical and physical requirements for a comparable 2-ton replacement system?<br />\nA34 - The government does not have legible nameplate data for the existing Wet Lab Observers Area unit and does not have documented voltage or phase for that circuit. Offerors shall base pricing on the 3-ton split system identified in A32 and shall verify field conditions prior to installation. The existing branch circuit may be reused where adequate to serve the proposed equipment. See A36.<br />\n<br />\n<strong>Q35</strong>&nbsp;-Turtle Barn &ndash; Dual-Head System Capacity and Configuration<br />\nThe SOW specifies a new 3-ton system with two (2) indoor heads for the Turtle Barn Aquaculture Area. During the site inspection, it was observed that the two rooms intended to receive the indoor heads are approximately 150 square feet each.<br />\nQuestion:<br />\nWould the Government permit a technical deviation from the specified 3-ton system to a 2-ton outdoor unit configured with two (2) 1-ton indoor heads, with one indoor head serving each room, provided the proposed system meets the Government&#39;s required temperature-control, performance, and operational requirements?<br />\nAdditionally, can the Government provide or confirm the preferred locations for the two indoor heads, the outdoor condenser, and the anticipated line-set routing/lengths for this new installation?<br />\nA35 - Yes. The Turtle Barn system shall be a 2-ton outdoor unit with two (2) 1-ton indoor heads, one serving each room. See A14 and A23.<br />\n<br />\n<strong>Q36&nbsp;</strong>-Electrical Infrastructure and Voltage Requirements<br />\nThe SOW requires the contractor to verify existing electrical capacity, install new circuits as required, and coordinate electrical connections with the existing building electrical service.<br />\nDuring the site inspection, the on-site POC indicated that 120V power is available for the newly installed equipment but recommended using 220V equipment so that the systems operate on a uniform voltage.<br />\nQuestion:<br />\nCan the Government confirm whether adequate 220V electrical capacity is currently available at the installation locations for all five (5) systems, including the Turtle Hospital units, Wet Lab/Observers Area unit, and Turtle Barn dual-head system?<br />\nIf 220V circuits are not currently available, should offerors include the cost of providing new dedicated circuits, breakers, wiring, conduit, and disconnects in their pricing?<br />\nA36 - The government does not have documented voltage, phase, or breaker capacity at each existing installation location. Existing branch circuits may be reused where adequate to serve the proposed equipment. If the offeror proposes equipment requiring a voltage or capacity different from the existing circuit, the cost of providing the new dedicated circuit, breaker, wiring, conduit, and disconnect is the offeror&#39;s responsibility and shall be included in the firm-fixed price. Offerors shall state the voltage of the proposed equipment in their technical approach. The sole exception is the Turtle Barn installation, for which NOAA will provide a new 208V breaker and the connection to building electrical service. See A37.<br />\n<br />\n<strong>Q37&nbsp;</strong>-Responsibility for Electrical Work<br />\nThe SOW includes requirements for electrical disconnects, circuit protection, wiring, and conduit associated with the HVAC installations.<br />\nQuestion:<br />\nFor the new installation in the Turtle Barn Aquaculture Area, as well as the replacement systems, is the contractor responsible for providing all required electrical work, including new circuits and connections to the existing electrical service, or will NOAA provide/perform any portion of the required electrical work?<br />\nA37 - For the Turtle Barn installation, NOAA will provide the new 208V breaker and connection to the building electrical service. All other electrical work is the contractor&#39;s responsibility and shall be included in the firm-fixed price, including disconnects, wiring, conduit, conductors, grounding, and any modification required to serve the replacement equipment. The contractor shall verify existing electrical capacity as required by the SOW.<br />\n<br />\n<strong>Q38&nbsp;</strong>-Disposal of Existing HVAC Equipment<br />\nThe SOW states that old HVAC appliances shall be turned over to the NOAA Project Lead for disposal. At the same time, the turn-key requirements state that the contractor shall remove and legally dispose of construction debris and excess materials.<br />\nQuestion:<br />\nPlease clarify the contractor&#39;s responsibility for the existing HVAC equipment. Specifically, will the contractor be required only to remove the equipment and transport it to a designated on-site location for NOAA disposal, or will the contractor be responsible for refrigerant recovery and off-site disposal/recycling of the HVAC equipment and associated materials in accordance with applicable EPA and environmental requirements?<br />\nA38 - The contractor shall perform refrigerant recovery in accordance with EPA regulations, remove the existing equipment, and turn it over to the NOAA project lead at a designated on-site location. Off-site disposal of the removed HVAC equipment is the government&#39;s responsibility. All other construction debris, packaging, and excess materials shall be removed and legally disposed of off site by the contractor.<br />\n<br />\n<strong>Q39&nbsp;</strong>- Coastal Corrosion Protection<br />\nThe SOW requires outdoor condensing units to have factory- or field-applied coastal corrosion protection suitable for a marine environment and applied in a manner that does not void the manufacturer&#39;s warranty.<br />\nDuring the site inspection, the on-site POC also confirmed the need for protective coating due to the coastal salt-air environment.<br />\nQuestion:<br />\nDoes NOAA require a specific manufacturer, product, certification, or coating standard for the coastal corrosion protection, or will any manufacturer-approved marine-grade corrosion protection coating be acceptable?<br />\nAdditionally, please confirm that this requirement applies to all five (5) outdoor units, including the Wet Lab/Observers Area system if a conventional split system is approved as an alternative.<br />\nA39 - No specific manufacturer, product, certification, or coating standard is required. Any factory-applied or manufacturer-approved marine-grade corrosion protection coating suitable for a coastal environment is acceptable, provided it does not void or reduce the manufacturer&#39;s warranty. Coastal corrosion protection is required on both indoor and outdoor units for all five (5) systems, including the Wet Lab Observers Area condensing unit and its matched indoor unit. This expands the Statement of Work requirement, which addressed outdoor condensing units only, and is incorporated by this amendment. See A6.<br />\n<br />\n<strong>Q40</strong>&nbsp;-Working Hours and Facility Access<br />\nThe SOW states that normal working hours shall be coordinated with the NOAA Project Lead and that work outside normal business hours may require prior written approval.<br />\nQuestion:<br />\nPlease confirm the standard working hours permitted for HVAC installation activities, particularly noisy or disruptive work, at the Wet Lab/Turtle Hospital and Turtle Barn facilities.<br />\nAre there any restrictions on weekend, evening, or after-hours work due to ongoing animal care and operations at these facilities?<br />\nA40 - Normal working hours are 8am to 5pm Central Time, Monday through Friday, excluding federal holidays. Work outside those hours requires prior written approval coordinated through the NOAA project lead. Noise-generating work in or adjacent to animal holding areas shall be scheduled in advance with the project lead.<br />\n<br />\n<strong>Q41&nbsp;</strong>-Preventive Maintenance Period of Performance<br />\nThe solicitation identifies a base year for installation/repairs followed by four (4) option years for quarterly preventive maintenance. The CLIN structure appears to extend through Option Year 4.<br />\nQuestion:<br />\nPlease confirm whether preventive maintenance is required for a total of four (4) option years following the base year, resulting in a total contract period of five (5) years (Base Year + Option Years 1&ndash;4), or whether the Government intends preventive maintenance to cover a different period.<br />\nA41 - Confirmed. Preventive maintenance is required for four (4) option years following the base year, for a maximum total contract period of five (5) years. Option years are exercised at the government&#39;s sole discretion.<br />\n<br />\n<strong>Q42</strong>&nbsp;- Submission of Alternate Technical Approach<br />\nIf the Government permits the technical alternatives described above&mdash;such as using a conventional ducted split system for the Wet Lab/Observers Area and adjusting the Turtle Barn system capacity&mdash;please clarify how these alternatives should be reflected in the quotation.<br />\nQuestion: Should offerors:<br />\nProvide pricing based on the original SOW requirements as the base proposal and separately provide pricing for the proposed alternate technical approach; or<br />\nSubmit pricing based solely on the approved alternate approach, accompanied by a technical narrative and justification?<br />\nPlease also confirm whether any proposed deviation should be specifically identified as an exception or alternate in the technical proposal.<br />\nA42 - Offerors shall quote to the corrected equipment configuration in A14, which is incorporated by this amendment and supersedes the equipment descriptions in the Statement of Work, the CLIN 0001 description, and the combined synopsis. Separate alternate pricing is not required, and offerors should not submit pricing to the original Statement of Work descriptions. Any remaining proposed deviation from the corrected requirement shall be clearly identified as an exception in the technical approach.&nbsp;<br />\n<br />\nAbout preventive maintenance&nbsp;<br />\n<strong>Q43</strong>&nbsp;-Preventive Maintenance &ndash; Base Year, Option Years, and Payment: Please confirm whether quarterly preventive maintenance is required during the Base Year or begins with Option Year 1, and whether the preventive maintenance will be paid per service visit or at a fixed annual amount under the applicable CLIN.<br />\nA43 - Quarterly preventive maintenance is required during the base year. Per the Statement of Work, preventive maintenance begins following final acceptance of the initial installation and is performed quarterly through the end of the base period, and continues through each successive exercised option year. Each option year includes four (4) quarterly visits as stated in the applicable CLIN.<br />\nBecause the base period runs one year from date of award and initial installation is not due until 12/31/2026, offerors shall price three (3) quarterly preventive maintenance visits in the base year.<br />\nPreventive maintenance shall be priced as a fixed annual amount under the applicable CLIN. Invoicing shall occur in arrears following each completed quarterly visit, in equal installments of that annual amount. All visits shall be coordinated with the Galveston Facility Manager at least five (5) business days in advance and performed during normal business hours unless otherwise approved.<br />\n<br />\n<strong>QUESTIONS AND ANSWER PERIOD IS NOW CLOSED FOR THIS SOLICITATION</strong></p>","text":"The purpose of this amendment 0001 is to clarify CAR 1352.246-70, as well as provide an updated revised SOW and respond to the questions received for Solicitation No. 1333MF26Q0110.\n\nCombined Synopsis Solicitation: 1333MF26Q0110\n\nCAR 1352.246-70 final inspection and acceptance will occur at the NOAA Galveston facility\n\nAn updated Revised Statement of Work is included in this amendment 0001 as an attachment to the amended solicitation. Revisions are clearly identified in “red font”.\n\nResponse to Questions:\n\nQ&A #1 Solicitation_1333MF26Q0110_FD-26-517 (Galveston HVAC repairs/Replacements)\n\nAll questions were due from vendors by 10am EST 9/10\n\nQ1-Please confirm the required nominal capacity for the three Mitsubishi PKA-A30KA6 replacements. The SOW describes these as 2-ton systems, while the model designation appears to indicate a different nominal capacity.\n\nA1 - There are two (2) 2 ½ ton and one (1) 2 ton machines in the Turtle Hospital. Clarified in more detail for question 14.\n\nQ2-Please provide the required capacity of each indoor head serving the new 3-ton dual-head system in the Turtle Barn Aquaculture Area.\n\nA2- should be a (2) two ton unit with each head being a one (1) ton unit\n\nQ3-Please confirm the voltage, phase, available breaker capacity, and whether the existing electrical circuits may be reused.\n\nA3 - Existing circuits will be reused. The new breaker for the turtle barn will be added by NOAA, it will be a 208volt\n\nQ4-Please clarify whether the base-year CLIN must include all four quarterly preventive-maintenance visits in addition to the five-system installation.\n\nA4 - Yes, base year must include quarterly preventive maintenance.\n\nQ5-Please confirm the correct option-year CLIN numbering. The solicitation identifies the option CLINs as 0002–0005 in one section and 1001–4001 in another.\n\nA5) Option CLINS will either be 0002-0005 or 1001-4001, no final decision has been made\n\nQ6-Please identify the acceptable coastal-corrosion coating standards, approved products, and required manufacturer or warranty documentation.\n\nA6 - Both the interior and exterior units must have appropriate coastal coating to meet the Galveston Climate and proximity to the ocean/sea air.\n\nQ7-Please confirm that final inspection and acceptance will occur at the NOAA Galveston facility. CAR 1352.246-70 currently identifies the NMFS Miami campus as the place of acceptance.\n\nA7) Final inspection will occur at the Galveston Facility\n\nQ8-Please provide any site-visit measurements, photographs, attendance notes, or other information available to prospective offerors who could not attend the scheduled walkthrough.\n\nA8) All Q&A from the site visit is located within this Q&A document and Amendment to the solicitation\n\nQ9-Please clarify whether NOAA will issue tax-exempt purchasing documentation for materials incorporated into the project.\n\nA9) The Federal government does not pay taxes, however we can not dictate state and local tax requirements on vendors. NOAA will not be issuing tax exempt purchasing documentation for material purchasing, however the contract itself will be tax exempt as the Federal Government does not pay taxes.\n\nQ10-Please confirm whether monthly-equivalent pricing is required only for preventive-maintenance services or also for the one-time installation under the base CLIN.\n\nA10 - Monthly pricing is not needed for the base one time installation, that should be FFP.\n\nQ11-Would the facility like the option, on the mini split systems, to turn the heat on during the winter months, or would like the systems to be cool only?\n\nA11 - Yes, all units installed will be dual use (Cooling and Heating) as they currently are.\n\nQ12-Is there a particular brand of choice for the systems? would they like direct replacements or will a different brand work like Daikin Systems?\n\nA12: The government is relying on proposals to recommend the best solution to meet the requirements as outlined in the solicitation, statement of work and Q&A.\n\nQ13-Would the facility be ok with swapping the voltage of the systems from 110v to 208/230v in the case of the 110v/2Ton systems are not in stock. These units are particularly hard to find in a 2 ton system.\n\nA13 - The government is relying on proposals to recommend the best solution to meet the requirements as outlined in the solicitation, statement of work and Q&A.\n\nQ14-Can we get verification of the correct tonnage of each of the units? There were some discrepancy`s during the site visit.\n\nA14 - The following is the final equipment configuration by location. It supersedes the equipment descriptions in the original Statement of Work, the CLIN 0001 description, and the combined synopsis, and is incorporated by this amendment.\n\nTurtle Hospital: Three (3) ductless mini-split systems. Two (2) at 2.5-ton nominal capacity and one (1) at 2-ton nominal capacity.\n\nWet Lab Observers Area: One (1) 3-ton split system tying into the existing ductwork. This system is not ductless. The existing ductwork will be reused. The existing coil is presumed unserviceable and shall be replaced with an indoor unit matched to the new condensing unit.\n\nTurtle Barn Aquaculture Area: One (1) new ductless mini-split at 2-ton nominal capacity with two (2) 1-ton indoor heads, one head serving each room.\n\nAll five (5) systems shall be heat pumps providing both heating and cooling. All equipment shall meet the coastal corrosion protection and materials requirements of the Statement of Work as modified by A39.\n\nWhere the original Statement of Work, CLIN 0001, or the combined synopsis conflicts with the above, this answer governs.\n\nQ15 - Please confirm required size of each condenser and head unit for the Turtle Hospital building. There was some confusion on what was requested vs what we were told.\n\nA15 - Answered in question 1 and 14 above\n\nQ16 - Do we need to replace all lines between inside and outside unit?\n\nA16 - The government is relying on proposals to recommend the best solution to meet the requirements\n\nQ17 - Please confirm a size on outdoor unit at the observation building. It doesn't have a tag.\n\nA17 - Based on future use it is recommended a three ton split unit. That will tie into the existing duct work.\n\nQ18 - Please confirm that duct and coil will be reused inside of observation building.\n\nA18 - The duct yes, the coil is presumed to be unserviceable. The Split unit should have an internal unit that will tie into the duct work.\n\nQ19 - New unit for Turtle Barn - does the supply power need to be included, or will it be provided by others during office construction?\n\nA19- NOAA will provide connection\n\nQ20 - Could you provide site-visit photos, equipment photos, measurements, or field notes available for review?\n\nA20 - The government does not have existing photos available for review. Vendors were advised to attend the one scheduled site visit to acquire necessary photos etc.\n\nQ21 - For the four replacement systems, should the existing refrigerant line sets be reused or replaced? If replacement is required, can approximate lengths and routes be provided?\n\nA21 - The government is relying on proposals to recommend the best solution to meet the requirements\n\nQ22 - Please confirm the existing electrical service for each system, including voltage, phase, breaker size, disconnect location, and whether the existing circuits may be reused.\n\nA22 - Existing circuits and disconnects will be reused. Vendors were advised to attend the one scheduled site visit to acquire necessary photos etc, opportunities were given throughout the site visit.\n\nQ23 - For the new 3-ton dual-head system in the Turtle Barn/Aquaculture Area, are the locations of the outdoor condenser and two indoor heads predetermined?\n\nA23 - The general locations are established. The outdoor condensing unit will be located on the exterior of the Turtle Barn, and one indoor head will serve each of the two rooms in the Aquaculture Area, each approximately 150 square feet. Exact mounting positions will be finalized with the NOAA project lead prior to installation. Offerors shall price a complete installation at these locations.\n\nQ24 - Can approximate distances and routes be provided for the refrigerant piping, condensate piping, and electrical runs for the new 3-ton system?\n\nA24 - The government does not have measured distances for the Turtle Barn installation. Offerors shall state the line-set, condensate, and electrical run lengths assumed in their pricing. Vendors were encouraged to attend the site visit to take any pictures, measurements and confirm all requirements prior to proposal.\n\nQ25 - Is gravity condensate drainage available at each indoor-unit location, or should bidders include condensate pumps?\n\nA25 - Gravity condensate lines are in use and should continue to be used.\n\nQ26 - Were any unusual access conditions, penetration requirements, mounting restrictions, or lift/scaffold requirements identified during the site visit?\n\nA26 - None\n\nQ27 - Are the existing outdoor-unit brackets, pads, and supports suitable for reuse, or should bidders include new supports?\n\nA27 - Stainless Steel material will be used IAW with the solicitation, based on the inspection/site visit solicitors should recommend proposals to meet the best requirements for each installation.\n\nQ28 - Were any additional deficiencies or site conditions identified during the site visit that are not included in the solicitation documents?\n\nA28 - All information was put out during the joint site visit, this information included the units that are not operational, such as the Observer Area unit, the non-working one at the Turtle Hospital plus the two that are going out at the same location.\n\nQ29. Are we expected to reuse the existing refrigerate lines if possible?\n\nA29 - Existing refrigerant line sets shall not be reused. The SOW lists new refrigerant line sets with UV-resistant insulation among the materials to be furnished. Offerors shall price new line sets for all systems.\n\nQ30. Are we expected to reuse the existing electrical disconnects if in good condition?\n\nA30 - New electrical disconnects shall be provided at each unit. The SOW requires the contractor to provide and install electrical disconnects, circuit protection, wiring, conduit, and associated electrical components, and lists electrical disconnects among the materials to be furnished. Existing branch circuits may be reused where adequate to serve the new equipment.\n\nQ31. Are we expected to reuse the existing wall bracket mounts if they are in good condition?\n\nA31 - Existing wall brackets, pads, and supports shall not be reused. The SOW requires galvanized or stainless steel brackets, mounting supports, and hardware, and prohibits untreated or bare steel. Offerors shall price new supports at each outdoor unit location.\n\nQ32. There was a little discussion on sizing on site is there going to be a final list produced of what size units to provide for each location?\n\nA32 - Yes. See A14 for the final equipment list by location.\n\nQ33 - Existing Equipment Type – Turtle Hospital/Wet Lab Observers Area\n\nThe SOW identifies four (4) failing systems in the Turtle Hospital/Wet Lab area for replacement with ductless mini-split systems. During the site inspection, we observed that three (3) of the existing units are ductless mini-split systems, while the fourth unit, located in the long room within the Wet Lab/Observers Area, is a conventional split system utilizing existing trunk-line ductwork and supply vents.\n\nQuestion:\n\nDoes the Government require this fourth system to be replaced with a ductless mini-split system as specified in the SOW, or would the Government accept a like-for-like replacement using a conventional split system that utilizes the existing ductwork?\n\nBased on the observed configuration, a single ductless indoor head may not provide uniform air distribution throughout the length of the room, whereas the existing ducted configuration may provide more effective coverage.\n\nA33 - The Wet Lab Observers Area system shall be a conventional split system tying into the existing ductwork. The existing ductwork will be reused. The existing coil is presumed unserviceable and shall be replaced with an indoor unit matched to the new condensing unit. The ductless mini-split requirement does not apply to this system. See A14.\n\nQ34 -Existing Equipment Specifications and Electrical Requirements\n\nThe SOW identifies three (3) failing Mitsubishi 2-ton units, Model PKA-A30KA6, in the Turtle Hospital. The model number of the existing unit in the Wet Lab/Observers Area was illegible during the site inspection.\n\nQuestion:\n\nCan the Government provide the existing unit's electrical requirements, including voltage, phase, and available electrical capacity, as well as any relevant equipment dimensions or installation requirements for the Wet Lab/Observers Area? Alternatively, should offerors base their pricing on standard electrical and physical requirements for a comparable 2-ton replacement system?\n\nA34 - The government does not have legible nameplate data for the existing Wet Lab Observers Area unit and does not have documented voltage or phase for that circuit. Offerors shall base pricing on the 3-ton split system identified in A32 and shall verify field conditions prior to installation. The existing branch circuit may be reused where adequate to serve the proposed equipment. See A36.\n\nQ35 -Turtle Barn – Dual-Head System Capacity and Configuration\n\nThe SOW specifies a new 3-ton system with two (2) indoor heads for the Turtle Barn Aquaculture Area. During the site inspection, it was observed that the two rooms intended to receive the indoor heads are approximately 150 square feet each.\n\nQuestion:\n\nWould the Government permit a technical deviation from the specified 3-ton system to a 2-ton outdoor unit configured with two (2) 1-ton indoor heads, with one indoor head serving each room, provided the proposed system meets the Government's required temperature-control, performance, and operational requirements?\n\nAdditionally, can the Government provide or confirm the preferred locations for the two indoor heads, the outdoor condenser, and the anticipated line-set routing/lengths for this new installation?\n\nA35 - Yes. The Turtle Barn system shall be a 2-ton outdoor unit with two (2) 1-ton indoor heads, one serving each room. See A14 and A23.\n\nQ36 -Electrical Infrastructure and Voltage Requirements\n\nThe SOW requires the contractor to verify existing electrical capacity, install new circuits as required, and coordinate electrical connections with the existing building electrical service.\n\nDuring the site inspection, the on-site POC indicated that 120V power is available for the newly installed equipment but recommended using 220V equipment so that the systems operate on a uniform voltage.\n\nQuestion:\n\nCan the Government confirm whether adequate 220V electrical capacity is currently available at the installation locations for all five (5) systems, including the Turtle Hospital units, Wet Lab/Observers Area unit, and Turtle Barn dual-head system?\n\nIf 220V circuits are not currently available, should offerors include the cost of providing new dedicated circuits, breakers, wiring, conduit, and disconnects in their pricing?\n\nA36 - The government does not have documented voltage, phase, or breaker capacity at each existing installation location. Existing branch circuits may be reused where adequate to serve the proposed equipment. If the offeror proposes equipment requiring a voltage or capacity different from the existing circuit, the cost of providing the new dedicated circuit, breaker, wiring, conduit, and disconnect is the offeror's responsibility and shall be included in the firm-fixed price. Offerors shall state the voltage of the proposed equipment in their technical approach. The sole exception is the Turtle Barn installation, for which NOAA will provide a new 208V breaker and the connection to building electrical service. See A37.\n\nQ37 -Responsibility for Electrical Work\n\nThe SOW includes requirements for electrical disconnects, circuit protection, wiring, and conduit associated with the HVAC installations.\n\nQuestion:\n\nFor the new installation in the Turtle Barn Aquaculture Area, as well as the replacement systems, is the contractor responsible for providing all required electrical work, including new circuits and connections to the existing electrical service, or will NOAA provide/perform any portion of the required electrical work?\n\nA37 - For the Turtle Barn installation, NOAA will provide the new 208V breaker and connection to the building electrical service. All other electrical work is the contractor's responsibility and shall be included in the firm-fixed price, including disconnects, wiring, conduit, conductors, grounding, and any modification required to serve the replacement equipment. The contractor shall verify existing electrical capacity as required by the SOW.\n\nQ38 -Disposal of Existing HVAC Equipment\n\nThe SOW states that old HVAC appliances shall be turned over to the NOAA Project Lead for disposal. At the same time, the turn-key requirements state that the contractor shall remove and legally dispose of construction debris and excess materials.\n\nQuestion:\n\nPlease clarify the contractor's responsibility for the existing HVAC equipment. Specifically, will the contractor be required only to remove the equipment and transport it to a designated on-site location for NOAA disposal, or will the contractor be responsible for refrigerant recovery and off-site disposal/recycling of the HVAC equipment and associated materials in accordance with applicable EPA and environmental requirements?\n\nA38 - The contractor shall perform refrigerant recovery in accordance with EPA regulations, remove the existing equipment, and turn it over to the NOAA project lead at a designated on-site location. Off-site disposal of the removed HVAC equipment is the government's responsibility. All other construction debris, packaging, and excess materials shall be removed and legally disposed of off site by the contractor.\n\nQ39 - Coastal Corrosion Protection\n\nThe SOW requires outdoor condensing units to have factory- or field-applied coastal corrosion protection suitable for a marine environment and applied in a manner that does not void the manufacturer's warranty.\n\nDuring the site inspection, the on-site POC also confirmed the need for protective coating due to the coastal salt-air environment.\n\nQuestion:\n\nDoes NOAA require a specific manufacturer, product, certification, or coating standard for the coastal corrosion protection, or will any manufacturer-approved marine-grade corrosion protection coating be acceptable?\n\nAdditionally, please confirm that this requirement applies to all five (5) outdoor units, including the Wet Lab/Observers Area system if a conventional split system is approved as an alternative.\n\nA39 - No specific manufacturer, product, certification, or coating standard is required. Any factory-applied or manufacturer-approved marine-grade corrosion protection coating suitable for a coastal environment is acceptable, provided it does not void or reduce the manufacturer's warranty. Coastal corrosion protection is required on both indoor and outdoor units for all five (5) systems, including the Wet Lab Observers Area condensing unit and its matched indoor unit. This expands the Statement of Work requirement, which addressed outdoor condensing units only, and is incorporated by this amendment. See A6.\n\nQ40 -Working Hours and Facility Access\n\nThe SOW states that normal working hours shall be coordinated with the NOAA Project Lead and that work outside normal business hours may require prior written approval.\n\nQuestion:\n\nPlease confirm the standard working hours permitted for HVAC installation activities, particularly noisy or disruptive work, at the Wet Lab/Turtle Hospital and Turtle Barn facilities.\n\nAre there any restrictions on weekend, evening, or after-hours work due to ongoing animal care and operations at these facilities?\n\nA40 - Normal working hours are 8am to 5pm Central Time, Monday through Friday, excluding federal holidays. Work outside those hours requires prior written approval coordinated through the NOAA project lead. Noise-generating work in or adjacent to animal holding areas shall be scheduled in advance with the project lead.\n\nQ41 -Preventive Maintenance Period of Performance\n\nThe solicitation identifies a base year for installation/repairs followed by four (4) option years for quarterly preventive maintenance. The CLIN structure appears to extend through Option Year 4.\n\nQuestion:\n\nPlease confirm whether preventive maintenance is required for a total of four (4) option years following the base year, resulting in a total contract period of five (5) years (Base Year + Option Years 1–4), or whether the Government intends preventive maintenance to cover a different period.\n\nA41 - Confirmed. Preventive maintenance is required for four (4) option years following the base year, for a maximum total contract period of five (5) years. Option years are exercised at the government's sole discretion.\n\nQ42 - Submission of Alternate Technical Approach\n\nIf the Government permits the technical alternatives described above—such as using a conventional ducted split system for the Wet Lab/Observers Area and adjusting the Turtle Barn system capacity—please clarify how these alternatives should be reflected in the quotation.\n\nQuestion: Should offerors:\n\nProvide pricing based on the original SOW requirements as the base proposal and separately provide pricing for the proposed alternate technical approach; or\n\nSubmit pricing based solely on the approved alternate approach, accompanied by a technical narrative and justification?\n\nPlease also confirm whether any proposed deviation should be specifically identified as an exception or alternate in the technical proposal.\n\nA42 - Offerors shall quote to the corrected equipment configuration in A14, which is incorporated by this amendment and supersedes the equipment descriptions in the Statement of Work, the CLIN 0001 description, and the combined synopsis. Separate alternate pricing is not required, and offerors should not submit pricing to the original Statement of Work descriptions. Any remaining proposed deviation from the corrected requirement shall be clearly identified as an exception in the technical approach.\n\nAbout preventive maintenance\n\nQ43 -Preventive Maintenance – Base Year, Option Years, and Payment: Please confirm whether quarterly preventive maintenance is required during the Base Year or begins with Option Year 1, and whether the preventive maintenance will be paid per service visit or at a fixed annual amount under the applicable CLIN.\n\nA43 - Quarterly preventive maintenance is required during the base year. Per the Statement of Work, preventive maintenance begins following final acceptance of the initial installation and is performed quarterly through the end of the base period, and continues through each successive exercised option year. Each option year includes four (4) quarterly visits as stated in the applicable CLIN.\n\nBecause the base period runs one year from date of award and initial installation is not due until 12/31/2026, offerors shall price three (3) quarterly preventive maintenance visits in the base year.\n\nPreventive maintenance shall be priced as a fixed annual amount under the applicable CLIN. Invoicing shall occur in arrears following each completed quarterly visit, in equal installments of that annual amount. All visits shall be coordinated with the Galveston Facility Manager at least five (5) business days in advance and performed during normal business hours unless otherwise approved.\n\nQUESTIONS AND ANSWER PERIOD IS NOW CLOSED FOR THIS SOLICITATION","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"1333MF26Q0110","place_of_performance":{"zip":"77551","city":{"code":"28068","name":"Galveston"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"J041"}],"due_at":"2026-09-16T16:00:00Z","due_date":"2026-09-16","closes_at":"2026-09-16T16:00:00Z","awardable":true,"dept_key":"d-013","dept_name":"COMMERCE, DEPARTMENT OF","sub_key":"s-1330","sub_name":"NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION","office_key":"o-1333MF","office_name":"DEPT OF COMMERCE NOAA","state":"TX","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z","principal_notice_id":"fb2d0875b9114f6388520a7a1013c011","description":{"text":"The purpose of this amendment 0001 is to clarify CAR 1352.246-70, as well as provide an updated revised SOW and respond to the questions received for Solicitation No. 1333MF26Q0110.\n\nCombined Synopsis Solicitation: 1333MF26Q0110\n\nCAR 1352.246-70 final inspection and acceptance will occur at the NOAA Galveston facility\n\nAn updated Revised Statement of Work is included in this amendment 0001 as an attachment to the amended solicitation. Revisions are clearly identified in “red font”.\n\nResponse to Questions:\n\nQ&A #1 Solicitation_1333MF26Q0110_FD-26-517 (Galveston HVAC repairs/Replacements)\n\nAll questions were due from vendors by 10am EST 9/10\n\nQ1-Please confirm the required nominal capacity for the three Mitsubishi PKA-A30KA6 replacements. The SOW describes these as 2-ton systems, while the model designation appears to indicate a different nominal capacity.\n\nA1 - There are two (2) 2 ½ ton and one (1) 2 ton machines in the Turtle Hospital. Clarified in more detail for question 14.\n\nQ2-Please provide the required capacity of each indoor head serving the new 3-ton dual-head system in the Turtle Barn Aquaculture Area.\n\nA2- should be a (2) two ton unit with each head being a one (1) ton unit\n\nQ3-Please confirm the voltage, phase, available breaker capacity, and whether the existing electrical circuits may be reused.\n\nA3 - Existing circuits will be reused. The new breaker for the turtle barn will be added by NOAA, it will be a 208volt\n\nQ4-Please clarify whether the base-year CLIN must include all four quarterly preventive-maintenance visits in addition to the five-system installation.\n\nA4 - Yes, base year must include quarterly preventive maintenance.\n\nQ5-Please confirm the correct option-year CLIN numbering. The solicitation identifies the option CLINs as 0002–0005 in one section and 1001–4001 in another.\n\nA5) Option CLINS will either be 0002-0005 or 1001-4001, no final decision has been made\n\nQ6-Please identify the acceptable coastal-corrosion coating standards, approved products, and required manufacturer or warranty documentation.\n\nA6 - Both the interior and exterior units must have appropriate coastal coating to meet the Galveston Climate and proximity to the ocean/sea air.\n\nQ7-Please confirm that final inspection and acceptance will occur at the NOAA Galveston facility. CAR 1352.246-70 currently identifies the NMFS Miami campus as the place of acceptance.\n\nA7) Final inspection will occur at the Galveston Facility\n\nQ8-Please provide any site-visit measurements, photographs, attendance notes, or other information available to prospective offerors who could not attend the scheduled walkthrough.\n\nA8) All Q&A from the site visit is located within this Q&A document and Amendment to the solicitation\n\nQ9-Please clarify whether NOAA will issue tax-exempt purchasing documentation for materials incorporated into the project.\n\nA9) The Federal government does not pay taxes, however we can not dictate state and local tax requirements on vendors. NOAA will not be issuing tax exempt purchasing documentation for material purchasing, however the contract itself will be tax exempt as the Federal Government does not pay taxes.\n\nQ10-Please confirm whether monthly-equivalent pricing is required only for preventive-maintenance services or also for the one-time installation under the base CLIN.\n\nA10 - Monthly pricing is not needed for the base one time installation, that should be FFP.\n\nQ11-Would the facility like the option, on the mini split systems, to turn the heat on during the winter months, or would like the systems to be cool only?\n\nA11 - Yes, all units installed will be dual use (Cooling and Heating) as they currently are.\n\nQ12-Is there a particular brand of choice for the systems? would they like direct replacements or will a different brand work like Daikin Systems?\n\nA12: The government is relying on proposals to recommend the best solution to meet the requirements as outlined in the solicitation, statement of work and Q&A.\n\nQ13-Would the facility be ok with swapping the voltage of the systems from 110v to 208/230v in the case of the 110v/2Ton systems are not in stock. These units are particularly hard to find in a 2 ton system.\n\nA13 - The government is relying on proposals to recommend the best solution to meet the requirements as outlined in the solicitation, statement of work and Q&A.\n\nQ14-Can we get verification of the correct tonnage of each of the units? There were some discrepancy`s during the site visit.\n\nA14 - The following is the final equipment configuration by location. It supersedes the equipment descriptions in the original Statement of Work, the CLIN 0001 description, and the combined synopsis, and is incorporated by this amendment.\n\nTurtle Hospital: Three (3) ductless mini-split systems. Two (2) at 2.5-ton nominal capacity and one (1) at 2-ton nominal capacity.\n\nWet Lab Observers Area: One (1) 3-ton split system tying into the existing ductwork. This system is not ductless. The existing ductwork will be reused. The existing coil is presumed unserviceable and shall be replaced with an indoor unit matched to the new condensing unit.\n\nTurtle Barn Aquaculture Area: One (1) new ductless mini-split at 2-ton nominal capacity with two (2) 1-ton indoor heads, one head serving each room.\n\nAll five (5) systems shall be heat pumps providing both heating and cooling. All equipment shall meet the coastal corrosion protection and materials requirements of the Statement of Work as modified by A39.\n\nWhere the original Statement of Work, CLIN 0001, or the combined synopsis conflicts with the above, this answer governs.\n\nQ15 - Please confirm required size of each condenser and head unit for the Turtle Hospital building. There was some confusion on what was requested vs what we were told.\n\nA15 - Answered in question 1 and 14 above\n\nQ16 - Do we need to replace all lines between inside and outside unit?\n\nA16 - The government is relying on proposals to recommend the best solution to meet the requirements\n\nQ17 - Please confirm a size on outdoor unit at the observation building. It doesn't have a tag.\n\nA17 - Based on future use it is recommended a three ton split unit. That will tie into the existing duct work.\n\nQ18 - Please confirm that duct and coil will be reused inside of observation building.\n\nA18 - The duct yes, the coil is presumed to be unserviceable. The Split unit should have an internal unit that will tie into the duct work.\n\nQ19 - New unit for Turtle Barn - does the supply power need to be included, or will it be provided by others during office construction?\n\nA19- NOAA will provide connection\n\nQ20 - Could you provide site-visit photos, equipment photos, measurements, or field notes available for review?\n\nA20 - The government does not have existing photos available for review. Vendors were advised to attend the one scheduled site visit to acquire necessary photos etc.\n\nQ21 - For the four replacement systems, should the existing refrigerant line sets be reused or replaced? If replacement is required, can approximate lengths and routes be provided?\n\nA21 - The government is relying on proposals to recommend the best solution to meet the requirements\n\nQ22 - Please confirm the existing electrical service for each system, including voltage, phase, breaker size, disconnect location, and whether the existing circuits may be reused.\n\nA22 - Existing circuits and disconnects will be reused. Vendors were advised to attend the one scheduled site visit to acquire necessary photos etc, opportunities were given throughout the site visit.\n\nQ23 - For the new 3-ton dual-head system in the Turtle Barn/Aquaculture Area, are the locations of the outdoor condenser and two indoor heads predetermined?\n\nA23 - The general locations are established. The outdoor condensing unit will be located on the exterior of the Turtle Barn, and one indoor head will serve each of the two rooms in the Aquaculture Area, each approximately 150 square feet. Exact mounting positions will be finalized with the NOAA project lead prior to installation. Offerors shall price a complete installation at these locations.\n\nQ24 - Can approximate distances and routes be provided for the refrigerant piping, condensate piping, and electrical runs for the new 3-ton system?\n\nA24 - The government does not have measured distances for the Turtle Barn installation. Offerors shall state the line-set, condensate, and electrical run lengths assumed in their pricing. Vendors were encouraged to attend the site visit to take any pictures, measurements and confirm all requirements prior to proposal.\n\nQ25 - Is gravity condensate drainage available at each indoor-unit location, or should bidders include condensate pumps?\n\nA25 - Gravity condensate lines are in use and should continue to be used.\n\nQ26 - Were any unusual access conditions, penetration requirements, mounting restrictions, or lift/scaffold requirements identified during the site visit?\n\nA26 - None\n\nQ27 - Are the existing outdoor-unit brackets, pads, and supports suitable for reuse, or should bidders include new supports?\n\nA27 - Stainless Steel material will be used IAW with the solicitation, based on the inspection/site visit solicitors should recommend proposals to meet the best requirements for each installation.\n\nQ28 - Were any additional deficiencies or site conditions identified during the site visit that are not included in the solicitation documents?\n\nA28 - All information was put out during the joint site visit, this information included the units that are not operational, such as the Observer Area unit, the non-working one at the Turtle Hospital plus the two that are going out at the same location.\n\nQ29. Are we expected to reuse the existing refrigerate lines if possible?\n\nA29 - Existing refrigerant line sets shall not be reused. The SOW lists new refrigerant line sets with UV-resistant insulation among the materials to be furnished. Offerors shall price new line sets for all systems.\n\nQ30. Are we expected to reuse the existing electrical disconnects if in good condition?\n\nA30 - New electrical disconnects shall be provided at each unit. The SOW requires the contractor to provide and install electrical disconnects, circuit protection, wiring, conduit, and associated electrical components, and lists electrical disconnects among the materials to be furnished. Existing branch circuits may be reused where adequate to serve the new equipment.\n\nQ31. Are we expected to reuse the existing wall bracket mounts if they are in good condition?\n\nA31 - Existing wall brackets, pads, and supports shall not be reused. The SOW requires galvanized or stainless steel brackets, mounting supports, and hardware, and prohibits untreated or bare steel. Offerors shall price new supports at each outdoor unit location.\n\nQ32. There was a little discussion on sizing on site is there going to be a final list produced of what size units to provide for each location?\n\nA32 - Yes. See A14 for the final equipment list by location.\n\nQ33 - Existing Equipment Type – Turtle Hospital/Wet Lab Observers Area\n\nThe SOW identifies four (4) failing systems in the Turtle Hospital/Wet Lab area for replacement with ductless mini-split systems. During the site inspection, we observed that three (3) of the existing units are ductless mini-split systems, while the fourth unit, located in the long room within the Wet Lab/Observers Area, is a conventional split system utilizing existing trunk-line ductwork and supply vents.\n\nQuestion:\n\nDoes the Government require this fourth system to be replaced with a ductless mini-split system as specified in the SOW, or would the Government accept a like-for-like replacement using a conventional split system that utilizes the existing ductwork?\n\nBased on the observed configuration, a single ductless indoor head may not provide uniform air distribution throughout the length of the room, whereas the existing ducted configuration may provide more effective coverage.\n\nA33 - The Wet Lab Observers Area system shall be a conventional split system tying into the existing ductwork. The existing ductwork will be reused. The existing coil is presumed unserviceable and shall be replaced with an indoor unit matched to the new condensing unit. The ductless mini-split requirement does not apply to this system. See A14.\n\nQ34 -Existing Equipment Specifications and Electrical Requirements\n\nThe SOW identifies three (3) failing Mitsubishi 2-ton units, Model PKA-A30KA6, in the Turtle Hospital. The model number of the existing unit in the Wet Lab/Observers Area was illegible during the site inspection.\n\nQuestion:\n\nCan the Government provide the existing unit's electrical requirements, including voltage, phase, and available electrical capacity, as well as any relevant equipment dimensions or installation requirements for the Wet Lab/Observers Area? Alternatively, should offerors base their pricing on standard electrical and physical requirements for a comparable 2-ton replacement system?\n\nA34 - The government does not have legible nameplate data for the existing Wet Lab Observers Area unit and does not have documented voltage or phase for that circuit. Offerors shall base pricing on the 3-ton split system identified in A32 and shall verify field conditions prior to installation. The existing branch circuit may be reused where adequate to serve the proposed equipment. See A36.\n\nQ35 -Turtle Barn – Dual-Head System Capacity and Configuration\n\nThe SOW specifies a new 3-ton system with two (2) indoor heads for the Turtle Barn Aquaculture Area. During the site inspection, it was observed that the two rooms intended to receive the indoor heads are approximately 150 square feet each.\n\nQuestion:\n\nWould the Government permit a technical deviation from the specified 3-ton system to a 2-ton outdoor unit configured with two (2) 1-ton indoor heads, with one indoor head serving each room, provided the proposed system meets the Government's required temperature-control, performance, and operational requirements?\n\nAdditionally, can the Government provide or confirm the preferred locations for the two indoor heads, the outdoor condenser, and the anticipated line-set routing/lengths for this new installation?\n\nA35 - Yes. The Turtle Barn system shall be a 2-ton outdoor unit with two (2) 1-ton indoor heads, one serving each room. See A14 and A23.\n\nQ36 -Electrical Infrastructure and Voltage Requirements\n\nThe SOW requires the contractor to verify existing electrical capacity, install new circuits as required, and coordinate electrical connections with the existing building electrical service.\n\nDuring the site inspection, the on-site POC indicated that 120V power is available for the newly installed equipment but recommended using 220V equipment so that the systems operate on a uniform voltage.\n\nQuestion:\n\nCan the Government confirm whether adequate 220V electrical capacity is currently available at the installation locations for all five (5) systems, including the Turtle Hospital units, Wet Lab/Observers Area unit, and Turtle Barn dual-head system?\n\nIf 220V circuits are not currently available, should offerors include the cost of providing new dedicated circuits, breakers, wiring, conduit, and disconnects in their pricing?\n\nA36 - The government does not have documented voltage, phase, or breaker capacity at each existing installation location. Existing branch circuits may be reused where adequate to serve the proposed equipment. If the offeror proposes equipment requiring a voltage or capacity different from the existing circuit, the cost of providing the new dedicated circuit, breaker, wiring, conduit, and disconnect is the offeror's responsibility and shall be included in the firm-fixed price. Offerors shall state the voltage of the proposed equipment in their technical approach. The sole exception is the Turtle Barn installation, for which NOAA will provide a new 208V breaker and the connection to building electrical service. See A37.\n\nQ37 -Responsibility for Electrical Work\n\nThe SOW includes requirements for electrical disconnects, circuit protection, wiring, and conduit associated with the HVAC installations.\n\nQuestion:\n\nFor the new installation in the Turtle Barn Aquaculture Area, as well as the replacement systems, is the contractor responsible for providing all required electrical work, including new circuits and connections to the existing electrical service, or will NOAA provide/perform any portion of the required electrical work?\n\nA37 - For the Turtle Barn installation, NOAA will provide the new 208V breaker and connection to the building electrical service. All other electrical work is the contractor's responsibility and shall be included in the firm-fixed price, including disconnects, wiring, conduit, conductors, grounding, and any modification required to serve the replacement equipment. The contractor shall verify existing electrical capacity as required by the SOW.\n\nQ38 -Disposal of Existing HVAC Equipment\n\nThe SOW states that old HVAC appliances shall be turned over to the NOAA Project Lead for disposal. At the same time, the turn-key requirements state that the contractor shall remove and legally dispose of construction debris and excess materials.\n\nQuestion:\n\nPlease clarify the contractor's responsibility for the existing HVAC equipment. Specifically, will the contractor be required only to remove the equipment and transport it to a designated on-site location for NOAA disposal, or will the contractor be responsible for refrigerant recovery and off-site disposal/recycling of the HVAC equipment and associated materials in accordance with applicable EPA and environmental requirements?\n\nA38 - The contractor shall perform refrigerant recovery in accordance with EPA regulations, remove the existing equipment, and turn it over to the NOAA project lead at a designated on-site location. Off-site disposal of the removed HVAC equipment is the government's responsibility. All other construction debris, packaging, and excess materials shall be removed and legally disposed of off site by the contractor.\n\nQ39 - Coastal Corrosion Protection\n\nThe SOW requires outdoor condensing units to have factory- or field-applied coastal corrosion protection suitable for a marine environment and applied in a manner that does not void the manufacturer's warranty.\n\nDuring the site inspection, the on-site POC also confirmed the need for protective coating due to the coastal salt-air environment.\n\nQuestion:\n\nDoes NOAA require a specific manufacturer, product, certification, or coating standard for the coastal corrosion protection, or will any manufacturer-approved marine-grade corrosion protection coating be acceptable?\n\nAdditionally, please confirm that this requirement applies to all five (5) outdoor units, including the Wet Lab/Observers Area system if a conventional split system is approved as an alternative.\n\nA39 - No specific manufacturer, product, certification, or coating standard is required. Any factory-applied or manufacturer-approved marine-grade corrosion protection coating suitable for a coastal environment is acceptable, provided it does not void or reduce the manufacturer's warranty. Coastal corrosion protection is required on both indoor and outdoor units for all five (5) systems, including the Wet Lab Observers Area condensing unit and its matched indoor unit. This expands the Statement of Work requirement, which addressed outdoor condensing units only, and is incorporated by this amendment. See A6.\n\nQ40 -Working Hours and Facility Access\n\nThe SOW states that normal working hours shall be coordinated with the NOAA Project Lead and that work outside normal business hours may require prior written approval.\n\nQuestion:\n\nPlease confirm the standard working hours permitted for HVAC installation activities, particularly noisy or disruptive work, at the Wet Lab/Turtle Hospital and Turtle Barn facilities.\n\nAre there any restrictions on weekend, evening, or after-hours work due to ongoing animal care and operations at these facilities?\n\nA40 - Normal working hours are 8am to 5pm Central Time, Monday through Friday, excluding federal holidays. Work outside those hours requires prior written approval coordinated through the NOAA project lead. Noise-generating work in or adjacent to animal holding areas shall be scheduled in advance with the project lead.\n\nQ41 -Preventive Maintenance Period of Performance\n\nThe solicitation identifies a base year for installation/repairs followed by four (4) option years for quarterly preventive maintenance. The CLIN structure appears to extend through Option Year 4.\n\nQuestion:\n\nPlease confirm whether preventive maintenance is required for a total of four (4) option years following the base year, resulting in a total contract period of five (5) years (Base Year + Option Years 1–4), or whether the Government intends preventive maintenance to cover a different period.\n\nA41 - Confirmed. Preventive maintenance is required for four (4) option years following the base year, for a maximum total contract period of five (5) years. Option years are exercised at the government's sole discretion.\n\nQ42 - Submission of Alternate Technical Approach\n\nIf the Government permits the technical alternatives described above—such as using a conventional ducted split system for the Wet Lab/Observers Area and adjusting the Turtle Barn system capacity—please clarify how these alternatives should be reflected in the quotation.\n\nQuestion: Should offerors:\n\nProvide pricing based on the original SOW requirements as the base proposal and separately provide pricing for the proposed alternate technical approach; or\n\nSubmit pricing based solely on the approved alternate approach, accompanied by a technical narrative and justification?\n\nPlease also confirm whether any proposed deviation should be specifically identified as an exception or alternate in the technical proposal.\n\nA42 - Offerors shall quote to the corrected equipment configuration in A14, which is incorporated by this amendment and supersedes the equipment descriptions in the Statement of Work, the CLIN 0001 description, and the combined synopsis. Separate alternate pricing is not required, and offerors should not submit pricing to the original Statement of Work descriptions. Any remaining proposed deviation from the corrected requirement shall be clearly identified as an exception in the technical approach.\n\nAbout preventive maintenance\n\nQ43 -Preventive Maintenance – Base Year, Option Years, and Payment: Please confirm whether quarterly preventive maintenance is required during the Base Year or begins with Option Year 1, and whether the preventive maintenance will be paid per service visit or at a fixed annual amount under the applicable CLIN.\n\nA43 - Quarterly preventive maintenance is required during the base year. Per the Statement of Work, preventive maintenance begins following final acceptance of the initial installation and is performed quarterly through the end of the base period, and continues through each successive exercised option year. Each option year includes four (4) quarterly visits as stated in the applicable CLIN.\n\nBecause the base period runs one year from date of award and initial installation is not due until 12/31/2026, offerors shall price three (3) quarterly preventive maintenance visits in the base year.\n\nPreventive maintenance shall be priced as a fixed annual amount under the applicable CLIN. Invoicing shall occur in arrears following each completed quarterly visit, in equal installments of that annual amount. All visits shall be coordinated with the Galveston Facility Manager at least five (5) business days in advance and performed during normal business hours unless otherwise approved.\n\nQUESTIONS AND ANSWER PERIOD IS NOW CLOSED FOR THIS SOLICITATION","html":"<p>The purpose of this amendment 0001 is to clarify CAR 1352.246-70, as well as provide an updated revised SOW and respond to the questions received for Solicitation No. 1333MF26Q0110.<br />\n<br />\nCombined Synopsis Solicitation: 1333MF26Q0110<br />\n<br />\nCAR 1352.246-70&nbsp; final inspection and acceptance will occur at the NOAA Galveston facility<br />\n<br />\nAn updated Revised Statement of Work is included in this amendment 0001 as an attachment to the amended solicitation.&nbsp; Revisions are clearly identified in &ldquo;red font&rdquo;.<br />\n<br />\nResponse to Questions:&nbsp;<br />\n<br />\nQ&amp;A #1 Solicitation_1333MF26Q0110_FD-26-517 (Galveston HVAC repairs/Replacements)<br />\nAll questions were due from vendors by 10am EST 9/10<br />\n<br />\n<strong>Q1</strong>-Please confirm the required nominal capacity for the three Mitsubishi PKA-A30KA6 replacements. The SOW describes these as 2-ton systems, while the model designation appears to indicate a different nominal capacity.<br />\nA1 - There are two (2) 2 &frac12; ton and one (1) 2 ton machines in the Turtle Hospital. Clarified in more detail for question 14.<br />\n<br />\n<strong>Q2-</strong>Please provide the required capacity of each indoor head serving the new 3-ton dual-head system in the Turtle Barn Aquaculture Area.<br />\nA2- should be a (2) two ton unit with each head being a one (1) ton unit<br />\n<br />\n<strong>Q3-</strong>Please confirm the voltage, phase, available breaker capacity, and whether the existing electrical circuits may be reused.<br />\nA3 - Existing circuits will be reused. The new breaker for the turtle barn will be added by NOAA, it will be a 208volt<br />\n<br />\n<strong>Q4</strong>-Please clarify whether the base-year CLIN must include all four quarterly preventive-maintenance visits in addition to the five-system installation.<br />\nA4 - Yes, base year must include quarterly preventive maintenance.<br />\n<br />\n<strong>Q5</strong>-Please confirm the correct option-year CLIN numbering. The solicitation identifies the option CLINs as 0002&ndash;0005 in one section and 1001&ndash;4001 in another.<br />\nA5) Option CLINS will either be 0002-0005 or 1001-4001, no final decision has been made<br />\n<br />\n<strong>Q6-</strong>Please identify the acceptable coastal-corrosion coating standards, approved products, and required manufacturer or warranty documentation.<br />\nA6 - Both the interior and exterior units must have appropriate coastal coating to meet the Galveston Climate and proximity to the ocean/sea air.<br />\n<br />\n<strong>Q7</strong>-Please confirm that final inspection and acceptance will occur at the NOAA Galveston facility. CAR 1352.246-70 currently identifies the NMFS Miami campus as the place of acceptance.<br />\nA7) Final inspection will occur at the Galveston Facility<br />\n<br />\n<strong>Q8</strong>-Please provide any site-visit measurements, photographs, attendance notes, or other information available to prospective offerors who could not attend the scheduled walkthrough.<br />\nA8)&nbsp; All Q&amp;A from the site visit is located within this Q&amp;A document and Amendment to the solicitation<br />\n<br />\n<strong>Q9</strong>-Please clarify whether NOAA will issue tax-exempt purchasing documentation for materials incorporated into the project.<br />\nA9) The Federal government does not pay taxes, however we can not dictate state and local tax requirements on vendors. NOAA will not be issuing tax exempt purchasing documentation for material purchasing, however the contract itself will be tax exempt as the Federal Government does not pay taxes.<br />\n<br />\n<strong>Q10</strong>-Please confirm whether monthly-equivalent pricing is required only for preventive-maintenance services or also for the one-time installation under the base CLIN.<br />\nA10 - Monthly pricing is not needed for the base one time installation, that should be FFP.<br />\n<br />\n<strong>Q11</strong>-Would the facility like the option, on the mini split systems, to turn the heat on during the winter months, or would like the systems to be cool only?<br />\nA11 - Yes, all units installed will be dual use (Cooling and Heating) as they currently are.<br />\n<br />\n<strong>Q12</strong>-Is there a particular brand of choice for the systems? would they like direct replacements or will a different brand work like Daikin Systems?<br />\nA12:&nbsp; The government is relying on proposals to recommend the best solution to meet the requirements as outlined in the solicitation, statement of work and Q&amp;A.<br />\n<br />\n<strong>Q13</strong>-Would the facility be ok with swapping the voltage of the systems from 110v to 208/230v in the case of the 110v/2Ton systems are not in stock. These units are particularly hard to find in a 2 ton system.<br />\nA13 - The government is relying on proposals to recommend the best solution to meet the requirements as outlined in the solicitation, statement of work and Q&amp;A.&nbsp;<br />\n<br />\n<strong>Q14</strong>-Can we get verification of the correct tonnage of each of the units? There were some discrepancy`s during the site visit.&nbsp;<br />\nA14 - The following is the final equipment configuration by location. It supersedes the equipment descriptions in the original Statement of Work, the CLIN 0001 description, and the combined synopsis, and is incorporated by this amendment.<br />\nTurtle Hospital: Three (3) ductless mini-split systems. Two (2) at 2.5-ton nominal capacity and one (1) at 2-ton nominal capacity.<br />\nWet Lab Observers Area: One (1) 3-ton split system tying into the existing ductwork. This system is not ductless. The existing ductwork will be reused. The existing coil is presumed unserviceable and shall be replaced with an indoor unit matched to the new condensing unit.<br />\nTurtle Barn Aquaculture Area: One (1) new ductless mini-split at 2-ton nominal capacity with two (2) 1-ton indoor heads, one head serving each room.<br />\nAll five (5) systems shall be heat pumps providing both heating and cooling. All equipment shall meet the coastal corrosion protection and materials requirements of the Statement of Work as modified by A39.<br />\nWhere the original Statement of Work, CLIN 0001, or the combined synopsis conflicts with the above, this answer governs.<br />\n<br />\n<strong>Q15</strong>&nbsp;- Please confirm required size of each condenser and head unit for the Turtle Hospital building. There was some confusion on what was requested vs what we were told.&nbsp;<br />\nA15 - Answered in question 1 and 14 above<br />\n<br />\n<strong>Q16</strong>&nbsp;- Do we need to replace all lines between inside and outside unit?<br />\nA16 - The government is relying on proposals to recommend the best solution to meet the requirements&nbsp;<br />\n<br />\n<strong>Q17</strong>&nbsp;- Please confirm a size on outdoor unit at the observation building. It doesn&#39;t&nbsp; have a tag.&nbsp;<br />\nA17 - Based on future use it is recommended a three ton split unit. That will tie into the existing duct work.<br />\n<br />\n<strong>Q18</strong>&nbsp;- Please confirm that duct and coil will be reused inside of observation building.<br />\nA18 - The duct yes, the coil is presumed to be unserviceable. The Split unit should have an internal unit that will tie into the duct work.<br />\n<br />\n<strong>Q19</strong>&nbsp;- New unit for Turtle Barn - does the supply power need to be included, or will it be provided by others during office construction?<br />\nA19- NOAA will provide connection<br />\n<br />\n<strong>Q20&nbsp;</strong>- Could you provide site-visit photos, equipment photos, measurements, or field notes available for review?<br />\nA20 - The government does not have existing photos available for review.&nbsp; Vendors were advised to attend the one scheduled site visit to acquire necessary photos etc.<br />\n<br />\n<strong>Q21</strong>&nbsp;- For the four replacement systems, should the existing refrigerant line sets be reused or replaced? If replacement is required, can approximate lengths and routes be provided?<br />\nA21 - The government is relying on proposals to recommend the best solution to meet the requirements&nbsp;<br />\n<br />\n<strong>Q22</strong>&nbsp;- Please confirm the existing electrical service for each system, including voltage, phase, breaker size, disconnect location, and whether the existing circuits may be reused.<br />\nA22 - Existing circuits and disconnects will be reused. Vendors were advised to attend the one scheduled site visit to acquire necessary photos etc, opportunities were given throughout the site visit.<br />\n<br />\n<strong>Q23</strong>&nbsp;- For the new 3-ton dual-head system in the Turtle Barn/Aquaculture Area, are the locations of the outdoor condenser and two indoor heads predetermined?<br />\nA23 - The general locations are established. The outdoor condensing unit will be located on the exterior of the Turtle Barn, and one indoor head will serve each of the two rooms in the Aquaculture Area, each approximately 150 square feet. Exact mounting positions will be finalized with the NOAA project lead prior to installation. Offerors shall price a complete installation at these locations.&nbsp;<br />\n<br />\n<strong>Q24</strong>&nbsp;- Can approximate distances and routes be provided for the refrigerant piping, condensate piping, and electrical runs for the new 3-ton system?<br />\nA24 - The government does not have measured distances for the Turtle Barn installation. Offerors shall state the line-set, condensate, and electrical run lengths assumed in their pricing. Vendors were encouraged to attend the site visit to take any pictures, measurements and confirm all requirements prior to proposal.<br />\n<br />\n<strong>Q25</strong>&nbsp;- Is gravity condensate drainage available at each indoor-unit location, or should bidders include condensate pumps?<br />\nA25 - Gravity condensate lines are in use and should continue to be used.<br />\n<br />\n<strong>Q26</strong>&nbsp;- Were any unusual access conditions, penetration requirements, mounting restrictions, or lift/scaffold requirements identified during the site visit?<br />\nA26 - None<br />\n<br />\n<strong>Q27</strong>&nbsp;- Are the existing outdoor-unit brackets, pads, and supports suitable for reuse, or should bidders include new supports?<br />\nA27 - Stainless Steel material will be used IAW with the solicitation, based on the inspection/site visit solicitors should recommend proposals to meet the best requirements for each installation.<br />\n<br />\n<strong>Q28&nbsp;</strong>- Were any additional deficiencies or site conditions identified during the site visit that are not included in the solicitation documents?<br />\nA28 - All information was put out during the joint site visit, this information included the units that are not operational, such as the Observer Area unit, the non-working one at the Turtle Hospital plus the two that are going out at the same location.<br />\n<br />\n<strong>Q29.</strong>&nbsp;Are we expected to reuse the existing refrigerate lines if possible?<br />\nA29 - Existing refrigerant line sets shall not be reused. The SOW lists new refrigerant line sets with UV-resistant insulation among the materials to be furnished. Offerors shall price new line sets for all systems.<br />\n&nbsp;<br />\n<strong>Q30.&nbsp;</strong>Are we expected to reuse the existing electrical disconnects if in good condition?<br />\nA30 - New electrical disconnects shall be provided at each unit. The SOW requires the contractor to provide and install electrical disconnects, circuit protection, wiring, conduit, and associated electrical components, and lists electrical disconnects among the materials to be furnished. Existing branch circuits may be reused where adequate to serve the new equipment.<br />\n<strong>&nbsp;</strong><br />\n<strong>Q31</strong>.&nbsp; Are we expected to reuse the existing wall bracket mounts if they are in good condition?<br />\nA31 - Existing wall brackets, pads, and supports shall not be reused. The SOW requires galvanized or stainless steel brackets, mounting supports, and hardware, and prohibits untreated or bare steel. Offerors shall price new supports at each outdoor unit location.<br />\n&nbsp;<br />\n<strong>Q32.</strong>&nbsp; There was a little discussion on sizing on site is there going to be a final list produced of what size units to provide for each location?<br />\nA32 -&nbsp; Yes. See A14 for the final equipment list by location.<br />\n<br />\n<br />\n<strong>Q33&nbsp;</strong>- Existing Equipment Type &ndash; Turtle Hospital/Wet Lab Observers Area<br />\nThe SOW identifies four (4) failing systems in the Turtle Hospital/Wet Lab area for replacement with ductless mini-split systems. During the site inspection, we observed that three (3) of the existing units are ductless mini-split systems, while the fourth unit, located in the long room within the Wet Lab/Observers Area, is a conventional split system utilizing existing trunk-line ductwork and supply vents.<br />\nQuestion:<br />\nDoes the Government require this fourth system to be replaced with a ductless mini-split system as specified in the SOW, or would the Government accept a like-for-like replacement using a conventional split system that utilizes the existing ductwork?<br />\nBased on the observed configuration, a single ductless indoor head may not provide uniform air distribution throughout the length of the room, whereas the existing ducted configuration may provide more effective coverage.<br />\nA33 - The Wet Lab Observers Area system shall be a conventional split system tying into the existing ductwork. The existing ductwork will be reused. The existing coil is presumed unserviceable and shall be replaced with an indoor unit matched to the new condensing unit. The ductless mini-split requirement does not apply to this system. See A14.<br />\n<br />\n<strong>Q34&nbsp;</strong>-Existing Equipment Specifications and Electrical Requirements<br />\nThe SOW identifies three (3) failing Mitsubishi 2-ton units, Model PKA-A30KA6, in the Turtle Hospital. The model number of the existing unit in the Wet Lab/Observers Area was illegible during the site inspection.<br />\nQuestion:<br />\nCan the Government provide the existing unit&#39;s electrical requirements, including voltage, phase, and available electrical capacity, as well as any relevant equipment dimensions or installation requirements for the Wet Lab/Observers Area? Alternatively, should offerors base their pricing on standard electrical and physical requirements for a comparable 2-ton replacement system?<br />\nA34 - The government does not have legible nameplate data for the existing Wet Lab Observers Area unit and does not have documented voltage or phase for that circuit. Offerors shall base pricing on the 3-ton split system identified in A32 and shall verify field conditions prior to installation. The existing branch circuit may be reused where adequate to serve the proposed equipment. See A36.<br />\n<br />\n<strong>Q35</strong>&nbsp;-Turtle Barn &ndash; Dual-Head System Capacity and Configuration<br />\nThe SOW specifies a new 3-ton system with two (2) indoor heads for the Turtle Barn Aquaculture Area. During the site inspection, it was observed that the two rooms intended to receive the indoor heads are approximately 150 square feet each.<br />\nQuestion:<br />\nWould the Government permit a technical deviation from the specified 3-ton system to a 2-ton outdoor unit configured with two (2) 1-ton indoor heads, with one indoor head serving each room, provided the proposed system meets the Government&#39;s required temperature-control, performance, and operational requirements?<br />\nAdditionally, can the Government provide or confirm the preferred locations for the two indoor heads, the outdoor condenser, and the anticipated line-set routing/lengths for this new installation?<br />\nA35 - Yes. The Turtle Barn system shall be a 2-ton outdoor unit with two (2) 1-ton indoor heads, one serving each room. See A14 and A23.<br />\n<br />\n<strong>Q36&nbsp;</strong>-Electrical Infrastructure and Voltage Requirements<br />\nThe SOW requires the contractor to verify existing electrical capacity, install new circuits as required, and coordinate electrical connections with the existing building electrical service.<br />\nDuring the site inspection, the on-site POC indicated that 120V power is available for the newly installed equipment but recommended using 220V equipment so that the systems operate on a uniform voltage.<br />\nQuestion:<br />\nCan the Government confirm whether adequate 220V electrical capacity is currently available at the installation locations for all five (5) systems, including the Turtle Hospital units, Wet Lab/Observers Area unit, and Turtle Barn dual-head system?<br />\nIf 220V circuits are not currently available, should offerors include the cost of providing new dedicated circuits, breakers, wiring, conduit, and disconnects in their pricing?<br />\nA36 - The government does not have documented voltage, phase, or breaker capacity at each existing installation location. Existing branch circuits may be reused where adequate to serve the proposed equipment. If the offeror proposes equipment requiring a voltage or capacity different from the existing circuit, the cost of providing the new dedicated circuit, breaker, wiring, conduit, and disconnect is the offeror&#39;s responsibility and shall be included in the firm-fixed price. Offerors shall state the voltage of the proposed equipment in their technical approach. The sole exception is the Turtle Barn installation, for which NOAA will provide a new 208V breaker and the connection to building electrical service. See A37.<br />\n<br />\n<strong>Q37&nbsp;</strong>-Responsibility for Electrical Work<br />\nThe SOW includes requirements for electrical disconnects, circuit protection, wiring, and conduit associated with the HVAC installations.<br />\nQuestion:<br />\nFor the new installation in the Turtle Barn Aquaculture Area, as well as the replacement systems, is the contractor responsible for providing all required electrical work, including new circuits and connections to the existing electrical service, or will NOAA provide/perform any portion of the required electrical work?<br />\nA37 - For the Turtle Barn installation, NOAA will provide the new 208V breaker and connection to the building electrical service. All other electrical work is the contractor&#39;s responsibility and shall be included in the firm-fixed price, including disconnects, wiring, conduit, conductors, grounding, and any modification required to serve the replacement equipment. The contractor shall verify existing electrical capacity as required by the SOW.<br />\n<br />\n<strong>Q38&nbsp;</strong>-Disposal of Existing HVAC Equipment<br />\nThe SOW states that old HVAC appliances shall be turned over to the NOAA Project Lead for disposal. At the same time, the turn-key requirements state that the contractor shall remove and legally dispose of construction debris and excess materials.<br />\nQuestion:<br />\nPlease clarify the contractor&#39;s responsibility for the existing HVAC equipment. Specifically, will the contractor be required only to remove the equipment and transport it to a designated on-site location for NOAA disposal, or will the contractor be responsible for refrigerant recovery and off-site disposal/recycling of the HVAC equipment and associated materials in accordance with applicable EPA and environmental requirements?<br />\nA38 - The contractor shall perform refrigerant recovery in accordance with EPA regulations, remove the existing equipment, and turn it over to the NOAA project lead at a designated on-site location. Off-site disposal of the removed HVAC equipment is the government&#39;s responsibility. All other construction debris, packaging, and excess materials shall be removed and legally disposed of off site by the contractor.<br />\n<br />\n<strong>Q39&nbsp;</strong>- Coastal Corrosion Protection<br />\nThe SOW requires outdoor condensing units to have factory- or field-applied coastal corrosion protection suitable for a marine environment and applied in a manner that does not void the manufacturer&#39;s warranty.<br />\nDuring the site inspection, the on-site POC also confirmed the need for protective coating due to the coastal salt-air environment.<br />\nQuestion:<br />\nDoes NOAA require a specific manufacturer, product, certification, or coating standard for the coastal corrosion protection, or will any manufacturer-approved marine-grade corrosion protection coating be acceptable?<br />\nAdditionally, please confirm that this requirement applies to all five (5) outdoor units, including the Wet Lab/Observers Area system if a conventional split system is approved as an alternative.<br />\nA39 - No specific manufacturer, product, certification, or coating standard is required. Any factory-applied or manufacturer-approved marine-grade corrosion protection coating suitable for a coastal environment is acceptable, provided it does not void or reduce the manufacturer&#39;s warranty. Coastal corrosion protection is required on both indoor and outdoor units for all five (5) systems, including the Wet Lab Observers Area condensing unit and its matched indoor unit. This expands the Statement of Work requirement, which addressed outdoor condensing units only, and is incorporated by this amendment. See A6.<br />\n<br />\n<strong>Q40</strong>&nbsp;-Working Hours and Facility Access<br />\nThe SOW states that normal working hours shall be coordinated with the NOAA Project Lead and that work outside normal business hours may require prior written approval.<br />\nQuestion:<br />\nPlease confirm the standard working hours permitted for HVAC installation activities, particularly noisy or disruptive work, at the Wet Lab/Turtle Hospital and Turtle Barn facilities.<br />\nAre there any restrictions on weekend, evening, or after-hours work due to ongoing animal care and operations at these facilities?<br />\nA40 - Normal working hours are 8am to 5pm Central Time, Monday through Friday, excluding federal holidays. Work outside those hours requires prior written approval coordinated through the NOAA project lead. Noise-generating work in or adjacent to animal holding areas shall be scheduled in advance with the project lead.<br />\n<br />\n<strong>Q41&nbsp;</strong>-Preventive Maintenance Period of Performance<br />\nThe solicitation identifies a base year for installation/repairs followed by four (4) option years for quarterly preventive maintenance. The CLIN structure appears to extend through Option Year 4.<br />\nQuestion:<br />\nPlease confirm whether preventive maintenance is required for a total of four (4) option years following the base year, resulting in a total contract period of five (5) years (Base Year + Option Years 1&ndash;4), or whether the Government intends preventive maintenance to cover a different period.<br />\nA41 - Confirmed. Preventive maintenance is required for four (4) option years following the base year, for a maximum total contract period of five (5) years. Option years are exercised at the government&#39;s sole discretion.<br />\n<br />\n<strong>Q42</strong>&nbsp;- Submission of Alternate Technical Approach<br />\nIf the Government permits the technical alternatives described above&mdash;such as using a conventional ducted split system for the Wet Lab/Observers Area and adjusting the Turtle Barn system capacity&mdash;please clarify how these alternatives should be reflected in the quotation.<br />\nQuestion: Should offerors:<br />\nProvide pricing based on the original SOW requirements as the base proposal and separately provide pricing for the proposed alternate technical approach; or<br />\nSubmit pricing based solely on the approved alternate approach, accompanied by a technical narrative and justification?<br />\nPlease also confirm whether any proposed deviation should be specifically identified as an exception or alternate in the technical proposal.<br />\nA42 - Offerors shall quote to the corrected equipment configuration in A14, which is incorporated by this amendment and supersedes the equipment descriptions in the Statement of Work, the CLIN 0001 description, and the combined synopsis. Separate alternate pricing is not required, and offerors should not submit pricing to the original Statement of Work descriptions. Any remaining proposed deviation from the corrected requirement shall be clearly identified as an exception in the technical approach.&nbsp;<br />\n<br />\nAbout preventive maintenance&nbsp;<br />\n<strong>Q43</strong>&nbsp;-Preventive Maintenance &ndash; Base Year, Option Years, and Payment: Please confirm whether quarterly preventive maintenance is required during the Base Year or begins with Option Year 1, and whether the preventive maintenance will be paid per service visit or at a fixed annual amount under the applicable CLIN.<br />\nA43 - Quarterly preventive maintenance is required during the base year. Per the Statement of Work, preventive maintenance begins following final acceptance of the initial installation and is performed quarterly through the end of the base period, and continues through each successive exercised option year. Each option year includes four (4) quarterly visits as stated in the applicable CLIN.<br />\nBecause the base period runs one year from date of award and initial installation is not due until 12/31/2026, offerors shall price three (3) quarterly preventive maintenance visits in the base year.<br />\nPreventive maintenance shall be priced as a fixed annual amount under the applicable CLIN. Invoicing shall occur in arrears following each completed quarterly visit, in equal installments of that annual amount. All visits shall be coordinated with the Galveston Facility Manager at least five (5) business days in advance and performed during normal business hours unless otherwise approved.<br />\n<br />\n<strong>QUESTIONS AND ANSWER PERIOD IS NOW CLOSED FOR THIS SOLICITATION</strong></p>","origin":"detail"},"contacts":[{"name":"Suzanne Johnston","role":"primary","email":"Suzanne.Johnston@noaa.gov"}],"place_of_performance":{"zip":"77551","city":{"code":"28068","name":"Galveston"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"64106","city":"KANSAS CITY","state":"MO","country":"USA"},"naics_codes":["238220"],"award":null,"attachments":[{"resource_id":"ec7545307c504930a3746f01875962ad","name":"Solicitation_1333MF26Q0110_FD-26-547.pdf","kind":"file","mime_type":".pdf","size_bytes":604175,"posted_at":"2026-09-04T23:29:21.359Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ec7545307c504930a3746f01875962ad/download","mirrored":false}],"awards":[],"related":[{"key":"1333MF26Q0111","latest_notice_id":"af5c37332d1b4a919b90f54eda7b68ca","title":"J--26-515 REKEYSEFSC GALVESTON CAMPUS","solicitation_number":"1333MF26Q0111","notice_type":"k","first_type":"k","first_posted":"2026-09-08","last_posted":"2026-09-14","notices":4,"due_at":"2026-09-16T20:00:00Z","due_date":"2026-09-16","closes_at":"2026-09-16T20:00:00Z","awardable":true,"open":true,"dept_key":"d-013","dept_name":"COMMERCE, DEPARTMENT OF","sub_key":"s-1330","sub_name":"NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION","office_key":"o-1333MF","office_name":"DEPT OF COMMERCE NOAA","naics":"561622","psc":"J053","set_aside":"SBA","state":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z"},{"key":"1333MF26Q0116","latest_notice_id":"f72bcf2dd65a4798b646f4d41e5a8f6c","title":"26-498 vessel services, repair, and updates","solicitation_number":"1333MF26Q0116","notice_type":"k","first_type":"k","first_posted":"2026-09-10","last_posted":"2026-09-10","notices":1,"due_at":"2026-09-16T20:00:00Z","due_date":"2026-09-16","closes_at":"2026-09-16T20:00:00Z","awardable":true,"open":true,"dept_key":"d-013","dept_name":"COMMERCE, DEPARTMENT OF","sub_key":"s-1330","sub_name":"NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION","office_key":"o-1333MF","office_name":"DEPT OF COMMERCE NOAA","naics":"336612","psc":"J019","set_aside":"SBA","state":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z"},{"key":"1333MF26Q0115","latest_notice_id":"1352522764ad49f5a45f3799671b458f","title":"PR GATHERING ESSENTIAL LIFE HISTORY INFORMATION","solicitation_number":"1333MF26Q0115","notice_type":"k","first_type":"k","first_posted":"2026-09-10","last_posted":"2026-09-10","notices":1,"due_at":"2026-09-17T17:00:00Z","due_date":"2026-09-17","closes_at":"2026-09-17T17:00:00Z","awardable":true,"open":true,"dept_key":"d-013","dept_name":"COMMERCE, DEPARTMENT OF","sub_key":"s-1330","sub_name":"NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION","office_key":"o-1333MF","office_name":"DEPT OF COMMERCE NOAA","naics":"541690","psc":"B516","set_aside":"SBA","state":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z"},{"key":"1333MF26Q0117","latest_notice_id":"7893c31b6cca4956b02f42feeb85b13e","title":"26-492 Manta Ray Tagging and Biological Sampling","solicitation_number":"1333MF26Q0117","notice_type":"k","first_type":"k","first_posted":"2026-09-11","last_posted":"2026-09-11","notices":1,"due_at":"2026-09-17T20:00:00Z","due_date":"2026-09-17","closes_at":"2026-09-17T20:00:00Z","awardable":true,"open":true,"dept_key":"d-013","dept_name":"COMMERCE, DEPARTMENT OF","sub_key":"s-1330","sub_name":"NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION","office_key":"o-1333MF","office_name":"DEPT OF COMMERCE NOAA","naics":"541990","psc":"B529","set_aside":null,"state":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z"},{"key":"1333MF26Q0099","latest_notice_id":"2658106fb7674ef6b83e1561e80f069a","title":"R--26-482 SEFSC Deep Coral Reef Monitoring Program Su","solicitation_number":"1333MF26Q0099","notice_type":"k","first_type":"k","first_posted":"2026-09-03","last_posted":"2026-09-14","notices":2,"due_at":"2026-09-18T20:00:00Z","due_date":"2026-09-18","closes_at":"2026-09-18T20:00:00Z","awardable":true,"open":true,"dept_key":"d-013","dept_name":"COMMERCE, DEPARTMENT OF","sub_key":"s-1330","sub_name":"NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION","office_key":"o-1333MF","office_name":"DEPT OF COMMERCE NOAA","naics":"541990","psc":"R499","set_aside":"SBA","state":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z"}]}