{"canonical":"https://abierto.us/opportunities/12970224q0034","key":"12970224Q0034","url":"https://abierto.us/opportunities/12970224q0034","title":"QL Water Line","solicitation_number":"12970224Q0034","notice_type":"o","open":false,"response_deadline":"2024-07-01T23:00:00Z","first_posted":"2024-06-06","last_posted":"2024-06-28","department":"AGRICULTURE, DEPARTMENT OF","subagency":"FOREST SERVICE","office":"USDA FOREST SERVICE-SPOC SW","naics":"237110","psc":"Y1ND","set_aside":"SBA","place_state":"CA","place_county":"06063","place_county_name":"Plumas County","place_city":"0659080","place_city_name":"Quincy","winner":"MICHAEL KIRACK CONSTRUCTION, INC","award_amount":null,"publications":[{"notice_id":"762a17d672204b488f7869a97d923a84","title":"QL Water Line","solicitation_number":"12970224Q0034","notice_type":"o","base_type":"o","posted":"2024-06-06","posted_at":null,"due_at":"2024-07-01T23:00:00Z","due_date":"2024-07-01","cancelled":null,"archived":null,"archive_date":"2024-07-16","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/762a17d672204b488f7869a97d923a84/view","enriched":false,"history":[]},{"notice_id":"a9a5c2a421fb46bd91f14714240bd7dd","title":"QL Water Line","solicitation_number":"12970224Q0034","notice_type":"o","base_type":"o","posted":"2024-06-12","posted_at":null,"due_at":"2024-07-01T23:00:00Z","due_date":"2024-07-01","cancelled":null,"archived":null,"archive_date":"2024-07-16","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a9a5c2a421fb46bd91f14714240bd7dd/view","enriched":false,"history":[]},{"notice_id":"f0649ef016fa492684aee6863d77c5c0","title":"QL Water Line","solicitation_number":"12970224Q0034","notice_type":"o","base_type":"o","posted":"2024-06-28","posted_at":null,"due_at":"2024-07-01T23:00:00Z","due_date":"2024-07-01","cancelled":null,"archived":null,"archive_date":"2024-07-16","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f0649ef016fa492684aee6863d77c5c0/view","enriched":false,"history":[]}],"latest_notice_id":"f0649ef016fa492684aee6863d77c5c0","first_type":"o","notices":[{"dates":{"posted":"2024-06-06","response_deadline":{"raw":"2024-07-01T17:00:00-06:00","utc":"2024-07-01T23:00:00Z","date":"2024-07-01","time":"17:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/762a17d672204b488f7869a97d923a84/view"},"naics":{"codes":["237110"],"primary":"237110"},"title":"QL Water Line","agency":{"office":{"code":"129702","name":"USDA FOREST SERVICE-SPOC SW"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"20250","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-07-16","archive_type":"auto15"},"contacts":[{"name":"Ernest Hernandez","role":"primary","email":"ernest.hernandez@usda.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"762a17d672204b488f7869a97d923a84","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"9aff9c547d764ce21507bd935e7be3e8206edcb7f6e85ee0103a69e28416e33c","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The goal of this project is to abandon the existing Queen Lily Campground water source and install a new distribution system with all components tied into the existing North Fork Campground Water System. This is to be accomplished by demolishing the existing hydrants and drain infrastructure, filling in existing valve boxes, capping the existing water distribution source, and installing new distribution line infrastructure. It is included as an option item to remove the existing Queen Lily water source above ground distribution lines.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"12970224Q0034","place_of_performance":{"zip":"95971","city":{"name":"Quincy"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1ND"},{"dates":{"posted":"2024-06-12","response_deadline":{"raw":"2024-07-01T17:00:00-06:00","utc":"2024-07-01T23:00:00Z","date":"2024-07-01","time":"17:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a9a5c2a421fb46bd91f14714240bd7dd/view"},"naics":{"codes":["237110"],"primary":"237110"},"title":"QL Water Line","agency":{"office":{"code":"129702","name":"USDA FOREST SERVICE-SPOC SW"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"20250","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-07-16","archive_type":"auto15"},"contacts":[{"name":"Ernest Hernandez","role":"primary","email":"ernest.hernandez@usda.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"a9a5c2a421fb46bd91f14714240bd7dd","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"8dfe51f5c0d25a54e4efd372c11e571678b992ec6d4561eff4a8b86547c273f7","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The goal of this project is to abandon the existing Queen Lily Campground water source and install a new distribution system with all components tied into the existing North Fork Campground Water System. This is to be accomplished by demolishing the existing hydrants and drain infrastructure, filling in existing valve boxes, capping the existing water distribution source, and installing new distribution line infrastructure. It is included as an option item to remove the existing Queen Lily water source above ground distribution lines.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"12970224Q0034","place_of_performance":{"zip":"95971","city":{"name":"Quincy"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1ND"},{"dates":{"posted":"2024-06-28","response_deadline":{"raw":"2024-07-01T17:00:00-06:00","utc":"2024-07-01T23:00:00Z","date":"2024-07-01","time":"17:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f0649ef016fa492684aee6863d77c5c0/view"},"naics":{"codes":["237110"],"primary":"237110"},"title":"QL Water Line","agency":{"office":{"code":"129702","name":"USDA FOREST SERVICE-SPOC SW"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"20250","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-07-16","archive_type":"auto15"},"contacts":[{"name":"Ernest Hernandez","role":"primary","email":"ernest.hernandez@usda.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"f0649ef016fa492684aee6863d77c5c0","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"c2648afaee8b88ad9cee9dccccba827c273f572cfc8c279f8dbeb62ed1e0eea8","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The goal of this project is to abandon the existing Queen Lily Campground water source and install a new distribution system with all components tied into the existing North Fork Campground Water System. This is to be accomplished by demolishing the existing hydrants and drain infrastructure, filling in existing valve boxes, capping the existing water distribution source, and installing new distribution line infrastructure. It is included as an option item to remove the existing Queen Lily water source above ground distribution lines.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"12970224Q0034","place_of_performance":{"zip":"95971","city":{"name":"Quincy"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1ND"}],"due_at":"2024-07-01T23:00:00Z","due_date":"2024-07-01","closes_at":"2024-07-01T23:00:00Z","awardable":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-129702","office_name":"USDA FOREST SERVICE-SPOC SW","state":"CA","county":"06063","county_name":"Plumas County","city":"0659080","city_name":"Quincy","country":"USA","winner_key":"FQ6KHVEA2VL9","amount":null,"linked_awards":3,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"f0649ef016fa492684aee6863d77c5c0","description":{"text":"The goal of this project is to abandon the existing Queen Lily Campground water source and install a new distribution system with all components tied into the existing North Fork Campground Water System. This is to be accomplished by demolishing the existing hydrants and drain infrastructure, filling in existing valve boxes, capping the existing water distribution source, and installing new distribution line infrastructure. It is included as an option item to remove the existing Queen Lily water source above ground distribution lines.","html":null,"origin":"extract"},"contacts":[{"name":"Ernest Hernandez","role":"primary","email":"ernest.hernandez@usda.gov"}],"place_of_performance":{"zip":"95971","city":{"name":"Quincy"},"state":{"code":"CA"},"country":{"code":"USA"}},"office_address":{"zip":"20250","city":"Washington","state":"DC","country":"USA"},"naics_codes":["237110"],"award":null,"attachments":[],"awards":[{"award_key":"CONT_AWD_12970224C0033_12C2_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_12970224C0033_12C2_-NONE-_-NONE-/","piid":"12970224C0033","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"FQ6KHVEA2VL9","recipient_name":"MICHAEL KIRACK CONSTRUCTION, INC","recipient_uei":"FQ6KHVEA2VL9","recipient_cage":"6VS00","recipient_city":"SUSANVILLE","recipient_state":"CA","sub_name":"Forest Service","office_name":"USDA FOREST SERVICE-SPOC SW","office_key":"o-129702","first_action_date":"2024-08-22","last_action_date":"2025-03-11","actions":3,"obligated":"326791.00","current_total_value":"326791.00","potential_total_value":"326791.00","naics":"237110","psc":"Y1ND","extent_competed":"COMPETED UNDER SAP","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":7,"description":"THE GOAL OF THIS PROJECT IS TO ABANDON THE EXISTING QUEEN LILY CAMPGROUND WATER SOURCE AND INSTALL A NEW DISTRIBUTION SYSTEM WITH ALL COMPONENTS TIED INTO THE EXISTING NORTH FORK CAMPGROUND WATER SYSTEM.","method":"solicitation","confidence":"high","evidence":["solicitation number 12970224Q0034 equals the FPDS solicitation identifier","same awarding office 129702"],"opportunity_key":null,"opportunity_title":null}],"related":[]}