{"canonical":"https://abierto.us/opportunities/1282b12r0034","key":"1282B12R0034","url":"https://abierto.us/opportunities/1282b12r0034","title":"Boundary Dagger Road Project in the Salmon-Challis NF","solicitation_number":"1282B12R0034","notice_type":"o","open":false,"response_deadline":"2024-06-14T18:00:00Z","first_posted":"2024-05-08","last_posted":"2024-08-20","department":"AGRICULTURE, DEPARTMENT OF","subagency":"FOREST SERVICE","office":"Salmon and Challis National Forests","naics":"237310","psc":"Z1LB","set_aside":"SBA","place_state":"ID","place_county":"16037","place_county_name":"Custer County","place_city":"1676780","place_city_name":"Stanley","winner":null,"award_amount":null,"publications":[{"notice_id":"ff7d88ab055347688b335ec5f09d93e2","title":"Boundary Dagger Road Project in the Salmon-Challis NF","solicitation_number":"1282B12R0034","notice_type":"o","base_type":"o","posted":"2024-05-08","posted_at":null,"due_at":"2024-06-14T18:00:00Z","due_date":"2024-06-14","cancelled":null,"archived":null,"archive_date":"2024-06-29","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ff7d88ab055347688b335ec5f09d93e2/view","enriched":false,"history":[]},{"notice_id":"ea7e2d3961aa45e5914a782e4d8898c8","title":"Boundary Dagger Road Project in the Salmon-Challis NF","solicitation_number":"1282B12R0034","notice_type":"o","base_type":"o","posted":"2024-05-14","posted_at":null,"due_at":"2024-06-14T18:00:00Z","due_date":"2024-06-14","cancelled":null,"archived":null,"archive_date":"2024-06-29","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ea7e2d3961aa45e5914a782e4d8898c8/view","enriched":false,"history":[]},{"notice_id":"b5d4995f865e45d1acba0f8e11660d18","title":"Boundary Dagger Road Project in the Salmon-Challis NF","solicitation_number":"1282B12R0034","notice_type":"o","base_type":"o","posted":"2024-05-23","posted_at":null,"due_at":"2024-06-14T18:00:00Z","due_date":"2024-06-14","cancelled":null,"archived":null,"archive_date":"2024-06-29","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b5d4995f865e45d1acba0f8e11660d18/view","enriched":false,"history":[]},{"notice_id":"2fbeab13030a47a9bc192de3034e12cb","title":"Boundary Dagger Road Project in the Salmon-Challis NF","solicitation_number":"1282B12R0034","notice_type":"o","base_type":"o","posted":"2024-06-05","posted_at":null,"due_at":"2024-06-14T18:00:00Z","due_date":"2024-06-14","cancelled":null,"archived":null,"archive_date":"2024-06-29","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2fbeab13030a47a9bc192de3034e12cb/view","enriched":false,"history":[]},{"notice_id":"0c1ff72ae0524b39b5ded15b9220cd04","title":"Boundary Dagger Road Project in the Salmon-Challis NF","solicitation_number":"1282B12R0034","notice_type":"o","base_type":"o","posted":"2024-08-20","posted_at":null,"due_at":"2024-06-14T18:00:00Z","due_date":"2024-06-14","cancelled":null,"archived":null,"archive_date":"2024-06-29","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/0c1ff72ae0524b39b5ded15b9220cd04/view","enriched":false,"history":[]}],"latest_notice_id":"0c1ff72ae0524b39b5ded15b9220cd04","first_type":"o","notices":[{"dates":{"posted":"2024-05-08","response_deadline":{"raw":"2024-06-14T13:00:00-05:00","utc":"2024-06-14T18:00:00Z","date":"2024-06-14","time":"13:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ff7d88ab055347688b335ec5f09d93e2/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Boundary Dagger Road Project in the Salmon-Challis NF","agency":{"office":{"code":"1202L3","name":"Salmon and Challis National Forests"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"83467","city":"SALMON","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-06-29","archive_type":"auto15"},"contacts":[{"name":"Erick Plamann","role":"primary","email":"erick.plamann@usda.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"ff7d88ab055347688b335ec5f09d93e2","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"df3e421e80c7c71181c1987ca8f8cc589fd3200f5f01458b9aa8c7d31b4fd16b","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Crush and Stockpile Aggregate includes development and use of pits, either government source or commercial source, to the specified gradation, including adding approximately 2% bentonite by weight to achieve desired properties. Actual % will be based on contractor’s initial materials testing. This includes clearing and grubbing, removing overburden, mining, crushing, mixing aggregate with bentonite using a pugmill, weighing, creating stockpiles (including any loading or hauling to create stockpiles), testing, and final site reclamation including placing overburden, waste materials, mulching, and seeding. Perform the work in accordance with MSHA 30 CFR, part 56. Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-07 and attached road logs). *PLEASE SEE ATTACHMENTS FOR SOLICITATION ALONG WITH THE ATTACHMENTS*","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"1282B12R0034","place_of_performance":{"zip":"83278","city":{"name":"Stanley"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"Z1LB"},{"dates":{"posted":"2024-05-14","response_deadline":{"raw":"2024-06-14T13:00:00-05:00","utc":"2024-06-14T18:00:00Z","date":"2024-06-14","time":"13:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ea7e2d3961aa45e5914a782e4d8898c8/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Boundary Dagger Road Project in the Salmon-Challis NF","agency":{"office":{"code":"1202L3","name":"Salmon and Challis National Forests"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"83467","city":"SALMON","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-06-29","archive_type":"auto15"},"contacts":[{"name":"Erick Plamann","role":"primary","email":"erick.plamann@usda.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"ea7e2d3961aa45e5914a782e4d8898c8","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"fd11be388693e613163b25dd1c1323531a6de3076c199f486ff132bba27ce65e","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Crush and Stockpile Aggregate includes development and use of pits, either government source or commercial source, to the specified gradation, including adding approximately 2% bentonite by weight to achieve desired properties. Actual % will be based on contractor’s initial materials testing. This includes clearing and grubbing, removing overburden, mining, crushing, mixing aggregate with bentonite using a pugmill, weighing, creating stockpiles (including any loading or hauling to create stockpiles), testing, and final site reclamation including placing overburden, waste materials, mulching, and seeding. Perform the work in accordance with MSHA 30 CFR, part 56. Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-07 and attached road logs). * Site visit is scheduled for May 28, 2024 at 11:00 AM Mountain Time. P.O.C. for this is Sharon Kosmalski at sharon.kosmalski@usda.gov.* *PLEASE SEE ATTACHMENTS FOR SOLICITATION ALONG WITH THE ATTACHMENTS*","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"1282B12R0034","place_of_performance":{"zip":"83278","city":{"name":"Stanley"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"Z1LB"},{"dates":{"posted":"2024-05-23","response_deadline":{"raw":"2024-06-14T13:00:00-05:00","utc":"2024-06-14T18:00:00Z","date":"2024-06-14","time":"13:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b5d4995f865e45d1acba0f8e11660d18/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Boundary Dagger Road Project in the Salmon-Challis NF","agency":{"office":{"code":"1202L3","name":"Salmon and Challis National Forests"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"83467","city":"SALMON","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-06-29","archive_type":"auto15"},"contacts":[{"name":"Erick Plamann","role":"primary","email":"erick.plamann@usda.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"b5d4995f865e45d1acba0f8e11660d18","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"4bb5737c7b2e8dc3f606ff826174f718ffed08cd33bc07bafc525b64135e6253","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Crush and Stockpile Aggregate includes development and use of pits, either government source or commercial source, to the specified gradation, including adding approximately 2% bentonite by weight to achieve desired properties. Actual % will be based on contractor’s initial materials testing. This includes clearing and grubbing, removing overburden, mining, crushing, mixing aggregate with bentonite using a pugmill, weighing, creating stockpiles (including any loading or hauling to create stockpiles), testing, and final site reclamation including placing overburden, waste materials, mulching, and seeding. Perform the work in accordance with MSHA 30 CFR, part 56. Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-07 and attached road logs). * Site visit is scheduled for May 28, 2024 at 11:00 AM Mountain Time. P.O.C. for this is Sharon Kosmalski at sharon.kosmalski@usda.gov.* *PLEASE SEE ATTACHMENTS FOR SOLICITATION ALONG WITH THE ATTACHMENTS* Amendment 0001 added","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"1282B12R0034","place_of_performance":{"zip":"83278","city":{"name":"Stanley"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"Z1LB"},{"dates":{"posted":"2024-06-05","response_deadline":{"raw":"2024-06-14T13:00:00-05:00","utc":"2024-06-14T18:00:00Z","date":"2024-06-14","time":"13:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2fbeab13030a47a9bc192de3034e12cb/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Boundary Dagger Road Project in the Salmon-Challis NF","agency":{"office":{"code":"1202L3","name":"Salmon and Challis National Forests"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"83467","city":"SALMON","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-06-29","archive_type":"auto15"},"contacts":[{"name":"Erick Plamann","role":"primary","email":"erick.plamann@usda.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"2fbeab13030a47a9bc192de3034e12cb","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"19e47cb7bfaa28b716e56163641fdcf1479a223798ae896585b8cb9192eef28e","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Crush and Stockpile Aggregate includes development and use of pits, either government source or commercial source, to the specified gradation, including adding approximately 2% bentonite by weight to achieve desired properties. Actual % will be based on contractor’s initial materials testing. This includes clearing and grubbing, removing overburden, mining, crushing, mixing aggregate with bentonite using a pugmill, weighing, creating stockpiles (including any loading or hauling to create stockpiles), testing, and final site reclamation including placing overburden, waste materials, mulching, and seeding. Perform the work in accordance with MSHA 30 CFR, part 56. Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-07 and attached road logs). * Site visit is scheduled for May 28, 2024 at 11:00 AM Mountain Time. P.O.C. for this is Sharon Kosmalski at sharon.kosmalski@usda.gov.* *PLEASE SEE ATTACHMENTS FOR SOLICITATION ALONG WITH THE ATTACHMENTS* Amendment 0001 added Amendment 0002 added- Please see attachments for Q&A's","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"1282B12R0034","place_of_performance":{"zip":"83278","city":{"name":"Stanley"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"Z1LB"},{"dates":{"posted":"2024-08-20","response_deadline":{"raw":"2024-06-14T13:00:00-05:00","utc":"2024-06-14T18:00:00Z","date":"2024-06-14","time":"13:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/0c1ff72ae0524b39b5ded15b9220cd04/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Boundary Dagger Road Project in the Salmon-Challis NF","agency":{"office":{"code":"1202L3","name":"Salmon and Challis National Forests"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"83467","city":"SALMON","state":"ID","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-06-29","archive_type":"auto15"},"contacts":[{"name":"Erick Plamann","role":"primary","email":"erick.plamann@usda.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"0c1ff72ae0524b39b5ded15b9220cd04","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"82aeb7e687cfc875abbfa84db414c814a5f15bde2da1d3d335c7f56163e5d89c","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Crush and Stockpile Aggregate includes development and use of pits, either government source or commercial source, to the specified gradation, including adding approximately 2% bentonite by weight to achieve desired properties. Actual % will be based on contractor’s initial materials testing. This includes clearing and grubbing, removing overburden, mining, crushing, mixing aggregate with bentonite using a pugmill, weighing, creating stockpiles (including any loading or hauling to create stockpiles), testing, and final site reclamation including placing overburden, waste materials, mulching, and seeding. Perform the work in accordance with MSHA 30 CFR, part 56. Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-07 and attached road logs). * Site visit is scheduled for May 28, 2024 at 11:00 AM Mountain Time. P.O.C. for this is Sharon Kosmalski at sharon.kosmalski@usda.gov.* *PLEASE SEE ATTACHMENTS FOR SOLICITATION ALONG WITH THE ATTACHMENTS* Amendment 0001 added Amendment 0002 added- Please see attachments for Q&A's","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"1282B12R0034","place_of_performance":{"zip":"83278","city":{"name":"Stanley"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"Z1LB"}],"due_at":"2024-06-14T18:00:00Z","due_date":"2024-06-14","closes_at":"2024-06-14T18:00:00Z","awardable":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-1202L3","office_name":"Salmon and Challis National Forests","state":"ID","county":"16037","county_name":"Custer County","city":"1676780","city_name":"Stanley","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"0c1ff72ae0524b39b5ded15b9220cd04","description":{"text":"Crush and Stockpile Aggregate includes development and use of pits, either government source or commercial source, to the specified gradation, including adding approximately 2% bentonite by weight to achieve desired properties. Actual % will be based on contractor’s initial materials testing. This includes clearing and grubbing, removing overburden, mining, crushing, mixing aggregate with bentonite using a pugmill, weighing, creating stockpiles (including any loading or hauling to create stockpiles), testing, and final site reclamation including placing overburden, waste materials, mulching, and seeding. Perform the work in accordance with MSHA 30 CFR, part 56. Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-07 and attached road logs). * Site visit is scheduled for May 28, 2024 at 11:00 AM Mountain Time. P.O.C. for this is Sharon Kosmalski at sharon.kosmalski@usda.gov.* *PLEASE SEE ATTACHMENTS FOR SOLICITATION ALONG WITH THE ATTACHMENTS* Amendment 0001 added Amendment 0002 added- Please see attachments for Q&A's","html":null,"origin":"extract"},"contacts":[{"name":"Erick Plamann","role":"primary","email":"erick.plamann@usda.gov"}],"place_of_performance":{"zip":"83278","city":{"name":"Stanley"},"state":{"code":"ID"},"country":{"code":"USA"}},"office_address":{"zip":"83467","city":"SALMON","state":"ID","country":"USA"},"naics_codes":["237310"],"award":null,"attachments":[],"awards":[],"related":[]}