{"canonical":"https://abierto.us/opportunities/1282b124q0054","key":"1282B124Q0054","url":"https://abierto.us/opportunities/1282b124q0054","title":"Lime Creek Replacement Trail","solicitation_number":"1282B124Q0054","notice_type":"o","open":false,"response_deadline":"2024-08-16T21:00:00Z","first_posted":"2024-07-17","last_posted":"2024-08-06","department":"AGRICULTURE, DEPARTMENT OF","subagency":"FOREST SERVICE","office":"USDA FOREST SERVICE-SPOC IM","naics":"237310","psc":"Z2LB","set_aside":"SBA","place_state":"ID","place_county":"16001","place_county_name":"Ada County","place_city":"1608830","place_city_name":"Boise City","winner":null,"award_amount":null,"publications":[{"notice_id":"3ab9779ca113480792fc25bcdc546d11","title":"Lime Creek Replacement Trail","solicitation_number":"1282B124Q0054","notice_type":"o","base_type":"o","posted":"2024-07-17","posted_at":null,"due_at":"2024-08-09T17:00:00Z","due_date":"2024-08-09","cancelled":null,"archived":null,"archive_date":"2024-08-24","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3ab9779ca113480792fc25bcdc546d11/view","enriched":false,"history":[]},{"notice_id":"16c37c5662074cdb8ea4c82ef1217d90","title":"Lime Creek Replacement Trail","solicitation_number":"1282B124Q0054","notice_type":"o","base_type":"o","posted":"2024-07-18","posted_at":null,"due_at":"2024-08-09T17:00:00Z","due_date":"2024-08-09","cancelled":null,"archived":null,"archive_date":"2024-08-24","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/16c37c5662074cdb8ea4c82ef1217d90/view","enriched":false,"history":[]},{"notice_id":"004386409adf4e548a47ba2d5eb8254a","title":"Lime Creek Replacement Trail","solicitation_number":"1282B124Q0054","notice_type":"o","base_type":"o","posted":"2024-07-22","posted_at":null,"due_at":"2024-08-09T17:00:00Z","due_date":"2024-08-09","cancelled":null,"archived":null,"archive_date":"2024-08-24","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/004386409adf4e548a47ba2d5eb8254a/view","enriched":false,"history":[]},{"notice_id":"a5881e4214fd4c6bad7743d7d83a8f7e","title":"Lime Creek Replacement Trail","solicitation_number":"1282B124Q0054","notice_type":"o","base_type":"o","posted":"2024-08-06","posted_at":null,"due_at":"2024-08-16T21:00:00Z","due_date":"2024-08-16","cancelled":null,"archived":null,"archive_date":"2024-08-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a5881e4214fd4c6bad7743d7d83a8f7e/view","enriched":false,"history":[]}],"latest_notice_id":"a5881e4214fd4c6bad7743d7d83a8f7e","first_type":"o","notices":[{"dates":{"posted":"2024-07-17","response_deadline":{"raw":"2024-08-09T12:00:00-05:00","utc":"2024-08-09T17:00:00Z","date":"2024-08-09","time":"12:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3ab9779ca113480792fc25bcdc546d11/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Lime Creek Replacement Trail","agency":{"office":{"code":"1282B1","name":"USDA FOREST SERVICE-SPOC IM"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202500001","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-08-24","archive_type":"auto15"},"contacts":[{"name":"Crystal Amos","role":"primary","email":"crystal.amos@usda.gov","phone":"6184678347"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"3ab9779ca113480792fc25bcdc546d11","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"8c9c5c9cc58aeb5ca107827dbe38a8b00fcee43c1bc5a8178c4296885a67fec6","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The Government intends to issue one FFP award for construction services, Lime Creek Replacement Trail, IAW with SOW, Specs & all attachments. The work shall consist of but is not limited to mobilization, soil erosion & pollution control, removal and disposal of an existing unserviceable trail bridge, rip rap armoring of new bridge abutments using local in-situ rock, design, purchase, transport, and installation of a prefabricated steel trail bridge, design, purchase, transport, and installation of new substructure (pre-cast concrete grade beams), construction of approach embankments, and general cleanup.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"1282B124Q0054","place_of_performance":{"zip":"83709","city":{"name":"Boise"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"Z2LB"},{"dates":{"posted":"2024-07-18","response_deadline":{"raw":"2024-08-09T12:00:00-05:00","utc":"2024-08-09T17:00:00Z","date":"2024-08-09","time":"12:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/16c37c5662074cdb8ea4c82ef1217d90/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Lime Creek Replacement Trail","agency":{"office":{"code":"1282B1","name":"USDA FOREST SERVICE-SPOC IM"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202500001","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-08-24","archive_type":"auto15"},"contacts":[{"name":"Crystal Amos","role":"primary","email":"crystal.amos@usda.gov","phone":"6184678347"},{"name":"trinika mason","role":"secondary","email":"trinika.mason@usda.gov","phone":"6185816970"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"16c37c5662074cdb8ea4c82ef1217d90","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"bf47e9025c547a060aff05cafaf12ea7375bc17d40217e767cda2eaa33b9a948","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The Government intends to issue one FFP award for construction services, Lime Creek Replacement Trail, IAW with SOW, Specs & all attachments. The work shall consist of but is not limited to mobilization, soil erosion & pollution control, removal and disposal of an existing unserviceable trail bridge, rip rap armoring of new bridge abutments using local in-situ rock, design, purchase, transport, and installation of a prefabricated steel trail bridge, design, purchase, transport, and installation of new substructure (pre-cast concrete grade beams), construction of approach embankments, and general cleanup.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"1282B124Q0054","place_of_performance":{"zip":"83709","city":{"name":"Boise"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"Z2LB"},{"dates":{"posted":"2024-07-22","response_deadline":{"raw":"2024-08-09T12:00:00-05:00","utc":"2024-08-09T17:00:00Z","date":"2024-08-09","time":"12:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/004386409adf4e548a47ba2d5eb8254a/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Lime Creek Replacement Trail","agency":{"office":{"code":"1282B1","name":"USDA FOREST SERVICE-SPOC IM"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202500001","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-08-24","archive_type":"auto15"},"contacts":[{"name":"Crystal Amos","role":"primary","email":"crystal.amos@usda.gov","phone":"6184678347"},{"name":"trinika mason","role":"secondary","email":"trinika.mason@usda.gov","phone":"6185816970"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"004386409adf4e548a47ba2d5eb8254a","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"f8ba675b0aaa1047f3ce5f1880915ca9c6265d1e63fb73b5eabbfc5678b71387","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The Government intends to issue one FFP award for construction services, Lime Creek Replacement Trail, IAW with SOW, Specs & all attachments. The work shall consist of but is not limited to mobilization, soil erosion & pollution control, removal and disposal of an existing unserviceable trail bridge, rip rap armoring of new bridge abutments using local in-situ rock, design, purchase, transport, and installation of a prefabricated steel trail bridge, design, purchase, transport, and installation of new substructure (pre-cast concrete grade beams), construction of approach embankments, and general cleanup.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"1282B124Q0054","place_of_performance":{"zip":"83709","city":{"name":"Boise"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"Z2LB"},{"dates":{"posted":"2024-08-06","response_deadline":{"raw":"2024-08-16T16:00:00-05:00","utc":"2024-08-16T21:00:00Z","date":"2024-08-16","time":"16:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a5881e4214fd4c6bad7743d7d83a8f7e/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"Lime Creek Replacement Trail","agency":{"office":{"code":"1282B1","name":"USDA FOREST SERVICE-SPOC IM"},"subtier":{"code":"12C2","name":"FOREST SERVICE"},"department":{"code":"012","name":"AGRICULTURE, DEPARTMENT OF"},"office_address":{"zip":"202500001","city":"Washington","state":"DC","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-08-31","archive_type":"auto15"},"contacts":[{"name":"Crystal Amos","role":"primary","email":"crystal.amos@usda.gov","phone":"6184678347"},{"name":"trinika mason","role":"secondary","email":"trinika.mason@usda.gov","phone":"6185816970"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"a5881e4214fd4c6bad7743d7d83a8f7e","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"595a994443cbc5a048a8a8e6667a0b899f86a0059f2096e276ac453443987624","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The Government intends to issue one FFP award for construction services, Lime Creek Replacement Trail, IAW with SOW, Specs & all attachments. The work shall consist of but is not limited to mobilization, soil erosion & pollution control, removal and disposal of an existing unserviceable trail bridge, rip rap armoring of new bridge abutments using local in-situ rock, design, purchase, transport, and installation of a prefabricated steel trail bridge, design, purchase, transport, and installation of new substructure (pre-cast concrete grade beams), construction of approach embankments, and general cleanup.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"1282B124Q0054","place_of_performance":{"zip":"83709","city":{"name":"Boise"},"state":{"code":"ID"},"country":{"code":"USA"}},"product_service_code":"Z2LB"}],"due_at":"2024-08-16T21:00:00Z","due_date":"2024-08-16","closes_at":"2024-08-16T21:00:00Z","awardable":true,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-1282B1","office_name":"USDA FOREST SERVICE-SPOC IM","state":"ID","county":"16001","county_name":"Ada County","city":"1608830","city_name":"Boise City","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"a5881e4214fd4c6bad7743d7d83a8f7e","description":{"text":"The Government intends to issue one FFP award for construction services, Lime Creek Replacement Trail, IAW with SOW, Specs & all attachments. The work shall consist of but is not limited to mobilization, soil erosion & pollution control, removal and disposal of an existing unserviceable trail bridge, rip rap armoring of new bridge abutments using local in-situ rock, design, purchase, transport, and installation of a prefabricated steel trail bridge, design, purchase, transport, and installation of new substructure (pre-cast concrete grade beams), construction of approach embankments, and general cleanup.","html":null,"origin":"extract"},"contacts":[{"name":"Crystal Amos","role":"primary","email":"crystal.amos@usda.gov","phone":"6184678347"},{"name":"trinika mason","role":"secondary","email":"trinika.mason@usda.gov","phone":"6185816970"}],"place_of_performance":{"zip":"83709","city":{"name":"Boise"},"state":{"code":"ID"},"country":{"code":"USA"}},"office_address":{"zip":"202500001","city":"Washington","state":"DC","country":"USA"},"naics_codes":["237310"],"award":null,"attachments":[],"awards":[],"related":[]}